Suggestions required for transferring cost from GL account to a Project

Hi,
We have a requirement where we want to transfer cost captured in GL to PA in a specific project.
For example:
Incurred a misc cost 100 (outside project) and posted to GL (a/c 600010)
Dr 60010, Cr 120010
Later, realized this should be absorbed as a project cost (a/c 220010)
We need some mechanism to capture cost in project ABC such that Dr 220010, Cr 600010
If we use Web ADI to upload 'Costed' transactions: Dr 220010 Cr <NULL> (GL Transfer Status - Accepted)
If we use Web ADI to upload 'Accounted' transaction: Dr 220010 Cr 600010 (GL Transfer Status - Received), but in this case the entry is no passed to GL, to nullify the a/c balance in 600010
Appreciate suggestions from experts, to address the requirement.
Ashutosh

Hi
You can reverse the transaction posted in GL.
Then load the amount to Projects, as costed, not accounted EI.
When distributing the cost in PA it will generate the right accounting, and you could interface it to GL.
Dina

Similar Messages

  • Transfering Cost from one WBS to Other while retaining CE

    Dear Gurus,
    My client requires to transfer cost from 1WBS of a project to several WBS's. We maintain different CoCd's for all the projects. Client also wants Fi document to keep track of the transaction, hence he has reject option of Manual reposting.
    My requirement is as under, (for eg.)
    WBSA CE(111) to WBS1 (CE111) amt 123
    WBSA CE(222) to WBS2 (CE222) amt 655
    WBSA CE(333) to WBS3 (CE333) amt 998
    WBSA CE(444) to WBS4 (CE444) amt 456
    WBSA CE(555) to WBS5 (CE555) amt 124
    WBSA CE(666) to WBS6 (CE666) amt 564
    WBS's 1-6 may or may not be from same project.
    but in reality when I test settlement rule for 1st transaction, I realized a behavior of settlement rule as belows,
    Cost 123 in WBSA CE(111)  went to WBS1 but proportionally splitted to various CE's i.e. CE111= 5.2,CE111= 27.6,CE111= 42,CE111= 19.2,CE111= 5.2,CE111= 23.8.
    Please assist.
    Manish

    Hi once more ...
    i will try to elaborate based on your example...
    please use transaction OKEU to create source structure.
    Create (for example) 1 source structure (ex ZZ) with
    6 different assignments
    (ex assignment 1 for cost element 111
    assignment 2 for cost element 222
    assignment 3 for cost element 333
    assignment 4 for cost element 444
    assignment 5 for cost element 555
    assignment 6 for cost element 666)
    Then you have to maintain the settlement rule of your sender wbs element WBSA and create 6 different segments as you may probably have done already.
    Be careful when entering the settlement rule use F8 button to go to Settlement parameters and insert the source structure ZZ that you have created.
    Then in each of the the assignments fill in the appropriate Source assignment field: in the example it will be
    WBS1 assignment 1 for cost element 111 ->Source Assignment 1
    WBS2 assignment 2 for cost element 222 ->Source Assignment 2
    WBS3 assignment 3 for cost element 333 ->Source Assignment 3
    WBS4 assignment 4 for cost element 444 ->Source Assignment 4
    WBS5 assignment 5 for cost element 555 ->Source Assignment 5
    WBS6 assignment 6 for cost element 666 ->Source Assignment 6...
    This way the system will not take proportionally from each cost element the amount but will only look for the cost elements
    you have specified.
    If you have more cost elements in your wbs WBSA (sender) that you don't want to settle then create an assignment 7 with the rest of the cost elements that will not be settled.
    Run the settlement to see the results (CJ88,CJ8G)
    Try it and let me know for your findings....
    Pan
    Edited by: Panagiotis Papaspyridakos on Apr 7, 2010 4:50 PM

  • Event for transferring information from the billing document to the fica do

    Dear all,
    We are having a requirement in which we need to transfer the information from the billing document to the fica document..Can anybody tell me which event can be used for  transferring information from the billing document to the fica document
    Susmita

    Susmitha Harini,
    Can you provide exactly what you want to transfer? Do u want to transfer that information at billing moment?
    Best Regards,
    Pedro Nunes

  • PI setting for transferring Contract from SRM to ECC - Classic scenario

    Dear Experts
    SRM 702
    ECC 6.0 EHP6
    SRM - Classic scenario
    Need to understand PI setting for transferring Contract from SRM to ECC, as currently document Central Contract document getting created in SRM, but it is not getting transfer to ECC
    No XML message getting triggered in ECC systm as well
    can you help me in this
    if any additional information needed, pls revert
    Regards
    Prashant K

    Fully approve and release the contract. It will trigger the XML Message.
    Go to https://websmp203.sap-ag.de/~form/handler?_APP=00200682500000002672&_EVENT=DISPLAY&_SCENARIO=01100035870000000122&_HIER_… and download the configuration guide & check the PI setting and required Software Components in PI.

  • What is the direct connect method for transfering photos from my macbook pro to my iphone without using iTunes syncronization? (iow: a simple photo copy from mac to iphone?)

