Support message and change requests only for production system

Hi guys,
I would like to connect the solman helpesk with CHARM ( CHARM is still running ).
In CHARM I have to create a CR only for production system. ( don't know why - but works as designed).
In SAP helpdesk I can create support messages for every kind of system type but if I want to connect both (HD and CR) , the source system (ibase component) of the issue will copied to the CR and runs in error because of the rule (only p-system) of CHARM.
Of course I can change the ibase to production system manually in SDCR but it seems a very error-prone method.
Now my question: is it possible to change the ibase component due to the creation of CR by copy rule or something like this?
Kind regards
Rayko

Hi Rayko,
We do not have this option.
Once in ChaRM, we assume that the changes will always correct an issue in the PROD system.
I would recommend to open the tickets directly with the PROD system IBase, once the issue is also happening there.
Best Regards,
Fernando

Similar Messages

  • Confirmation of Support notification and Change request.

    Hi Guru's,
    In my clinets landscape we are using ChaRM for Change requests and Urgent correction. We have two situation here to handle.
    1. I (Change Manager) should only be able to confirm a support notification if all the dependent/subsequent change requests have been confirmed
    2. I (Change Manger) should only be able to confirm a change request if all the dependent/subsequent urgent corrections have been confirmed.
    Request your help.
    Vinod

    Hi,
    you can customize that your change request will automatically get a new status if the linked urgent correction reached a specific satus.
    You can then do the same with support message and change request. This will lead to a chain where your support message is confirmed automatically if your urgent correction is confirmed.
    Check SPRO - Make Setting for Change Transaction Types - Assign Actions "SET_PREDOC"
    Best Regards
    Daniel

  • Restrict print out of Purchase order only for Production system

    Hi,
    I want to restrict print out of Purchase order only for Production system, don't want to take it in devep or quality.
    is there any identifier to find the system is production or development.
    can anyone tell me how to restrict it,
    is there any function module, not based on client system.
    Thanx in advance
    Kesav

    Hi Kesavarathinam Vaidyalingam ,
    yes, I also use thomas' suggestion using
    t000-cccategory = 'P'.
    to determine productive client.
    Just one small hint: I found this condition as true in a test system: The admin had done a system copy to create a fresh test client - but forgot (or did not see a good reason) to change t000-cccategory = 'P. to  t000-cccategory = 'T'.
    Regards,
    Clemens

  • My daughter's ipod is on my itunes account. Now we're getting each others messages and facetime requests. How do I change that?

    My daughters iPod is on my iTunes account. Now we're "linked" so that I get most of her text messages and facetime requests and she gets some of my text messages. Is there any way to make sure this doesn't happen? It's very annoying!!

    Welcome to the Apple Community gr8leakes.
    You could simply ensure that only the numbers and addresses you wish to use on each device are checked at Settings > Messages > Send & Receive. However this isn’t an ideal solution because the other person can always change these settings from their device and have some fun with you and your contacts.
    You’d be far better getting them to delete your account from their device and have them create one of their own. If you are sharing an ID for some other service such as iTunes, you can continue to do so, you only need change the ID for messages.

  • ChaRM scenario for only one productive system

    Hi CHaRM-experts!
    I would like to know whether or not is it possible to use the Change Request Management scenarion for only one productive system?
    It means we have systems and cases where we should apply the emergency correction only in productive system, without any transport from DEV or QAS system.
    Does ChaRM support such case?
    Thank you very much!
    regards
    Thom

    Hi Don,
    thank you very much for your answer.
    No, I do not plan any transport in the productive system.
    I would just make any adminstrative changes without transport.
    Does ChaRM support such scenarios?
    Thank you!
    regards
    Thom

  • I bought an ipod in 2006 and used it only for a few days, and i lost it when it fell two times from my hand and it wasn`t working, help me regarding this.

    i bought an ipod in 2006 and used it only for a few days, and i lost it when it fell two times from my hand and it wasn`t working, help me regarding this.
    REGARDS
    RISHABH AULIYA

    Apple - Support - iPod - Repair pricing - http://www.apple.com/support/ipod/service/prices/
    ipod repair options - https://discussions.apple.com/thread/3900047 and https://discussions.apple.com/message/18867033
    Service Answer Center - iPod - http://support.apple.com/kb/index?page=servicefaq&geo=US&product=ipod  <-- enter correct country once on page.

