Sweet spot MacPro line for CS?

Dear Group,
Since i got a suddenly dead G5 too, I'm suddenly wondering which MacPro
might be the sweet spot for CS4 performance, now, and CS5. I'm just a typical photoshop user ranging from web to layered 300 MB files. I've been out of the loop on improvements because i was content with my G5, tho it had its limitations of course.  Any advice is welcome, thanks.
Steve Z

Dear Group,
Since i got a suddenly dead G5 too, I'm suddenly wondering which MacPro
might be the sweet spot for CS4 performance, now, and CS5. I'm just a typical photoshop user ranging from web to layered 300 MB files. I've been out of the loop on improvements because i was content with my G5, tho it had its limitations of course.  Any advice is welcome, thanks.
Steve Z

Similar Messages

  • How do you take out spots or lines in photos?

    How do you take out spots or lines in photos?

    Generally speaking, with the spot healing brush and/or the clone stamp tool. However, there are other methods as well.
    It would help if you post a representative picture for us to look at. You can do that via the camera icon at the top of the reply box. However, you can not do it in an e-mail reply.

  • Re: RAM - Sweet Spot

    Hey guys,
    Does anyone know of any benchmarks out there that tests for the RAM sweet spot for Adobe Premiere Pro CS5?
    Windows 7 64-bit Professional can support up to 192GB of RAM.  When is it too much RAM?

    Hey guys,
    Thanks for the link to PPBM5, I will definitely check it out!
    Also for the 'memory chips' or DIMM size as they say in the industry, there are actually 16GB DDR3 ECC Registered modules out there.  The cheapest is the Hynix 16GB (DDR3 ECC Registered) at memorydepot.com for $500.  All the new server/workstation boards support it (well actually the memory controller embedded on the die of the AMD and Intel CPUI's support it).
    The upcoming AMD Interlagos and Xeon E7-xxxx chips will support 32GB Modules (Samsung is the first to provide the actual chips to ODM's).
    I think the main thing for me (keep in mind I have yet to check out the PPBM5 site yet, so my opinion may change after having checked it) is to get a motherboard that has the most expandability so that later on I can add more RAM.  Right now I really like the Asus KGPE board (this is an AMD Opteron Socket G34 chipset) as it has 16 DIMM slots with each of them supporting up to 16GB sized modules!
    Yes I know that Windows 7 64-bit Profissional/Ultimate only supports up to 192GB, but again it is about future proofing as my current motherboard 'only' supports 16GB in total.
    Also I like the AMD Opteron platform (Socket G34) because future AMD chips (at least for the next cycle of SKU's) will support the SAME motherboard without having to buy a new one unlike with Intel.
    Althernatively there is the SUPERMICRO MBD-H8SGL-F-O motherboard which is also Socket G34 for AMD and is a SINGLE socket board with 8 x DIMMs with each DIMM supporting 16GB modules, this would be a good economical choice.  The board is also half the price of the Asus KGPE.
    Intel however doesn't seem to have the same value offering, although yes they do perform better with Premiere Pro CS5 so it may be worth the price premium.

  • When was last update to MacPro line?

    My MacBook is almost 3 years old and am contemplating a new laptop. I would rather buy a new model than one that will soon be replaced with a better version. How long has it been since the MacPro line was last updated? Just trying to figure out if I have a long wait until new models might be released.

    The rumor site contains considerably more information. For example, the Mac Pro was las updated March 3, 2009 (386 days ago). The site tells you that Apple has released 11 updates to the product, the average interval between updates is 236 days. The longest interval between updates was 14 months, and the shortest interval was 5 months.
    The site also covers other Apple products. For example, the poster asked about the Mac Pro in the MacBook Pro forums, so it's unclear whether he's looking for Mac Pro or MacBook Pro information -- both of which are presented on that site.

  • How to put schedule lines for one year  in a schedule line agreement

    dear all
    thanks for the support till now from the forum
    now i need some seetings by which the scheduling agreement will autoumatically take the schedule line for one year automatically
    in my client we are getting open PO so
    we have to make one agreement acording to that PO and thats for one year
    and this one yr will have same quantity to be produced everyday
    means 12nos of material every day for 12 month and this will be for every day
    and as per that it should generate a sales order.i need to put schedule line automatically not mannually one by one for each date.so wat is the settingand how to reffer this scheduling agreement we can produce sales order.
    please help
    subrat
    Message was edited by:
            subrat panda

