Substitution for control key

Dear Gurus,
  I am creating a project with 6 WBS elements. When I am creating internal activity then my control key is PS01.
My requiremenet is that only for 1st WBS of every project, my internal activity should be ZPS1 and for remaining it would be PS01. Is it possible through substitution ?
Please guide
Keshav

Hi,
SPRO >> PS >> Structures >> Operative Structures >> Work Breakdown Structure (WBS) >> Define Field Selection for Work Breakdown Structures >> Field Selection: WBS Element >> F2
Here define the 6 levels of WBS as per your requirement.
And in substitution, try to add control Key as fixed value for WBS level 1.
I am not sure it will work, but have a try
Regds,
CB

Similar Messages

  • Activating WCM for control key WCM (operation level)

    Hi Guys,
    I want to activate WCM in the PM order when i enter WCM control key in operations.
    I do NOT want to activate it using "Activate Work Clearance Management for Maintenance Orders".
    I have done all the config but maybe i missed something as the work approval icon is not appearing for WCM key in order.
    Can someone think of what i may have missed?

    I guess it wont solve my problem as the WCM is working at operation level in another system without it
    any more suggestions?

  • Vendor bank control key

    Hi,
    does anybody know the bank control key for italian banks.
    when I upload vendors containing italian banks information, it asks for a bank control key...and it is mandatory. I am thinking there will be a specific value for italy.
    Regards,
    Vijay

    okay i assumed it as already existing vendor with u ..
    BNKA -- FOR THE MASTER BANK
    T005-COUNTRY
    then look for control key in
    may be check this in table TIBAN for a particular entry .
    hope this helps ..
    regards,
    vijay

  • Auto GR with Control Key or Prod.Scheduling Profile

    Hi PP champs
    As we can use both i.e. Control key and Production scheduling profile for activating the Auhto GR for prodcution order confirmation ..Can some one help me which is the more <b>preferred</b> or  which is considered first by the system if we have both in <b>material master and routings respectively</b>.
    I have gone thru the documentation but couldn't get clearity as in both its mentioned as if its not activated in scheduling profile control key will take over and same thing for control key that if its not mentioned in control key system will check for production scheduling profile...
    BR
    Sumit

    Sumit,
    Generally Production scheduling profile is the prefered option, as most of the clients also prefer using to control certain auotmation at the time of order creation and release.
    To me i dont see a big difference between using control key or scheduling profile to define auto GR.
    As far as priority is concerned Control key is first checked by the system, if not available checks for scheduling profile.
    Regards,
    Prasobh

  • PReq not generated from Service Order SM03 using Control Key SM02

    Hi,
    The PReq is not getting generated for Control Key SM02 for service order SM03. I am using PReq generation as "Immediately". The issue is I am filling all the required fileds in the External Processing Operation Popup Screen & saving my Service Order. After that when i check the Document flow - there is no Preq number & in Actual Data for External opration, i find the fileds i have filled in the Preq popup screen as blank (such as Material group, Purc. grp, cost element, vendor etc). I have checked the config also, but cant find any clue.
    Thanks.

    did you check the control key settings for sm02?
    is it happening for this control key with other order types nd sm03 order type with sm03 ( external services ) control key?
    is it possible to replicate it? it is also possible tht the order didnt get saved as the user didnt see some warning info in the bottom bar

