Subcontracting Semifinished Product, without providing component to Subcon.
Dear all
I have the following scenario for subcontracting, all involvoing placing Subcon PO for Semifinished Product, GI raw materials and GR Semifnished Product back for further production processing in the own factory.
Scenario:
My factory places a subcon PO for chroming a raw metal (FG = Chromed Metal). We only provide the raw metal but do not provide the Chroming paint (GI only raw metal to subcontractor), Subcontractor will use their own Chroming paint. After chroming the raw metal, we will perform a GR for Chromed Metal from the subcontractor.
My question, how do we tackle this in subcontracting? As we never provide the Chroming Paint. Does it mean I create a single item single level bom and at the time of Invoice verification, I will put in 2 lines item Subcon Service + Chroming Paint?
Please advise.
Sorry, YMREDDY, I just want to confirm.
Hi
Question: In that case, I just changed the BOM Header to put HALB (Chromed Metal) and Component as ROH?
Question: In that case, I will only GI Raw Metal (ROH Material in BOM Component) and then GR the HALB, that is it?
If you are doing as above , you can as well go ahead with subcon it self ?
And you include the cost of chrome paint in your subcontrating cost.
Pl. try.
Regards
YMREDDY
You put a question mark at "you can as well go ahead with subcon itself?". What does it mean? Is my previous 2 quesions set the correct logic?
Thanks.
Similar Messages
-
Subcontracting GR creation without changing component quantity
We are using subcontracting process in SAP. When GR document is created the user sometime by mistake changes the quantity of component that is going to be consumed through material movement 543. Is there any setting through which we can restrict user from changing quantity of the component
Hi
Why user will change the quantity for BOM component?
If you are using BOM for sub contract process, I hope you can't change the BOM items.
Otherwise check function module EXIT_SAPLMBMB_001 with the help of developer.
regards
Srinivas -
I just purchased photoshop elements and went to retrieve my serial code. The web page provided to retrieve it loads blank, even when clicking on the URL through adobe's web site. I can not install my product without this. Please help
Drusso77 if you are continuing to face difficulties locating your serial number then please see Find your serial number quickly - http://helpx.adobe.com/x-productkb/global/find-serial-number.html. You are also welcome to contact our support team at http://adobe.ly/1aYjbSC.
-
Dear colleague,
can anybody provide some clarification on the implication of the changes done below
A semifinished product which was produced for a final product needs also to be sold seperatly as a service product and for this the service product bom needs to be created.
can you please let me know the implication of creating a new bom for this service product.
Thanks
SandeepHi,
I do not see any implications for the same.
It should work the way a normal Semi-finished product with BOM would work.
If you would like to sell the material, you would need to create Sales Org views for the material in ERP.
Regards,
Sandeep -
Consumption for semifinished product
Hi!
Is there a possibilty in just one step to give in consumption a semifinished product in order to manufacture a finished product (without making a transfer from semifinished product to raw material and then to give in consumption in order to manufacture)?
Thanks!Hi,
Your question is not totally clear to me. Do you have any specific reason to ask this?
What does SFG mean in your terminology? What is the process?
I cannot see any problem, you can put the SFG in the BOM of the FG. If your config and master data are maintained properly you can create a PrdOrd and get the FG by mvt 101 and consume the SFG by mvt 261.
Regards,
Csaba
Edited by: Csaba Szommer on Feb 19, 2009 9:34 PM -
Available QTY is not shown in Production Order for SemiFinished Product?
Hi
In Production Order Available Qty value is not shown for SemiFinished product ( Stock is there), but it showing the Available for other rawmaterials in same Prdn. ordr..
The SemiFinished product is manufactured and its having lot of stocks ..while i am calling this SemiFinished product in other Production order the available qty is not shown.. so how come the end user comes to know that availlable..
GiriHi Jey
I will explain clearly so u can come what is hapening For Ex: Item ABC having child item A,B & C.
when calling the BOM of ABC in Prodn.order its showing the available of A, B & C... But after the production over for the Semifinished product it increases the stock.
When i am calling this Semifinished Product in other Produciton Order For Ex: Item AZ having Child item ABC & XYZ.