  • What is meant by change pointer and change request

    hi,
    what is meant by change pointer and change request in sap r3
    plz can u any one notes or link on this , or if possible briefly tell about this..
    i am looking for clear idea on this..
    thanks
    Ruban

    With respect to Dictionary Change pointers means all the changes done to dictionary objects.
    All the change logs with respect to tables are stored in CDHDR and CDPOS table
    Change Pointers in broad sense are used with respect to IDOC
    Change Pointers & Reduction of IDOCs.
    Applications, which write change documents, will also try to write change
    pointers for ALE operations. These are log entries to remember all modified
    data records relevant for ALE.
    Following Steps must be followed in case of Change Pointer.
    1) Goto Transaction BD60.
    Note down the Details of the Message Type for which change pointer has to activate. Details like Function Module, Classification Object, ALE object Type etc.
    E.g. ZDEBP3
    2) Next step is goto transaction BD53
    Click on change button.
    First select the segment for which the fields has to modified (either remove or
    add ).
    It will show the fields in a pop-up window where the user can select, deselect the respective fields.
    Save the settings for the Message type. Don’t forget to activate the change pointers by clicking Activate Change pointers button on the main screen.
    3) Once the activation is done system will reset the settings for the Message type in Change pointers (BD60). Maintained the old settings for the Message type.
    Check this FAQ
    . Do you really need change pointers?
    You need change pointers to distribute changes with the ALE SMD tool. If you do not use this tool, you do not need to write change pointers.
    You can deactivate change pointers and activate them again with the transaction BD61.
    2. Do you really need to activate change pointers for this messages type?
    If some messages types are no longer to be distributed by change pointers, you can deactivate change pointers for this messages type.
    You can deactivate change pointers for the message type
    and reactivate them again.
    For reduced message types, deactivate the change pointer with the
    Reduction tool (transaction BD53).
    3. Are there still too many change pointers to be processed?
    The change pointers are analyzed with the transaction BD21 or the report RBDMIDOC in ALE and flagged as processed. If the change pointers are created periodically, this report should also run periodically.
    4. Are no longer required change pointers reorganized in time?
    The report RBDCPCLR (transaction BD22) to reorganize the change pointer should run periodically. Depending on how many change pointers are created or processed, you can schedule the background job hourly, daily or weekly. You should delete all obsolete and processed change pointers. You can also use this report for specified message types.
    We come across change pointer technique while dealing with master data distribution thru ALE/IDOCs
    When we want to reflect changes made to master data(i.e customer master, vendor master, material master ...) visible to other clients listed in customer distribution model, we follow change pointer technique.
    What is customer distribution model?
    A customer model depicts various messages (master data, transactional data) exchanged between the systems and establishes a sender and receiver of data
    A customer model is always maintained on any system for the entire distributed network of SAP systems, so it must be distributed to various systems in the distributed network.
    These r some details regarding change pointer technique which u may find it usefull.............
    The change pointers technique is based on the change document technique, which tracks changes made to key documents in SAP, such as the material master, customer master, vendor master & sales orders. changes made to a document are recorded in the change document header table CHDHR, and additional change pointers are written in the BDCP table for changes relevant to ALE. BDCPS table stores the status of changed documents processed or not.
    The process for distributing master data using change pointers involves the following steps.
    The application writes change documents. SAP maintains change documents for
    several objects in the system, such as materials, customers, invoices, and bank data, to provide an audit trail for changes made to an object. A change document object represents a set of tables for which changes are recorded. For example, the change document for the material master is named MATERIAL and it contains the various tables of the material master object, such as MARA and MARC.
    When an application transaction makes changes to an object, the application writes change documents, which are stored in the CDHDR and CDPOS tables for each change made to an object.
    Tip
    Execute transaction SCDO to see a list of change document objects and
    their tables.
    The SMD (Shared Master Data) tool writes change pointers. When changes are made to an object, the SMD tool checks the ALE settings and consults the ALE distribution model to determine whether a receiver is interested in the object that was changed. If the system finds an appropriate receiver, the system creates change pointers in the BDCP table that point to change documents in the CDHDR table.
    The ALE programs analyze change pointers and generate IDocs. SAP provides
    standard function modules that read the change pointer table and generate IDocs for the objects that were changed. These programs are designed to ignore multiple changes and create only one IDoc. For example, if a material is changed four times before the function module is invoked, only one IDoc with the latest data from the material master data is created. The function modules are invoked by a standard report, RBDMIDOC. The selection parameters of this report allow you to specify the message type for which change pointers are to be analyzed. Configuration
    you must carry out the following configuration steps to enable master data
    distribution based on changes to the object.
    Step 1: Enable Change Pointers Globally
    Transaction: BD61
    This option enables the change pointer process globally. Make sure that the flag is checked.
    Step 2 :Enable Change Pointers for a Message Type
    Transaction: BD50
    This setting is required for activating change pointers for a specific message type.
    make sure that the Active flag is checked for your message type.
    Step 3 :Specify the Fields for Which Change Pointers Are to Be Written
    Transaction: BD52
    For standard master data objects such as the material, customer, and vendor objects, SAP already provides a list of fields for which change pointers are written. If you are satisfied with the standard set of fields, you can skip this step. If you want to add new fields, you must add entries for the required fields. If you are not interested in IDocs being generated for changes to a particular field, you can remove it from the list. For example, if you do not want to distribute the
    material master for changes made to the Catalog Profile (RBNRM) field, you can delete this entry from the table.
    Step 4: Changing a Field in the Master Data
    Change a field in the master data object for which the change pointer is enabled. For example, if you change the net weight of a material in the material master data, a change pointer is written.
    Tip : You can verify a change document and change pointer by viewing entries in
    tables CDHDR and BDCP, respectively.
    Step 5 :Executing Program RBDMIDOC to Process Change Pointers
    Execute program RBDMIDOC to initiate the process of generating an IDoc. On the selection screen, specify the message type. For example, you can specify MATMAS. After you execute the process, it displays the number of entries processed.
    Note :
    Normally, you schedule this program to run frequently and start IDoc
    generation for different message types.
    Step 6 : View the idocs in WE02/05

