Summary of plan verses production month

dear gurus,
i m having a prob. actually my client want monthwise report on plan vs producion.
i have no idea of this.
please help me out..
thanks :
piyush singh

Exactly what Help you Need?
First Get the Requirement from your user like Formats of Report  and what are the values they need to be dispalyed.
After then create a Functional Spec and give that Spec and Report Formats to the ABAPer and he will create the Report.

Similar Messages

  • Hello! I want to cancel my annual plan, but in my account under plans and products it is blank. I have signed up for indesign with a monthly fee.

    Hello! I want to cancel my annual plan, but in my account under plans and products it is blank. I have signed up for indesign with a monthly fee.

    If you have more than one email, are you sure you are using the correct Adobe ID?
    https://www.adobe.com/account.html for subscriptions on your Adobe page
    This is an open forum, not Adobe support... You need Adobe support to cancel a subscription
    -start here https://forums.adobe.com/thread/1703848
    -or by telephone http://helpx.adobe.com/x-productkb/global/phone-support-orders.html
    --and two links which may provide more details, if the above links don't help you
    -http://helpx.adobe.com/x-productkb/policy-pricing/return-cancel-or-change-order.html
    -http://helpx.adobe.com/x-productkb/policy-pricing/cancel-membership-subscription.html

  • User issue with a report supply planning area today monthly

    this is a support issue....the user has an issue with a report supply planning area today monthly.  The user is getting wrong values in BW, it sums PLOs and POs under production (config).  for eg:  BW says we are producing 46T while in R/3 we have 4T.

    The issue was related to the heap size being too much and as a result the Class block memory was not getting enough memory. I think we can make a use of -XXCompressedRefs:32 parameter in the Java start up to allow the heap size to increase till 32 Gb.

  • How to migrate Planning from Production to Disaster-Recovery server?

    We are using Planning 11.1.1.3 Oracle repository. Presently our DR Planning Application name is different than production's name, and the DR's Windows server names are different from Production's. Otherwise, all other configuration the same.
    How do we migrate Planning from Production to Disaster-Recovery server? We stopped Planning on DR server. Then we exported production planning Oracle repository and imported it to DR Planning. We restarted DR's Planning. DR planning seems to be running fine, but I am afraid to click "Refresh Planning" on DR Planning - it might update Production server. So how can I be sure DR and Production planning are disconnected ?
    Is there anything we need to do? This method seems to be faster than migrating with LCM.
    Edited by: Essbase Fan on Oct 18, 2010 10:11 AM

    You are definitely go about it the correct way, if you are migrating the whole planning application I have to agree it is a safer and quicker route.
    The connection information to essbase is stored in the planning system database/schema so as long as you have not migrated that then you should be good to refresh.
    To put your mind at rest, log into the planning application and edit the datasource associated with the application then you will see where the essbase server is it is going to refresh.
    Cheers
    John
    http://john-goodwin.blogspot.com/

  • I have prepared a personal budget and sorted the planned expenses by month, but the months are out of order. How do I correct?

    I have prepared a personal budget and sorted the planned expenses by month, but they are out of order. How do I correct?

    David,
    You've got to give us something to go on here. At least post a screen shot so we can see how your data is arranged. I suspect that you may have named the months with text strings rather than as actual Date values, so when you sort they are in alphabetical order rather than date order.
    Jerry