  • Issue with Period Control 03 for Depri key MSTL with 6446

    Hi Gurus,
    We want to use mid-month calculation for Dep. key MSTL using period control 03 (i.e. 03/03/03/03). We are also using 6446 as year-depedent Fiscal year (i.e. Jan and Dec 6 weeks other rest 4 weeks).  period control 03 is pro rata at mid period
    period 12 for 2009 start 11/14/09 ends 12/25/09
    period 1 for 2010 start   12/26/09 ends 02/05/10
    as per period control 03 mid month is Dec-04-2009 (setup in OAVH)
    When i acquire an asset on Dec-04-09, the dep start date is Nov-14-09 which is correct and all calculation is correct
    however when i acquire an asset on Dec-06-09 the dep start date is still Nov-14-09 which is not correct infact it should start dep from next month which will be Dec-26-09 (This is 1st period of Fiscal year 2010)
    As mentioned above we are using 6-4-4-6 fiscal year
    When acquiring an asset with mid month concept at year end we are facing problem in depri start date and hence calculation.
    The setting in OAVH for period control 03 are as below
    FV   Period Control     Desc.                             Year   Month   Day    Period    MidMonth
    NL        03              Pro rata at mid period          2009    12        4         12           ticked
    NL        03              Pro rata at mid period          2009    12        25       12           ticked
    NL        03              Pro rata at mid period          2009    12        31        1            ticked
    NL        03              Pro rata at mid period          2010    1          15        1            ticked
    Thanks in advance

    Deepak,
    Your period 12/2009 starts and ends between 11/14/09 ends 12/25/09. Now you acquire an asset on 12/4/2009. As per OAVH, you want depreciation calculation start mid-period. Then how is depreciation start date of Nov 14, 2009 for this case?
    Then you acquire an asset on Dec6, 2009. This, as per OAVH, falls into period 12/2009. Then why should the calculation start from period 1/2010 for this case?
    Thanks,
    Asheesh

  • Confirmation control key check for inbound delivery creation

    Hi,
    Currently, in the Client's company, the process of receiving goods from purchase orders looks like that (SAP-wise):
    - create a purchase order,
    - receive goods using MIGO and automatically create an inbound delivery,
    - pack the delivery and post goods receipt.
    Recently, some patches have been installed, including one described by note 1602047 (which basically enforces checking confirmation control keys if goods receipt assignment and goods receipt relevance are activated for inbound deliveries). Note says that it only affects two-step stock transfer and creation of automatic inbound deliveries using SPED output but it seems it also affects other basic processes like PO receipt in MIGO.
    Now, when using the old control key (that had MRP-Relevant and GR-Relevant fields checked), the system is unable to automatically create an inbound delivery after the goods receipt is posted with MIGO (with message VL148 - Not possible to create an inbound delivery). I learned that this is because the "GR Assignment" field must be checked in the confirmation control key so it's possible to automatically create aninbound delivery after receiving a purchase order in MIGO.
    After changing the confirmation control key to have the missing field checked it's not possible anymore to receive goods from PO in MIGO as the PO requires shipping notification in order to be processed in MIGO thus requiring of manual creation of an inbound delivery.
    Is there any way to skip this check so the process would remain the same (this model has been working fine for few years in the Client's system) and the inbound delievery would be created automatically after posting the receipt in MIGO?
    Thanks in advance,
    Piotr

    Hi,
    don't know if you found a solution, but we received the following message from SAP:
    The advent of the new version requires some attention to the users. It
    was necessary to avoid inconsistencies which in the past version the
    system was susceptible.
    Main Program SAPMM07M
    Source code of MM07MLVS
    sy-msgid VL sy-msgty E sy-msgno 148
    I have checked the process and through debugged I could confirm the
    following information SAP is providing to all similar incidents reportedfor us:
    Error message VL 148 is issued if in the confirmation control key used
    in the purchase order, the fields for MRP-relevance (T163G-KZDIS),
    GR relevance (T163G-WEREL) and GR assignment indicator (T163G-WEZUO)
    are not set.
    The correction of note 1602047 was necessary to avoid inconsistencies
    (table EKES) in the purchase order. Without having the GR assignment
    (T163G-WEZUO) set, there is no unique reference created between the
    purchase order history (table EKBE) and the inbound delivery
    confirmation (table EKES) at goods receipt which leads to a problem if
    several inbound deliveries exist for the same purchase order.
    If you set T163G-WEZUO to 'X', this assures that, for an inbound
    delivery, the confirmation record (EKES) belonging to this inbound
    delivery (EKES-VBELN) is also accurately updated at goods receipt.
    How to solve the issue?
    Use a confirmation control key with the GR assignment indicator set
    and then create the inbound delivery with VL31N. If you want to be able
    to create the inbound delivery with reference to a certain line item in
    the PO, use transaction VL34.
    If you still want to use transaction MIGO, there is the following
    workaround:
    - Create a purchase order without any confirmation control key
    - Create a goods receipt (GR) in transaction MIGO with reference to this PO and post the GR to a non-HU-managed storage location
    - Create a transfer posting with MIGO using movement type 311 to
    transfer the goods from the non-HU-managed storage location to the
    HU-managed storage location.
    As the transfer posting is an additional step for the user, the whole
    process could be automated using a partner storage location
    (T001l-PARLG) for the GR which then triggers (through a modification)
    the BAPI 'BAPI_GOODSMVT_CREATE' to create the transfer posting without
    user interaction.
    I hope to have satisfied you on the reason why it is now happening and
    also I believe you can explain to business that it is a new behavior
    necessary done from SAP side to avoid worse situations, we are aware of
    potential dissatisfaction it might cause. SAP Support is always
    available to clarify any issue.
    Sorry for not having a more positive answer.
    I hope it helps!
    Leentje

