Sunday 17-Jan-2010: In week 2 or week 3? Does Apple use ISO week dates?
According to Wikipedia, http://en.wikipedia.org/wiki/ISOweekdate "All week-numbering years start with a Monday and end with a Sunday."
http://personal.ecu.edu/mccartyr/isowdcal.html shows this too.
However, my MBP running 10.5.8. shows today, Sun 17 Jan 2010 as week 3.
This can be seen quickly by, following http://lifehacker.com/316029/display-the-date-on-the-menubar and dragging the Week of Year into the clock time shown on the menu bar, and viewing it on a Sunday.
Or does Apple not follow the ISO week date numbering standard?
Thanks,
Martin.
red_menace wrote:
Actually, Apple does use (or is supposedly using) ISO 8601, but the System Preferences settings can override some of these, such as the region, calendar, or first day of the week.
Actually, I think it is still an open question. According to Apple developer documentation:
NSISO8601Calendar Identifier for the ISO8601. The ISO8601 calendar is not yet implemented.
It does look like some of the conversions are a bit off, even in Snow Leopard, unless there is something I'm missing, too. Changing the date format (week starts with Monday) in System Preferences shows the correct week there (2), but getting the date from AppleScript, for example, shows week 3.
I played around with my system preferences and could change the week start day, but I could never get an ISO 8601 date. Today (Sun, Jan 17th, 2010), I get either week 4 (Sunday) or week 3 (Monday).
Clearly there are lots of date and time APIs to choose from and many of them on MacOS X already support this format. They haven't made it to the official system preferences level. Considering all the other calendar formats that Apple supports, I think this is a bug and mostly reflects MacOS X's American heritage. Americans don't use this value at all and don't even know to add it to a locale option.
I filed a bug report on it. Don't hold your breath for it getting fixed anytime soon. In the meantime, here is a widget that will display the current week number: http://www.apple.com/downloads/dashboard/status/weeknumber_ntnu.html
Similar Messages
-
Disaggregate Periodic Data to Weekly Data (Modeling Time Dimension)
Hi,
We are using BPC MS Version 7.0. Our users plan at period level and I need to disaggregate periodic data to weekly data by looking up weeks from Time Dimension.
Suppose if 2009.Jan has 4 weeks I need the following result
Periodic Data
2009.Jan Acct1 1000$
Weekly Data
2009.Jan Wk1 Acct1 250$
2009.Jan Wk2 Acct1 250$
2009.Jan Wk3 Acct1 250$
2009.Jan Wk4 Acct1 250$
Can we model Time Dimension with two hiearchies to achieves this?
Which is best way to dissaggrate? (Stored Proc or SSIS Pacakge or Script Logic) ?
Thanks
RajAn easy way to achieve this feature is to have the time dimension be weekly and do the spread on the input schedules before sending.
There would be two EVDREs (one refresh only of monthly data and the other send only of weekly data). The data range of the monthly EVDRE would be input and where the user enters data. The data range of the weekly EVDRE would be formulas (pointing to the monthly data and doing the correct division based on number of weeks in a month). The user is inputting monthly data, but the schedule is sending the weekly values.
The allocation will work as well, but I would suggest to create a weekly input node under each month to capture the monthly value and then spread to the weekly members.
JAN
|---WK Input
|--- WK1
|--- WK2
|--- WK3
|--- WK4 -
Calendar item does not appear in day view for Sunday August 1, 2010
I have a strange problem. I have an appointment on Sunday August 1, 2010. When in day view, and move from Saturday July 31 to Sunday Augsust 1 the appointment does not appear. However, if you look at list view or month view, it is there. If you continue to Monday and then go back to Sunday (all in day view) it appears. There is another person in my office with the exact same problem, so I know it is not just my phone. Anyone else have this issue? Any fix? I am concerned about appointments I will miss because of this. I added appoinments directly into the phone, no server, no exchange, no sync, same problem. It appears to be a bug in OS4.
Refer following link for understanding & solution:
Accounting document not posted from billing document SD module
Hopefully this can assist you.
Thanks & Regards
JP -
Dear all ,
Our Fiscal year is April to March .
I am in MMPV transaction .
presently following is available :
Current period 09 2009
Previous period 08 2009
I have to Open the period for Jan 2010. In MMPV what period & fiscal year i need to Enter ?
period = 10
Fiscal year = 2009 will be the correct Entry ?
pl guide
Regards,
Edited by: venky shree on Jan 2, 2010 4:34 AMHi,
yes...it is 10 as per your FI year.
But When u 10 give this System may give u error
Period 010/2009 is not open for account type S and G/L *********
Message no. F5286
Go to OB52....Gives your posting period Varient as 1 to 12
Regards,
Pardeep Malik -
MacBook Unibody (Early Jan 2010) Unable to Connect to Airport Extreme
The situation is that one MacBook purchased in Jan 2010 constantly unable to connect to the Airport Extreme.