  • Planning "Configure Product Option" using configuration utility

    Hi All,
    I have installed HSS on server1 and Planning, Oracle DB in server 2.
    Done the HSS configuration and i can able to log into HSS successfully. When i tried to configure my planning,
    1. Open the EMP system configurator from planning server
    2. Select Hyperion Foundation ( Configure DB, Common database). Here by default "Previousely configure the DB" was secected and configuration was success.
    3. Next select planning "Configure Product Option" was not success.
    Register with shared service was failed.
    getting following error messages.
    (Jul 24, 2011, 00:29:22 PM), com.hyperion.cis.config.CmsRegistrationUtil, ERROR, Authentication failed:
    com.hyperion.interop.lib.OperationFailedException: Unable to Authenticate.Unable to Authenticate.
         at com.hyperion.interop.lib.helper.RegistrationHelper.register(Unknown Source)
         at com.hyperion.interop.lib.CMSClient.register(Unknown Source)
         at com.hyperion.cis.config.CmsRegistrationUtil.registerProduct(CmsRegistrationUtil.java:142)
         at com.hyperion.cis.config.wizard.RunAllTasksWizardAction.executeHubRegistrationTask(RunAllTasksWizardAction.java:452)
         at com.hyperion.cis.config.wizard.RunAllTasksWizardAction.execute(RunAllTasksWizardAction.java:236)
         at com.installshield.wizard.RunnableWizardBeanContext.run(Unknown Source)
    (Jul 24, 2011, 00:29:22 PM), com.hyperion.cis.config.wizard.RunAllTasksWizardAction, ERROR, Error:
    java.lang.Exception: Unable to Authenticate.Unable to Authenticate.
         at com.hyperion.cis.config.CmsRegistrationUtil.registerProduct(CmsRegistrationUtil.java:154)
         at com.hyperion.cis.config.wizard.RunAllTasksWizardAction.executeHubRegistrationTask(RunAllTasksWizardAction.java:452)
         at com.hyperion.cis.config.wizard.RunAllTasksWizardAction.execute(RunAllTasksWizardAction.java:236)
         at com.installshield.wizard.RunnableWizardBeanContext.run(Unknown Source)
    (Jul 24, 2011, 00:32:12 PM), com.hyperion.audit.client.exception.AuditLoggingHandler, ERROR, XML-RPC failed
    org.apache.xmlrpc.XmlRpcException: org.apache.xmlrpc.XmlRpcException: null values not supported by XML-RPC
         at org.apache.xmlrpc.XmlRpcClientResponseProcessor.decodeException(XmlRpcClientResponseProcessor.java:104)
         at org.apache.xmlrpc.XmlRpcClientResponseProcessor.decodeResponse(XmlRpcClientResponseProcessor.java:71)
         at org.apache.xmlrpc.XmlRpcClientWorker.execute(XmlRpcClientWorker.java:73)
         at org.apache.xmlrpc.XmlRpcClient.execute(XmlRpcClient.java:194)
         at org.apache.xmlrpc.XmlRpcClient.execute(XmlRpcClient.java:185)
         at org.apache.xmlrpc.XmlRpcClient.execute(XmlRpcClient.java:178)
         at com.hyperion.audit.client.AuditXmlRpcClient.pingServerForStartUp(Unknown Source)
         at com.hyperion.audit.client.runtime.PingForServerStartUp.run(Unknown Source)
    Please help me to solve this issue.
    Thanks in Advance,
    GTS.

    Hi
    Assuming this is 11.1.2.1 env.For Planning were you able to
    Deploy to app server
    Configure database

  • Checking material availability during conversion planned to production orde

    Hi All,
    Please could you advise a way how to setup automatically conversion planned to production orders through material availability check, and in case of component unavailability to make system schedule start date as overall components availability date.
    I also need that in case of material availability is unknown, SAP should not convert planned to production order.
    thank you,
    Regards, Andrey

    Dear,
    Please refer my reply from this link,
    opjk
    Regards,
    R.Brahmankar

  • Hi, my current plans and products include Creative Cloud Photography plan (one-year) and Creative Cloud single-app membership for Photoshop (one-year), I only use photoshop occasionally and for very basic things, are these two plans required for basic p

    Hi, my current plans and products include Creative Cloud Photography plan (one-year) and Creative Cloud single-app membership for Photoshop (one-year), I only use photoshop occasionally and for very basic things, are these two plans required for basic photoshop use or am I able to go with one or the other ?