In this Scenerio it has to show the Available of item ABC whic is semifinished product its not showing,but in the same Production order it showing the available for Other item XYZ which is purchased one .. So this is the nature of SAP or i am doing any wrong....
Giri -
Over the years I have had many ISP and email addresses - but now we have finally gone almost fully virtual...
I have a live login and MS ID 4 my SkyDrive account but I only use my MS touch with 8.1, SkyDrive and office 365 for mobility.
And I still like to backup to my own server!!!
What would be good is if I can put all the software licenses and product keys of the software and keep a record of my mac addresses for hardware and even static IP's in a file or a secure location within the MS online store.
That's where MS wants me to get my computing needs from in future and I will always be able to retrieve it in future but what about the $$$$$ I have spent on software, hardware and applications prior to now???
I know u guys love 2 collect data 4 marketing analysis,
4 example I have an old PC that is still running a server from last century - if you knew about it a simple script would allow you to offer upgrades or at least relevant MS products - UNLIKE the rubbish adds I just turn off or tune out
now...
Why cant I add products previous online email purchases into the 1 MS live ID account where I can keep it together? If you make that available I don't have to have separate steam accounts, EA game accounts, ASUS and adobe accounts etc
etc.
What has brought me 2 this is I was looking for my office pro 2007 disks to rebuild a HOME USE ONLY windows 7 laptop (NO touch screen so 8.1 is no benefit at all)
I HAVE 4 Genuine PRODUCT KEYs for Office 2007 BUT EVERY TIME I WENT TO DOWNLOAD the software - regardless of the key I used - I got the error message: We are sorry, but we are unable to complete your request.•The Office 2007 Product Key
provided is already associated with another user on this site. Please log in with the user information originally used with this Office 2007 Product Key.
That's crap - This is a clean brand spanker install of Win7 and there was nothing b4 I put the oem drivers from Toshiba back on.
I looked at dozens of support pages and forum blogs and tried for hours to get a copy to download - including incognito and other logins but because my default PC name is also my MS Windows live ID the same error was repeated.
I keep away from the non MS sites for these things and with good reason - there were heaps of similar users with the same issue or very close to it that had downloaded from a supposed MS copy from eValue or digital river etc and the next
thing was total corruption of the OS.
EVENTUALLY I found a LIVE MS chat on a support site in the US and she gave me a link to a slightly older version which will need updating and some reg edit changes but so far, so good.
The point is - what a crock !
I should be able to just keep all my software, drivers, updates, service packs, and versions that I have upgraded in the MS store.
If Microsoft aren't going to support XP or Office 2003 and eventually 2007, vista & Windows7 not far behind??? then that's still no excuse for them to put these restrictions and limits when I OWN my copy of the software!!
Unlike office 365 and SkyDrive space which is described in the T&C (that we all read before ticking that radial button to agree of course) as ONLY under a leased licence.
IF Microsoft can support AND develop software that supports SQL2000 Servers, why is it so hard to archive and keep the same info for everyone???Over the years I have had many ISP and email addresses - but now we have finally gone almost fully virtual...
I have a live login and MS ID 4 my SkyDrive account but I only use my MS touch with 8.1, SkyDrive and office 365 for mobility.
And I still like to backup to my own server!!!
What would be good is if I can put all the software licenses and product keys of the software and keep a record of my mac addresses for hardware and even static IP's in a file or a secure location within the MS online store.
That's where MS wants me to get my computing needs from in future and I will always be able to retrieve it in future but what about the $$$$$ I have spent on software, hardware and applications prior to now???
I know u guys love 2 collect data 4 marketing analysis,
4 example I have an old PC that is still running a server from last century - if you knew about it a simple script would allow you to offer upgrades or at least relevant MS products - UNLIKE the rubbish adds I just turn off or tune out
now...
Why cant I add products previous online email purchases into the 1 MS live ID account where I can keep it together? If you make that available I don't have to have separate steam accounts, EA game accounts, ASUS and adobe accounts etc
etc.
