Subcontracting: Prob with batch pick in MIGO

Hi All,
I follow these steps for subcontracting :
1. Creating Subcon PO
2. Send components to Vendor thru MB1B (541) w.r.t PO#. here I do batch split, and multiple batches get picked up for the components.
3. next when i do MIGO w.r.t PO#, I want the component materials to pick up the batches automatically, i.e., it has to pick up the same batches, which were sent to the vendor in MB1B, so that the stock from those respective batches gets consumed.
Can anybody please tell me how to make this happen
Rgds,
S S

Eric, Thanks for your reply.
Can you suggest any other way of doing this because my client does not want to enter batches manually in MIGO, as each component has multiple batches.
What i have observed is, if i enter batches manually in PO (under explode BOM), then while doing MIGO w.r.t PO, the batches get picked up. But the problem is, in PO (explode BOM) we cannot do batch split.
Rgds,

Similar Messages

  • BAPI_GOODSMVT_CREATE, will do the goods receipt ( MB01 )for the subcontracting PO with batch management.

    Dear Professionals ,
    I Just want to confirm that whether BAPI "BAPI_GOODSMVT_CREATE " will do the goods receipt ( MB01 ) for the subcontracting PO with batch management.
    Since I will be passing only 101 mvy type in BAPi, will the system automatically call 543 mvt type with batch management and post the consumption.
    can I change the batch of the component items ?

    Hi ,
            Delivery note is like a ref document number
    so you can use the
    In the BAPI_GOODSMVT_CREATE There is header structure BAPI2017_GM_HEAD_01 which has a field REF_DOC_NO
    you can pass the delivery note value to that field .
    <REMOVED BY MODERATOR>
    Edited by: Alvaro Tejada Galindo on Jul 10, 2008 3:41 PM

  • Auto assignmrnt of batch no. in MIGO

    dear friends,
    I want to assign batch no. of vender provided materials automatically  to the receiving material in MIGO.
    I provide material to vender with batchs. In MIGO while doing GRN, I select the provided materials batches by batch  determination. I want to split incoming material  quantity as per batch sizes of provided material and assign their batch nos.automatically.
    Please help me.
    Thanks!

    Hi,
    Create Batch search strategy condition records in MBC1 tranaction for the combination of material,movement type etc as per your wish.
    Then make no of splits also as per the requirement while maintaining the condition records.
    You can also selct the selection rule if you want. Then the batch numbers will be automatically assigned.
    Thanks and regards
    Murugesan

  • Batch determination in MIGO of subcontracting orders

    Hi guys,
    We are using batch determination for raw materials and internal batch will be assigned at the time of Goods REceipts.  This particular material will be sent to subcontracting  vendor for producing another end-product.  While doing transfer posting of this item, we have given the batch no also.
    While doing MIGO for the end-product against the subcontracting order, the system should consume the raw material with 543 movement.  While doing this, the batch no has to be selected automatically from the transfer posting document.  But it is  not picked up automatically and we are giving the batch no while doing MIGO for the end-product.  Can we get the batch no from the transfer posting document directly. 
    Do we need to do any config settings for this?
    Please suggest me the solution
    Thanks in advance

    A Question here - can automatic batch determination trigger at MIGO? Since we only set it up for :
    > Automatic Batch Determination for Sales Order Items
    > Activate Automatic Batch Determination for Delivery Item Cat
    I have an external warehouse system with no batch management. I also have an external sales system interfaced with SAP. Hence no sales documents in SAP - just inventory and FI postings. When I will be posting inventory (iDoc) from this external WM and Sales system to SAP - can I trigger an automatic batch determination in order to post inventory with batch????
    BONUS POINTS FOR ANSWER!

