Synchroniz​ing BB Bold

I have installed the BB Desktop Manager Version 4.6.0.12 (May 22, 2008) on my Laptop. When trying to synchronize I get a message stating "The computer must be connected to the Internet in order to initially configure synchronization settings. Please ensure that you are able to connect to the Internet and try again".
I am connected to the Internet and fail to understand why the message pops up. Do I need to make some local settings?
Terence Alva
Solved!
Go to Solution.

in the desktop manager there is an option to transfer from one device to another. I am not familiar with it. You can first look at how it works.
If you don't like it, you can also (but I am not familiar with it either) :
1) backup the database you want (address book, or calendar, or...)
2) restore that database on the new Blackberry
The search box on top-right of this page is your true friend, and the public Knowledge Base too:

Similar Messages

  • Synchroniz​ing two counter frequency inputs with multiple analog inputs

    Hello all,
    I'm fairly new to LabVIEW and I'm trying to collec​t data from multiple sources with synchronized tim​ing on the acquisition but I'm having trouble figu​ring it out. My problem is that I've got two count​er frequency inputs, one optical tachometer readin​g one pulse per revolution, and a max machinery fl​ow meter with a k factor of 12000. I can't seem to​ figure out how to sync the timing with my multiple analog inputs. I've be​en attempting to get the tachometer  to sync with ​the analog inputs first by following the example l​inked here. (https://decibel.ni.com/content/docs/DOC-10785) So far each time I run it I either get a timeout e​rror on the DAQmx read or a "Multiple sample clock​ pulses were detected" error (see attached image).  It seems if I slow the sampling rate way down to ​say 10 hz and ensure that the tachometer signal is​ over 800-1000 RPM (13-17 Hz) before starting the VI then the program will run without errors until ​the RPM drops below that threshold then the "Multi​ple sample clock pulses" error occurs.  The code is attached below.
    Does anyone know of a more effective way of syncin​g counter frequency inputs with analog inputs?  I'd like to have a VI that can show 0 RPM (and ev​entually 0 flow as well, but I think I need to fig​ure out the timing of one counter before I add ano​ther as it seems I can't have two counters in the ​same task). Any help on this would be greatly appr​eciated.
    LabVIEW version 13.0
    cDAQ-9178 Chassis with NI 9401 for the two counter inputs and NI 9205 for the analog inputs.
    Thanks!
    Richard
    Solved!
    Go to Solution.
    Attachments:
    SimpleDAQ.vi ‏44 KB
    LV_Error.JPG ‏31 KB

    Maybe third times the charm? 
    So I've finally got a good handle on why the VI is having problems at low RPM though I'm somewhat embarassed how long it took me to do that
    Because I have the counter time synced to my Analog input task if it doesn't see at least two pulses between the two clock pulses set by the analog input task I get the -201314 "Multiple sample clock pulses" error. This seems fine at first as it just sets a minimum RPM that I can measure and it's well below the area I'm interested in so no problems there.  I tried a simple error handler that would clear the error when it happend assuming the loop would keep iterating until the RPM went above that minimum at which point I would get a signal again. This is not the case, the read function just continues to spit out the -201314 error even after the RPM is back in the readable range. So then I tried adding two case structures so that when the error occured it would stop the task, clear the error, and then start the task again on the next loop iteration (Code Attached). This also doesn't work as the error shows up again on the stop task and then AGAIN on the start task on the next loop iteration. It seems this error is not actually being cleared and once it happens it stays with the task regardless of what the error cluster is carrying. 
    Anyone have any ideas?  The only solution I can think of is to just clear all tasks and recreate them each loop iteration until the RPM is readable again but that strikes me as a horribly clunky solution.
    Richard 
    Attachments:
    SimpleDAQ_1_Start Stop.vi ‏48 KB

  • Synchroniz​ing my calendar

    I have had this problem with both my Curve model, and my previous Pearl model but it's never been resolved.  I can synchronize my contacts in Outlook, but every time I try to synchronize my calendar I get the error message 0x80040fb.3.  I have spent ages going round in circles on the troubleshooting part of the website, and am sick of it.  There is no option to contact Blackberry to ask for support - I did contact my service provider first and they told me to go to the website as there are no other problems with the phone.
    Can anyone explain this error message in very, very simple language and tell me what I can do about it?