    PS is part of the photography plan, so your single app plan is redundant.
    Mylenium

  • Availability Check in planned Order & Production Order

    Dear All,
    How can I achieve the same Availability Check (missing Parts ) output in Planned Order & Production Order.
    Currently in Availability check in Planned Order is bit different in the sense, I have the Component in Stock without any reservation. But in Planned Order it shows in Missing part.
    But if I convert this Planned Order to Production Order, it is not visible in Missing parts which is correct.
    I want to have the same missing part report for both Planned Order & Production Order.
    Thanks
    Regards'
    Raghu

    Dear Brahmankar,
    Thanks for replay.
    Now i did, the said possibility, in OPJK is different from my Regular material master rule.
    When i see, availability in MD12 it shows the material available, and same as in Production Order check as well.
    But when, I use MDVP, for check. the same planned order shows the same component as missing.
    am i on the right track?
    Please suggest.
    Thanks
    Regards
    Raghu

  • Disabling GATP for planned orders/production orders

    Hi,
    We have a scenario where we need to disable ATP check for production orders happening through GATP. That is, ATP check for production order materials should happen in SAP R/3.  This is a problem because we have activated ATP check in integration models for sales orders and it is happening through GATP.  Production Planning is happeninig in R/3 and we dont have either PP/DS or SNP in APO. ..only GATP.
    any pointers on how the ATP check for planned orders/production orders can be blocked in GATP for the same materials which are active for sales order GATP check?
    Thanks.

    hi Pawan /Prasun /vikas
    Thanks for your helpful answers
    @Pawan : Since we have recently gone live with production planning and its in the process of stabilizing we do not want to enable ATP check for production orders in GATP yet. Also since we are also using batch-determination with ATP check in production orders we still have to check how the system responds with the combination.  Therefore,as of now, we dont intend to switch on ATP for production orders in GATP.
    @ Prasun :  I understand there would be a user exit (EXIT_SAPLATPC_001) which would help in doing GATP check based on order type/business event.  However my concern is if the order does not belong to any of the order types will the system do a normal standard ATP check in APO or it will do a ATP check in R3 ? Our programmers are still looking how to tweak it but any pointers based on your experience will be helpful
    Thanks

  • I've used almost all of the 30 gigs of my 4G LTE wireless internet plan for this month.

    Hello, I've used almost all of the 30 gigs of my 4G LTE wireless internet plan for this month and I'd like to purchase additional data immediately. How do I go about this?

    If you are on the special double data offer getting 30GB for $130, you can't change data plan without losing your $130 deal.  In this case it may be best to absorb overages
    if you just have 30 GB at regular price, you can go online and go to the next data level and retrospectively apply it to the first day of your plan. 

  • Data Plan Charged a Month in Advanced

    Why is Verizon charging me a month in Advance for my data plan?  My bill is due and they are making me pay for my data plan for next month.  It says this:  Email & Web Unlimited 07/09 - 08/08 (month in advance)  So if I ever did decided to go back to a feature phone instead of a smart phone I would lose 30.00 dollars?  I am currently not on a contract or anything so I am really confused and do not find this fair that they charge me before I even use it....Please someone help me.  Thanks

    Worry not, Jwd! They bill EVERYTHING like that! Look closely at your price plan. If you have something like a 450 minute or 900 or 1400 minute plan they bill you for 07/09 to 08/08 as well. If you change your phone and go back to a feature phone (say, for example on 07/22), you'll get a refund for the data plan that you don't use from 07/23 to 08/08 on the next bill.

  • Difference Between planning plant & production plant ?

    Hi PP members:
    I would like to know difference between planning plant & production plant ? Why do we maintain planning plant
    Thanks for your time & efforts
    Thanks Again,
    Suren R

