Submitting multiple tasks within a job?

So far I have been submitting scripts/commands to my grid which execute as single tasks. I want to learn how to submit multiple tasks within a single submitted job. Does anyone know a good reference to learn this topic? I tried the man pages but I would like something less cryptic to read.

So far I have been submitting scripts/commands to my grid which execute as single tasks. I want to learn how to submit multiple tasks within a single submitted job. Does anyone know a good reference to learn this topic? I tried the man pages but I would like something less cryptic to read.

Similar Messages

  • Need to find a calendar to schedule multiple assignments with multiple tasks set on specific days for multiple people

    There may be no such animal as what I am searching for, but I thought I'd give it a try.
    What I need to do is find a calendar app that allows me to have individual calendars for staff members that I can place a several-days-long assignment and have those people access remotely on an iPad or iPhone (autosync).
    I also want to be able to have tasks set on specific days within that assignment that have alerts/reminders for each stage of the assignment.
    Being able to custom colour each individual assignment (not just the person's own calndar) is also necessary, as these asignments overlap and need to be easily distinguishable at a glance. Each assignment needs to be its own entity and not affect any furture or previous entries, even if I choose the same colour.
    It needs to be in a month by month view and be able to be something each person can subscribe to and sync up with for changes on a daily basis. It does nothave to be a calendar like in the screen shot below, it could be a linear calendar that has days across the top and assignments down the left side.....
    Here is a screen shot of a rudimentary excel spreadsheet I have been using. It is awkward and becoming unmanageable as the number of assigments increases and more staff are being added on. And I must send a new spreadsheet out every time I make a change or add an assignment, which is several times a week.
    I suspect I may be asking for the world, but if anyone knows a direction I can go in to start a search, I'd be grateful. I haven't had success of my own so far and need to find something soon.
    iCal doesn't work for me due to the fact I can only colour code the calendar itself and not the event, plus not being able to have multiple tasks within one event. And the qty of assignments I'd have would see most getting lost, eliminating my abilty to see every staff member's assignmanet at the same time.
    Thank you in advance if you have a suggestion and if not, thanks for looking at my dilemma! 

    check with T-code TPM44
    zashok

  • I am getting a error IO when trying to upload multiple images within wordpress using the flash uploader. I do not get the error when uploading using explorer. The error only appears if I try uploading using firefox....any ideas?

    I am getting a error IO when trying to upload multiple images within wordpress using the flash uploader. I do not get the error when uploading using explorer. The error only appears if I try uploading using firefox....any ideas?

    Logged the call with SAP who directed me to 'Define settings for attachments' in IMG and setting the 'Deactivate Java Applet' & 'Deactivate Attachment versioning' checkboxes - problem solved.

  • Is there a way to create an email button to multiple addresses within a PDF?

    I have to regularly update a list of committee members and their email addresses which is then sent to all of the members. 
    Does anyone know if there a way of creating a button for each of the committees in the list which, when clicked, creates an email to all the  members contained within that committee?  I will need to add up to 14 email addresses to the one button. I need to know this because the various members in the committees are  fed up of copying and pasting all the email addresses into their email messages.
    I am now using Acrobat XI but I still can't figure out if this is even possible. If not a button, is there some other way of being able to launch an email to multiple addresses within a PDF?
    Thanks in advance for any help.

    Not really. But you can combine the data from multiple forms into a single (new) spreadsheet via Tools - Forms - More Form Options - Merge Data Files into Spreadsheet...

  • UWL Help - How can i create my own task within the Enterprise Portal

    Dear all,
    I am currently working with UWL .
    I have tried the customization and those stuffs associated with UWL , and it is working properly.
    My current issue is , how can create my own task within the Portal ( not using Ad Hoc  Workflow , which is present in Portal) ?.
    If i can create my own task within portal by API or using another method , then How can i add that task link within the drop down box that is present in the Collaboration launch pad and Mytask Workset.?
    Is there any API regarding  UWL (which is useful for creation of custom tasks in Portal using Developer Studio by means of Portal Application Creation) ?
    How can i add that custom task in the drop down ?.
    I have tried the customization of existing UWL.
    I shall be grateful to those who can help me to solve this issue with links regarding the  solution of my problem's.
    with regards
    Kishor Gopinathan

    Hi Kishore,
    I am trying to do the same thing. When i am creating Collaboration Task, it has standard templates in the dropdown like "Single Step" and "Multi-Step" etc., If i want to create my own Custom Task Template and display in that dropdown, how can i do that? Your help is really appreciated.
    Thanks
    Vijay

  • How to find out the users assigned tasks within a GP process using GP API?

