Supplier relationship status for Source inspection

Is it not possible to intiate supplier relationship status in quality info record for source inspected material???, please advice..
I already assigned no GR inspection in Quality info..

Hi,
Please go through the below links.
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/e0c680d3-0706-2e10-4a9a-a5c67d6c4321?QuickLink=index&overridelayout=true
http://help.sap.com/saphelp_46c/helpdata/en/2d/351149448c11d189420000e829fbbd/content.htm
Regards
Hari

Similar Messages

  • Quality Mgt - can I create a new inspection type for source inspection

    I want to create a new inspection type for surce inspection and I will assign it to Miscellaneous insp lot origin.
    What is the application of vendor inspection lot origin ? Can be used for source inspection ?

    HI,
    For source inspection.
    If existing insp types are not going to solve your purpose , you can create insp type & assign it to insp lot origin 01.
    But before that , check whether you can use  the existing insp type 01 / 0130.
    You need to assign that inspection type in the Q-info record , in the source insp field of insp control.
    Also go through the help tips provide by SAP
    Inspection Type for Insp. Lot Origin (Source Inspection)
        Inspection type for the source inspection
    Use
        If you enter an inspection type for inspection lot origin 01 in this  field, you can create an inspection lot for the source inspection within the lead time before the (scheduled) delivery date.
    Dependencies
        The inspection type must be active in the inspection setup (Quality Management view) of the material master.
        If a status profile is stored in the quality info record for the supply  relationship, a goods receipt inspection takes place instead of a source  inspection.
    Regards
    K.M.Arun

  • Block goods receipt if open inspection lot for source inspection (SAP QM)

    hello!
    i would like to block the goods receipt for a purchase order item, if there is an open inspection lot for source inspection. i know how to block, if it rejected, but not what to do in this case.
    thanks!
    matthias

    Hi matthias,
    can you tell me how to block GR if inspection is rejected in source inspection??? as you said u know. please let me know.
    Thanks!!
    vinay

  • Sample size calculation for Source Inspection

    Dear Gurus,
    I have an issue regaring sample size calculation for Source Inspection.
    I created a PO for 500 nos.
    The sampling procedure assigned in the Quality Plan is %age based (10%).
    When Inspection lot is created, system is caluating the Sample size as 500 and not 50.
    Moreover, when I go to Result Recording, the Inspection qty for the MIC is shown as 1. If the system is calculating sample size as 500, then the inspection qty for the MIC should also be 500. Moreover, the sample size should be 50 only.
    Please provide your inputs on this.
    Regards,
    Nitin

    Thanks Sujit!
    Your are correct. It works in the same way as u told.
    Assigned you the points for the answer.
    Closing the thread.
    Regards,
    Nitin

  • Stock posting in block stock after grn for source inspection

    Hi All,
    I have following scenario
    I am doing source inspection at vendor site i have maintained control key 0005 in material master & necessary certificate with certificate check required at GRN & UD stage
    i am creating a source inspection lot for a release po through t.code qi07 & then processing that lot before GRN
    Now when i am doing GRN for same PO it is giving me the following message  stage
    <b>A category ZC01(user sp. category) inspected certificate is required</b>
    Message no. QA312
    Diagnosis
    An inspected certificate must exist at the first goods receipt for a purchase order item.
    Procedure
    Check whether a suitable certificate exists for the purchase order and delivery, and create a certificate record with the status "Certificate checked and stored".
    If there is no certificate or no suitable certificate, this does not comply with the requirements in the material master record. If there is no inspection lot for this goods movement, the system posts the quantity to blocked stock or does not post the goods receipt.
    If you have created an inspection lot, the system marks the certificate check with the status "In lot". You must confirm the availability of an inspected certificate by the time you make the usage decision.
    after doing the GRN stock is being posted to block stock
    if i do not process the source inspection lot then the stock is posted to quality stock but this does fulfill the requirement of source inspection
    plz suggest soultion
    It's urgent
    Regards
    Ashutosh Shende
    9860681314