    Hi,
    Suppose there are two plants A & B in an organisational structure.
    Suppose you need a material in plant A but you cannot produce it in plant A because of unavailability of resources. And these resources are available in plant B.
    So you can produce the material in plant B and the requirement is thru plant A (e.g thru MRP). Here plant A becomes planning plant & plant B becomes production plant.
    To carry out the actual planning and production, follow the following steps-
    1) In SPRO, in the special proc key parameter's setting for plant A, mention plant B as the alternative plant.
    2) Prepare the material master of the required material in plant A, in MRP 2 view maintain spl proc key as 40 (proc from alt plant) or 80 (production in alternative plant)
    3)Maintain the material master in the alternative plant too. In MRP 2 maintain proc type = E. Maintain routing.
    4) Carry out MRP run in plant A. If there is any demand, a  STPR (spl proc key 40) or planned order (spl proc key 80) will be created in plant A. The stock requirement list will show plant B as the production plant.
    5) In case of 40, a planned order will be created in plant B. In case of 80, with proper settings, the planned order in plant A after converting becomes a production order in B.
    6)Carry out the production. In case of 40 the material can be sent to plant A from B thru STPO. In 80 the stock in plant A is directly updated when you hit a GR against production order in plant B
    7) KINDLY CLOSE THE THREAD.
    Regards,
    Mahesh Patil

  • Planning with product priority

    Dear Consultants,
    The following is a requirement from my client.
    There are Finished goods ...
                                 FG1  (size :20 Dia)
                                 FG2  (size :18 Dia)
                                 FG3  (size :14 Dia)                                                                               
    FG4  (size :10 Dia)           
    All these  FGs  are manufactured in a single Workcenter (Flowline).
    The changeover time required to setup the line to make it ready FG1 to FG2 (20 Dia to 18 Dia) is less and from FG1 to FG4 (20 Dia to 10 Dia) is more.
    So , they want to plan/schedule the Orders in such a way that the FGs of descending size are  planned within a month
    ( sequence - Fg1 , Fg2, Fg3, Fg4.... ) and
    for the next month , planning/scheduling for the Orders should be in such a way that the FGs of ascending size are  planned
    (reverse sequence of previous month - Fg4, Fg3, Fg2 , Fg1)
    Kindly suggest whether this can be mapped in R/3 ?
    Regards,
    Sheik

    Hi,
    In STD i think its not possible,
    But check the user exit LMDZU001, it may help you.
    Regards,
    Vinayak.

  • Can I change my family plan to the month to month plan prior to my contract end date and still use the same phone without an etf

    can I change my family plan to the month to month plan prior to my contract end date and still use the same phone without an etf

        Great question dreyfusdad !
    I understand it’s always good to be aware of the changes once your contract is completed and I’m happy to help you. You can log into My Verizon to view the contract end date. Tikibar1, thank you for pointing in the right direction; it will automatically continue to bill you as usual, but it will be on a month to month basis. It will keep you on a post paid account; however, if you wanted to transfer to a Prepaid account the process may be different. We’d love the opportunity to review your account for the best plan for you. Please let us know if we can help you with that.
    AdaS_VZW
    Follow us on Twitter at @VZWSupport

Maybe you are looking for

  • Forms: How do we select two diffrent lov for two seperate conditons

    DECLARE      a_value_chosen BOOLEAN; BEGIN      if :reports.report in('OQ29','OQ25','OQ22') then                a_value_chosen := Show_Lov('lov_agen');                if :reports.office_id is not null then                a_value_chosen := Show_Lov('l

  • How do I get DNS searchs to span multiple network interaces?

    Each of our developer machines have two network cards. One is attached to the corporate network the other to a private network. There is a DNS server running on both networks. On our windows boxes we have no trouble doing something like      ping <de

  • How Can I transfer invoice details to customer through IDOC in EDI

    Dear Sir,   I have some requirements That I want to Transfer Invoce To My Customer In EDI.so how can I do that .I have no Idea Plz Help Me and give the Details Steps with TCODES.

  • I want to add an image to a title

    The photo album title option begins with an image and then it pushes into and then slides right into the next scene which should correspond with the image that it should have in the title page. I cannot for the life of me figure how to replace the im

  • Urgent PTG on APACHE/NT Servlet Error: ClassNotFoundException: oracle.jsp.JSPServlet

    Hi all, I try to install PTG 1.0.2 with apache server (version 1.3.9 with jserv 1.1) on windows NT. I follow install instructions and when I try to access test page (test.jsp), the page colud not be displayed, and the following error is added in the