Subcontracting PO against Sales Order

Hi MM Guru
I have a subrontracting PO against a sales order(Procurement Type E) with account assigment Categories "E"
I wish to issue the material to vendor from special stock
how do i do that??
Thanks & Regds:
N. N. Tiwari
nntiwari2004 at g m a i l
Edited by: Narendra Nath Tiwari on Jul 26, 2008 8:40 AM

hi
you can use the trnadx MB1B move type 541
do gr 101 and cons 543
But if you want to mantain that while issuing you should link it with sales order stock with stk type E
Then use 311 E ie storage location transfer create an vendor storage location for the same also.
In tax on goods mov-> India.->basic settings->buss trax->sub contracting->mantain move ment type grps->there for 0001 set 311 e and 312 e for 0002 issue and receipt grps. Rest remains the same as for normal process.
Also ste the account determination for the same with FICO cons.
So you can issue wrt to sales order and can do GR with movement type 101 for FG and 543 for cons of cons.
Hope this helps
Regards
Sujoy

Similar Messages

  • Plant to plant subcontracting against sales order

    hi
         my scenario is like this
    two plants A and B under one company code, its repair scenario in this sales order come in plant b ,in this repairing we have 5 process out of which one process has to be carried out in plant 1,so  for that  we will do subcontracting against that sales order with plant b. so how to handle subcontracting with plant a against sales order.
    Edited by: AMIT RANE on Mar 4, 2009 7:55 AM

    Purpose: - Subcontracting is also possible in conjunction with sales order  The subcontracting orders are account-assigned to a slaes order . Thus, the components are not transferred (using a transfer posting) to the "stock of material provided to vendor" but are directly withdrawn from the sales order stock the time of the goods receipt. The material manufactured is also posted to the SO
    The cost of subcontracting is then debited to the SO.
    Since the components are not transferred to the "stock of material provided to vendor", it is recommended that you use a transfer posting to transfer the provided components to a new storage location (for example, 9999). This enables you to obtain an overview of those stocks that are physically located at the subcontractor. This information is particularly important when you carry out a physical inventory of the Project stocks.
    Features: -
    Withdrawal from Stock of Mat. Provided for Project: -
    For components that are managed in Project stock, you can define whether the components are to be withdrawn directly from each Project or from the stock of material provided to vendor. You manage this via the dependent requirements indicator for individual customer requirements and collective requirements (MARC-SBDKZ).
    You can maintain this indicator in the following places:
    In the MRP view of the material master record (MRP 4)
    In the explosion types for the BOM item (in Customizing for Production in the step Basic Data -> Bill of Material -> Item Data -> Define explosion types)
    Configuring the explosion types has priority over the configuration in Inventory Management.
    If the indicator is set at Collective requirements only (2), the materials are withdrawn from the stock of material provided to vendor. If this indicator is set any other way, the system withdraws materials from Project stock.
    Regarding Subcontracting Challan: -
    Go to OMJJ, select the field "movement type" and press enter
    Enter movement type "311" and double click on "Field selection (Enjoy)" under Dialog Structure on left side.
    here "New Entries" and add field "LIFNR" (Vendor- plant as vendor )
    Now in MIGO, at the time of transfer posting of components using movement type "311 E", specify the vendor code of the Subcontracting PO (i.e. Subcontractor)
    Now create Subcontracting Challan in J1IF01 for material document of 311 E movement type.
    Also check in SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Maintain Movement Type Groups > here for Movement Type Group "0001", Movement Type "311 E" should be maintained.
    Then do GR against PO and refer the Subcontracting Challan here.
    And then do reconciliation in J1IFQ for the GR Document against Subcontracting Challan.
    Also check in SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Maintain Movement Type Groups > here for Movement Type Group "0002", Movement Type "543 E" should be maintained.
    Follow the below mentioned process;
    Process Steps: -
    1. OX09 - Create Storage Location as "9999" for Subcontractor Location
    2. MB1B - Do Transfer Posting of material from RM Warehouse to this Storage Location via movement type "311 E" (Instead of doing 541)
    3. Now go to J1IF01 - here use material document of movement type "311 E" and create Subcontracting challan. (If required)
    Prerequisite: - In SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Maintain Movement Type Groups > Here for Movement Type Group "0001" (For issues), maintain movement type "311 E" also along with 541.
    Rest all; refer subcontracting challan during GR and then reconciliation and completion, etc... Will be same as usual.
    Note: - At the time of GR, consume components from storage location "9999" (for 543 movement type)
    regards
    KI

  • Stock transfer to subcontracting vendor through sales order stock

    Hi Gurus,
    MRP run is taken against sales order and subcontracting PR is generated with referance to that PR subcontracting PO is created, in components there are four material and against this component special Stock Indicator E is there.
    Now I want to transfer material to vendor through MB1B with referance to PO.
    when I  enter PO and movement type 541 no material is coming.
    Please advice.