The other MacBook could connect successfully without must fuss. Even the Win7 laptops also has no issue to be connected.
Do you think the MacBook has a connectivity issue?
Thanks in advance.Samuel Tan wrote:
The situation is that one MacBook purchased in Jan 2010 constantly unable to connect to the Airport Extreme.
You might try resetting your connection settings using the steps listed in this message:
http://discussions.apple.com/thread.jspa?messageID=10695921&start=1
They're not guaranteed to solve the problem, but they'll only take a minute or so to try. -
Versions of Adobe since Jan 2010
Is anyone able to state the stats on the number of versions of adobe reader have been released since Jan, 2010.
thankssee http://www.adobe.com/support/downloads/product.jsp?product=10&platform=Windows
-
Cpu jan 2010 patch for windows
Hi All,
can i know the patch number for cpu jan 2010 patch set number for windows.
kkIt depends on your version of Windows (2000,2003,2008, 32bit, 64bit, itanium, etc).
Your best bet is to view the My Oracle Support note for the Jan 2010 CPU (ID 986632.1) to find the correct patch number. -
I am trying to get "First day of the week" data from CLDR spec24 but cannot find where to look for it in the spec. I need this data to calculate numeric value of "LOCAL day of the week".
This data to implement "c" and "cc" day formats that equals numeric local day of the week.
e.g if "First day of the week" data for a locale is 2 (Monday) , it means numeric value for local day of the week will be 1 if it is Monday that day, 2 if it is Tuesday that day and likewise.Hi
If you want to week to be started with Sunday then use the following formula:
TimestampAdd(SQL_TSI_DAY, 1-DAYOFWEEK(Date'@{var_Date}'), Date'@{var_Date}') if it's retail week(starts from Monday) then the follow below:
TimestampAdd(SQL_TSI_DAY, 1-DAYOFWEEK(Date'@{var_Date}'), Date'@{var_Date}')
I'm assuming var_Date is the presentation variable for prompt...
Edited by: Kishore Guggilla on Jan 3, 2011 4:48 PM -
Hi all
Please help in writing a query to get the previous week data.
If the input date is sysdate then it should return values for previous week Monday to Sunday.
Whatever the input it should get the value for previous week from Monday to Sunday.
Thanks
JoIW is the formatter for the "Iso-Week"
ISO = international standard organization
See also: http://en.wikipedia.org/wiki/ISO_week
Main thing is that it will always start with monday. The weeknumber might be different then for ww format. This doesn't matter in your case. But you migh want to do some experiments with to_char(sysdate,'IW'), to_char(sysdate,'WW').
Trunc(<datevale>,'IW') will cut the date back to the first day of this iso-week.
select to_char(sysdate-365,'IW') IW , to_char(sysdate-365,'WW') WW from dual;
IW WW
37 36Edited by: Sven W. on Sep 9, 2010 2:29 PM -
SQL to generate last weeks date(not a stored procudure)
I need SQL to generate last weeks dates starting from Monday to Sunday. I don't want to use any table data or stored procedure. I need inline SQL. Please help me with your suggestions. Thanks in advance for the help.
varun wrote:
I need SQL to generate last weeks dates starting from Monday to Sunday. I don't want to use any table data or stored procedure. I need inline SQL. Please help me with your suggestions. Thanks in advance for the help.below should get you started
1* SELECT SYSDATE-LEVEL from dual CONNECT BY LEVEL < 8
SQL> /
SYSDATE-L
21-APR-13
20-APR-13
19-APR-13
18-APR-13
17-APR-13
16-APR-13
15-APR-13
7 rows selected. -
Hi I'm trying to put a query together that shows the dates, from monday to saturday for the current week. So for example if it's friday it has to show me monday / tuesday / wednesday / thursday and the current friday.
Does anyone know how to accomplisch this with the use of sysdate?
This is what I got now.
select trunc(trunc(sysdate,'y') + (:fw * 7),'iw') "Monday",
trunc(trunc(sysdate,'y') + (:fw * 7),'iw')+1 "Tuesday",
trunc(trunc(sysdate,'y') + (:fw * 7),'iw')+2 "Wednesday",
trunc(trunc(sysdate,'y') + (:fw * 7),'iw')+3 "Thursday",
trunc(trunc(sysdate,'y') + (:fw * 7),'iw')+4 "Friday"
from dual
but I need to get this in one column and that it wil automaticly fill in the current week date
Message was edited by:
SilvertraXSQL> select to_char(next_day(sysdate,'sunday')-7+rn,'day')
2 from
3 (select rownum rn
4 from dual
5 connect by level <= (next_day(sysdate,'sunday') - sysdate)+1)
6 /
TO_CHAR(N
monday
tuesday
wednesday
thursday -
Getting previous weeks data based on parameters entered
I am using CRXI. I have a RT that gives me the current week data but I need to be able to report on previous week data based on the paraments so if I enter dates between sunday and saturday of one week it will report on those data plus the same days of the previous week. I looked at the lastfullweek function, but not sure how to implement it in my scenerio. any ideas?