What has brought me 2 this is I was looking for my office pro 2007 disks to rebuild a HOME USE ONLY windows 7 laptop (NO touch screen so 8.1 is no benefit at all)
I HAVE 4 Genuine PRODUCT KEYs for Office 2007 BUT EVERY TIME I WENT TO DOWNLOAD the software - regardless of the key I used - I got the error message: We are sorry, but we are unable to complete your request.•The Office 2007 Product Key
provided is already associated with another user on this site. Please log in with the user information originally used with this Office 2007 Product Key.
That's crap - This is a clean brand spanker install of Win7 and there was nothing b4 I put the oem drivers from Toshiba back on.
I looked at dozens of support pages and forum blogs and tried for hours to get a copy to download - including incognito and other logins but because my default PC name is also my MS Windows live ID the same error was repeated.
I keep away from the non MS sites for these things and with good reason - there were heaps of similar users with the same issue or very close to it that had downloaded from a supposed MS copy from eValue or digital river etc and the next
thing was total corruption of the OS.
EVENTUALLY I found a LIVE MS chat on a support site in the US and she gave me a link to a slightly older version which will need updating and some reg edit changes but so far, so good.
The point is - what a crock !
I should be able to just keep all my software, drivers, updates, service packs, and versions that I have upgraded in the MS store.
If Microsoft aren't going to support XP or Office 2003 and eventually 2007, vista & Windows7 not far behind??? then that's still no excuse for them to put these restrictions and limits when I OWN my copy of the software!!
Unlike office 365 and SkyDrive space which is described in the T&C (that we all read before ticking that radial button to agree of course) as ONLY under a leased licence.
IF Microsoft can support AND develop software that supports SQL2000 Servers, why is it so hard to archive and keep the same info for everyone??? -
how can i purchase a macbook air in Nigeria? apple has no shop in the entire country and independent dealers charge ridiculously sometimes more than double the prices of mac products without guarantee of getting it with required specifications. its sad cos Nigeria has a very large apple market plus phones and most recently ipads especially. its been frustrating trying to get a macbook, even have to wait for when someone will travel out of the country, then you send the person(thats if you have the money at that time). Please somebody help inform apple maybe they can do something about this, its really disappointing.
This is a user-to-user technical support forum. You're not addressing Apple here. Use the apporpriate link on fhe Feedback page to let Apple know how you feel:
http://www.apple.com/feedback -
I wanna download an app without providing payment details.But unable to find the 'no payment' option on the page.What should I do?
Hi Aaradhya2002,
Welcome to the Apple Support Communities!
If the account you are using has already been created, you will have to add a payment method to verify the account. You can add the payment method and then remove it directly after it is added. If the account has not yet been created, please use the following article for instructions on how to create the account without a payment method.
Creating an iTunes Store, App Store, iBooks Store, and Mac App Store account without a credit card
http://support.apple.com/kb/ht2534
I hope this helps,
-Joe -
Hello I Download Adobe Photoshop CC 2014 Last Night
i INSTALLED it But it Crashes in 30-40 Sec After i Launch the Product Without Any Error Message
I Need Help Can You Resolve This ProblemLotfi are you receiving any error messages during the installation? I would recommend reviewing your installation logs for errors. Please see Troubleshoot install issues with log files | CC - http://helpx.adobe.com/creative-cloud/kb/troubleshoot-install-logs-cc.html for information on how to locate and interpret your installation log files. You are welcome to post any specific errors you discover to this discussion.
-
HT1918 Apple ID for kids without providing credit card information
I want to create an Apple ID for my 10 year old son, without providing credit card information. on the web I found a video telling that it is possible to set the payment information to "none" - but this choice does not show up in my settings
I'm not sure how this "none" option works in other countries, but it is accessible in the U.S. So I assume that you are not in the U.S. You can create another Apple ID for the child to use
The minimum age for an Apple ID needed to create an iTunes account is 13. You will have to set this up using your information (your birthday, address, etc.) and you will need another email address. You can create a free email account using AOL, Hotmail, Yahoo, or Gmail as well.
Create iTunes Store account without credit card - Support - Apple
Use this Apple ID only for the kids account. Purchases cannot be transferred from one Apple ID to another one. -
Backflush Semifinished product and stock post to quality inspection stock
Dear Experts,
Please advise is it possible for the below in SAP. How to do?
