Hi,
I have the following scenario-
One Production Plant supplying to a Hub. The Hub supplies to various DCc.
I run CTM / Heuristic, which create the Planned STRs btw DCs and HUB; and btw HUB and the Production plant.
Next I run Deployment Heuristic, with Fairshare rule A.
Pull Depl Hz = 3 wks
Push Depl Hz = 3 wks
I run depl heuristic from the hub to various DCs.
On the HUB,
ATR = Stock and STOs coming from the Production plant for the next 3 weeks.
ATI = Sales orders.
Now looking at the 3wks Planned STRs, I have confirmed them based on the 3weeks STOs.
The same result . confirmed STRs are sent to ECC.
Now , after 1 wk, I realise there is a huge variation in supply.
i.e. the daily STOs of 300 qty, will not come , but only 30 per day...
Now, with this changed scenario on the supply side, how do I unconfirm the confirmed STRs.
regards
Niranjan

Hi Looking at your scenario, u have confirmed the STRs on the basis of STO, now there is fluctuation in the supply side
( STO),
There are two situations
One that your confirmed STRs can t become into STO (TLB Output) if you run the TLB on the basis of stock, so shipment can be controlled.
Other option to rectify the same is to delete the confimed STRs and run the fresh Deployment considering the fersh STO ( supply side).

Similar Messages

  • How to Prevent the confirmation of quantity in Sales Order

    Hi All,
      I want to make sure that if the quantity in a line item for certain customers exceeds certain threshold quantity the quantity does not get confirmed and we set up a delivery block on the entire order.
      I know how we can setup the delivery block. Could someone tell me, if we can programmatically ensure that quantity is not confirmed for that particular item. Is there a standard SAP way (function module/BAPI etc) of doing it? Or do I need to find and update the table.

    Hello krishna,
    You need to delete the confirmed schedule line programatically in the user exit. 
    Delete the corresponding entry in the internal table xvbep. You need to do this in a appropriate user exits in the include mv45afzz.
    I guess you can also do this in atp function module user exit.
    Hope this helps you..
    Regards,
    Jiten

  • How to get the confirmation slip for a production order

    Hi experts,
      Can anybody tell me how to find out the confirmation slip for a given production order?
    Is there any standard BAPI/Function module which generates the confirmation slip?
    Please help me out.
    Thanks in advance.
    Regards
    Sireesha.

    Check
    <b>BAPI_PRODORDCONF_CREATE_ACT</b>
    CALL FUNCTION 'BAPI_PRODORDCONF_CREATE_ACT'     
       EXPORTING                                     
         POST_WRONG_ENTRIES = POSTWRONGENTRIES       
       IMPORTING                                     
         RETURN = RETURN                             
       TABLES                                        
         ACTIVITIES = ACTIVITIES                     
         DETAIL_RETURN = DETAILRETURN                
       EXCEPTIONS                                    
         OTHERS = 01.                                
    Regards,
    Santosh

  • How to stop the Confirmation of Prod. Order if GI to Prod Order not done?

    Dear all
    I am new to PP. Please bear with me with this silly question.
    My user always forgets to perform GI to Order using MVT 261 and straightaway go ahead with Confirmation of Production Order (CO11).
    It does give rise to some problem that some of the raw materials have been marked as Final Issue in Components Overview of Prod. Order but in real life, those raw materials are still sitting in the warehouse.
    Please advise what can I do in system configure so that If GI to Order (MVT 261) has not been done, user is not allow to perform Confirmation of Prod ORder?
    THanks in advance!

    Hey,
    GO TO
    BS02
    1) Create Status Prof with name XYZ,
        D.click on Status Prof, Select Object Type as PP/PM
        Go Back, now
        You will find a user status table
         Create status in status tab with two options,
                   Status   Short text                                   int st
        Say 1)  XY      Confirmation not allowed.          tick box
               2)  YZ       Confirmation allowed.
    Double click on XY Click on Create , You will find sum options with status like allowed, forbidden etc..
    Now go to confim Order tab
    1) Goods Movement             Set radio button on both 'Forbidden' and 'no activity' Button.
    Now go back to user status Again, Double click on YZ button,
    Again click on Create Button , You will find same options with status like allowed, forbidden etc.. this time you give set for
    two  options
    1) Confirm Order                Set Radio Button on both 'Allowed' and  'Set'
    2) Goods Movement           Set Radio Button on both 'Allowed' and 'Set'
    Save the Request.
    Go to Order type Parameter assign the Status Profile XYZ to Your Order Type.
    This will work out,
    Solve Your Problem.
    As a Result,
    In initial stage system will check the Confirmation status before GI, if Conf is not done system will give error.
    If confirmation is done the system changes its status , allows the GI by Checking the Status .
    Thank Regards,
    J.K.Pavan Kumar.
    SAP PP-PI.