  • How to control change request creation for particular IBase Component?

    Dear Experts,
    Can anybody suggest , how to control change request creation for particular IBase Component?
    We have implemented ChaRM which is integrated with SAP ECC & SAP BI.
    ChaRM is not integrated with SAP Solution Manager.
    End Users are creating support notifications from -Help Menu- Create Support Notification.
    The IBase Component is not editable once notification is created. This Ibase is copied to change request when the action-create change document is saved.
    Requirement is that, during creation of change document, system should check the IBase component of support notification. If the IBase is related to solution manager system, system should restirct the change request creation.
    Kindly suggest how to achieve this.
    Regards
    Vivek

    Hello Vivek,
    The way to do what you want is to create a schedule condition for action Create Change Document. The action has to be displayed only when the IBase/Component value differs from SolMan. To add the IBase/Component value to the container so that it can be evaluated during runtime, you will have to create a subtype of BUS2000116 on which condition can be buit.
    See the following posts for more information :
    Hope this helps,
    BR.
    Stéphane.

  • How to give authorisation to create and change request?

    How to give authorisation to create and change request? Which T Code is needed to create request and change request?
    Rajkumar.

    Hi,
    For creating/changing/displaying change requests, you need to give access for SE01, SE09/SE10.
    You needn't give access to transaction SE03 to all users, only super users should have that access from security point of view.
    Regards,
    Sarita

  • What is the difference between task and change request?

    Hi all
    What is the difference between task and change request?
    thanks all

    Dear Ispit,
    <a href="http://help.sap.com/saphelp_nw2004s/helpdata/en/19/3f5bf8a4b011d285090000e8a57770/content.htm">Request Types and Task Types</a>
    <a href="http://help.sap.com/saphelp_sm32/helpdata/en/dd/cc86a571464559a2685a404397065b/content.htm">Change Transactions in Change Request Management</a>
    For more information about the SAP Change and Transport System (CTS), visit the following link:
    http://help.sap.com/saphelp_nw04/helpdata/en/57/38ddff4eb711d182bf0000e829fbfe/frameset.htm
    Transport Request is generated in following scenarios:
    1. Customizing Request - When doing or changing some customization.
    2. WorkBench Request - When configuration is cross-client. Eg Generating new Table, making changes in access sequence, Abap development, etc.
    Transport request is not generated for Master Data. For eg: Customer Master, Material Master, price master, etc.
    Benefit of Transport Request:
    SAP Landscape normally has 3- Tier system:
    Development Server - Where customization takes place. Transport request is generated at this level & then first transported to Quality server for testing whether it meets the requirement or not. Once the requirement is met in Quality server then Request is transported from Development Server to Production Server (Actual / Live System)
    Quality Server - Mainly useful for testing.
    Production Server Actual / Live server, where the real transactions are created & posted.
    Procedure to Release & Transport Request:
    1. In development server, go to T.Code: SE10 & select the check box Modifiable & enter
    2. In the next screen, you will see list of transport request created.
    Note: Transport request consist of main request along with sub request. These sub request hold the object to be transported.
    3. Expand the main request & you will be able to view the sub requests attached to main request.
    4. First release the sub requests.
    Note: To release the request, select the request ni & click on release request individually (Do not select release all request)
    5. Next release main request.
    6. Once the request is released sucessfully, imform the basis person to import the request to QA server.
    or
    If the authority is with you, through T.Code: STMS, select development server --> select request no & release to QA server. Here when it pops up client no, user id & password, maintain it of QA server & release the request to QA server.
    Reward points if this is helpful.
    Regards,
    Naveen.

