We use discontinuations all the time but now we are fully subcontracting some products and the discontinuation is not being planned for either the old part or the new part. SAP help clearly says that subreq discontinuation is not planned but with several parts at any one time on boms of over 200 parts, we just can't manually manage this.
I don't believe we are the only one with this problem but I am unable to find any solution - please help!
Thanks

Hi Krishna,
Thanks for your reply but I don't understand how safety stock would work. Are you suggesting loading safety stock against the new part?
We have 12+ weeks lead times and constantly changing forecasts. The discontinuation worked very well in managing the old part down to zero stock with all the variables involved but safety stock is a fixed figure?
Please advise.
Donna

Similar Messages

  • Difficult question?? Discontinued Parts with replace function????

    Hi Experts
    In our company ,there is a requirement very emergent , as follow example:
    In the BOM of material CDE, there is a component material A.
    And for some reasons(for example: product development with new technique) ,we want to replace
    material A with material B in the BOM. And because the stock of A in the warehouse is not zero,so we
    want to continue use material A for a period.
    And when the stock of A in the warehouse is zero 0 ,means that A has use out, we want to the SAP system automatictlly replace material A with material B in the BOM.
    I konw I can use "discontinued Parts" , but with "discontinued Parts",the system only can transfer
    all the dependent requirements of the discontinuation material  to the follow-up material, not replace the  discontinuation material with the follow-up material in the BOM really! 
    We want with "discontinued parts", the system can replace the discontinuation material with the follow-up material in the BOM really ?
    How to achieve this?? Or if there is some other functions can achieve this??
    Thanks for any reply!!

    Dear Fei,
    What's your exact doubt?
    If you want to stop using a component from a certain date and instead you would like to replace the
    same using another followup material which has the same unit of measure,then you can do the
    necessary settings in MRP4 view of the material master.
    One more concept is alternative Item concept,where in some period material A will be available for some
    period and in some other period B may be available and in sometimes a combination of both will be
    used.
    Then in that cases in the BOM an alternative item group will be created to combinae these 2
    components along with their priority,usage probability and strategy.
    Regards
    Mangalraj.S

  • Discontinued parts with MRP type VB

    We have scenario as below :
    1.       We have material A with stock 100, open PO 50.
    2.       The material A is now planned to be phased out by replacing it with a new material B
    3.       Material A had MRP type VB now we will change it to ND
    4.       Material B will have MRP type VB
    5.       So when we run MRP for materil B it should consider stock of material A & Open PO of Material A for calculation during the MRP run and the new requirement calculation should be
    Example :
    Material B is set up with RO point 100 and max stock of 150
    So when we run MRP for Material B even though stock for material B is zero it should not generate any new requirement as stock & open PO of material A exists.

    Hello
    Please take a look on the following note, which explains the general restrictions of the discontinuation process:
    43636 - Discontinued parts
    The note provides the following explanation regarding the MRP type:
    The material is planned using an MRP procedure, for example, MRP type PD.
    Therefore, since you are using MRP type VB, which uses a reorder point procedure, the discontinuation will not happen and your system is working as designed.
    BR
    Caetano

  • Discontinued parts - how include fixed receipts??

    In the MRP 4 view , we can set Discontinuation indicator for one material ,and defined the follow-up material.
    And the system will transfers the dependent requirements in materials planning to the follow-up material if they are no longer covered by warehouse stocks.
    In standard SAP system , When discontinuing parts, the system does not include fixed receipts such as order proposals or production orders if they are after the effective-out date. The system issues the "Please cancel and Receipt" after effective-out date exception messages in Stock/Requirement List  (MD04 View)
    But we now indeed need the system to include fixed receipts,that is affter the last fixed receipt ,the discontimuting parts begin to take effect!
    How to do this? How discontinuing parts include fixed receipts??
    Thaks for any replay!