  • Confirmation Control Key Should be mandatory for PO document type

    Hi All,
    I want to know, is there any configuration settings to make mandatory "confirmation control key" for the Particular Purchasing document type's.
    If it is not there what should be the best to achieve this requirement.
    Thanks in Advance,
    Shankar.

    Hi
    I think there is no standard setting to make mandatory document "confirmation control key" for the Particular Purchasing document type's.
    Best way is to maintain in Purchasing view of vendor master record since confirmations rare sent by the vendor.If you want for some perticular materials you can maintain in Purchasing info record.
    Regards
    Ramakrishna

  • Vendor Bank Details - Bank control Key for Spain

    Greetings,
    Can anyone tell me how to maintain the bank control key for Spain in the vendor master data? I can see that Spain uses the key to check the combination of bank number and bank account number, and it looks like the validation points to table BNKAIN. However, where do I get the two digit bank control key (from the vendor?), and how do I maintain it in the table (this table is buffered)?
    Any advice you have would be greatly appreciated, and I will gladly assign points for helpful responses.
    Thanks!

    Hi Eric,
    Thank you for your quick response. My problem is not location of the field itself, but rather on what data to use to populate the field. There is no input help for this field, and the system issues an error message every time I try to populate the field. We ran a trace and discovered that the system appears to be running a check against table BNKAIN. I think perhaps I need to maintain that table, but cannot figure out how to access the table to maintain the entries. Do you know how to maintain this table, or is there a specific bank control key that should be used for Spain?

  • Default values for confirmation control key

    Dear forum
    I am using a confirmation control key 0004 Shipping notification (standard SAP) in the Purchase order line item (created with ME21n).
    When I enter the confirmation data (with transaction ME22n) in the purchase order line item (confirmations tab), I have to type in delivery date, quantity and so on manually, which is standard.
    But, what if I want to copy the original delivery date and quantity from the line item in the order, and use this as default value for the line item confirmation data...is it possible somehow?
    The reason why I want to do this is for the user not having to go in and update this date manually all the time, but only when the confirmed dates/quantities differ from the desired delivery date and quantities in the purchase order line item. We are not on EDI or using Inbound deliverys for Purchase orders.
    Thanks
    Ola

    Hi,
    The Confirmation is nothing but the acknowledgement.So, its usually entered manuallly by the authorised User allowing follow on documents for Purchase Order.
    You can chesk once the customisation of Confiramtion control keys for automatic update indicator.
    Yes, you can use User Exit and develop with the help of ABAPERS.
    Hope it will help you.
    Regards,
    Smitha

  • Mass change for field Confirmation control Key in PO / SA

    Dear All,
    There is a need to do mass change in value for field Confirmation control Key in PO / SA. Some of them have PO history. If we have PO history system wont allow to change conf. ctrl key. Also since it is a production system we can not cancel previous po histories. This is in SAP 4.7 where we dont have mass change tcode for Scheduling agreements.
    Can we maintain the values thru table entries. like using se16n maintain entries check box. This option is greyed out. can we activate that & do this requirement.
    please suggest.

    hi Greetings!
    The confirmation control key can not be changed in the scheduling agreement if GR for item had already been posted. If the GRs can be canceled , it is possible to change the confirmation control in the SA item.
    Version 4.7 do not support Mass change of scheduling agreements, hence you have to either create a SCAT or BDC to perform the task.
    Gobinathan G

  • Bank Control Key for Spain

    Does anybody know how the Bank Control Key works for Spain.
    The help on the field LFBK-BKONT is not that helpful.

