Suncontracting period exceeded 180 days

what is the procedure to be followed if the material sent for subcontracting not recieved before 180 days.
& what needs to be done if material recieved after 180 days.
thnks & regards
Madhu

Check this sap help link for material not returned after 180 days
Completion, Reversal, and Recredit
http://help.sap.com/saphelp_erp60_sp/helpdata/en/09/ebf138cdd78a4be10000000a114084/frameset.htm

Similar Messages

  • Closing of 57F4 Challan or Making GR after 180 Days

    Hi,
       I want to know  if we have made a 57F4 Challan   and partial material we have received from the vendor  and remaining material we have not recd  till the specified period of 180 days  then how to make the GR after 180 Days  or how to close the challan
    second scenarion  if we have send material to vendor with 57F4 channlan  and we have not receievd  material  with in 180 Dya  then  how to close the challan.
    regards,
      zafar

    Hi niti,
        Thanks for reply,  i want to know  even  if after 180 days we have not receieved the material  and if we want to cancel  all the document how is the sequemce and process for it  as we have created PO  ,  MB1B,  and J1IF01 challan  then  how to cancel all the documents
    and as u have steps for making GR after 180 Days  with J1IF  this is std. procedure avalibale for this   is there any effect of this on other FI entry etc.
      regards,
        zafar

  • Material received after 180 days

    Hi,
    We have a requirement of Challan Report, which has been exceed 180 Days and received. Means after 180 days received the material's.
    How can i find the received materials list after 180 days..
    please tell me table name from which i can refer data and if any standard report exist for this, please tell me...
    we have following fields:
    Challan No.....     Challan Date.....Vendor Code..........Material.........Qty..........Received Date.........Total No. of Days
    Regards,
    Anil Kumar

    Hi Anil,
    In purchasing you can find the PO date for the PO which has the material in 'EKKO-BEDAT'. And the receipt of the material date can be found from MKPF-BUDAT, for the material document corresponding to the PO.
    This can be found from EKBE. Then You calculate the difference between MKPF-BUDAT and EKKO-BEDAT and check whether this is more that 180 days. I am not sure whether this will meet your requirement, but you can try this...
    Regards,
    Birendra

  • Quota deduction when EE has been inactive for more than 180 days / Advance quota days when employee does not have enough balance

    Dear experts,
    We have two requirements regarding to the "Anual leave" quota.
    1. Quota reduction when employee is inactive for more than 180 days
    2. Advance quota days when employeee does not have enough balance
    We have in place an "Anual Leave" quota related to a calendar year period, that gets generated dialy in time evaluation. This quota gets the employee entitlement from a set of rules that stored the corresponding balance in a period time type, that is the one that we defined in the customizing. This is working fine. The problems start when we try to incorporate the other two requirements.
    Regarding the first requirement, if the employee has been inactive for more than 180 days in a calendar year due to unpaid leave, we need to start quota reduction as follow,
    First, we need to clear the balance that was calculated above in the schema.
    Then, we need to calculate one leave day for every 20 days worked till the end of the year, considering as such, everyday the employee is expected to work, except days on which the employee has been absent on unpaid leave.
    For the second requirement we created a manual quota call "Advance Anual Leave". So, if the employee, wishes to take 20 working days holiday, but in his/her Anual Leave quota has only 10 days available, we have to create an "Advance Anual Leave" quota manualy for 10 days. When the quota for next year gets generated, we need to deduct these advanced 10 days from it. This deduction should stop the year after.
    The problem we are finding with these two requirements is that, due to the Anual Leave quota gets generated dialy, we can't get the balance right.
    Thanks in advance!
    Kind regards,
    Alex

    Hello binbingogoABC,
    Shopping on BestBuy.com should be easy and fun and not fraught with the kind of trouble that you describe. I regret very much that this has been your experience.
    Using the information you provided when you signed up for Best Buy Unboxed I was able to locate your cancelled orders. I have requested more information from my back-office partners. As soon as I have additional details about your situation, I will reply again to this message. In the interim, I'm sorry that I must impose upon your patience.
    I'm very grateful that you wrote to us with your concerns.
    Sincerely,

  • Why does everyone else seem to get 180 days and several warning messages before THEIR accounts are deleted??