  • Subcontracting - Mov 541 with Batch Split

    Hi,
    I'm trying to send materials with batch management to subcontract. My problem is when I do the MB1B (541) to send 1KG of the roh material X and I have to batchs of 0,5KG I cannot do this at the same time. Do you know if has a batch split to do that or other solution?
    Thanks,
    Guiza

    Hi
    Split the batch numbers according to the availability i.e 0.5 KG each and give ref batch number against each line item.
    cheers!!!!!!!!

  • Batch Determination during MIGO Movement 543 O

    Dear All SAP Gurus,
    I want to know about batch determination during MIGO transaction for subcontracting cycle , movemnt type 543 O -consumption for parts provided to vendor.
    In Brief: Suppose clients executing subcontracting cycle and send the RM/PM against subcontracting PO to vendor. At the time of MIGO we have to enter the batch number of RM/PM which we had sent to vendor. But when we serach the batches available at the vendor it shows number of batches. My client want batch determination process so that system will take the batch number accordingle po as we sent material with reference to po.
    Please suggest in this matter or if any one has solution please tell.
    Thanks in advance
    Mahesh

    Hi Mahesh,
    Go to SPRO > Logistics - General > Batch Management > Batch Determination and Batch Check > Batch Search Procedure Allocation and Check Activation > Allocate IM Search Procedure/Activate Check > Here assign Batch Search Procedure "ME0001" to Movement Type 543 O
    Then go to MBC1 and maintain condition record for Strategy Type ME02 i.e. Plant and here keep selection method as "O"
    In MIGO, click on "Stock Determination" button for automatic batch determination.
    Hope it helps!
    Preethi.
    Edited by: preethi R on Nov 24, 2008 2:10 PM

  • Problem with batch management indicator

    Hi Gurus,
    I have an issue with batch management.
    There is one material which was not batch managed. The requirement was to make it batch managed. There were no open purchase orders and the only thing pending was the stock in the present and previous periods. The stock quantity in the previous period  and the present period matched(470 Kg). I opened the previous posting period, used movement type 551 and scrapped the stock. There was zero stock for the current period and the present period.
    I changed the batch management indicator successfully. Now the issue is whil i am trying to cancel the material document
    1. Now that the material is batch managed, whie trying to cancel the material document using MIGO, the system prompts  for a batch to be entered. But the batch field is greyed out and i am not able to enter a batch
    2.  I have tried to cancel the material document using MBST and MIGO. The sytem prompts for a batch to be entered but not allowing me to do so as the batch field is greyed out.
    Any pointers will be appreciated.
    Many Thanks,
    Sajin

    Hi Sajin,
    What is a reason to cancel a material document? When was that material document created? Before or after flagging the indicator in the material master?
    Ilya.

  • Classification purchase order (with batch management)

    Hi,
    I need some help in the next situation:
    I need to order a material with batch management. I've used the classification system to assign the material specifications to the material of a batch. When I create a purchase order I want to specify some caracteristics as a lowest level than the material level, but that specifications are not real, it's a kind of a limitation.
    I don't now if I can use some classification of purchase order or somthing like that.
    Thanks a lot and regards.

    Create characteristics CT04
    Process to create class CL02
    when you create a class with type 001 it is Material class, it means when you assign the class at the material level you are assigning those characteristics to the material not to the specific batches.
    But if you create a class with type 023 it is batch class. You will assign this class at the material when creating in MM01 under classification tab and check the Batch management tab in purchasing or sales data while creating a material.
    This will help you to classify each batch with different characteristic values. when you create the batch with MSC1n you batch will be automatically classified with the batch class from material and you can give the values over there.
    You can give the values for the batch when you receive the batch in MIGO, even though u give the batch in PO u can give the details in classification for that batch in MIGO when u receive it in the item tab "Batch" there is button classification to give those values.
    hope it helps.