    Dear Subrat,
    you cannot create a yearly schedule line in the scheduling agreement. It is not possible due to format restrictions of the date field. But what you can do is the follows (it is the modification, but it should work with the help of user-exits):
    1. You can split the year schedule line to the monthly schedule lines. There are two ways to do it. If you apply the DELINS IDOC, then you can do it already during transfer of the data to the application (itr is the best way). Here you can use, for example, user-exit USEREXIT_ZUORDNEN_IDOCS (include LVED4FZZ) or customer function EXIT_SAPLVED4_002, called from the subroutine USEREXIT_DYNPRO (Include LVED4F0U). Alternatively, you can use the user-exit USEREXIT_MOVE_FIELD_TO_VBEP (Include MV45AFZZ) within the call transaction, then it will work also in the dialog case.
    2. After getting the monthly schedule lines, you can create a planning delivery schedule, where you can split mothly schedule lines automatically to daily schedule lines according to the customer factory calender.The settings for generation of planning delivery schedules can be found under:
    Customizing SPRO: Sales and Distribution => Sales => Sales Documents => Scheduling Agreements with Delivery schedules => Maintain Planning Delivery Sched. Instruct./Splitting Rules
    It is the only ways, how you can reach your aim. I hope, this information will help you further.
    Kind Regards,
    Akmal Vakhidov
    Development Support SD, SAP, Walldorf/Germany

  • Can't get itunes.  I get the following message when I click on either the shortcut or the program.  It says ITunes has stopped working and I can either check on line for a solution and close the program or just close the program.

    When I click on the itunes shortcut or the program  I get the following message:
    ITunes has stopped working.  My two options are:  Windows can check on line for a solution to the problem or close the program. 
    It seems that my entire library is not there.  If I sync my ipod will it add it back into my library on the computer? 
    I've even tried installing again and nothing works.  Tried the "repair" and it says that ITunes is loaded but I stil get the above error when I try to open the program.
    Thanks

    Let's try the following user tip with that one:
    iTunes for Windows 10.7.0.21: "iTunes has stopped working" error messages when playing videos, video podcasts, movies and TV shows

  • How do I set up a ringmaster on my fax 2140 so that I can use the same line for phone

     I have  the HP 2140 Fax Machine and have always had a separate line for the fax.  Now, I have only one line which is
    to be used for both the telepone and my fax machine.  This will save me approx. $200 per year. 

    cannot get my fax machine to except the drpd distintive ring. went to change the print cartg. and screwed something up?     Can you help?

  • Not able to generate multiple lines for headers in report

    Hi,
    I am new to BI publisher and not able to generate multiple lines for headers. Please help me to resolve.
    I am using RTF template, data source as PS Query and XML file (system generated from the data source)
    When I am using system generated 'First XML' file, I am getting output in the follwoing format.
    TEAM_MEMBER, PROJECT_ID, NAME, START_DT
    e.g.
    EMP1 , 71000, Sample, 01-Jan-2010
    EMP1 , 72000, Sample, 01-Feb-2010
    EMP1 , 73000, Sample, 01-March-2010
    But I want the report to be generate with multiple projects for one employee like below format , for that I used 'Second XML' file but I am getting blank report.
    In short if there is one to many case, how to show in reports??? Please correct if I am going wrong.
    TEAM_MEMBER
    PROJECT_ID, NAME, START_DT
    PROJECT_ID, NAME, START_DT
    PROJECT_ID, NAME, START_DT
    e.g.
    EMP1
    71000, Sample, 01-Jan-2010
    72000, Sample, 01-Feb-2010
    73000, Sample, 01-March-2010
    **********First XML**************System generated XML ****************************
    <?xml version="1.0"?>
    <query numrows="2" queryname="SY_EMP_PROJECT" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="">
    <row rownumber="1">
    <TEAM_MEMBER>TEAM_MEMBER </TEAM_MEMBER>
    <PROJECT_ID>PROJECT_ID samp</PROJECT_ID>
    <NAME>NAME sample data</NAME>
    <START_DT>2010-08-25</START_DT>
    </row>
    <row rownumber="2">
    <TEAM_MEMBER>TEAM_MEMBER</TEAM_MEMBER>
    <PROJECT_ID>PROJECT_ID samp</PROJECT_ID>
    <NAME>NAME sample data</NAME>
    <START_DT>2010-08-25</START_DT>
    </row>
    </query>
    **********Second XML**************Manually created XML and using to show multiple projects for one employee****************
    <?xml version="1.0"?>
    <TEST numrows="2" queryname="SY_EMP_PROJECT" xmlns:xsi="http://www.w3.org/2001/XMLSchema-instance" xsi:noNamespaceSchemaLocation="">
    <TEAM_MEMBER rownumber="1">
    <TEAM_MEMBER>1</TEAM_MEMBER>
    <EMPLOYEE_NAME>SAMPLE</EMPLOYEE_NAME>
    <PROJECT>
    <PROJECT_ID>1111</PROJECT_ID>
         <PROJECT_DESCR>SAMPLE</PROJECT_DESCR>
    <START_DATE>01012010</START_DATE>
    </PROJECT>
    <PROJECT>
    <PROJECT_ID>1112</PROJECT_ID>
         <PROJECT_DESCR>SAMPLE</PROJECT_DESCR>
    <START_DATE>01022010</START_DATE>
    </PROJECT>
    </TEAM_MEMBER>
    <TEAM_MEMBER rownumber="2">
    <TEAM_MEMBER>2</TEAM_MEMBER>
    <EMPLOYEE_NAME>SAMPLEC</EMPLOYEE_NAME>
    <PROJECT>
    <PROJECT_ID>1111</PROJECT_ID>
         <PROJECT_DESCR>SAMPLE</PROJECT_DESCR>
    <START_DATE>01012010</START_DATE>
    </PROJECT>
    <PROJECT>
    <PROJECT_ID>1112</PROJECT_ID>
         <PROJECT_DESCR>SAMPLE</PROJECT_DESCR>
    <START_DATE>01022010</START_DATE>
    </PROJECT>
    </TEAM_MEMBER>
    </TEST>
    Edited by: ganeshtw on Aug 25, 2010 12:14 AM