  • How to get the Confirmation message.

    Hai all, In my application there is a delete button in a particular jsp page where a user on clicking this delete button can delete a task from a particular list.I had coded all the functionality for this button fine.But now i want a confirmation box to appear whenever a user clicks this button.The box should read like"Do u want to delete this task? If the user clicks "yes" then that should be deleted and if he clicks no,just quit.
    I am not able to get an idea of coding this particular task and where to code it.I request your kind help in this regard.Plz help me in getting this code or just give me an idea.

    Hmmm, I stepped away for a cup of joe in the middle of my reply and BOOM, there you were again.
    The hyperlink link idea is even easier:
    <a href="/<context>/confirm.jsp?id=xxx&action=xxx">Delete</a>Then have something like this in confirm.jsp:
    Are you sure you want to delete this record?
    <form action="/<%context%>/servlet/<%=request.getParameter("action")%>" method="POST">
    <input type="hidden" name="id" value="<%=request.getParameter("id")%>"/>
    <input type="submit" value="Yes"/>
    </form>This way you can one single confirm page and you simply supply the id for the record and the servlet you want to handle it.
    For example:
    <a href="/<%context%>/confirm.jsp?id=5&action=DeleteUser">Delete</a>
    Then you'd get:
    <form action="/<%context%>/servlet/DeleteUser" method="POST">
    <input type="hidden" name="id" value="5"/>
    <input type="submit" value="Yes"/>
    </form>
    How's that?

  • How to redirect the confirmation box without refresh

    hello
    friends i have one problem Am having confirmation box with ok,cancel option,when i clicked ok button i will call the another method and then redirecting same page using struts.Now i used normal javascript its working but page will take more time for refresh the page
    heIp me..i want solution for page refreshing using script or ajax?

    Hi,
    Good day to you.
    Apologize for quoting "Parallel" port. It is a in-built 25pin serial connector placed next to regular 15 pin serial port.
    Just to make a point here, this 25 pin serial connector has an external converter attached with other side having RJ45 jack.
    CAT5 cable connected between switch port to this RJ45 jack.
    I did tested this converter with another machine and could able to access the display on my console server. So it seems to be the connectivity from serial port to switch port works fine.
    Adding to that, this ultra 5 box with the current connectivity set up was working fine until I rebuild this machine. I was very well accessing this box thro my console server. There was no changes done except rebuilding the operating system.
    I think some work needs to be done at the ultra 5 box level to get this 25pin serial connector to act.
    Thanks.

  • PO Publish from Supplier to send the confirmation

    Hi,
    In SNC once PO is published by Supplier then agian Supplier cannot modify the PO.Here client wants SNC to allow Publishing of PO  as many number of times (i.e.allowing to resend the confirmation ).
    i.e.Assume supplier confimed PO with Delivery date August 30 for a PO and Published PO.
    But after 1 week Suppier came to know that he cacnot deliver the item on August 30 but only on Sep 10th.
    Now how to resend Delivery confirmation since SNC will not allow you to change once Published.
    Regards
    Ragahvendra Pai

    Hi Raghav
    Your requirement is quite interesting,
    With a very minimal intervention is required by customer and entire repetative publishing process is required at supplier end, whenever he get to know that the delivery cant be met and new date is proposed and published
    I have never played like this in the system, but i believe, I am pointing you to the right node
    SPRO-SNC-PURCHASE OREDER- GENERAL SETTINGS FOR PURCHASE ORDERS
    whre you get to define, how the system should get update and the changes to be shown in the status.
    for the SCM001 profile, distribution status.....Published by supplier, item status---open you could see , filed disp.only checked
    which means he/she cannot edit. now leaving this field unchecked you might be able to republish again
    The thing i am worried is how to handle the confirmation line in ECC, how to replace the old confirmation line or is there any update possible. I would suggest you get help of MM-purchasing guy here.
    Please let me know, if this is really possible.
    In standard scenario as explained by nickel and others, you cannot change PO in web ui when it recieves the status Published by supplier, unless until a new change rqst comes from customer.
    Best Regards
    Vinod