    All,
    I am trying to get details of all the running GP processes. As a part of this, I need to get the user information of who is assigned a task within a process.
    Any inputs on this ?
    Do I have to use the IGPProcessRoleInstance interface? Also how do I get the execution context of all the callable objects within the process?
    -Thanks in advance
    KN

    Hi Chandan,
    I am basically looking for the roles responsible for each task in the process.
    I get the below exception when I execute the code provided by you.
    <i>com.sap.caf.eu.gp.exception.api.GPEngineException: No active version of the given development object existscom.sap.caf.eu.gp.exception.api.GPEngineException: No active version of the given development object exists at com.sap.caf.eu.gp.exception.impl.ExceptionUtil.convertTo(ExceptionUtil.java:36) at com.sap.caf.eu.gp.process.impl.GPProcess.getActiveTemplate(GPProcess.java:116) at com.sap.caf.eu.gp.process.dt.impl.GPDesigntimeManager.getActiveTemplate(GPDesigntimeManager.java:276) at com.sap.caf.eu.gp.process.dt.impl.GPDesigntimeManager.getActiveTemplate(GPDesigntimeManager.java:269) at com.bp.cmd.wd.GPReporting.getOverdueProcesses(GPReporting.java:346) at com.bp.cmd.wd.wdp.InternalGPReporting.getOverdueProcesses(InternalGPReporting.java:184) at com.bp.cmd.wd.GPReportingView.onActionSubmit(GPReportingView.java:145) at com.bp.cmd.wd.wdp.InternalGPReportingView.wdInvokeEventHandler(InternalGPReportingView.java:169) at com.sap.tc.webdynpro.progmodel.generation.DelegatingView.invokeEventHandler(DelegatingView.java:87) at com.sap.tc.webdynpro.progmodel.controller.Action.fire(Action.java:67) at com.sap.tc.webdynpro.clientserver.window.WindowPhaseModel.doHandleActionEvent(WindowPhaseModel.java:420) at com.sap.tc.webdynpro.clientserver.window.WindowPhaseModel.processRequest(WindowPhaseModel.java:132) at com.sap.tc.webdynpro.clientserver.window.WebDynproWindow.processRequest(WebDynproWindow.java:335) at com.sap.tc.webdynpro.clientserver.cal.AbstractClient.executeTasks(AbstractClient.java:143) at com.sap.tc.webdynpro.clientserver.session.ApplicationSession.doProcessing(ApplicationSession.java:299) at com.sap.tc.webdynpro.clientserver.session.ClientSession.doApplicationProcessingStandalone(ClientSession.java:746) at com.sap.tc.webdynpro.clientserver.session.ClientSession.doApplicationProcessing(ClientSession.java:699) at com.sap.tc.webdynpro.clientserver.session.ClientSession.doProcessing(ClientSession.java:255) at com.sap.tc.webdynpro.clientserver.session.RequestManager.doProcessing(RequestManager.java:154) at com.sap.tc.webdynpro.serverimpl.defaultimpl.DispatcherServlet.doContent(DispatcherServlet.java:62) at com.sap.tc.webdynpro.serverimpl.defaultimpl.DispatcherServlet.doPost(DispatcherServlet.java:53) at javax.servlet.http.HttpServlet.service(HttpServlet.java:760) at javax.servlet.http.HttpServlet.service(HttpServlet.java:853) at com.sap.engine.services.servlets_jsp.server.HttpHandlerImpl.runServlet(HttpHandlerImpl.java:390) at com.sap.engine.services.servlets_jsp.server.HttpHandlerImpl.handleRequest(HttpHandlerImpl.java:264) at com.sap.engine.services.httpserver.server.RequestAnalizer.startServlet(RequestAnalizer.java:347) at com.sap.engine.services.httpserver.server.RequestAnalizer.startServlet(RequestAnalizer.java:325) at com.sap.engine.services.httpserver.server.RequestAnalizer.invokeWebContainer(RequestAnalizer.java:887) at com.sap.engine.services.httpserver.server.RequestAnalizer.handle(RequestAnalizer.java:241) at com.sap.engine.services.httpserver.server.Client.handle(Client.java:92) at com.sap.engine.services.httpserver.server.Processor.request(Processor.java:148) at com.sap.engine.core.service630.context.cluster.session.ApplicationSessionMessageListener.process(ApplicationSessionMessageListener.java:33) at com.sap.engine.core.cluster.impl6.session.MessageRunner.run(MessageRunner.java:41) at com.sap.engine.core.thread.impl3.ActionObject.run(ActionObject.java:37) at java.security.AccessController.doPrivileged(Native Method) at com.sap.engine.core.thread.impl3.SingleThread.execute(SingleThread.java:100) at com.sap.engine.core.thread.impl3.SingleThread.run(SingleThread.java:170)</i>
    I guess this is because there is no active version of the process available now. Any inputs on this and how to avoid this ?
    -Thanks,
    KN.