    Hi Fei Liu,
    The thing is rather simple; the idea with discontinuation is that from a certain date on we don't want to procure material A anymore, but B instead. Nevertheless, if there's any stock left from A I want to use it first.
    In this situation, if somebody manually creates a fixed procurement element, like purchase or production order, the system will only create an exeption message for the planner, since by the normal course of the process this should not have happened.
    If you have this situation happening a lot, the question is then if you're using the right functionality for your business case.
    Regards,
    Mario

  • PS subcontracting with external activity

    Hi,
    I have a couple of questions about "PS subcontracting with external activity" I have not found any information about this for PS subcon flow, I was looking for a subcon PS Wiki but no succeed.
    The scenario is to use a  external activity to a subcontractor and put the material components to deliver in the  external activity and check the subcon check box. Then use the valuated project stock for holding the materials.
    For material components there is an option in tab "Proc. Param" and fiel "Mat. Prov. Ind." = "Material Provision Indicator", do you know if this option can be use or be available in PS? This field is grey so I can not do anything with it, so my guess is that option use only by a BOM, could you confirm that for me?
    Right now I have a problem in the system so I can not save a project when creating a external activity and use the subcon check box, this is at OSS right now. But I was wondering if I put the material components in a external activity, how will it be represented in the PO?
    Will it be only one item in the PO, the service from the external activity? and inside this item will hold all my material components? this can be found in tab "Material data" -> "Components".
    Please share if you have some information about this,
    Regards
    Jose
    PS Note that this scenario is not a MM subcon

    abdul,
    I'm talking what you can do in the system, there is 3 posibilities I have in mind:
    Alternative 1 
    Is when I will send all the parts, thats right separated parts to be one. The material which will be the final material, is not in my stock/company. It is a new material Im manufacturing with the help of a subcontractor.
    In PS I want to create a subcontracting external activity, create a PR from PS, create a PO and deliver it to the receiver in other words the subcontractor who will put it together to the final material.
    For this alternative I think I have to create the material which the subcontractor will put together and have it as a head material in a BOM. The BOM will represent the parts Im sending for assembly, so when the material is deliver back to me, I will do a goods receipt of the head material.
    My question is in this if I have thought this right, if you have experience of this please contact me.
    Alternative 2
    Is when I will send a existing material and all the parts which will be use to maintain/repair this particular material from my stock/company to a subcontractor who will do the work. This material will have the same material no. when I do the goods receipt.
    In PS I want to create a subcontracting external activity, create a PR from PS, create a PO and deliver it to the receiver in other words the subcontractor who will maintain/repair the material.
    For this alternative I think I can use a BOM, create a BOM of this existing material which will be maintain/repair with the parts I will send.
    My question is in this if I have thought this right, if you have experience of this please contact me.
    Alternative 3
    This alternative is almost the same as alternative 2 with the exception that the material Im sending will change the material no when its back from the subcontractor. So I will send a existing material and all the parts which will be use to maintain/repair this particular material from my stock/company to a subcontractor who will do the work. This material will get a new material no. when I do the goods receipt.
    In PS I want to create a subcontracting external activity, create a PR from PS, create a PO and deliver it to the receiver in other words the subcontractor who will maintain/repair the material.
    For this alternative I think I can use a BOM, create a BOM of this existing material which will be maintain/repair with the parts I will send. Then I have to put the new material in my external activity as a material component with negative quantity as part of the subcontracting delivery
    My question is in this if I have thought this right, if you have experience of this please contact me.
    I hope my question is now clear for you, we are using the defence and aero solution so what I know I do can use the subcontracting with valuated project stock

  • Delete data from DSO only with a part of the key

    Hi experts,
    I have a DSO with 9 key fields and i want to delete some entrys. Our source system only provides 2 fields of the key. My problem is, that the BI is not able to delete from DSO unless I have the full key.
    Now I want to get the rest of the key fields from the active table of the DSO. Can sombody help me please with the ABAP Code? Or is there another possibility?
    I already found this thred in SDN but this is for BW 3.5:
    Delete data from ODS with only part of the key
    Thanks
    Ralf

    Ralf,
    the thread pointed out by you is for passing deletion entries to the DSO / target using the deletion entries .. namely recordmode = D.
    Are you looking at deleting data from the DSO as a one time activity or you want to handle the same using a start / end routine ...? and pass deletion entries to other data targets which get the data from this DSO ?
    Arun

  • OSSNOTES for releasing process orders with missing parts in background

    Hi All,
    The bapi 'BAPI_PROCORD_RELEASE' is not releasing the process orders
    with missing parts in background.
    Is there any OSSNotes for releasing these process orders in backgound through this bapi.
    Pls help.
    Thanks .

