Subscriber keeps reporting Work order IN completed.

We have a Zenworks 6.5sp1a site with 1 distributer and 15 subscribers on
remote site's.
One subscriber keeps reporting Work order IN completed / Receiving
distribution...... / Received magic data length = 8 . This results in a
very large TED.log, sometimes it grows to almost 2Gb. Normaly, due to
extended logging, it will be around 200Mb. 200Mb is readable by most
utilities, 2Gb will not load in an editor or it will take a while to load.
Has someone an idea what causes the multiple reports of Work order IN
completed?
Thanks, Erik

Well, with loglevel set to 6 you'll get lots of messages. The workorder in
message indicates that the distributor received a responce from the
subscriber, quit notmal traffic.
Off topic: Erik If I'm right you are working for a company that has an
office in Capelle (NL), is that right? Are you working from the CPL office
or at another location (I'm cycling along your CPL office almost every day
Ron
<[email protected]> wrote in message
news:[email protected]...
> Ron.
>
> The loglevel on the distributor is 6 for filelog. The loglevel on the
> subscriber is the same as the other subscribers.
> The only difference I discovered is the attribute LoginTime on the other-
> page of the subscriber object. I will take a closer look on that one.
>
> Erik
>
>> Hmm, what is the loglevel on your distributor?
>>
>> Ron
>>
>> <[email protected]> wrote in message
>> news:[email protected]...
>> > The distributor is scheduled from 19.00 to 19.15 and the channels are
>> > scheduled from 20.00 to 8.00.
>> > The "faulty" subscriber keeps sending statusreports to the distributor,
>> > causing the ted.log on the distributor to grow up to 1 or 2Gb.
>> >
>> > The distributions go well, even on the "faulty" subscriber. I like to
> know
>> > what the messages mean, I can not find anything in the knowledgebase.
>> >
>> > Erik
>> >
>> >> I'm wondering how you configured your schedules, if this is causing
> the
>> >> TED.LOG to grow to 2Gb, I wonder how often you refresh your
> distributor
>> > and
>> >> open the channel.
>> >>
>> >> Do you get the distribution directory on the subscriber? Does the
>> >> distfile.ted grow over time?
>> >>
>> >> Ron
>> >>
>> >> <[email protected]> wrote in message
>> >> news:[email protected]...
>> >> > We have a Zenworks 6.5sp1a site with 1 distributer and 15
> subscribers
>> > on
>> >> > remote site's.
>> >> > One subscriber keeps reporting Work order IN completed / Receiving
>> >> > distribution...... / Received magic data length = 8 . This results
> in a
>> >> > very large TED.log, sometimes it grows to almost 2Gb. Normaly, due
> to
>> >> > extended logging, it will be around 200Mb. 200Mb is readable by most
>> >> > utilities, 2Gb will not load in an editor or it will take a while to
>> > load.
>> >> >
>> >> > Has someone an idea what causes the multiple reports of Work order
> IN
>> >> > completed?
>> >> >
>> >> > Thanks, Erik
>> >>
>> >>
>> >
>>
>>
>

Similar Messages

  • Work order less completion

    Hi ,
    By mistake we have performed WIP Assembly Return through Work order less completion, due to this On hand got reduced.
    Could you please advice how to reverse this transaction.
    Regards
    Ravi

    Hi Ravi,
    Yes, system will not allow to transact the same schedule number again. New schedule number will be generated automatically when you perform the WIP Assy Completion transaction using Work Order-Less Completions window and all the accounting entries will be balanced in the system.
    Regards
    Shabbir

  • Work Order Less Completion Form-Help

    Hello Guys i have a question on WIP- Work Order Less Completion Form.
    In the form when we enter the assemebly item and go to Components-->Lot/Serial, In Lot entry form there is a field called Lot number which has LOV and also allows user to enter his own Value what he needs.
    My question is is there any controls in Oracle where we can prevent user from entering his value in the LOt number field,instead he has to select it from LOV only.
    Please help me on this.
    Thanks

    Hi,
    Please see if these documents help.
    Note: 112055.1 - Lot/Serial Control Setups
    Note: 338189.1 - When Receiving an RMA, Lot Number LOV Shows All Lots
    Regards,
    Hussein

  • Inventory transactions - Work Order Less Completions

    Hi,
    I am looking for some information on 'work order less completion' (WOLC) type of transaction in inventory (type of inventory transaction).
    Please point me to the right link where I can get some info on this. This is an urgent need, hence request you to respond immediately.
    Thank you very much, in advance

    After enabling debug mode to statement level we pinpointed the problem:
    The record is failing on interface completion (wip_flowUtil_priv.processFlowInterfaceRecords), when calling validateInterfaceCompletion procedure.
    The exact reason is unknown because the procedure writes the error code directly into not commited record (column error_code, mtl_transactions_interface table).
    It seems we are not the only one:
    Metalink, Bug 9801561, Status: 11 - Code Bug (Response/Resolution)
    Let's wait and see.
    Regards,
    Kristjan
    Edited by: user10676522 on 2.7.2010 2:59