  • Note 951952 - Incorrect excise values if batch split in MIGO for import PO

    Dear participants,
    We have applied Note 951952 - Incorrect excise values if batch split in MIGO for import PO,
    for following issue,
    While doing import goods receipt for batch split quantity,
    excise base value is calculating for entire amount not by splitted quantity.
    We are unable to solve this issue.
    We are using SAP ECC release 6.0 level 11 whether above mentioned note can be applied or else any other
    new notes to apply solve this issue.
    Advance thanks
    Regards,
    A.Jeyakanthan

    Thanks for reply,will check note is applicable for current package level.
    Actually we found excise base value is same for GR of batch split quantities for same material
    with valuation type import duty free.

  • Vendor Batch number in MIGO

    Hi All
    The Vendor Batch ( MCHA-LICHA)  Number field is of 15 characters in MIGO transaction, where as we receive many material with batch numbers more than 15 characters.
    What is the possibility of extending the length of this field.
    Kind Regards
    Samson

    Dear Gabriel,
    Can you brief how did you resolve your issue, I am facing the same issue with my client.
    Regards
    Vivek Kumar

  • SubContract Process with Excise Flow

    Hello All,
    Can anyone please explain me in Detail Subcontract Process with Excise flow considering these...
    1. Subcontracting without payment of Excise duty
    2. Subcontracting under full payment of Excise duty
    and if scrap is to generate under process. So how to maintain that in PO.  and Later how to reconcile that in Excise flow..
    I will be very thankful if anyone help me ...
    Abhinay....

    hi,
    SUBCONTRACTING:
    To create Subcontracting challan:
    J1IF01 - Creating sub contracting Chelan
    J1IFQ - Reconciliation for Chelan
    J1IF13 - after receiving all items
    Subcontracting without Payment of Duty
    Creation of Subcontracting PO (ME21N)
    Transfer Posting of Components to Subcontractor (Mvmt Type - 541) (MB1B/ME2O/MIGO)
    Creation of Subcontracting Challan w.r.t. Transfer Posting Doc (J1IF01)
    Goods Receipt w.r.t. Subcontracting PO and Refer Subcontracting Challan at the time of GR (MIGO) {GR with 101 and auto consumption of components with 543 movement}
    Reconciliation of Subcontracting Challan (J1IFQ)
    Completion of Subcontracting Challan (J1IF13)
    Generation of Annexure IV (J1IFR)
    Note: - In this case, you have to maintain the Assessable Value for the Components to be supplied to Vendor in J1ID and also Excise Tax rates for the Chapter IDs linked with these components. So during J1IF01, system will take the Assessable Value as Excise base Value and calculates the Excise Duties by taking Excise Tax Rates.
    Subcontracting under Full Payment of Duty
    Creation of Subcontracting PO (ME21N)
    Transfer Posting of Components to Subcontractor (MB1B/ME2O/MIGO)
    Creation of Outgoing Excise Invoice w.r.t. Transfer Posting Document (J1IS) - Used to send the components to Subcontractor's. Here 57F4 Challan is not created.
    Master Data
    MM01- Material Masters for Components and FG
    XK01 - Vendor Master (Subcontractor)
    CS01 - BOM for FG
    ME11 - Purchase Inforecord for Subcontracting
    Regards
    Priyanka.P

  • Subcontracting cycle with duty payment

    Hi,
    Configration required for subcontracting cycle with duty payment (CIN) with suitable example giving detailed cycle with sap tcodes & transaction data.
    Sanjay kohli

    Plz follow the following steps for subcontracting
    Configuration: -
    - SPRO > Logistics - General > Tax on Goods Movements > India > Business Transactions > Subcontracting > Subcontracting Attributes
    Here maintain following;
    Excise Group
    Excise TT - 57FC
    Subtran Type Text   -- 57FC CHALLAN
    Subc. Period          -- 180
    1. Creation of Subcontracting PO (ME21N)
    2. Transfer Posting of Components to Subcontractor (Mvmt Type - 541) (MB1B/ME2O/MIGO)
    3. Creation of Subcontracting Challan w.r.t. Transfer Posting Doc (J1IF01)
    4 Goods Receipt w.r.t. Subcontracting PO and Refer Subcontracting Challan at the time of GR (MIGO) {GR with 101 and autoconsumption of components with 543 movement
    5 Reconciliation of Subcontracting Challan (J1IFQ)
    6 Completion of Subcontracting Challan (J1IF13)
    7Generation of Annexure IV (J1IFR)
    And you i need to maintain Accessable value in J1ID
    regards
    anamika