    You create one stroge location like SC01 and Issue the material using the mvt type 311(loc to loc) or 301 plt to plt wherever the location is sitted. We are using this method for  good issue  to subcontracting. Finally using 231 mvt type make consumption entry from SC01.

  • Manual Creation of  PO against Against Sales Order AAC - M

    Dear Gurus ,
    I am facing issue that , as in MTO scenario some of the components in my BOM material  is not fixed and they can be known after some time like labels of finish goods , now i want to create Manual PO with reference to sale order AAC is M , but i found that when MRP is creating purchase requisition , G/L account in acc. ***. tab is  stock G/L , but when i am creating manual PO it is taking G/L from  GBB  Acct modification  VKA (account as in acc. assignment cat. is  M.)
    But I want it should take G/L from BSX  as it is taking  in case of MRP generated PR  against same sales order.
    Thanks & Regards,
    Akshay

    Dear Sir ,
    As here we are taking valuated stock against sale order , we are using account assignment category M and requirement class with valuation M and account assignment category M , as per bellow link.......
    Valuated Sales Order Stock Configuration - ERP Financials - SCN Wiki
    now i am facing problem , when MRP is creating purchase requisition , G/L account in acc. assignmrnt. tab is  stock G/L from BSX which is right , but when i am creating manual PO with respect to same sales order , it is taking G/L from  GBB  Acct modification  VKA (account as in acc. assignment cat. is  M.)
    But I want it should take G/L from BSX because stock is valuated stock.
    Thanks & Regards,
    Akshay

  • Reg.Purchase against sale order

    Dear Friends
    Anybody have idea regarding purchase material against sale order and that will be kept as stock.
    As and when it is used according to the requirement. The procurement should be posted to stock account in purchase order itself. how to do it. pls help me.
    Thanks
    Rajakumar.K

    Dear ,
    i thinck ur company using trading business
    based on sales order u can create PO with account assignment E Sales order , system will asl sales order number in account assignment data at item detail level.
    the process will be
    Pre-shipment Shipment Procedure :
    1) create a sales order
    2) create PO with account assignment E where system will ask for sales order number
    3)delivery with vl10n
    3) preshipment invoice-VF01
    POST-SHIPMENT Procedure:
    1) do the GR the stock will be invetorized for ur sales order
    2)invoice verification MIRO
    3)Final Delivery: vl02 u have to change the intial delivery
    4)Final (Post-Shipment) Invoice: VF01
    work with ur FI consultant for G/L accounts
    Regards
    venu gopal
    Edited by: venu kk on May 19, 2009 6:36 AM

  • Account Assignment Error When Posting GI Against Sales Order

    Hello SAP Experts,
    We are currently experiencing a problem during goods issueance against sales order (VL02N). The system terminates the issueance and gives error:
    "Account XXXXXX requires an assignment to a CO object".
    We have tried maintaining the GL account in OKB9 and assign a default profit center there but i didn't work. The material master also contains the profit center. We were only able to post the transaction if we try to default the a cost center in FS00. However we dont want to assign a default cost center as cost centers differ by plant. We are wondering why it asks the cost center considering that it already contains the sales order assignment. We checked the field selection of the GL account, movement type and even the posting key and all showed that the cost center is not required. We are now in a dead end situation here. Please please help us.
    Thanks in advance!

    Hello Praveen,
    Thank you for your immediate response.
    What confuses me is the fact that it asks for a CO element when in fact it is already assigned to one (it is goods issuance against sales order). Do you know why is the system behaving that way?
    Thanks!.

  • Stock reservtion against Sales order creation

    Hi friends,
    Presently in our system, after creation of sales order, Stock against sales order has been reserved
    & same has been shown in MD04.
    In case of demand for same material from our regular customer ,we can not delivered it to them.
    In SPRO,WHICH SETTING SETTINGS NEED TO CHANGE TO AVOID STOK RESERVATION AGAINST SALES ORDER.

    Hi,
    unCheck - Transfer of reqirement in  Sch. line cat

  • Account Determination Error When Posting Goods Issue Against Sales Order

    Hello SAP Experts,
    We are currently experiencing a problem during goods issueance against sales order (VL02N). The system terminates the issueance and gives error:
    "Account XXXXXX requires an assignment to a CO object".
    We have tried maintaining the GL account in OKB9 and assign a default profit center there but i didn't work. The material master also contains the profit center. We were only able to post the transaction if we try to default the a cost center in FS00. However we dont want to assign a default cost center as cost centers differ by plant. We are wondering why it asks the cost center considering that it already contains the sales order assignment. We checked the field selection of the GL account, movement type and even the posting key and all showed that the cost center is not required. We are now in a dead end situation here. Please please help us.
    Thanks in advance!