    Hello Ashutosh,
    In the material master you have defined certificate type with the customizing setting indicator for  'Enhanced Certificate Processing' active.
    If you set this indicator, extended certificate processing is active for
    this certificate type. You can then manage the inbox for quality        
    certificates independent of the goods receipt.                          
    The electronic inbox of certificates for the purchase order is only     
    possible if this indicator is set.                                                                               
    This means you have to create a certificate in QM (Transaction QC51),   
    before you can update your PO with cert. enclosed.  
    If you do not want the enhanced certificate processing you have change  
    the indicator into inactive.    
    Another problem known here is if you have activated the 05 Inspection type in the material master, that it is not activated in all plants relevant although QM in Procurement is set in all plants.                                        
    I hope that this resolves the described issue.
    Regards,
    Isabelle

  • Settings for source inspection lot

    Hi,
    Can any one explain how do you set source Inspection?
    Regards
    vikram raghuwanshi

    Hi,
    Do following settings:-
    Go to Q-info record (QI02)
    1. source inspection type 010
    2. Number of days ahead of lot to be created.
    3. Tick the check box u201Csource Inspection No GRu201D in the quality info record.
    4. Through transaction code QI07 run the manual program to create a lot.
    5. Control key contains the control on GR if source inspection lot is rejected.
    Regards
    Nikhilesh Ray

  • Source Inspection -GR for Rejection

    Hi Gajesh,
    I tried the scenario But at the time of GR Lot is not creatd
    The setting as foolows
    Control key contain- Source rejection-Create new inspction lot
    In QI02 I maintained Inspection type 0101 for source Inspection & Tick is active for source insption no GR (if I Dectivate tick system will reg create lot for GR for 01 (*I maintain 01 & 0101 in material master in which 0101 is preferrred)
    Please explain
    Regards
    Adi

    Hi adi,
    As per your statement Tick is active for source insption no GR , in that case lot will not create at the time of GR.
    If you want lot to be created at the time of GR then you have to remove the above tick as well as in inspection control tab you have to maintain inspection active status then only lot will generate
    Thanks
    Vinay

  • Source inspection - inspection lot skip for certified vendor

    Hii,
    I have a requirement in which during source inspection, the inspection lot should not be created if the Vendor is certifed. I have made the following settings:-
    1. In Vendor Master, maintained the Actual QM system in control-reference data.(QM system marked for skip in customizing)
    2. In Material Master-
        - Activated QM Proc- QM control Key -Delivery release
        - Target QM system
        - Inspection type for source inspection activated in inspection set up
    3.In Quality Info Record for Vendor,Material,Plant combination-in Inspection Control tab-
        - Maintained the existing QM system & validity
        - Selected 'No Inspection' in Insp. control
        In Vendor source inspection tab maintained the inspection type & lead time.
    Inspite of the above settings, I can see this PO (for vendor,material,plant) in the source inspection worklist(QI07).
    Please suggest as to which setting I might be missing.
    Thanks!!!
    Regards,
    SV

    Hi,,
    You have to go T code QI07
    where give input Vendor ,Material plant,
    Delivery dateopening peroid
    Then execute the transaction .
    Select line item click oninsp lot & save.
    Where you have trigger lot for the same then only lot will get genarated.
    Regards
    SANIL
    This confugaration required if you have option if lots get rejected.
    Quality management-QM logistics-QM procurement -Control key
    Define control key;
    GR/Source inspection control;
    GR for rejection; three option is available
    1.source inspection has no effect on goods receipt
    2.Creation of new inspection  lot
    3.Goods receipt not allowed
    Regards
    SANIL
    Edited by: Sanil Vadke on Mar 12, 2010 7:29 AM

  • Scenario with reference to source inspection and MIGO

    Hi all,
    My scenario as follows:
    1.Source Inspection lot should get generated as per the lead time given in Q-Info while creating PO.
    2.MIGO should not be allowed when source inspection lot is open(Means UD is not taken).
    3.Inspection lot should be generated while doing GR in MIGO when source inspection lot is accepted.
    These all three points are with reference to one raw material.
    Kindly throw some light on the above said scenarios.
    Thanks in advance
    Sudhar