  • Add a watermark to multiple files within a PDF Portfolio in Acrobat X Pro?

    Can I add a watermark to multiple files within a PDF Portfolio in Acrobat X Pro? If so, how?  It appears as though it is a removed option.

    I've figured this out. (kind of) not using PDF Portfolio; where you could apply watermark to multiple files in Acrobat 9.
    I'm answering my own question in case there are others looking to add a watermark to multiple files.
    Step 1: Open a single file
    Step 2: Tools>Pages>Watermark>Add Watermark
    Step 3: In bottom of Watermark Edit Box, Select "Apply to Multiple"
    Step 4: Select "Add Files
    etc etc.

  • HT4623 Opening multiple tabs within Internet Safari on my iPad mini

    How am I able to open multiple tabs within Internet Safari on my iPad mini?? I have an iPhone and I can do so but on my iPad mini I can't figure it out or it just doesn't have that option. Someone please help with some answers, thank you!!

    Thanks for your response, that's exactly what I thought the + sign was for but I've tried that and when I do it completely closes out safari. I did some other research and it seems to be happening to others also. So not sure what to do now or how I can get multiple tabs opened just like you can on the iPhones.

  • How to setup Compressor to create video from multiple sequences within FCP?

    I am wondering how I can set compressor up to create videos from multiple sequences within FCP. When I click file -> export - > compressor for a sequence and go into the program, it doesn't allow me to go back into FCP. I just get a spinning beach ball. Is there no way to set it up so I can prep a bunch of fcp sequences within compressor and then click submit and walk away? I have over 100 sequences that need to be exported so it would be a little difficult to do this one at a time. Thanks.

    Batch processing
    *Step one. Make sure everything in every sequence is rendered.*
    *Step two. Make a folder somewhere and name it something relevant.*
    *Step three. In FCP select all you sequences that you want to compress and right click (option), choose Batch Export from the contextual menu.*
    *Step three point one. In the batch export window click on settings and choose the folder you made in step two for the destination. Make sure Make Self-Contained is not check and include Audio and Video.*
    *Step four. Click export in the batch window.*
    Once that is done you can close FCP.
    Now in Compressor
    *Step five. Make a setting that will give you the output that you want (mpeg2, AC3, h.264, whatever). Make a destination for where you want to save the output.*
    *Step six. Make a droplet from the settings you made in step five.*
    You can quit Compressor now.
    *Step seven. Take the files that you batch exported from FCP in step three and four and drop them on the droplet you made in step six.*
    o| TOnyTOny |o

  • Mx-DAQ multiple tasks

    Hello,
    Im using LV7.1 with NI-Daq 7.4.
    in my Application i use multiple tasks, a few for aquiring analog and digital input from my first 6024E and one to aquire digital input from my second 6024E.
    In most of the time this works very well, but from time to time, when the mxdaq read VI for the second task is executing for the first time, an error message occurs. This erromessage tells me, that i passing an empty string instead of an task reference to the mxdaq read VI of my second card. After Reexecuting my App it works fine without creating error messages until I reboot. For me it looks like an initialization/synchronization problem. Both cards are properly installed and visible/testable in MAX.
    For syncroniziation of these cards i use the same MX-DAQ clock source.
    Perhaps i have to reconfigure the task initailization but i dont know what is wrong.
    thank for help