    Hi and Welcome to the Forums!
    Here is a KB that discusses that error. Hopefully it contains something useful for you.
    Good luck and let us know!
    Occam's Razor nearly always applies when troubleshooting technology issues!
    If anyone has been helpful to you, please show your appreciation by clicking the button inside of their post. Please click here and read, along with the threads to which it links, for helpful information to guide you as you proceed. I always recommend that you treat your BlackBerry like any other computing device, including using a regular backup schedule...click here for an article with instructions.
    Join our BBM Channels
    BSCF General Channel
    PIN: C0001B7B4   Display/Scan Bar Code
    Knowledge Base Updates
    PIN: C0005A9AA   Display/Scan Bar Code

  • Trouble synchroniz​ing my centro

    After I have loaded 6.2 software and plug phone in using USB port I get a low alarm saying that the computer is searching for device drivers. This message pops up and goes away continuously. Then it finally tells me the driver cannot be found contact PALM. I have uninstalled and reinstalled many times. Also did a soft reset on the phone. Please help....
    Post relates to: Centro (Verizon)
    Post relates to: Centro (Verizon)

    Try the procedure in the following article on kb.palm.com.
    Click on the following link to the kb.palm.com webpage for the article regarding Windows New Hardware Wizard asks for a USB driver when I try to synchronize.
    http://www.palm.com/cgi-bin/cso_kbURL.cgi?ID=26405
    For reference purposes, click on the following link for the support page for your device on the kb.palm.com webpage.
    http://www.palm.com/us/support/centro/centro_vzw/
    There are links on the page to the user guide, troubleshooting, how to's, downloads, etc.
    Post relates to: Palm i705

  • Synchroniz​ing counter and analog tasks

    Hi,
    I would like to synchronize an analog task and a counter task. I want to share the AI sample clock for the analog task and the counter task. I found an example on NI website that seem be be suitable:
    http://digital.ni.com/public.nsf/allkb/BB7AE2D12BB​04CBE862574FA005D3826
    I'm trying to use the first example given in the KB: CounterSynch-Analogtask.vi. I'm using a PCI 6621 with LV 8.6 and DAQmx 8.7.2.
    I'm getting an error when running this example (see attachment).
    I also tried to insert a DAQmx read property node(available samples per channel) inside the while loop reading the data and connect to one of the counter task This one always displays a 0 value. If I simulate the 6621, the property node value is increasing at the beginning and then decreases to reach 0 and I finally get the same error that I got with the card.
    If you have an idea on what could be the root of problem.
    Thanks in advance.
    Best regards.
    Clément GIROD
    DAM
    Solved!
    Go to Solution.
    Attachments:
    DAQmx error.JPG ‏83 KB

    Hi Clemente,
    The reason you were getting this error is because the counter task was set to finite while it is continuously reading in the while loop.
    The VIs on the same link have been editted so that they will work. Please chech them out and see if they work.
     Please let me know if you have any further questions.
    Best Regards,
    Faris A
    Bueller

  • Synchroniz​ing x-series pxie 6358 and 6363

    Hi,
    I have 2 pieces of PXIe-6358 at the moment and planning to extend the kit by 3 pieces of PXIe-6363 and to perform HW-timed analog readings on all devices synchronously.
    Using all AI channels of the PXIe-6363s, the max. sampling freq. is going to be 31.25 kHz I guess. Thus the sampling freq. of the PXIe-6358s have to be set to 31.25 kHz as well. To enforce the synchronisation with low jitter I think all sample clocks should be tied to a reference clock - OnBoardClock for example. The question is: how can I synchronise these X-series cards to a same reference clock and to the same frequency? Can somebody please suggest how it is done efficiently.
    Thanks,
    Krivan