    Dear Sudhar
    1) For generating inspection lot automaticaly please use QA51. here you can shedule the program as in Qi07 and can be sheduled in a defined frequency
    2) You may have to go for user exit if you need to stop GR when the source inspection is open. You may use MB_CF001. Please check the exact exits as there is no option in standard for the same
    3) just check - in config maintain GR for Rejection -  GR not allowed and in quality info record maintain No GR inspection for source inspection
    Please let me know the issues
    Regards
    Gajesh

  • Source Inspection

    Hi
    Qm Gurus
    Can Anybody Tell me the cycle of Source Inspection
    As Per My Knowledge we can decide Source Inspection In QInfo Record
    Here We Gave lead time Days
    Then In QI07 we trigger it Manually & generate Inspection Lot .
    My Quesion is how it trigger Automatically.This inspection lot is not Stock Relevant? why
    Regards
    Sanjay

    Hi Sanjay,
    Here are the steps and settings for Source inspection:
    In Q-infor record, select source inspection. Activate 01 insp type for material master in the QM view.
    ME21N-CREATE PURCHASE ORDER
    QI07-WORKLIST OF SOURCE INSPECTION -Select Create insp. lot and save.
    QA32-INSPECTION WORKLIST
    QA11-UD FOR SOURCE INSPECTION
    MIGO-GR
    QF11-DEFECT RECORDING
    QA11-UD FOR GR
    QA12-INCASE TO CHANGE QUALITY SCORE
    QA13-TO CHECK HISTORY CHANGES
    Reward if cleared or get back with queries
    Keerthi

  • Source inspection configuration

    dear all,
    what is source inspection and vendor evaluation, please give me details of configuration steps for it.
    thanks in advance