    Hi Suri - Thanks for your response. I tried both with blank(individual and collective) and 2 (collective req. only) but I still get the same result. I found one other setting that can solve this issue and that is checking the activate full confirmation logic at the the MRP group level in OPPR. I will test more and let you know if that works but we dont use MRP groups here at our client and that is why I was little hesistant to set up collective availability check parameters at the MRP group level. But looks like this is the only option that we can use to get this resolved.
    Thanks,
    Bharath

  • Using up all discontinued parts stock

    Hi all,
    How can i use up all discontinued parts stock before follow up material has been valid by using engineering change management when the change comes into effect on valid to date?
    thanks

    discontinued parts

  • I have Iphone 5 and have an issue with deleting part of the messages in Imessage conversation. The trash button is not displayed to delete part of the imessage. I see only delete all option. Is it a bug?

    I have Iphone 5 and have an issue with deleting part of the messages in Imessage conversation. The trash button is not displayed to delete part of the imessage. I see only delete all option. Is it a bug?

    Hi An Iphone user,
    If you are having issues deleting a specific message from an iMessage conversation (not seeing the Trash icon), you may want to double-check that you are following the steps outlined in the following article:
    How do I delete a message?
    To delete a message, tap and hold the message bubble, then tap More.
    Tap Delete All to delete all the messages. Or tap to select the messages you want to delete, then tap .
    After you delete a message, you can recover it only by restoring from a backup.
    Send messages with your iPhone, iPad, or iPod touch - Apple Support
    Regards,
    - Brenden

  • BPEL Compilation Error: Load of wsdl "with Message part element undefined..

    Hi Friends,
    I am getting following error while compiling my BPEL process:
    Error: Load of wsdl "FTPWrite.wsdl with Message part element undefined in wsdl [file:/D:/MyData/_MyProjects/052_Amazon_MetadataInterface/001_SVN/002_Intl/trunc/MetadataInterfaceIntl_2013Apr15_WorkingCode/MetadataInterface_Intl/MetadataInterface_Intl.wsdl] part name = reply     type = {http://com.fox.metadata/MetadataInterfaceIntl/MetadataInterface_Intl/types}processResponse" failed
    However the reply message is already defined in the MetadataInterface_Intl.wsdlas shown below:
    Code for MetadataInterface_Intl.wsdl::::
    "<?xml version= '1.0' encoding= 'UTF-8' ?>
    <wsdl:definitions
    name="MetadataInterface_Intl"
    targetNamespace="http://xmlns.oracle.com/MetadataInterfaceIntl/MetadataInterface_Intl/MetadataInterface_Intl"
    xmlns:wsdl="http://schemas.xmlsoap.org/wsdl/"
    xmlns:inp1="http://com.fox.metadata/MetadataInterfaceIntl/MetadataInterface_Intl/types"
    xmlns:tns="http://xmlns.oracle.com/MetadataInterfaceIntl/MetadataInterface_Intl/MetadataInterface_Intl"
    >
    <wsdl:types>
    <xsd:schema xmlns:xsd="http://www.w3.org/2001/XMLSchema">
    <xsd:import namespace="http://com.fox.metadata/MetadataInterfaceIntl/MetadataInterface_Intl/types" schemaLocation="xsd/Metadata_Interface.xsd"/>
    </xsd:schema>
    </wsdl:types>
    <wsdl:message name="requestMessage">
    <wsdl:part name="request" element="inp1:process"/>
    </wsdl:message>
    *<wsdl:message name="replyMessage">*
    *<wsdl:part name="reply" element="inp1:processResponse"/>*
    *</wsdl:message>*
    <wsdl:portType name="execute_ptt">
    <wsdl:operation name="execute">
    <wsdl:input message="tns:requestMessage"/>
    <wsdl:output message="tns:replyMessage"/>
    </wsdl:operation>
    </wsdl:portType>
    </wsdl:definitions>"
    Surprisingly, this same code was compiling file last week and now I have no clue why I am getting this error. Can someone please shade some light on this issue?
    Thanks,
    Sachin.