    Synchronizing DSA, S Series, and X Series Devices With a Single NI-DAQmx Task
    NI-STC3 Timing and Synchronization Technology
    Synchronization Explained
    Christian

  • Difficulty synchroniz​ing data from VISA resource with data from a physical channel

    Essentially what I'd like my program to do is control the electrical power going (sourcing either current or voltage) into a light and measure the intensity of the light at a given power level, and then do this automatically for ~1000 increments of the source voltage/current.
    One of my lab partners made a program a while back which does what we want("LIV Sweep Rev.vi" the first image in the link at the end of this post), but it's a bit sloppy: the program is able to interact with the power supply (connected directly to the computer via USB) and make it turn on, increase the voltage/current, and record the "IV" characteristics just fine. The program can also interact with the light detector (connected via NI-BNC 2110) and gather the photocurrent data. The problem, however, is that the data wouldn't be in sync. The photocurrent data for when the light was actually supplied with 1V would be improperly recorded in the cell for when 2V are applied to the light. To fix this problem my lab partner added in a time delay so that the detector will pause for ~0.35 sec (user-specified in front panel) before gathering data.
    The program works, but I figured there had to be a better way. The thing about the timing, however, is that it changes from run to run. Sometimes a delay of 0.45 s works well, and other times the power supply will have shut down while the detector is still gathering data (and thus we miss the low end of the sweep). Other times the detector will turn on too early, which will cut off the high end of the sweep.
    (Note: I have next to zero experience with LabVIEW, but I know a little bit of java, so I understand most programming jargon)
    I spent all day yesterday trying to find out how to synchronize two data aquisitions (my attempt is shown in the "LIV SweepSummerDuncanRev3.vi" in the link at the bottom, 2nd image) but I'm running into trouble when I try to trigger the sample clock using the VISA Resource Name for the power supply.
    The programs can be viewed here:
    http://imgur.com/a/Up3eS
    I'd really appreciate any and all advice that you folks have to offer!

    Change the code such that rather than using a ramp from your power supply, just output a single value. Then do your measurement and then step to the next value in your ramp.
    You can use a State Machine (SEarch if you do not know that term in LV).
    Some gear will allow specifying a ramp driven by an external clock. If you widget can handle an external clock/trigger that approach could run faster.
    Without hardware to syncronize the various sub-systems you would have to resort to using a RT OS and depending on the instruments, even that could be hit-n-miss.
    So re-code to step-measure-step-measure etc.
    Ben
    Ben Rayner
    I am currently active on.. MainStream Preppers
    Rayner's Ridge is under construction

  • Synchroniz​ing Palm Centro Windows 7 (64 bit)

    I was dismayed to discover, when I had to purchase a new PC, which came with Windows 7 (64 bit), that my Centro (Verizon) could not HotSync via the USB cable.  I did find the following instructions to HotSync with Bluetooth (with which I am not familiar).
    http://kb.palm.com/wps/portal/kb/common/article/49​229_en.html 
    I purchased a Targus Bluetooth 2.0 Adapter (ACB10US) at our local Staples, then phoned Targus to verify that it i
    s compatible with Windows 7 (64 bit).  I was advised that it is - to follow the installation directions (for Vista) in the package and, if it did not install successfully to download an update from the Broadcom website - but, this was not necessary.
    Once I installed the Bluetooth Adapter and it appeared on my PC as a device, I followed the directions on the page above, but my Centro did not find my PC.
    I phoned Palm Support and a rep guided me through configuring the Bluetooth settings and settings in HotSync Manager to change for first time synchronization.  My Centro "found" my PC and I was able to successfully HotSync!  It took a while (about 25 minutes) as I have a lot of third party programs on the Centro.  There was only one minor error (SysZLib.prc already exists), but everything else appears to be just fine, including adding files to third party desktop programs (E-Wallet, ThoughtManager, etc.).  Everything seems fine.
    I hope this will be helpful to others with a Palm Centro and Windows 7 (64 bit).
    Post relates to: Centro (Verizon)

    Thank you for this information I also just created an post located here: http://forums.palm.com/palm/board/message?board.id​=windows_hotsync&thread.id=53678
    I do apologize this was not out there earlier so you could make use of it

  • Synchroniz​ing Torch 9800 contact list with my Playbook

    I am trying to avoid retyping all my contacts on my Torch 9800 into the Contact on my Playbook.  Is there a way to port them from my phone to the Playbook and then sychronize them so when one changes, it automatically changes the other?