    *What is Source Inspection* 
    What is source inspection and what are the setup required to do in system to implement successfully?
    A source inspection is a quality inspection in which Buyer required the quality check before the material received. So that he performed the quality inspection at the vendoru2019s Location.
    To setup source inspection, you should define inspection type (01 and 0101) in material master QM View. (MM01)
    When requesting source inspection, include the following information:
    a)  Purchase order number
    b)  Item number
    c)  Part number
    d)  Quantity of parts to be inspected
    e)  Date source inspection is required
    f)   Types of inspection  required
         - In Process
         - Final
         - Interim
         - First Article Inspection (FAI)
    g)  Contact name and phone number
    Go to transaction QI07 and give the material code, vendor, plant and opening period. When you execute the transaction you would find open purchase orders for the given input data. Select the Purchase Order you wish to perform Source Inspection and choose Create Inspection Lot. These inspection lot triggers for inspection type 0101. Against this inspection Lot perform result recording QE01 & QA11.
    When finally you received Goods at your premises, then inspection lot will triggered automatically (01) and perform result recording QE01 & QA11 
            How to do Source Inspection in QM
    Can any one guide how to do Source Inspection in QM. What are the settings required to be done and can the lot for source inspection be trigerred manually or automatically. 
    The Q-Info Record is used to trigger a source inspection lot for a material/vendor and plant. Under the tab key Inspection Control in Q-Info Record, you would find vendor source Inspection and under that select the inspection type desired for source inspection (say 01,0101) and give the lead time required to perform the  inspection in days (say 10 days).  If you do not want to trigger an inspection lot @ GR for a source Inspection lot then check the box (Source Insp. No Gr).
    Ensure that the inspection type selected @ source inspection is activated in the Material Master Record for the chosen material in the Quality Management View.
    To trigger the lot manually you need to have some open purchase orders for the material/plant/vendor. Go to transaction QI07 and give the material code,vendor,plant and opening period. When you execute the transaction you would find open purchase orders for the given input data. Select the Purchase Order you wish to perform S.I and choose Create Inspection Lot. 
    This would trigger the lot and then it is QE01 & QA11.
    Vendor Evaluation for Purchasing
    Define the weighting keys in SM30 - V_T147J.
    Weighting keys 01 and 02 are defined in the standard system. You combine the following
    weighting shares for the standard main criteria:
    Main criterion     Key 01 Key 02
    Price                   1      5
    Quality                 1      5
    Delivery                1      2
    Gen. service/support    1      1
    Ext. service provision  1      2
    Define the criteria in SM30 - V_T147G - Double click on the line items
    In this step, you define the criteria by which the system computes scores for vendors and
    specify whether the scores for the subcriteria are computed manually, semi-automatically, or
    automatically.
    You can also store your own methods of computation for the scores for subcriteria in the
    form of user exits. The enhancement MM06L001 is available for this purpose.
    Define the scope of list in SM30 - V_T147M - Double click on the line items
    Define Purchasing Organization data for vendor evaluations in transaction OMGL.
    An example :-
    How the system calculates the score for the automatic subcriteria
    "On-Time Delivery Performance"?
    The system uses the statistics-relevant delivery date in the purchase order
    (Items -> Delivery Schedule) and the goods receipt date to calculate date variances.
    You use the statistics-relevant delivery date, for example, if you know that the vendor
    will not deliver the material as scheduled on September 15 but on September 30. Enter the
    delivery date as September 30, but enter the statistics-relevant delivery date as
    September 15.
    In calculating the score for on-time delivery performance, the system will then not use
    the actual delivery date, but the statistics-relevant delivery date. This has a negative
    effect on the score for this goods receipt.
    However, materials planning and control uses the realistic delivery date (September 30)
    which the vendor will actually adhere to.
    The system considers only goods receipts against purchase orders and scheduling agreements
    into stores and the release of GR blocked stock into stores. In the standard system, these
    are the movement types 101 and 105.
    Minimum Delivery Percentage - OMGL in the On-time delivery section
    If you do not want a vendor to receive a very good score if he delivered the goods on time,
    but did not deliver the required quantity, you can maintain a minimum delivery percentage
    in Customizing.
    Assume you set the Min. del. perc. parameter to 60% and the vendor delivers the goods on
    time, but only 55% of the ordered quantity. Although the goods receipt is punctual, it is
    not included in the calculation of the vendoru2019s score for on-time delivery performance. So
    that the non-scoring of the on-time delivery performance criterion in this case does not
    bring an unfair advantage in comparison with a poor score, the vendor is awarded a low score
    for quantity reliability. On-time delivery performance is thus always to be seen in
    conjunction with quantity reliability.
    Standardizing Delivery Date Variance  - OMGL in the On-time delivery section
    To rate delivery date variances in days, maintain the Std.del.time var. parameter.
    If you assign a lower standard value, this means that relatively low date variances produce
    high percentage variances. If you set a higher standard value, this results in a relatively
    low percentage variance:
    The Std.del.time var. parameter has the value 20. The goods receipt took place on Nov. 27;
    the statistical delivery date was Nov. 15. There is thus a difference of 12 days.
    The system calculates the percentage variance as follows:
    12 / 20 x 100 = 60
    If the Std.del.time var. parameter had the value 60, the variance would be 20%
    (12 / 60 x 100 = 20).
    If you do not maintain this parameter, the system calculates the delivery time variance via
    the firm zone in the case of scheduling agreements, and via the order date and the
    statistics-relevant delivery date in the case of purchase orders.

  • How to prevent MIGO when source inspection lot is either open or rejected.

    Hi
    How to prevent doiMIGO when source inspection lot for the vendor/material is open or the source inspection lot is rejected.