  • Consuming Confirmed STR based on STO

    Hi Experts,
    Due to some difficulties, I am deviating from the SAP standard.
    I am doing SNP planning based on Heuristics tool.
    In my scenario, a Stock Transfer Order is created based on the completion of a production order. STO is created in reference to Production Order. During the day, whenever a production order is completed, at the same time STO is also created. Please note that STO is created based on production order and not based on confirmed STR.
    So, automatic consumption of confirmed STR based on Stock Transfer Order doesn't help here or work here. So, is there any possibility to achieve this automatic consumption? STO created without any reference to confirmed STR in ERP.
    Like whenever a STO is created, the confirmed STR's should be consumed using FIFO logic (STO consumes the first confirmed STR and then the next). And if, STO is larger than the quantity of confirmed STR, then the first confirmed STR to be consumed and then the next (until the STO quantity is completely consumed by the existing confirmed STRs).
    If it is not possible to do via standard, I am planning to achieve this using the enhancement of CIF inbound logic of APO (Custom development ). But if I do this, the pegging relationship between the Production Order and confirmed STR, should it be retained? Or will the pegging relation to the confirmed STR is automatically lost if production order is completed?
    Thanks,
    Suresh

    Hi,
    Error message VL609 is designed to prevent PGI before picking was
    complete. If not, posting cannot be carried out unless you
    change delivery quantity. Partial postings are not possible!
    Function 'copy picked quantity as delivery quantity' could be used.
    To sum up, It is not be possible to goods issue a delivery that is not
    fully picked and for that reason error message VL 609 is issued.

  • How to find the supplier user who done the confirmation

    We have the setup- Supplier can confirm either through Web UI or by uploading a XL file into SNC.
    we have several supplier user account per BP, Say (user1,user2...user5 - BP 2000010). Now i need to find which user have made the confirmation and Published.
    I knew its possible to get that information through PO history details but its possible only for those confirmations which are made through Web UI.
    In my case - confirmation is done by file upload
    Distribution status - Published by Supplier
    Changed by - PIREMOTE (system name).
    Thanks in advance
    regards
    Vinoth

    Hi Vinoth,
    I assume that the file transfer is done via File Upload in Web UI.
    If you would like to which supplier user has uploaded the file / done the confirmations, you can ask the supplier user to create his own upload profile and then upload the file.
    Once this is done, in PO details you would get to see "Changed By" as Supplier user. You can also check the same thing in "PO History".
    This may not be the best option but will met your requirement.
    Regards,
    Sandeep

  • I purchased a student subscription to Creative Cloud. I got the confirming email. When I attempted to install the aps, kept getting a 30-day trial for all the aps. In the case of Photoshop, it was expired. How do I activate my Creative Cloud?

    I purchased a student subscription to Creative Cloud. I got the confirming email. When I attempted to install the aps, kept getting a 30-day trial for all the aps. In the case of Photoshop, it was expired. How do I activate my Creative Cloud?

    ChristinaW1111 for information on how to resolve the connection error preventing the active membership from authorizing then please see Sign in, activation, or connection errors | CS5.5 and later.  If you have any questions regarding the steps listed within the document you are welcome to update this discussion.

  • Why doesn't siri know how to change the time of a reminder? When asked, "Do you want to confirm or cancel your reminder?" Reply, "Can I change the time to a half hour later?" Siri doesn't know how to respond.

    Why doesn't siri know how to change the time of a reminder? When asked, "Do you want to confirm or cancel your reminder?" Reply, "Can I change the time to a half hour later?" Siri doesn't know how to respond.