    Hey pratiktnm,
    Welcome to the BlackBerry Support Community Forums.
    Thanks for the question.
    Are you setup on a BlackBerry Enterprise Server?  With the Desktop service book appearing it seems you were on one.  If you are still on a BlackBerry Enterprise Server, I would suggest creating a full backup with BlackBerry Desktop Software: www.blackberry.com/btsc/KB33505
    Then proceed with a security wipe by going to Options>Security>Security Wipe and then contact your network service provider to generate a new Enterprise Activation password.  Then proceed with the enterprise activation by going to Options>Advanced Options>Enterprise Activation.
    Once the activation is completed, test out the wireless synchronization of the contacts.
    Let me know if you have any more questions.
    Cheers.
    -ViciousFerret
    Come follow your BlackBerry Technical Team on Twitter! @BlackBerryHelp
    Be sure to click Like! for those who have helped you.
    Click  Accept as Solution for posts that have solved your issue(s)!

  • Remotely synchroniz​ing my BlackBerry 8820

    TOPIC:  Looking for a solution to remotely synchronize my BlackBerry 8820 with Outlook 2007 
    DISCUSSION: I am trying to find a way to streamline the synchronization process of my BlackBerry 8820 to my Outlook 2007 software.  Do to the nature of my work I am always traveling and have little accessibility to my schedulers computer.  My schedule is constantly adjusting throughout the day/week and my scheduler is unable to remotely push the updates to me.  I am aware that T-Mobile’s Sidekick has a downloadable software the allows the operator to synchronize without docking the unit.  I am wondering if there is anything like this for the BlackBerry. 
     Any advice would be GREATLY appreciated!

    There is another solution, that consists on using a Google Calendar. There is a Google tool to sync with an Outlook calendar, and another Google tool to sync with a blackberry calendar.
    Please read :
    http://supportforums.blackberry.com/rim/board/mess​age?board.id=BlackBerryDesktopSoftware&message.id=​...
    The search box on top-right of this page is your true friend, and the public Knowledge Base too:

  • Tool for synchroniz​ing multiple Palm Desktops across a network

    Hello, I'm new to this site but it seems as though if there's an answer to my question it's here so I'm diving right in.
    I have my handheld set up to synchronize with multiple computers.  I have a home desktop, work desktop, and laptop, each of which has Palm Desktop installed and knows how to sync with my handheld. Syncing any one of the PD installations is easy -- I've been able to get it to work over a variety of methods and am very happy with that.
    The problem is that if (as happens frequently) I make some changes to the data on my laptop, then later some changes on my desktop, and then finally some other changes on my handheld, the only way to get all the systems in sync again is a series of hotsync operations driven by the handheld.  (Three in that case.)
    What I'd like to be able to do is synchronize the two PCs directly, so that I only need the handheld to be involved in the process once.  I know there are tools to get PD to sync with other software like Outlook.   Are there any that sync PD with PD?
    Thanks for your help!
    Post relates to: Treo 755p (Sprint)

    Hello fruitbat and welcome to the Palm forums.
     As far as I know, there are no tools from Palm or any third-parties that will sync the Palm Desktop PIM databases between two computers without the handheld being involved.  Palm OS 5, Palm Desktop, and the HotSync Manager, where never intended to be network applications.
    Alan G
    Post relates to: Treo 755p (Sprint)

  • Synchroniz​ing 8830 using previously installed Desktop Software

    I have 8830 and a Curve.  I have installed the Desktop Software that came with the Curve.  When I tried to install the software that came with 8830, I received an error message and I can't install it.  Neither am I able to sync 8830 with the current Desktop Software. 
    Since I need to use both the Curve and 8830, how do I go about synchronizing both devices using the same Desktop Software?
    Thank you

    The error message is "no applications configured for synchronization". 