    Hello
    I have had the same problem in Oracle BPM and solved it using the following steps:
    1- In your application navigator window, expand the project that contains the business rule.
    2- In the SOA Content, double click on your wsdl file.
    3- When the file opens, select the schema view from the bottom of the page.
    4- In the schema view, expand all the schema nodes and check if you see any values in red. If you see one, that value has probably caused the error and you should correct it using the property inspector window.
    In my case, the schema location value was set to a wrong path, so I changed it and the error resolved.
    Also, some error that appear as warning in the rule editor will show as compile error later, such as input types not being used and such, so those must be resolved before compiling.
    Hope that was helpful
    good luck

  • Replacing Macbook Pro parts with Macbook parts...........???

    I have a MacBook pro that has recently bit the dust and is out of warranty. I'm 99% positive it is a combination of the hard drive and the logic board failing. I have a new MacBook that I hardly ever use and I am wondering if I can replace the faulty parts in my MacBook pro with the parts from my working MacBook.
    I know replacing the hard drive on my mbp with the hard drive
    from my mb will work just fine... But here's my longshot question.. Can I replace the logic board in my mbp with the logic board from my mb? Are they interchangable?
    If not, will my mb accept the ram from my mbp? I may just throw my 2 GB RAM from my mbp into my mb to tide me over until the new mbp comes out/I can afford it.
    Thanks.

    Well i'm not too sure about the logic board, but i do know that the ram in your macbook pro will work in your macbook.

  • PDF with movable parts.

    I'm trying to create a PDF file with movable parts.  I'm doing a research project where participants will try to match wallpaper to a specific room.  I would like to have a PDF file that has wallpaper squares that can move around a hallway in another layer.  Is it possible to do?
    Thanks.

    Possibly with either OCG (Optional Content Groups) or via a 3D PDF file.  Depends on what you mean by the term "movable parts".  Do you mean make them invisible?  Do you mean actually make them move via JavaScript animation?  If it is the former then that is OCG.  If it is the later then that is 3D PDF.  OCG is not a simple thing to do even with Acrobat.  3D PDF is also in the same realm of difficulty and perhaps more difficult because it means you need to have other software that can create specific 3D files that then can be imported into Acrobat or a third party software company's software called tetra4D ( http://www.tetra4d.com/ )

  • J1IS in subcontracting with full payment of excise duty

    hi
    Can u tell me please
    In subcontracting with full payment of excise duty I have created PO,sent material to stock provided to vendor (541).while creating outgoing excise invoice with referance to material doc.(MATD)
    i am getting following error.
    GL account has not been assigned for MSUSP in customization
    Message no. 8I447
    Diagnosis
          GL account has not been assigned for the excise a/c in customization
    I am not getting where to assign G/L
    Reg
    Roc

    hi
    please check this customization setting
    Logistics - General --> Tax on Goods Movements --> India -->Account Determination
    Specify Excise Accounts per Excise Transaction &
    Specify G/L Accounts per Excise Transaction

  • Subcontracting with full payment of excise duty

    Hello friends,
    Can u plz give the complete configuration details for setting up Subcontracting with full payment of excise duty, Cenvat, Edcess.
    Purushotham

    Hi,
    Process Flow for Sub contracting with Excise duty
    1)The purchasing clerk creates a subcontract order for the subcontractor’s srvices.
    2)The warehouseman creates a transfer posting for the materials that you want to send to the subcontractor.
    3)The excise clerk creates an outgoing excise invoice for the materials.
    4)You send the materials to the subcontractor, together with the excise invoice.
    5)The subcontractor processes the materials and returns them to you, together with another excise invoice.
    6)The excise clerk captures the subcontractor’s excise invoice, using the purchase order as the reference document.
    7)The warehouseman enters the goods receipt.
    8)The excise supervisor posts excise invoice.
    The accounts payable clerk posts the subcontractor’s invoice.
    For this one only u require Account dtermination for ETT for OTHER in Logistic general-Tax on goods movement-India-Account determianation.
    Raghu