  • MaxDB support for production systems

    Hi,
    I have a DMS with MaxDB version 7.6.00.18.
    I opened OSS message regarding an issue. I got a solution, however I was told that '7.6.00.18 is very outdated and no longer supported for productive systems'.
    I can install the latest patch but how do I know when MaxDB version is no longer supported for productive system.
    Can someone refer me to a note/article?
    Thanks,
    Omri

    here is the details i found
    Especially make sure to check in the Product Availability Matrix (PAM) http://service.sap.com/pam that the MaxDB / SAP DB version you plan to use is released for your specific SAP product!
    Note 1178367 - SAP MaxDB: End of Support Dates
    Cheers,
    -Sunil

  • Acro 9 Pro/CS3 new install - "action valid only for product that is currently installed"

    Hi,
    I successfully installed CS3 on XP/SP3 followed by the Acrobat 9 Pro upgrade to 8 that was included. The install seemed fine, and I activated Acrobat 9. However, when I click the start menu icon created by the installation, the got the message "action valid only for product that is currently installed". In addition, the standard IE integration is not present. Starting a repair from the Acro Help menu doesn't seem to do anything, and the product does not appear in Control Panel Add & Remove programs.
    I can start Acr 9 by navigating to the .exe in Program Files, but really need to fix the install.
    Has anyone seen this and fixed it?
    Also, if I (hopefully not) have to manually uninstall and reinstall, does anyone know
    - how to manually uninstall Acro 9
    - if uninstall destroys the activation I've already completed?
    Thanks much,
    Gordon

    CS3 comes with AA8, not AA9. I don't know where you got AA9, unless it was a trial. As far as I know, there was no packaged upgrade to AA9 with CS3. Others can confirm that I guess. You probably need to uninstall AA9 and reinstall AA8. Then update AA8 to the current version, AA8.1.4. Bill

  • Service Desk and Change Request Config document

    Hi SolMan Experts,
    Could you please help in getting Service Desk and Change Request Management Configuration document please !!!
    Thanks in advance.
    - Ignacio.

    Hi,
    Please get the stuff from the following sites.
    1. http://help.sap.com/ -> SAP NetWeaver -> SAP Solution Manager
    2. http://service.sap.com/solutionmanager
    3. use tcode SPRO--> search for service desk and follow the steps.
    4. use tcode SPRO--> search for Change Request management and follow the steps
    Regards,
    Srini Nookala

  • HT204003 if i open passbook on iphone 5, it always say cannot connect to itunes, any fix from apple tech support? and whats the reason for this problem? why do we have to figure it out and not even apple can give answer??

    if i open passbook on iphone 5, it always say cannot connect to itunes, any fix from apple tech support? and whats the reason for this problem? why do we have to figure it out and not even apple can give answer??

    actually i found out how to fix it
    1 sign out of apple account
    2 close down passbook app
    3 change year to 2013
    4 reopen passbook and sign in at the button with your apple ID
    5 change the time to auto update and it should work from now on.
    this worked for me let me know if it work for you:)

  • I have my email set at 1000 messages and it is only holding messages from the last four days, any ideas

    I have my email set at 1000 messages and it is only holding messages from the last four days, any ideas

    With an exchange account, it's "Mail Days to Sync":
    http://support.apple.com/kb/HT2723

Maybe you are looking for

  • In Business Rule child elements of Unbounded element are not visible.

    Hi All, Jdev version 11.1.1.7.0 I am facing one issue in Business Rule... Scenario: I am creating Approval Service (BPEL) with Human Work flow and Bunises Rule. I am assingning participant in HW by using Rule based(Connecting HW and BR). Problem here

  • How to get rid of annoying tool tips while editing SQL files

    I'm using Visual Studio 2013 to edit an .SQL file and I have attached the editor to a local SQL Server 2008 R2 database. While editing the string that is passed to a sp_executesql procedure it keeps popping up a tool tip saying: "Parameter help is no

  • Folders Opening on their own in CS4

    I've noticed that in my largest site whenever I open a folder in the "file window on the right hand side by clicking the arrow to see the contents inside Dreamweaver automatically opens my "images" folder as well. Does anyone have any idea why this i

  • How to enabale trace in Easy DMS ?

    Hi, I used BADI: DOCUMENT_MAIN01 & method: ASSIGN_NUMBER to assign document number. Now am creating document through Easy DMS am getting error "Exception Occurred". How can i find, where is the problem ? How can i enable Trace option in Easy DMS ? I

  • How to Run Reports Demo on IAS Rel.2

    I have successfully installed 9ias Release 2, infrastructure and Business Intelligence and Forms on one Solaris server. I am now trying to run the demos. Forms demo runs fine, but the Reports Demo is confusing. I am presented with a screen that says