  • Preventing Deletion indicator in PR once work order is completed

    Dear colleagues,
    Users create work orders in IW31 with the choice of external service; control key is PM02. Once work order is saved purchase requisition (PR) is created in background. With reference to PR, purchase order (PO) is created by purchase specialist.
    When work order is technically completed (system status TECO) deletion indicator is set to PR line item(s) automatically which result in undesirable situations since PR(s) has subject to release strategy in our system.
    Is it possible to prevent setting deletion indicator in PR once reference work order is technically completed?
    Kind regards
    Melih

    Hi,
    In this case that behavior has negative effects on PR Workflow process because in our system when PR(s) is created it is subject to release strategy according to preconfigured conditions.
    Once the order is technically completed (TECO) deletion indicator is set to PR line item(s) automatically meanwhile release strategy tab is disappeared from PR line item(s).
    In addition to that in ME54N system gives the MEPO822 (Purchase requisition XXXXXXXXX cannot be released) message even PR is approved before the order is technically completed.
    Kind regards
    Melih

  • Complete work orders without complete notifications from Overall Completion

    We have a work order assigned to a notification type and we need to complete the work order from the overall completion transaction  (IW42) without completing the notification when clicking on technical completion button.
    Is it possible?

    You can check with your netweaver team if this could be controlled from user authorizations. Do check if the following Business Transactions are available against the tcode "iw42"
    PMM2     Put notification in process     
    PMM4     Complete notification     
    PMM6     Put notif. in process again     
    I hope this will help.
    Regards

  • EAM Work order completion issue

    Hi guys
    We have a requirement where we need to complete a work order using an API call .
    There are times where even when all operations are completed the users dont change the status to complete.
    I've tried using the EAM_PROCESS_WO_PUB.PROCESS_WO to change the status to different statuses and it works for some statuses,
    but when I try to change the status of the WO from released to complete it gives me the following error.
    change from 3 to 4 not poss
    oddly this call does change the system status of the work order to complete but not the status type
    any ideas , suggestions?
    Thanks
    Dan

    user eam_completion API
    take care
    Aamir

  • Different between work order closed and completed

    HI experts
    I would like to know what is different between closed work order and completed on SAP PM Module.
    regards
    nasser

    See this conversation:Completed is technical comptete (TECO) - the technician has done his/her work, closed is settled and done also from an accounting perspective (settlement)
    PM Work Order TECO and CLSD
    http://scn.sap.com/thread/3158261

  • Work Order - TECO Status Question

    Dear All,
    Is there a way to indicate who performed the last accounting transaction with a Work order?
    For example, Who Teco'd the order and when it was Teco'd, etc..
    This allows me to create a report to show productivity of how many work orders being complete.
    Any suggestions will be greatly appreciated. Thank you!
    Mike

    Hello Michale
    From PP Stand point ,if you are looking at TECO of Production order with individual person did , U can use COOIS functionality seleting Sytem Status : TECO  and Give the Production Scheduler .There are lot of functionality u can use within date ranges, plant wise , material wise and u have the option to choose various lay out to generate report from COOIS.
    Hope this will solve your problem.
    Regards
    Jia

  • Eam Work order assignment info

    Hi Guys
    This is a followup to a question I asked in the SCM forum but was asked to post EAM questions here by Sandeep who answered my previous questions graciously.
    A> I am tracking a specific situation- when every operation assigned to a work order is completed I need to execute a pl/sql Concurrent program.
    For this one I think the work order status would be changed to complete?
    B>I am also tracking another situation- When a resource is assigned to a work order I need to execute a pl/sql conc prog.
    What table info gets set when this happens?
    Thanks
    Jake

    A> WIP_MOVE_TRANSACTIONS is probably what you are looking for. Write a trigger on that table.
    B> WIP_OPERATION_RESOURCES is the table used. So you can write a trigger on that table.
    Hope this helps,
    Sandeep Gandhi

  • Maintenance work order-- Time confirmation report for work orders

    Could you please let me know how to pull actual time confirmation report for the maintenance work orders?
    regds
    Arun

    Use transaction IW43 or  IW47 for maintenance order confirmation ( inprocess & completed ) and refer [link|http://help.sap.com/saphelp_erp2005/helpdata/en/66/158661547611d182cc0000e829fbfe/frameset.htm]
    -S.N

  • WIP : Work Order Aging report

    Hello,
    Is there any standard program given by Oracle on WIP  as 'Work Order Aging report' ?
    I guess not.
    If its not, then is there any other program related to WIP Aging exists in Oracle?
    Thanks in advance.