  • Subcontract with full payment of excise duty

    hi gurus
    Can any one provide me itutor link of subcontract with full payment of excise duty,import cycle,import under custom bonded ware house
    Thanks in advance
    Roc

    hi
    This is a subcontracting under full payment of duty scenario.
    Refer this link
    http://help.sap.com/saphelp_erp60_sp/helpdata/en/09/ebf138cdd78a4be10000000a114084/frameset.htm
    Subcontracting Under Full Payment of Duty
    Purpose
    This procedure illustrates how you use the system to send materials to your subcontractors for processing using normal excise invoices.
    Prerequisites
    You have created a condition type for manually entering excise duty in the subcontract order. In the standard system, you can use condition type JEXC, maintain in pricing procedure.
    Process Flow...
    1. Create a
    tract order for the subcontractoru2019s services.Enter excise manually in the condition type JEXC & take a tax code for VAT calculation.
    2. Do the transfer posting for the materials that you want to send to the subcontractor.
    3. Create an outgoing excise invoice for the materials by J1IS & J1IV.
    4. You send the materials to the subcontractor, together with the excise invoice.
    5. The subcontractor processes the materials and returns them to you, together with another excise invoice.
    6. Captures the subcontractoru2019s excise invoice, using the purchase order as the reference document.
    7. Do the goods receipt & refer excise invoice in excsie tab.
    8. Posts excise invoice.
    9. The accounts payable clerk posts the subcontractoru2019s invoice.
    for imports
    Import scenario
    To map Import procedure into SAP , follow the following steps :
    1.Create material master of import goods.
    2.Create vendor master record of import vendor and Customs clearing vendor.
    3.Maintain CIN settings.
    4.Maintain J1id.
    5.Maintain Pricing procedure SAP standard JIMPOR..,maintain required conditions..JCDB,JCV1...
    6.Assign the schema to respective import vendor in Purchasing view of VMR.
    7.Create import PO ,check in conditions of JCDB, JCV1 the customs clearing vendor(Indian vendor) and percentage is assigned..This can be done by In condition tab select condtion then click on display,then enter.
    Save the PO.
    8.MIRO --Capture Bill Of Entry.(Commercial Invoice No.,).Customs clearing first .Here CVD will b converted to BED.
    9.Capture Excisse invoice--j1iex.
    10.MIGO.
    12.Post Excise Invoice.
    13.MIRO...Payment to vendor(import vendor)
    http://help.sap.com/erp2005_ehp_01/helpdata/en/95/3ca40a110511d4b5ae006094b9ec21/frameset.htm
    regards
    kunal
    award if helpful

Maybe you are looking for

  • Suppress Ring/Sound Events

    Is there a method to suppress sound events with any of the development SDK's. My PALM allowed me to suppress SOUND events for anyone who was NOT in my contacts. I can't seem to do that with my new iPhone If one of the SDK's would allow trapping of so

  • How to make helvetica the default font for Endesign?

    everytime that I create a document, times is the default font, but most of the time I use helvetica and I want to make it the default font. thanks.

  • Scrollbar does not get active

    Hi, I am using XY graph to display temperature Vs. Timestamp. I need to use scroll bar for my graph. I have enabled scroll bar for X-axis but it doesnt seem to work. It is always disabled and grey. I need data points on my plot to be spaced out so th

  • Upgrade-SPSite -VersionUpgrade hanging

    Hi there I have an 89GB Content Database I am upgrading from 2007 to 2010 and then to 2013. Upgrade to 2010 took 30 hours. (No errors) Upgrade to 2013 took 5 hours. (Only errors reported were for "ERROR Feature upgrade incomplete for Feature 'Publish

  • Upload data from BW cube

    Hi Experts, Can anybody explain in detal how can you get a package to load data from a BW cube to a BPC application selecting the variants of the Data manager package the Entity and the time you need to load? Regards.