    Hi,
    This is a key for checking the combination of bank number and bank account number. Permitted length, characters and other country information for Spain are :
    The bank key has eight digits (4 positions stand for the bank number + 4 positions for the branch), is numerical, and without gaps.
    The bank account number has 10 digits, is numerical, and without gaps.
    The control key has 2 digits and is numerical.
    The bank key, the bank account number and the control key are checked simultaneously.
    If an error message is displayed when entering bank data, you should check whether data has been entered correctly. Here's a sample.
    Country           Bank key         Bank account       Control key
    Spain              00120345            0000067890            03
    Hope this helps. I had copied this from a note long back and can look for the actual note if required.
    Cheers !

  • Control key for sub-operation

    Hi, what is the control key used for sub-operations for which we do not want seperate confirmation. when main operation confirms, the sub-operation should get confirm automatically. please advise.

    hi,
    You can use PP03 or *PP05 * or any other which dont have tick for confirmation required.
    only thing is that , other details also you need to check for.
    Depending on your requirements, a sub-operation can contain the following data:
    A control key, which specifies
    Whether costs are determined for the sub-operation
    Whether the sub-operation is processed internally or externally by a vendor.
    Whether, afterwards in order processing, a confirmation can or must be made
    A wage type for settling incentive wages
    Standard values, which are planned values for the activities to be performed in a sub-operation.
    External processing data, which form the basis for externally processing sub-operations
    User-defined fields with any customer-defined data
    Check and revert back
    regards
    Ritesh

  • Control Key for Quality Management in Procurement

    if we activate Control Key for Quality Management in Procurement in material master then wether we need  also store a control key at the plant level for quality management in procurement.
    if we want want to maintaine
    pls tell me how it is
    pls expalin
    faisal

    if we activate Control Key for Quality Management in Procurement in material master then wether we need also store a control key at the plant level for quality management in procurement.
    I am not clear about your question. But I guess you want to know about control key function. You activate "proc. asctive" box in QM view of material master, that is always at plant level. When you activate this, system automatically asks for a control key & cert type, thats mandatory field.

  • Control key is set for u2018Process mfg

    Hi ALL,
    Which control key is set for u2018Process mfg., Inspection, AutoGRu2019

    Hi,
    Adding to the information given by srini,You can find the config setting for each control key in OPJ8 (Tcode)
    If needed you can create your own control keys here & use the same in the Master recipe
    Regards,
    SVP

Maybe you are looking for

  • Vendor open items wise ALV Grid Display (FBL1N) report to Excel Sheet

    Hi All, I need vendor wise open items and cleared items in ALV Grid format in excel sheet. I'm Trying that in T Code FBL1N, After the execution. I had select ALV Grid format like this From the menu bar->Settings-> Switch list. After that i get ALV  G

  • Not printing nor recognized

    My HP C4385 is not printing anything but the test page.  I am running Windows 7, 64 bit with a wireless network.  The printer worked fine until a few months ago and I'm about ready to throw it out the window.  I can print a test page no problem, wire

  • How do you use green screen and picture in picture in iMoive at the same scene?

    I understand how to do green screen and picture and picture... but how do you do it in the same sequence.. so when you are speaking with a background picture and you want to add a picture or a story within that picture... there has to be a way to do

  • Loading dynamically a Image

    Post Author: Fabio CA Forum: General Is there a way to load a image dynamically? For example, depending on the Theme of my application or the .css.

  • Exception raised in f4 help

    hi ,    i am new to this forum.i have a problem with my coding.just a simple program for creating a search help for select options. i paste my code below while i executing it it raise exception. i dono what is the mistake.pls anyone help me.thank in