    I feel like I should know the answer to this. I can't believe it is a hard question.
    What is the direct connect method for transfering photos from my macbook pro to my iphone without using iTunes syncronization? (iow: a simple photo copy from mac to iphone?)
    Easy? Right?
    Just plug my iphone in to a mac and copy a photo from the mac to my iphone.
    I don't have internet access - I can't email it, or mobileme it, or dropbox it.

    iTunes. Other than that there is no direct method. However, do try the iPhone forums.

  • TS1314 can you write the steps for transferring photos from my pc to ipad2

    Can you please write down the steps for transferring photos from my PC to IPAD2?

    Sync photos to iPad
    http://support.apple.com/kb/HT4236

  • Is there a process for moving costs from maintenance work orders to capital

    Is there a process for moving costs from maintenance work orders to capital projects?
    We have reversed the settlements on the work orders, and then trying to put the relevant NWA in , then receive error message :
    Rule for allocation of PM order to PS network is not maintained.

    hi
    check the allocation structure and the settlement related customization settings.

  • Business scenairo for transfering data from Non Sourace system.

    Hi everyone,
    i am looking for sample business scenario for transferring data from non source system.
    If the case study is for any Financial system that will be even great.
    if any one has good Document Please Fwd it to e-mail [email protected]

    hi rk,
    what you means to say something source like flat file, not from r/3 side.
    or
    what exactly you want,plz explain?
    regards,
    San!
    if helped,assign point!

  • TS1389 how to authorize computer in itunes for the purchased from another account

    how to authorize computer in itunes for the purchased from another account ??

    Use that account's Apple ID and password; the procedure is otherwise the same as authorizing it for the first account. If the iTunes library contains protected content from more than five iTunes Store accounts, you may not be able to fully sync it.
    (92807)

  • I have an iphone 4 with videos on it that I'd like to transfer to an IMac so that I can email them.  (the iphone isn't in use anymore.)  What's the procedure for transfering videos from an iphone to an iMac?

    I have an iphone 4 with videos on it that I'd like to transfer to an IMac so that I can email them.  (the iphone isn't in use anymore.)  What's the procedure for transfering videos from an iphone to an iMac?

    Connect the iPhone to your Mac with its USB cable and launch iPhoto.  In iPhoto you can select which files to upload into the library.  Once in the library export them out of iPhoto to a folder on the Desktop via File ➙ Export ➙ File Export  with Kind=Original. That will give you copies of the videos in the folder for use outside of iPhoto.
    If you want to bypass importing into iPhoto try launching Image Capture and manually upload the selected video files to the folder of your choice.
    OT

  • Components required for sending Email from SAP [Kernel Release 46D]?

    Hi All,
    Can somebody please tell me the components and the Configuration settings required for sending Emails from SAP system[Kernel Release 46D] to the mail server[Win NT] using SMTP.
    From note 455127, I understood that "Sap Internet Mail Gateway" is required and there are other settings to be done. (SAPconnect with RFC can only be used as the Kernel version is 46D)
    It will be great if somebody can explain me in simple steps if He/She has done this before.
    Thanks,
    Varun

    Varun,
    sendmail comes with UNIX OS, there are versions of sendmail programs available for Windows too, but i guess you have to purchase them.
    Another alternative is a discontinued product called SAP Exchange connector, if you have a Windows environment and MS Exchange server as your mail server, you could use a SAP exchange connector and get your SAP Email config done.
    Regards,
    Siddhesh

  • What are the backend configuration required for photo upload from portal?

    Hi all,
    When i am trying to upload the photo from portal  it is giving error
    can not archive the photo
    we are using portal 7 and  ecc 6.0
    I want to know
    What are the backend configuration required for photo upload from portal
    Can any but help me out
    Rajendra

    Hi,
    Are you using the standard iview. If that's the case you need to configure in the backend. Meaning you need to store the photo in the Org management(HR) which the HR functional guys will do. You just need to add the iview to your role.
    Let me know if you require further informationn.
    Award points if helpful.
    Cheers,
    sathya

  • Uploading Production Requirements For Finished Goods From External System To Run MRP For Components in SAP.

    Hello Production Planning experts,
    I'm looking to solve the current business problem:
    The company bought a third party software (JD Edwards) to calculate production requirements instead of using SAP's standard Production Planning or a tool like SAP's APO. They run a batch job to query Sales Orders, Deliveries, available stock, stock in transit, etc. from sap and feed/upload it to the third party software so it can calculate the Finished Goods Production Requirements for them. They love the third party software, so replacing it is not an option. Since the third party software is already taking into account Sales Orders, Deliveries, available stock, stock in transit, etc. from SAP, it just outputs a "Finished Goods Production Schedule" by week.
    My questions are:
    1) What's the best way to upload something like that in SAP in the form of Planned Orders or something of that nature?
    After i get that schedule in SAP:
    2) Is there any way to calculate components' requirements for that "Finished Goods Production Schedule" alone? The company would like to IGNORE existing stock AND expected-goods-issues in the future (sales orders, deliveries, etc) for Finished Goods ONLY. The components calculations would work the standard MRP way, taking into account existing stock and AND expected-goods-issues in the future (sales orders, deliveries, etc)
    I started looking into Master Production Schedule (MPS), but I don't know if that's the right approach since I'm not very familiar with it.
    Thanks in Advance! I will gladly reward points for helpful/correct answers.