    Hi Sudhar,
    Please find the process steps for your question : 
    How to prevent MIGO when source inspection lot is rejected
    Go to Q-info record (QI02) for that particular material, vendor and Plant combination.
    1.Use Inspection Type 0130 for source inspection.
    2.Number of days ahead of lot to be created.
    3.Through transaction code QI07 run the manual program to create a lot.This source Inspection may be rejected as in your case.
    4.Control key contains the control on GR in the QM view of MM.
    In the spro>QM>QM in Procurement-->Define Control Key and assign it to MM.
    We can define here under Source Inspection Control that in case of GR for rejection-->GR not allowed.
    This will prevent MIGO if in case Source Inspection Lot is rejected.
    Thanks,
    Ravi.

  • Pre requisite for sourse inspection...

    Hi All,
    whats Pre requisite setting required for source inspection.?
    Thanks,
    sid

    hi,
    Pre- Requisite are:
    maiantain 01 / 0101 in Material master , and active preferred and active indicator .
    Goto QI01, maintain Release Untill date, goto inspection tab, enter 01/0101 in source inspection type and lead time like 15 days or go as per ur requirement, u may tick or not it depends on ur requirement on "Source inspecction- NO GR."
    and save ur setting .
    Regards

  • Source inspection-0101insp.type

    Resp.Gurus,
    For practice Source inspection in IDES client,When I searched in Scn & SDN documents,all are suggesting to select 01 insp.type & 'additional' only 0101 inspection type  for source inspection.
    I am getting very much confusion about 0101,0102,0130 and tick mark in Preffeerd insp.type ,
    Q1:a)Is it must to select 0101 only for S.Inspection?(is GR insp.model = Sorce inspection?)
    what is the use of 0101,0102,0130.
    Gurus,Please guide me to start up.I will practice and attach the screen shots.
    Thanks in advance,

    Hello
    01 - Inspection against GR w.r.t PO
    0101 - Source or model inspection - this is widely used when you want inspection at vendor location. You can use 01 as well but only for the sake of identification, master data and as usage is different it is suggested that you use 0101.so that during reporting you will get clarity.
    Lots of decision before GRN you will take w.r.t PO against vendor if source inspection is active.
    0103 - this inspection is used while receiving any inspection data or inspected material from external processes against GR. AS its description is self explanatory.
    Preferred indicator is used when more than one inspection type belongs to same lot origin. like 01, 0101, 0103 or lets take example of some customize  like  Z01 , if they all belongs to same lot origin 01 and their order define in QM customization. system buy default take if seq order of any inspection type is 1. and for rest you need to mark pefered indicator if you are using e.g 01 / 0101 both in same material. ( Check inspection lot origin  and read it Stdn docs).
    I will suggest you to use and run each one process in your Test server. after activating each one by one in material master.
    Regards

  • Source inspection lot

    I made a settings in job planning for source inspection to create inspection lot.
    But when PO is released, it is creating 4 inspection lots for the same PO., please advice what i went wrong.

    How about schedule delivery?
    Delivery split into 4 times?

Maybe you are looking for

  • DSO Will Not Activate after Transport with rc=8

    Hello, I had a requirement to make two Purchasing DSOs (2LIS_02_ITM & 2LIS_02_SCL based) write-optimized. I made my changes in the development environment and transported them to QA. The transport went in with rc=8. All of my changes propogated; the

  • Pass one parameter from parent to child report.

    Hello experts, I am new in OBIEE. I have devloped report1 and report2. Report1 is master report and report2 is child report. Both reports are madeup of combined request to need to business requirement. I am facing issue to create navigation from repo

  • How do I remove video effect from maps?

    I changed the video effect on my maps using the inspector, I did not like what I selected. I went back into the inspector to change to another video effect. Thew inspector shows I changed it, however when I play back the clip, the old video effect is

  • I Can't Import An Audacity AIFF

    I do a lot of sound editing and always found it easy to import aiff's from audacity of soundstudio into garageband. However, since soundstudio 2 won't work with my new macbook (what the @#$) I am using audacity. HOWEVER (as many howevers as a pc... h

  • Non-numeric primary is good or bad for design

    In general, the primary key created using the non-numeric key is good or bad ?  Any specific reason?