    I got a text message this morning informing me that my vzw pix account had been permanently deleted due to 60 days of inactivity. So I searched online to see if there was some way to get my pictures back, since I had very little room to store them on my crap phone I deleted them once they were uploaded. I come to find out that no, there is no way to get them back and also it seems that everyone else in the whole world had 180 days and more than one text message an entire month before their account was deleted. This is ridiculous and I would have preferred that Verizon not offer any storage at all if they just delete everything you save with only one warning that you can easily forget about in a month. I also want to know why everyone else seems to get 180 days of inactivity and I get 60, and why they get multiple messages warning them when I got one.

        Hello arlahalvorsen,
    I know pictures have great value. I'm sorry to hear your pictures were deleted. As you already know once the pictures have been deleted there is no way to retrieve them. The inactive period for "Free" Multimedia and Messaging accounts has been reduced from 180- to 60-calendar days. Previously, a customer would be sent messages at day 150, 170, and 180 letting them know that their account is inactive and subject to termination at day 180 of inactivity. Now customers receive messages at day 30, 50, and 60-calendar days of inactivity. Thank you.
    Tominque B.
    Please follow us on Twitter @VZWSupport   

  • 180 days depreciation as per IT act

    Hi,
    I want to post 180 days depreciation ( Ours FSV is AP to Mar, if i acquire asset from Apr to Sep it should calculate full year depreciation and if i purchase after, it should calculate depreciation for 180 days as per IT Act, for that i've made setting in Period control, i've taken IN1 in period control, but when i create group asset and if i select the IT depreciation key, system is throwing error message, "E003 SYST: Period 000 is not valid in financial year variant", if please suggest me the possible errors behind it.
    Regards,
    Sudheer

    Hi Sudheer,
    This 180 days calculation can be done for Income tax depreciation if you provide the below details in the income tax related depreciation key
    Base method: IND1
    Declining Balance method: I01 to .... (whatever is available in F4 option based on rates you select)
    Period control: IN1
    Multi level method: M1 to M9 as provided by standard SAP
    Class: 2 Declining balance depreciation
    Change method: No automatic changeover
    Multiple shift: 2 no effect on depreciation and useful life
    Scrap value: 3 cut off value is ignored
    shutdown: No
    If you follow the above details in the depreciation key, then you will get that 180 days calculation. ie., from 1st april to 30th september if you capitalise any asset, your system will calculate full depreciation and from 1st october to 31st march if you capitalise any asset, you system will calculate 180 days depreciation.
    Hope this helps. Assign points if useful
    Regards
    Dwarak

  • Depreciation as per IT act India problem in asset acquisition for less then 180 days.

    Dear All,
    As requested by our client we need to configure depreciation as per IT act.We are using fiscal year variant K4(Oct to Sept) in our company code but as per specification from client we need to use fiscal year variant (April to March) for reporting purpose as per IT act.While posting for asset acquire for less then 180 days asset is not coming in display as per Indian Income tax report(J1IDISPBLK - Display Transaction Details at Asset Level).
    We also try to use V3 (fiscal year variant as maintained for Indian IT act with period control "IT").But while putting V3(Fsv) for Depreciation area 15 (Financial Accounting (New) > Asset Accounting > Valuation > Fiscal Year > Fiscal Year Variants) got error that Fiscal year should be same as of company code.In this case we are not able to configure it.Kindly advice if anybody has configured this.