    Dear,
    Message no. KI235?
    GO TO T-CODE FS00 AND EDIT COST ELEMENT AND THEN YOU ASSIGN COST CENTER
    Please check this link,
    [Account Determination |"Account 'xxxxxx' requires an assignment to a CO object"]
    Regards,
    R.Brahmankar

  • Advance Receive from Customer against Sales Order

    HI FI Expert
    customer pays advance how do we track the payment against sales order.
    Sales Order Filed Mandatory  done for Posting key 19 in T code FBKP, after this at the time of transaction error message coming
    Rules for posting key 19 and acct 2260000 set incorrectly for "ETEN2" field
    Message no. F5272
    Diagnosis
    One of the rules specifies that the field demands a required entry, the other rule says that the field is to be suppressed.
    Procedure
    Correct one of the two rules for the field selection.
    You find the field status group in the G/L account master record:
    Execute function
    You can find the rules for the field status group in the Financial Accounting Implementation Guide in the activity Maintain field status  variants.
    You can find the posting key in the Financial Accounting Implementation Guide in the activity
    Define posting key.
    Please help
    Thanks
    Kamlesh

    Hi
    Error message is self explanatory. Did you check the field status definition of the GL Code 2260000

  • Purchase Order against Sales Order

    Hi Experts,
                     It could be possible to prepare purchase order against sales order in which the data of sales order could be pulled in  purchase order. Please help me in this matter.

    Hi Shailesh......
    Off course it is possible. All you need to do s Open Sales Order and go to Logistic Tab and while creating Sales Order ctick on Split Purchase Order and the moment you add the Sales Order it will Pop up the Purchase Order creation window where you need to fill the details and add PO and then add Sales Order.
    But if you have defined Preferred Vendors in Item Master Data then while autocreation of PO by this way will take its Preferred vendors automatically.......
    Regards,
    Rahul

  • Report of purchases against sales order

    I would like to know if there is any standard report available is SAP wherein we can view the total purchase orders generated against the sales order/orders itemwise.
    Nitin Naik

    Hi,
    As you want to se all purchase against sales order you can use the report ME2M with account assignment category as C or X.
    regards,
    zafar

  • Costing against Sales Order

    Hi,
    We are manufacturing a FERT material with strategy 20 MTO Production. we create a sales order and against sales order we run MRP to generate a planned order, then we convert the planned order to production order. Our entire planning is based on sales order. When we release the production order the cost is getting calculated but when we view cost itemization the material cost is not getting planned or updated inspite of having proper BOM.
    Pl any one guide us to solve the issue.

    Hi,
    First Calculate the planning cost of that material with Costing Run : CK11n and check there material cost and other cost. If these cost exist in that then definatly u will get in production order. Again cross check component material master. ( In costing view : material origin must be Tick, in BOM and routing - costing relevance indicator must active.
    Regards,
    Sulabh

  • BAPI For PGI against sales order

    Dear all,
                 I want BAPI for PGI(Post Goods Issue) against sales order.Can anybody suggest BAPI for this?

    Hi,
    Please check the link given below:
    bapi for PGI
    Hope it will help you.
    Thanks & Regards,
    Sarita singh Rathour

  • Purchase Order created against sales order.. report

    Hi Folks!
    I want to see purchase orders created against sales orders.
    Is there any report?
    Regards

    Hi,
    You can develop your own report by using table VBAK-VBELN(sales document),VBAK-BSTNK(Customer purchase order number).
    Just try....
    Hope it helps you...
    Regards,
    Jaheer.

  • Production against sales order

    Hi all experts,
    I am creating a report for Linewise width wise handover
    summary(OK production against sales order)
    I am taking Date from MKPF and QTY from MSEG
    I need to show Work Center [ CRHD-ARBPL ]
    but dont know how to link tables
    can any one send me the code and link btween MSEG and
    CRHD or any other table which having ARBPL field linking with
    MSEG.
    Thanx in Advance ......

    Hi,
    CAUFV and AFKO tables are linked with table CRHD. These two tables are related to order. You can try these tables to get the desired data.
    Regards
    Amit parkhi

Maybe you are looking for

  • Keyboard set up will not accept code

    I am setting up my Mac mini for the first time.  The track pad set up okay but when trying to set up the keyboard it shows the code but keeps cycling back to the code again and again, never accepting it.   Does any one know what to do?

  • Archive_schedule_job

    I am calling FM archive_schedule_job and these are my parameters:     CALL FUNCTION 'ARCHIVE_SCHEDULE_JOB'       EXPORTING         object              = 'IDOC'         jobtype             = 'DEL'         cleanup_job_table   = ' '         start_immedi

  • Error Start Process Scheduler after configure Crystal Path

    Hi All, Kindly help me to solve this issue. I'd installed Peoplesoft HCM 9.2, Application Server and Process Scheduler run sucessfull but after i install Crystal Report Runtime Redistribute 2008 and configure crystal path (C:\Program Files(x86)\Busin

  • While upgrading iphoto database, the program stops responding.

    I updated my iPhoto, but when the progam opens it says it must upgrade the iphoto library.  When I do this, it stops responding near the end of the upgrade.

  • Copy/Paste Dropping First Character

    The first character is dropped every time I copy and paste a block of text in Word (2008) and Photoshop CS6, but strangely not in my email client or Google Docs. I am using an iMac running OS 10.9.5. Has anyone else ever encountered this, or does any