    Hi,
    With your first xml you can print like
    EMP1
    71000, Sample, 01-Jan-2010
    72000, Sample, 01-Feb-2010
    73000, Sample, 01-March-2010While creating the RTF template you can use the Group by option.
    <?for-each-group:ROW;./columnname> then print the column name
    <?columnname?>
    --Then your table format
    71000, Sample, 01-Jan-2010
    72000, Sample, 01-Feb-2010
    73000, Sample, 01-March-2010
    <?end for-each-group?>
    Thanks.

  • To generate Schedule lines for scheduling Agreement when MRP is run.

    Hi,
    Please help advise on my following requirement:
    When I run the MRP for 'Single Item - Multi level' (MD02) for a material, I want MRP to generate delivery schedule lines for that material in Scheduling agreement.
    Please advise as to how i can go about with this.
    Regards,
    Manju

    Hi Manju,
    For this you need to set creation indoactor for planning run in SPRO.
    The path is spro-MM-CBP-Carry out overall maintenance of plant parameters-Click on maintain-give your plant-click on external procurement under planning run-here you can give your option for the schedule line creation.
    Traction code is omi8. Hope this will help you.
    Cheers
    Ravi

  • Schedule Lines for Sales BoM Material

    Hi All,
    When i trying to maintain the multiples schedule lines for the Sales BoM Material(Both Header and Item), system is not allowing to maintain it.Please guide me how to achieve this?

    Hi,
    "Schedule Line allowed" is enabled at Item category. The Requirement is If we have multiple schedule lines for BoM Line Item, we are not able to maintain. Suppose the Order Quantity is 50 Units and we need schedule line of 10 Quantity each month. We are not able to maintain. System takes the complete 50 quantity and do the availability check and proposes the availablity Date. We are not able to maintain different schedules manually.

  • Schedule lines for outbound process

    hi
    can anyone tell me what is schedule lines for outbound process
    thanks

    thanks charlie for your answer can you pl tell me what does it means configured delivery types, item categories and schedule line for outbound processes.
    thanks

  • Schedule lines for schedule agreement

    Hi,
    I need get all schedule lines for schedule agreement (all schedule lines = all visible in tab analysis u2013 all lines for all forecast dlv. sched).
    I check table VBEP and VBEH and I canu2019t find all items.
    Could you help?
    Thanks in advance,
    E

    Hi Manju,
    For this you need to set creation indoactor for planning run in SPRO.
    The path is spro-MM-CBP-Carry out overall maintenance of plant parameters-Click on maintain-give your plant-click on external procurement under planning run-here you can give your option for the schedule line creation.
    Traction code is omi8. Hope this will help you.
    Cheers
    Ravi

  • Schedule Lines for TATX items

    I know that by default, schedule lines are not active for TATX (text) items in sales documents.
    I'm also pretty sure that this option is not valid even if you activate it in the IMG.
    Can anybody tell me:
    1) Is my statement above correct ?
    2) If so, why are schedule lines not allowed for TATX items.
    3) Is there any way around this limitation ?