    I'm guessing that the reason that you only see this sometimes is that it is a race condition between the read call and task creation. I've seen this problem before and the cause is usually that you are trying to read before your task is created. This can be caused by using an asynchronous process to create your channels/tasks apart from doing your multi-channel reads. To eliminate this problem I suggest you write your application in such a way that you create all of your tasks first, before trying to read from any of them. The easiest way to do this is to wire up your create task VI's in order before your reads, as these VI's will block until they complete task creation.
    Hope this helps,
    DB

  • Creating multiple tasks

    I am using the CVI plug-in for MSVC.  My application requires that I toggle a set of digital lines based on a user's input.  For a variety of reasons I would like to initialize my DAQ task handles at the start of the program so that when I need to toggle the lines I just call Run and Stop.
    Some of my tasks use the same lines.  I know that if I try to define multiple tasks using the same lines that I will get an error (-200089). 
    My question is this: Is there a clever way to pre-define my tasks at the start of the program even if they use the same lines? 
    Thanks. 

    UGH!  Cut and paste got me.  Stupid syntax error.  I can do what I wanted to do.

  • Synchronize multiple tasks and multiple boards with X-series USB devices

    Hi all,
    I am trying to figure out how to synchronize multiple tasks across multiple X-series USB boards (6353, to be precise). 
    I have to run a digital output task AND an analog output task on each board.  All four tasks (the DO and AO on Board 1, and the DO and AO on Board 2) must be synchronized.
    I know how to synchronize multiple tasks on a single board.  I've been doing that for years.  That works fine.
    I know how to synchronize a single task across multiple boards (say, a DO task across 2 different boards).  That works fine too.
    For the life of me, I can't figure out how to marry the two.  Everything I've seen, all of the examples, etc. assume you want to do one or the other, or that you have a RTSI cable available.  Are there any examples out there that synchronize multiple tasks across multiple USB boards?
    I tried exporting the AO clock signal from my master AO task to PFI12, and then using the signal on PFI12 to as the clock source for the remaining tasks (Dev1/PFI12 physically connected to Dev2/PFI12, and Dev1/PFI12 set as the clock source for Dev1's DO task). 
    I have also tried setting Dev1/aoSampClock as the source for Dev1's DO task.
    Under both configurations, I invariably get error -89137 when I try to start the tasks -- required resources (PFI12) in use by Dev1/do/SampClock.  I understand what the error is telling me.  What I don't understand is why I'm receiving this error when I don't have any of my tasks configured to use the DO Sample Clock.  It seems as though it is not possible to export a clock signal to a PFI line and simultaneously run a clocked digital task, even if the clock source for that task is specified as something other than the DO Sample Clock?
    So, my question is, is it possible to do what I want to do?  And if so, how do I do it?  How do I configure a common clock source across multiple tasks running on multiple USB boards?
    Hoping for insight from those wiser than I...
    Diane
    Solved!
    Go to Solution.

    Update:  I decided to try using a counter as the source clock.  One cannot use counter 0 to accomplish this, but it does appear to work with counter 1.
    I'll take what I can get.  Fortunately I have two spare counters.  (Yes, I'm running counter tasks too -- 6 of them -- but they don't have to be synchronized.)
    I have to add both digital and analog input tasks as well -- all synchronous with each other, but not with the output tasks since they'll be running at different sample rates.  I hope I'm able to use a counter as the source clock for those as well.
    My head aches.

  • Create multiple Task Instance from one Task Instance

    We have a process, where user can request for multiple resources(access) in one single request.Currently user has to wait until all the resource requests are approved by application owners to start the provisioning process.
    I am thinking of splitting that one request(task) into multiple task, based on the number of resources requested.so that, if one resource request is approved user can get that particular access.
    My question :
    1.How will I split the one task into multiple task and pass the required information to child task?
    2.How do I handle views?Currently since its one task , we checkout and check-in the same view.
    3.How will I overcome the possibility of one view overwritten by the other.
    Thanks.