    Hi Sudheer,
    This 180 days calculation can be done for Income tax depreciation if you provide the below details in the income tax related depreciation key
    Base method: IND1
    Declining Balance method: I01 to .... (whatever is available in F4 option based on rates you select)
    Period control: IN1
    Multi level method: M1 to M9 as provided by standard SAP
    Class: 2 Declining balance depreciation
    Change method: No automatic changeover
    Multiple shift: 2 no effect on depreciation and useful life
    Scrap value: 3 cut off value is ignored
    shutdown: No
    If you follow the above details in the depreciation key, then you will get that 180 days calculation. ie., from 1st april to 30th september if you capitalise any asset, your system will calculate full depreciation and from 1st october to 31st march if you capitalise any asset, you system will calculate 180 days depreciation.
    Hope this helps. Assign points if useful
    Regards
    Dwarak

  • Subcontracting Material return date after 180 days

    Dear all,
    We have issue while reconcilling challan against material documents,some cases excess cosumption/under consumption while doing GR & Single GR is done for different challans, due to this we are unable to
    close challan against return date,now challan return date exceede by 180 days,in J1IFR,it is showing red status,
    Stock is not available @ subcontractor or at our end,Entire parent componets were received,
    How to reconcile & complete challan ?
    Jeyakanthan
    Edited by: Jeyakanthan A on Apr 7, 2010 8:01 PM

    Anyone share your valuable views/ideas ????

  • Windows Server 2008 R2 180 Day Trial License

    Hi,
    I'm running the Windows 2008 R2 Trial on VMware Player.  As you can see from the link below:
    http://www.microsoft.com/download/en/details.aspx?displaylang=en&id=11093
    ...it says it's a 180 day evaluation.  But further down on the page there is no trial key.  All there is is a mention that it can be activated 5 times at 10 days per activation.  When it pops up saying that my copy is illegal, it takes me
    to a website selling Windows 7 licenses.
    I've read other articles on this and there doesn't seem to be an answer as to where the trial keys are, or what process you follow to get your 180 day evaluation?  Anyone have any ideas?
    Cheers,
    Adrian 

    You need to activate the product in 10 days. This 10 day activation period can be reset 5 times by using the
    rearm command. Once activated, the evaluation will run for 180 days. So you can evaluate this version for 240 days.
    (10 days + 5 * 10 days using rearm) + 180 days after activating = 240 days
    OEM – RETAIL – Maximum 120 days
    You need to activate the product in 30 days. This 30 day activation period can be reset 3 times by using the
    rearm command. So you can evaluate this version for 120 days.
    30 days + 3 * 30 days using rearm = 120 days
    Volume License - VOLUME_KMSCLIENT – Maximum 120 Days
    You need to activate the product in 30 days. This 30 day activation period can be reset 3 times by using the
    rearm command. So you can evaluate this version for 120 days.
    30 days + 3 * 30 days using rearm = 120 days
    You can verify the license type using the Slmgr /dlv command
    For more information:
    http://portal.sivarajan.com/2010/10/windows-2008-r2-evaluation-period-and.html
    Thanks

  • Scheduling orders within 180 days

    Hi, I'm setting up a working environment using CDP and block schedule.
    I have the master data set, orders are created correctly but I'm not being able to schedule orders within a period shorter than 180 days. I have tried this in block scheduled and not block scheduled resources and same thing happened in both.
    Even if I try to schedule a single order in the whole resource the same thing happens. Resource don't have shuts or things like that defined.
    I though the 180 days referred to the planning parameters set up in the resource but if I change this nothing happens.
    Any help is welcomed.
    Many thanks,
    Diego

    Hi Diego,
    Check the factory calendar assigned the time streams maintained for resources and re-generate the time stream in the resource. Also check if there is inbound resource (IBR) assigned in the location master. if IBR assigned, check and re-generate the time stream assigned to it.
    It should work.
    Regards
    Venkat DR

  • System Center 2012 - 180 days expired

    Hi,I have the following question.
    I've installed System Center 2012 evaluation version and it will expire in 90 days.
    If I would like to restart again the 180 days, can I uninstall System Center and install again the evaluation version on the server so that the 180 days count starts again?
    Thanks
    Anna

    Hi
    For SCOM it would not work, because the licensing data is stored in the database. If you would reinstall the Management Servers it would just pull the data out of the database and therefore it would be expired again.
    As far I know the only way to get a Version longer than the eval period is adding a license key
    http://support.microsoft.com/kb/2699998/en-us .
    Using the pre-configured VHD might be another Option
    http://www.microsoft.com/en-us/download/details.aspx?id=40844 .
    Cheers,
    Stefan
    Blog: http://blog.scomfaq.ch