When backflush "Semifinished product", system automatically post to quality inspection stock. Then it is skip for 9 lots. The 11th lot again post to quality inspection stock.
1st backflush posting -> post to quality inspection stock
2nd until 10th backflush posting -> post to unrestricted stock (skip)
11th backflush posting -> post to quality inspection stock
Thanks.
Regards,
WongDear Experts,
Let me further explain what I want.
Production people produce semifinished product, but quality inspection people not inspect all the product. For example they will inspect 1st and 11th batch of product only.
So I propose when backflush the semifinished product, system post the stock to quality inspection stock. Then production people know this batch of product need to be inspected and pass to quality inspection people. Once quality inspection people complete the inspection, they will release the material (UD) to unrestricted stock.
I have no idea on how to configure and maybe it is not possible in SAP. Please advise.
Question: Is it we should manually create inspection lot for each transaction (eg. backflush or material movement)?
Thanks in advance.
Regards,
Wong -
Search using a specific user without providing password
Hi Experts,
I'm trying to impersonate a search in FAST or atleast in Sharepoint search without providing the password. Below is a similar thread.
http://social.technet.microsoft.com/Forums/en/sharepointsearchlegacy/thread/49475fbc-3c6d-42f2-bf35-82365bf0a0c8
Any help?
Much Thanks!!
Freddie Maize ..A story with Glory is History. Doesn’t matter whether Glory rest in the world of Demon or God. Lets create History..Hi Freddie,
Here is another similar post about performing an impersonated search in SharePoint without providing a password, please check the details from below,
http://stackoverflow.com/questions/1025409/can-you-perform-an-impersonated-search-in-sharepoint-without-providing-a-passwor
http://www.threewill.com/2010/06/connect-to-sharepoint-forwarding-user-identities/
Thanks
Daniel Yang
TechNet Community Support -
Dummy Product & Dummy Logical component???
Hello SolMan Gurus,
Can anybody throw some light on how to create Dummy Product & Dummy Logical component?
Your replies will be greately appreciated.
best regds,
Alagammai.hi Alagammai
I would add that you could try creating servers, databases, systems and logical components, just by connecting Solution Manager to itself, could it be?
Cheers,
Cesar Aranda -
Transport products and software component version
Hi,
I created a Products and its Software Component Version in System Landscape Directory of XI development.
I imported this Software Component Version into Integration Builder and developed design and configuration objects.
The scenario is completed and now I want to transport the Products and Software Component Version to XI Production.
Could someone please explain the transport procedure.Hi Shravan,
Thanks four your instructions. I would like to have more details on the export/import procedure. Please confirm the following steps are correct:
From SLD of XI development:
1/ Edit new product and its software component version.
2/ Click on icon Export: XI generates a zip file and downloads it in c drive.
From SLD of XI Production:
1/ Select Import utility under system catalog.
2/ Browse and select the zip file
In XI production there are existing third party products, and I do not want the transport of this new product causes any problem.
Design and configuration objects will be exported/import ed after the successful transport of product and software component version transport.
Regards,
Daniel
Maybe you are looking for
-
..
-
ABAP Mapping :: for multi files
Dear Experts, We are doing an Idoc to file interface, using ABAP mapping. This is 1:n mapping i.e receiver message interface is 0..unbounded. We have achieved the mapping for 1:1. But when I test for multi, i get an error in moni saying Parsing error
-
IPhoto books- Delete text boxes?
For several pages in an iPhoto book I am making, I do not want any text or descriptions. However, there are empty text boxes whose outlines are still showing up. I don't want the pages to print with the text box outlines. There is nothing typed in th
-
Extractor on Function Module Not Passing Deltas
Hi Experts, We have created an extractor on a function module in ERD and initialized it in BWD with no issue. However, when we change a record in ERD, the delta is not passed to BWD. We have debugged the function module and it appears the records are
-
How to mount network share on lion permanently
I want to know how to mount a network share from my NAS on mountian lion. I have seen and tried the suggestions about using command+k or the "go connect to server" and mounting that way so the password for the share is put into the keychain, then dra