    We have a process, where user can request for
    multiple resources(access) in one single
    request.Currently user has to wait until all the
    resource requests are approved by application owners
    to start the provisioning process.
    I am thinking of splitting that one request(task)
    into multiple task, based on the number of resources
    requested.so that, if one resource request is
    approved user can get that particular access.
    My question :
    1.How will I split the one task into multiple task
    and pass the required information to child task?
    2.How do I handle views?Currently since its one task
    , we checkout and check-in the same view.
    3.How will I overcome the possibility of one view
    overwritten by the other.
    Thanks.Hi,
    yes u can split one task into multiple task means as ur requirment diffrent task for different resource. so u have to write diffrent W/F for each resource and call them by setting a counter for number of resource.
    the below code help u.
    <Variable name='index'>
              <i>0</i>
         </Variable>
    <Activity id='1' name='createNewTask'>
              <Action id='0' name='createView' application='com.waveset.session.WorkflowServices'>
                   <Argument name='op' value='createView'/>
                   <Argument name='type' value='Process'/>
                   <Argument name='viewId' value='Process'/>
                   <Argument name='taskName'>
                             <s>give any name to the task</s>
                   </Argument>
                   <Argument name='process'>
                             <s>task name that u want to launch</s><!-- u can get task name dynamicly by rule also by passing resource name -->
                   </Argument>          
                   <Argument name='accountId' value='$(accountId)'/><!-- pass the required information to child task as argument -->
                   </Action>
                   <Action id='1' application='com.waveset.session.WorkflowServices'>
                   <Argument name='op' value='checkinView'/>
                   <Argument name='view'>
                        <ref>view</ref>
                   </Argument>
                   </Action>
                   <Action id='2'>
                        <set name='view'>
                        <null/>
                        </set>
                   </Action>
                   <Transition to='incrementIndex'/>
    </Activity>
         <Activity id='2' name='incrementIndex'>
              <Action id='0'>
                   <set name='index'>
                        <add>
                             <ref>index</ref>
                             <i>1</i>
                        </add>
                   </set>
              </Action>
              <Transition to='createNewTask'>
                   <lt>
                        <ref>index</ref>
                        <ref>length</ref><!-- number of resource-->
                   </lt>
              </Transition>
              <Transition to='end'/>
         </Activity>

  • Creating multiple tasks in labview fpga

    Hi,
    I need to create multiple tasks in labview fpga....I need to set one update period in each task so that i can make my while loop run at this rate everytime my input frequency changes....How do i do this?

    Hi,
    just to be sure: You are talking about multiple tasks on the FPGA to acquire data? Or do you want to have multiple tasks on the host to display the data?

  • Create Multiple tasks for Single Item in List using state machine workflow in sharepoint

    Hi,
    I want to create multiple create tasks for Single Item in List based on Assigned to column using state machine Workflow through visual studio
    Here Assigned to column allows multiple users. so i have to create task for every user based on column .
    I'm trying for this but i didn't got any solution
    Please provide solution for this.

    Hi,
    According to your post, my understanding is that you wanted to allow multiple users to approve.
    There are some articles about creating parallel tasks in state machine workflow, you can have a look at them.
    http://www.codeproject.com/Articles/477849/Create-Parallel-Task-in-State-Machine-Workflow-in
    http://msdn.microsoft.com/en-us/library/office/hh128697(v=office.14).aspx
    http://social.technet.microsoft.com/Forums/office/en-US/b16ee858-4360-479a-a686-4ee35b7be9db/sharepoint-2010-workflow-creating-multiple-tasks?forum=sharepointdevelopmentprevious
    Thanks & Regards,
    Jason
    Jason Guo
    TechNet Community Support

Maybe you are looking for

  • PSE12: unable to edit layers in file created in Photoshop 4.0. [was: Adobe Photoshop 4]

    Changed computers from XP to windows 7. I was using Adobe Photoshop 4.0 from a floppy. I can't load it on my new computer so I bought elements 12. It doesn't allow me to alter the layers I created? Please advise.

  • Stack Size

    For an assignment I had to create a postfix calculator, and one of the errors we had to catch was: if there is more then one integer left in the stack when printing the final result, it needs to give an error message and exit. We were provided the im

  • ProcessOrder API not populating the Price from the pricing attribute setup.

    Hi, I am having a problem while adding a line on the existing order through the Oe_Order_pub.Process_order API. A line is added but the pricing is not fetched using the pricing attribute. I have passed calculate_Price_flag=’Y’ but in vain. I am not p

  • Secure login form as part of a not-secure page

    I know how to make a login page secure via SSL, and I also know how to do a login box on the other application pages that aren't secure. What I can't find out how to do -- or if it is even possible -- is to make a secure (via SSL) login box on a page

  • Dropped from a 60- 70 cantimeter

    i just dropped my phone from a 60-70 cm to ground and its just closed nothing happend to screen or backof the phone nothing happend to appearance but it stops working  i puted it to charge but its still not working nothing is happening not even a lit