  • Dead inventory since 60 / 180 days

    All SAP Gurus,
    What is the report to view / know the Dead inventory since 60 days (or from certain period).
    we want to know the inventory items for which no movement has occured since certain period (say 60 days or 180 days).
    Regards,

    Hi
    MC50 - Dead Stock Report
    Regards
    Ram

  • Subcontracting days limit 180 days

    Dear all ,
    where we can see the setting for Subcontracting Challan material expiry is for 180 Days in Spro ?
    Pl guide

    Hi,
    IMG =>Log general=>Tax on goods movement=>India=>Business transactions=>Subcontracting=>Subcontracting attibutes.
    In here for each excise groups you can maintain the subcontrecting challan periods (180 days), along with other required details.
    BR

  • QuickTime Pro - I am trying to find a way to retrieve my Quick Time Pro code and re-register it but, because I bought it more than 180 days ago, I cannot find the code anywhere, or any way to get an answer from Apple's website.

    I have been going round in circles, trying to resolve this
    I bought the MPEG2 component from the Apple UK store on 4th July 2010. I still have the email and the order number but they are no use to me because it is more than 180 days since I ordered this from them.
    My operating system got corrupted and I had to do a clean install, then a return of the relevant files, folders and applications from my Time Machine. With that should have been my MPEG2 component for QuickTime Pro but it refuses to register.
    I need it to convert my videos taken on my older video camera, which is a Sony, using mpeg2. I cannot look at any of these videos any more, which is deeply irritating. Still lots of editing to do.
    I think it is a bit off if I have to buy it all over again
    Any ideas?
    Mac OS X 10.6.8
    Quick Time and Quick Time 7

    I still have the email and the order number but they are no use to me because it is more than 180 days since I ordered this from them.
    The registration cade is contained in the email Apple sent you on purchasing.

  • I need help highlighting an expiration date on my Numbers '09 spreadsheet. I want the text/fill of a cell to change color when the expiration date of an item is within 180 days of the current date.

    I need help highlighting cells on my Numbers '09 spreadsheet.  I want the cell text/fill to change color when the date is 180 days or less from the current date.  I already have a cell with the current date in it.  I also know how to change the fill/text colors.  All the cells have been formatted to show date only.  I am having trouble with the formula.  I can get to the Conditional Formatting menu and select "With Dates" but after that I am lost.  Can anyone help?
    Thank you for any assistance.
    B

    Set a Conditional Format rule as shown in the illustration below. The rule has been applied to all dates in column B of the table.
    Regards,
    Barry

Maybe you are looking for

  • Problem in installation of Oracle 10g database on RHEL 6

    I am facing the problem when I am trying to install Oracle 10g database on Red Hat 6. When ./runinstaller is run, the message seems to be if I remember correctly is like '-----bad ELF interpreter'. But, the same source seems to be installing correctl

  • How do you continue a game app on a restored device that refuses to load the old game?

    I have recently today restored my device since I have frogotten the orignal password to my iPod at that time. I reinstalled all of my apps, and most of them seems to load the old game I had on my device (thanks to my GameCenter account). But, there a

  • Remove network device inventory from SCOM database

    Hello Gurus I have a quick question. I think one of the internal connectors in my SCOM environment has got deleted by mistake. As a result all the network devices that were being monitored previously has now disappeared. I believe because they were p

  • Importing data from SQL Server 2005 database

    Dear Friends Scenario: We have built an application for which the database is SQL Server 2005. Now, we have planned to switch over to Oracle 8i database. There is a field with data type as Varchar(Max) – which can hold data with a maximum length of 2

  • Sound acts weird - ipod toch

    first my ipod workt perfect, untill last week. suddenly the sound of my ipod acts like really weird. if i have the volume at his maximum, i only hear a weird murmur. when i connect my ipod with other speakers or with my headphone i hear the sound ver