    Hi,
    Can you please make Ship To also as Primary Business Purpose?
    Regards
    Raghavender K

  • Open Work Order report and shortage report

    Hello,
    First of all, I am very new to SAP and sap forum. I do need to learn SAP very fast. I work as Buyer and Planner. I would like to know how do you run open work order report and also how do run shortage report.
    I appreciate different feedback.
    Thanks
    Raj

    Hi,
    Use tcodes CO24. First you need to activate that report PPCOXPR1 in SE38 enter report name and execute
    In COOIS select list components you can be requirement qty and withdrawn qty , here you can find out open work orders also
    Thanks
    Diwakar

  • Work Order Status report

    Hi,
    Any body have ideal?
    What are the work order summary report mean for?
    I am using T-code ZPM02 to view the report but the report display the work center according to the category CRTL,REL,PCNF,CNF,TECO and CLSD with each colunmn display the figure.
    What is mean for CRTL,REL,PCNF,CNF,TECO and CLSD?

    PeteA,
    Thank you for the information, the report is indeed a customized report.
    Could advice how to diffrentiaze between customize and standard report in SAP system?
    Can the IW39 list all orders with all the status in IW39?
    The reason being I am having problem with the customize report display (work order summary report)the status diffrence with the IW39 is the detail report.I am now looking for the SAP standard report for work order summary report to compare with the customize report to verify which report are display not correct.
    Do you have any ideal others than IW39 what others report in SAP system show the work order summary report?
    Many thanks.
    Karen

  • SSRS 2008 Work order report , in sub total donot want to add the 0 level in ( how to add the expression )

    working in Work order report, this report has different level , for example
    0 level transaction
    1 level transaction
    in subtotal don't want to add 0 level transaction,
    when I did the sub total it added all the level , so in sub total amount double up because of that
    how to add the expression so I can the level 0 take out from sub total , so it does not include in sub total
    can some one please help me with this
    thanks in advance

    Hi Simon_ Hou
    I tried the expr the way you suggested , it did not work  getting  error message,  the exp I added is below
    this the expression I added on sub total where is highlighted in Yellow,  under Cost amount column,
    I really appreciate the help
    =Sum(IIF(Fields!COLLECTREFLEVEL.Value=
    "0",0,Fields!CostAMOUNT.Value),"DataSet1")
    please see below my QUERY, can you please help and let me know what I did wrong in my exp
    SELECT        PRODTABLE.PRODID, PRODCALCTRANS.COSTGROUPID, PRODTABLE.QTYCALC, PRODTABLE.PRODSTATUS, PRODCALCTRANS.COSTAMOUNT,
                             PRODCALCTRANS.COSTMARKUP, PRODCALCTRANS.REALCOSTAMOUNT, PRODCALCTRANS.CALCTYPE, PRODTABLE.DATAAREAID, PRODCALCTRANS.KEY3,
                             PRODCALCTRANS.CONSUMPVARIABLE, PRODCALCTRANS.REALCONSUMP, PRODTABLE.ITEMID, PRODTABLE.SCHEDDATE, PRODTABLE.FINISHEDDATE,
                             PRODCALCTRANS.KEY1, PRODCALCTRANS.TRANSDATE, PRODCALCTRANS.QTY, PRODCALCTRANS.KEY2, PRODCALCTRANS.COLLECTREFLEVEL,
                             PRODCALCTRANS.LINENUM
    FROM            PRODTABLE INNER JOIN
                             PRODCALCTRANS ON PRODTABLE.PRODID = PRODCALCTRANS.PRODID AND PRODTABLE.DATAAREAID = PRODCALCTRANS.DATAAREAID
    WHERE        (PRODTABLE.PRODSTATUS = 7) AND (PRODTABLE.DATAAREAID = N'AR1') AND (PRODTABLE.ITEMID = @itemid) AND
                             (PRODTABLE.FINISHEDDATE >= @Paramfromdate) AND (PRODTABLE.FINISHEDDATE <= @Paramtodate)

Maybe you are looking for

  • Fn F7 keys won't work in BootCamp on MBP

    I'm trying to use a projector with my MBP to teach CAD in BootCamp. The problem is that I can't mirror my screen when using bootcamp, like I can in OS X. I can get an extension of my screen, but can't display the contents of my screen on the projecto

  • Reporting on Purchase Order Discounts

    Hi experts! I read some threads about condition types etc. I have a requirement with my customer to not only enter a discount but also run reports on the given discount or at least a report which shows gross and net price. Does anybody know if there

  • Setup Error Minisap (Sap Netweaver 7.0 ABAP Trial Version)

    Hello forum, Is giving me the following error while installing minisap (Sap NW 7.0 ABAP Trial Version) Tue Jun 16 16:25:05 CEST 2009 MaxDB sdbinst: NSP creating database ... Tue Jun 16 16:25:06 CEST 2009 MaxDB sdbinst: getInstalledReleasesWin (): wro

  • How do I copy a music file with artwork to a non Apple phone?  Sometimes it works, sometimes not!

    When I copy MP3 files from iTunes to my non-apple phone, sometimes the artwork goes with the the track and othertimes it doesn't.  Anyone have an idea why this might be?

  • Can see my documents on the Ipad but cannot open them

    Hi I need help. Since a few days I still have all my documents in the cloud but first they all dissapeared from my IOS devices (Iphone4 and Ipad2). After a few times deleting the Iwork apps and reinstalling they finally came back but I cannot open th