    Hi
    In iMovie'11 (version 9.0.x)
    on top menu row - Apple/iMovie/File/Edit/Cut (Can vary dep. on language - in Swedish Apple/iMovie/Arkiv/Redigera/Klipp . . . )
    down Cut menu - Slow playback/Raspid Playback/Re-play in Slow Motion and onvards
    Here one can select the Pre-Set speeds
    Are you familiar with getting 'inspector' to run?
    No - but I guess that Double Click on clip/sequense or ctrl-Click on it might open it.
    Yours Bengt W

  • How to change the status of an incident, after it is "Confirmed"

    Hi, I'm new to ITSM and the client asking me how he can change the status of an incident, after he change it to "Confirmed".  Is there a way to change the status of an incident after it is set to "Confirmed"?  Or can I change the configuration of the Status field to allow that change?
    Thank you

    hi
    I dont think, you can reopen the confirmed ticket by standard, but please try with the report CRM_SOCM_SERVICE_REPORT.
    if not try with the status profile customization, remove the FINI settings from the confrimed status  also change the highest and low values also accordingly.
    please try.
    Thanks
    Jansi

  • How we can give the confirmation of the sales order to the customer.?

    how we can give the confirmation of the sales order to the customer.?
    after the we generate thge sales order how we will give the confirmation to the customer automatically or in any way in SAP SD

    A confirmation can be given to the Sold to party for the sales order by means of an output type, which is the  most used functionality.
    You can create an output which can be a word or PDF document, or an email , fax etc. Based on the kind of confirmation you want to give (Document, email, fax) do corresponding settings in the output for printers, email settings, fax settings etc. and enable this output to be triggered during sales order creation by assigning the output to output procedure for sales documents. This part of configuring an output is done by Functional team while the email, fax settings are done by basis team in combination with tech team.
    The output should have a smartform and corresponding report program to populate the smartform. This part should be taken care of by the technical team.
    Once all these things are done, if a sales order is created, the output will be triggered which will send a confirmation document, email , fax as per the configuration to the sold to party. If you want the confirmation to be send to more partner functions, that is also configurable in the output configuration.
    Pls reward points if it helps.

  • How to track the history of supplier sites used for tax reporting (1099)

    Hi,
    Oracle financials doesn't allow two supplier sites setup as tax reportable sites (Unless one is inactive). Suppose if the supplier uses site1 for the year 2009 and site 2 for 2010 and now there is site3 setup as tax reportable. All three sites were setup in 2009 and all three sites are active. Supplier chosen different sites for each year as their tax reportable site.
    How do we know which site oracle used to send 1099 for 2009 & 2010? How to track the history of supplier sites used for tax reporting (1099) in previous years?
    Thanks in advance.
    Regards,
    Ram

    Would the begin_date, end_date and status columns on HZ_PARTY_SITES_USES be any good? Our R12 installations is too new to have accumulated much data yet, but I would look in those columns first.

  • How to get the User input of Dynamic Action confirmation message ?

    Hi Guys,
    I'm using apex 4.1,
    I have added a confirmation message box as page Dynamic Action. How can i get the user input of that confirmation pop up ?
    Thanks

    Hi,
    you don't directly get the user input. But you should still be able to get what you want. Let's assume you have a dynamic action which fires for a "Change" (or any other) event and which has two or more actions
    1) Confirm
    2) Execute PL/SQL Code
    If the user clicks Cancel/No in the confirm dialog, APEX will stop the execution of this dynamic action and not run "Execute PL/SQL Code".
    Hope that helps
    Patrick
    My Blog: http://www.inside-oracle-apex.com
    APEX Plug-Ins: http://apex.oracle.com/plugins
    Twitter: http://www.twitter.com/patrickwolf

Maybe you are looking for

  • Retrieving Acrobat Pro 9 Serial Number before installing Windows 7

    Hi everyone, I need to format the hard drive to install Windows 7 on a computer running Windows XP x64 and the user is not able to find it nor to tell me if it is a boxed version or a downloaded version possibly bought from the University Campus book

  • Error on polling 2.5 gb file using FTP adapter

    HI All We have FTP adapter which is polling 2.5 gb of file on single node instance in SOA 11.1.1.6. It is working fine with single node instance but its failing on cluster 2 node instance. We are polling zip file and all the FTP configuration are mad

  • Make to Order settings in Sales Order

    Hi All, When setting up Make to Order I am not able to get the requirement type to default in to the procurement tab. I have strategy 20 set in the material master. The item category is TAK. I believe it is possible to get the requirement type 'KE' t

  • Image turns negative when cropping.

    When I try to crop in CS6 the image turns negative until I finish the crop when it goes back to positive. Anything I can do to stop this?

  • Tutorial For Windows Application Help System RoboHelp 8

    Hi, I'm using Robohelp 8 and I've created several web based help projects. I now need to create a help system that will be part of a Windows application. A local help that will install with the app. Are there any tutorials on how to do this? Thanks