    Hello Oscar
    I suggest you to upload your production plan in the for of "Planned Independent Requirements" using BAPI BAPI_REQUIREMENTS_CREATE. Later, MRP will create planned orders to cover the PIRs.
    If you don't want to consider the existing stock of the finished product, you should use the planning strategy 11 to create your PIRs. Take a look on the following link for more details about this planning strategy:
    Gross Requirements Planning (11) - Demand Management (PP-MP-DEM) - SAP Library
    Here you will find the following information:
    The make-to-stock strategy gross requirements planning is particularly useful in mass production environments; it is often combined with repetitive manufacturing. This strategy is particularly useful if you need to produce, regardless of whether you have stock or not. For instance, steel or cement producers might want to use this strategy because they cannot shut down production; a blast furnace or a cement factory must continue to produce, even if this means having to produce to stock.
    This strategy is also frequently used if there is a Material Requirements Planning system in a legacy system that needs to be linked to an SAP system which serves as a production execution system. The legacy system calculates a specific production plan, which has to be executed, regardless of the stock situation in the SAP system
    It looks like this planning strategy is exactly what you are looking for.
    BR
    Caetano

  • Transferring credits from one account to another..

    Hi there, I have a skype account in my name. I have subscriptions on that account as well as credit. I would like to pay my subscription from my credit amount and as well, would like to transfer credit to a new account I just set up for my husband..how do I transfer my credit to his account please? And how do we pay, not from my credit card but from my credit until the credit is used as I don't need both a subscription and credit. Thank you

    Hi, Cherylgustavson, and welcome to the Community,
    Skype credit, subscriptions, and features can not be transferred from one account to another, unfortunately.  If you have purchased the credit within the past 15 days and not used it, you may request a refund: https://support.skype.com/en/faq/FA12147/when-can-​i-get-a-refund?
    To change the payment method of a subscription from whatever you were using to use your credit, this FAQ article explains how to do this: https://support.skype.com/en/faq/FA1781/how-can-i-​pay-for-a-subscription?
    Regards,
    Elaine
    Was your question answered? Please click on the Accept as a Solution link so everyone can quickly find what works! Like a post or want to say, "Thank You" - ?? Click on the Kudos button!
    Trustworthy information: Brian Krebs: 3 Basic Rules for Online Safety and Consumer Reports: Guide to Internet Security Online Safety Tip: Change your passwords often!

  • Help transferring data from one account to another

    I bought my computer in August 2008 and had previously had an iBook. When transferring my data from my old computer to the new one, I guess I did it wrong so instead of it transferring all to the same place it created two accounts.
    Is there way to transfer my music/pics etc to my main account?
    Also, my iphone is backed up the other account because thats where all my music is, is there a way to also keep all this data once I am using only the main account?

    When you use Migraine Assistant, it transfers the account of the older machine to the newer because the users name is involved in everything, like iTunes playlists etc.,
    Since to run Migraine Assistant you need to have gone through setup on the Mac and created the main Admin account, when you Migrate, you transfer the other account so you wind up with two accounts on the new machine.
    All you have to do is log into the Admin account of the first user you created, then change the acount status of the Migrained account to Admin and reboot, check it out well, then delete the first Admin account at your own leaisure. However it's best to leave two accounts on the machine, just in case your locked out for some reason.
    If you rather transfer your files from one account to another use the Shared Drop Box
    If you have three accounts on the machine (original admin and two migrained migrateda accounts), you'll just have to monkey around and clean up the mess.

Maybe you are looking for

  • Sync issues with Windows 7 and Office 2010

    Just got a new computer running Windows 7. Downloaded and installed BB Desktop . When I try to sync with my Bold 9650 via USB cable I get message telling me that I have to have an internet connection to set up sync options. Never saw this message bef

  • Run javascript (not in a jsx file) from the command line extendscript

    Hi all, I was wondering if anyone knew how to run javascript from the command line in Extendscript (meaning Extendscript would be the target application). I know about the -run command line flag in which allows you to run a .jsx script from the comma

  • Location and Notes not showing up in Published Calendar

    When viewing my published calendar on its Web link, I cannot see the location and notes information. I see everything else. I made sure to check all options when I published. Does anyone else have this problem? I am publishing with my new MobileMe ac

  • Can i use a monitor as a picture display

    can i use a monitor as a picture display without any PC?

  • Small upgrade to mac osx 10.5.8

    At a recent visit to the Genius Bar, I was given a phone number to call to purchase an small upgrade to my mac osx 10.5.8.  Now I've lost the phone number. Any help?