  • Batch Classification in MIGO

    Hello,
    I'm using enhancement MBCFC004 (user exit EXIT_SAPMM07M_004) in order to fill batch classification in MIGO transaction, when pressing 'Classifications' button in 'Batch' tab.
    I've put a break point in the code I've created, but when pressing the classification button nothing happens.
    The project and the user-exit are activated.
    What can be the problem.
    Thanks,
    Hagit.

    Hi Hagit!
    BADIs are defined (and can be searched with) in transaction SE18.
    Own extensions can be implemented with transaction SE19.
    Both transactions have little blue 'i'-buttons: press them and you get pretty good help.
    Otherwise look at help.sap.com
    Regards,
    Christian

  • Automatic Batch determination in MIGO for IM movements/GI/TF Postings

    I have configured batch determination to use SLED for batches in Ascending Order.
    GRs have been done for 2 batches, one with SLED a day earlier than the other.
    Now,
    I know there is some auto batch determination for SD documents, but I want batch suggestions for IM Movements.
    I am trying to post 301 transfer to another plant, and it asks ME to enter the batch.
    How can I make the system propose the desired batch (earlier SLED) automatically?
    Thanks.

    there is no automatic batch determination in MIGO, you have to click the stock determination button

  • Batch Determination in MIGO

    Dear Gurus
    I have implemented the automatic batch determination base on shelf life expiry date.
    While issuing the material stock by using transaction MB1A (Movement:201), system is giving correct result and working fine.
    But when I issue the material stock by using transaction MIGO (Movement:201), Automatic batch determination is not working and system doesn't give any result.
    Is there any setting I have missed out? Please guide.
    Kuldeep Jaiswal

    A Question here - can automatic batch determination trigger at MIGO? Since we only set it up for :
    > Automatic Batch Determination for Sales Order Items
    > Activate Automatic Batch Determination for Delivery Item Cat
    I have an external warehouse system with no batch management. I also have an external sales system interfaced with SAP. Hence no sales documents in SAP - just inventory and FI postings. When I will be posting inventory (iDoc) from this external WM and Sales system to SAP - can I trigger an automatic batch determination in order to post inventory with batch????
    BONUS POINTS FOR ANSWER!

Maybe you are looking for

  • Mountain lion installation pauses

    Tried to reinstall mountain lion and right after installation says complete then reboots, on start up spinning wheel tuns for about 3 minutes then stops spinning and computer never boots fully. Anyone else having this problem? Only work around for me

  • ABAP Run time error in SD

    Hi I am Belongs to SD. In my home PC i am getting following ABAP Runtime error. Plaese help me ABAP Guys. <b>DBIF_RSQL_INVALID_REQUEST</b> This error i am getting in most transanctions. Please give me the solution for this. Regards, Ravi Chandra

  • Activation Material Ledger with material working in price control "V"

    Hi experts! I have activated Material Ledger and I have a question about this.. 1) Before the activation, I have for example a material with the next values in the "Accounting 1" tab: Total stock = 7 UNI Price Control = V Moving price = 166 USD Stand

  • SQL Developer and DB2

    Hello. I connected with success a Mainframe (MVS) DB2 Database in my SQLDeveloper 3.0.04. I have Orable Database conencted too. I'm able to expand the Oracle database to get the list of the tables for example. I'm not able to expand the DB2 database

  • HT201413 i get error 21 when trying to restore my iphone 4s.  can anyone help?

    any ideas?