    Thanks for your input so far.  Perhaps you'll be kind enouth to stick with me a little more.
    Let me expalin what my user is doing:
    In the IMG configuration of our system, schedule lines were activated for TATX item category, however it still does not work as expected.
    User enters a quantity of deliverable product on line item 1 with item category of TAN.
    User creates a delivery schedule for line item 1 using schedule lines (category CP).
    For line item 2, user wants to send "DOCUMENTATION" for each schedule line.
    "DOCUMENTATION" exists in our SAP system as a material master, but no stock exists.
    User enters a quantity of DOCUMENTATION on line item 2 with item category TATX.
    User creates delivery schedule for line item 2.  (auto populates sched category CT).
    When delivery is created, the first schedule line for both items works fine.
    For subsequent deliveries, line item 1 continues to work, but the line item 2, DOCUMENTATION material does not show up.
    I suspect that we are trying to use the TATX item category differently than it was intended, and that some other method would be a better fit for making deliveries of non-stocked material.

  • Unable to enter multiple Schedule lines for BOM material in Sales Order

    Hi All,
    We have a Sales Order where in which we cannot add additional schedule lines for BOM material.
    The schedule lines are greyed out, user was able to add schedule lines earlier.
    I have checked all assignments in VOV6, VOV7 and everything seems to be fine and no changes have been made to item category being used.
    Please provide a solution for this.
    PFB link in which similar situation posted in this community but the final resolution method is not discussed.
    http://scn.sap.com/message/13201504#13201504
    Regards,
    Samiksh

    Hi Samiksh,
    Pls check for that particular customer, only complete delivery allowed(c) is set in the CMR or CMIR. If so, you can't enter multiple schedule lines for that customer.. it would be grayed out in the sales order schedule lines except confirmed line.
    or check the problematic sales order at item level shipping tab if the par del/item is set to 'C'
    With regards
    S.Siva

  • Multiple Schedule Lines for Individual Qty in Standard Order

    Hello All,
    I have a Client Requirement to Set up the Standard Order for a Material which will be sold on Single Quantity every Month.
    This will have to occur from the same Order. For this Multiple Schedule Lines are required to be generated as per Monthly Delivery Schedule.
    I know this functionality comes under Scheduling Agreements where we can deliver goods as per confirmed Schedule Lines for the Month.
    But Client Requirement is to set up this functionality in Standard Order Only as setting up scheduling agreements calls for mapping of New Order Types which is not feasible.
    So Can you provide with your valuable Inputs as to whether this can be possible through Standard Order in the system.
    Looking forward to your esteemed reply!!
    Warm Regards,
    Onkar Khedekar

    Dear Onkar:
    If you don't want to use Schedule agreements, you can enter several schedule lines for each item in "Schedule line" tab at  item level.
    Enter in this tab each schedule line per month.
    But be aware which date you enter becuase this requirement will be transfered to MRP.
    Check it and revert.
    Jose Antonio Martinez

Maybe you are looking for

  • I am getting dump error while running one report in one select query

    Hi, While running a report program, I am getting a dump error in one select query. So could you please correct the select query so that I can't face the dump error. SELECT vbeln parvw kunnr INTO CORRESPONDING FIELDS OF TABLE l_t_vbpa   FROM vbpa   FO

  • Phone Shuts Down Repeatedly & Restarts & Won't Charge Since IOS 8 Upgrade

    Jesus please take the wheel. After reading about all the IOS 8 problems in the past few weeks I thought everyone was nuts until two days ago. My iphone 5 has never been mistreated, dropped, slung across a room, or undergone anything approaching tortu

  • Problems with tutorial: Building an Application

    Hi, I made the step by step tutorial (Building an Application Part 1: Application Objects, http://developer.java.sun.com/developer/onlineTraining/new2java/divelog/part1/page8.jsp) There is a problem. If I compile the DiveLog.java Code as it calls on

  • Convert a JSP to PDF

    Hi everybody! can any one help me in converting the dynamic JSP page to a PDF file including the dynamic content of the page on fly. Please give the saple code too thanks

  • Resetting Mac OS X Server 10.5

    During the setup process for 10.5 Server, the install seems to have trashed its settings - all sorts of weird behaviour and can't reliably connect using serveradmin. Can anyone provide a way of completely resetting 10.5 Server, so that I can run Serv