RalphThat worked, thankyou. My next question along the same lines, is I am also having a third column that will indicate the percent change. for example
Current Previous % Change
97 108
I am trying to computer the % change between curent and previous basically it would look at previous as being the control and computer positive or negative based on what current is. I can do the math formulas, but I'm not sure what to comute to find the % change.
Ralph -
How to update the Weekly data using BAPI for MD61
Hi All,
i have used two BAPI's in my Z program to upload data from flat file to sap-system (BAPI_REQUIREMENTS_GETDETAIL and BAPI_REQUIREMENTS_CHANGE) and i uploaded the Monthly Data from the flat file on sap system successfully.
but i have to also upload the Weekly Data on the sap system using BAPI.
is there any BAPI for the same or what can be the solution for the uploading weekly data on sap system ?
Please reply me.
Thanks in advance..
Edited by: Prajapati_Shyam on Dec 29, 2010 4:19 PMHi Jovito,
thanks for your reply,
i developed a Z program to upload monthly data as well as weekly data into tcode MD61 by selecting the radio button weekly or monthly but i am not able to upload the weekly data as i didnt' get any BAPI OR any other logic to upload weekly data Or not able to use the existing BAPI BAPI_Requirement_create , because the upload file is in monthly format.
MD61 tcode can be used for both data (Monthly or weekly data).
can you suggesst me any BAPI to upload the weekly data or any other logic for the same
thanks & regards
Prajapati -
I am using a mac mini 2011 an 3gs i phone 2010 macbook white 2008 and a new 2013 apple tv box. When i check info on the cloud I get 'upgrade your operating system to the latest. My question is is it possible to use the icloud system without an upgrade
iCloud requires OS X 10.7.2.
-
Hi -
When attempting to render a report (.rdl) in a SharePoint 2010 document library that has a
Connection Type specified as a Shared data source (the connection succeeds when tested in the SharedDataSource.aspx page), the following error message is displayed in the report:
The data source that I'm using passes the test when tested in isolation but when used in the report it yields to the error message above. Below are some of the details of the .rsds file:
For this particular Web Application, Kerberos has been enabled. I couldn't spot any traces in ULS nor in the Security Windows logs.
Any feedback on how to fix this issue is appreciated.
Thanks.Hi
There are multiple resolution found for the same issue, please refer
http://www.marc-lognoul.me/itblog-en/an-existing-connection-was-forcibly-closed-by-the-remote-host/
http://social.technet.microsoft.com/Forums/sharepoint/en-US/4ad2a302-8a77-44f3-91ce-803d36efc9c5/sharepoint-2010-an-existing-connection-was-forcibly-closed-by-the-remote-host-when-log-in-using?forum=sharepointadminprevious
http://social.technet.microsoft.com/Forums/sharepoint/en-US/235ca863-f540-4fa0-9688-0b0b46c2d75d/sharepoint-2010-an-existing-connection-was-forcibly-closed-by-the-remote-host-when-log-in-using?forum=sharepointadminprevious
Let us know if this helps, thanks
Regards,
Pratik Vyas | SharePoint Consultant |
http://sharepointpratik.blogspot.com
Posting is provided AS IS with no warranties, and confers no rights
Please remember to click Mark As Answer if a post solves your problem or
Vote As Helpful if it was useful.
Maybe you are looking for
-
I write a program to convert a plain message into a scrambled message. During the compliation, nothing happened. When I run the program, it says ArrayIndexOutOfBondsException: 26. I have no idea how to solve the problem. I have highlighted the line w
-
Little cd is blocked inside macbook pro. What to do please ?
I put a little cd in my Macbook Pro, for installing drink program. The little cd is blocked in the macbook. What i have to do ?
-
How to prevent update in a tabular form
Hello, I have a tabular form table based. I need one cannot update rows, but just insert and delete. I'm working on Apex Application Express 4.1.0.00.32. How can i do? Thank you.
-
Pass parameter to dynamically assign datasource?
Post Author: bradness CA Forum: Data Connectivity and SQL I've been struggling with this one... I have a current set of reports that run on a single set of SQL queries. The problem is that at the end of each period (lets just say a year) the tables a
-
Regarding Go Green Eat Fresh tutorial
Okay, so I was going through the above tutorial and was building the portal in my home. I had no problems until I landed on this chapter 'Connecting to and Managing Content Repositories', where I have to create a content repository connection. Now I