  • Error synchroniz​ing calendar and contacts

    With the Desktop Software (version 6.0 package 2949) for my Macbook (OS 10.7.2) I want to synchronize my Blackberry 9700. My Blackberry is found by the softeware. After using the button synchronize I see " initialize synchronization engine" and soon an error occurs : " an error synchronize calender"; try again". I try again over and over but ... Can somebody help me out ?
    Henk
    Netherlands

    Hello hemiko and welcome to the BlackBerry Support Community Forums.
     KB24125 will address the error you are seeing with your sync.
    Based on that article it is advised you contact your mobile network carrier and ask this issue be transferred to Research In Motion to investigate further.
    Thanks!
    -HMthePirate
    Come follow your BlackBerry Technical Team on twitter! @BlackBerryHelp
    Be sure to click Kudos! for those who have helped you.Click Solution? for posts that have solved your issue(s)!

  • Synchroniz​ing AI and Counter Tasks in DSA and M Series devices

    Hello DAQ fellows, I am new in the Counter field, so it would be really helpful to have your comments and advices about my application.
    I need to acquire simultaneouslythe following signals:
    - AI Voltage signal with a DSA device (PXI 4461).
    - AI voltage signal with a M Series device (PXI 6250).
    - Periods between TTL pulses signal with one counter of the same M Series device. I want to use the counter as it is shown in the figure 7-8 attached below.
    You can see my approach in the vi attached below (4461-6250ai-6250Ctr.vi). The 4461 is the master device.
    For the synchronization between both AI tasks I am using the "SampleClockTimebase" of the master device as a source for the 6250. I am also using the "StartTrigger" signal from the master device to trigger the start of the AI acquisition in the 6250. As I understand, this configuration is OK.
    Now come the second stage, which is to include the Ctr task to the acquisition process. I am creating the 3 tasks previously with another vi, the vi which creates the counter task (CreateTask6250Ctr.vi) is also attached. Now in the measurement vi (4461-6250ai-6250Ctr.vi), I use the "SampleClock" of the 6250-AI task in order to synchronize the AI with the Ctr task (I am not sure that this is the proper way to do this). Then I ask the "CounterTimebase.Source" in order to know which one is been used as SOURCE signal for the tick counting between the TTL pulses. Finally, I use the same "StartTrigger" signal from the master device to trigger the start of the Ctr task. In this way, when the AI task from the 4461 is started, it give the "StartTrigger" signal to the AI and Ctr tasks from the 6250 and the 3 start at the same time.
    What do you think. am I right with my approach?
    Is the Ctr task properly created to use the counter as in figure 7-8?
    Are the three tasks properly synchronized?
    Which other options do I have in order to synchronize the Ctr task with the other 2?
    Thanking in advance,
    Cristián
    Attachments:
    4461-6250ai-6250Ctr.vi ‏1561 KB
    Fig 7-8 from M SeriesUserManual.jpg ‏16 KB
    CreateTask6250Ctr.vi ‏35 KB

    Could I also use the PXI_Clk10 as a "ReferenceClock.Source" for the three tasks in order to synchronize them? I mean, instead of using the "SampleClock" of the AI task of the 6250 and the Ctr tasks of the same device. See the attachment to see what I mean.
    Greetings,
    Cristián
    Attachments:
    4461-6250ai-6250Ctr - PXI_Clk10.vi ‏1558 KB

  • Synchroniz​ing contacts

    I tried to synchronized contacts via Desctop Software from BB Torch 9800 to the new BB Torch 9810 and by contacts it appeared this message: "Crads Databaze error (5221): There is an error converting Unicode string or to from code page string." Could you help me what to do to be able to synchronize my all previous contacts?

    Hi and Welcome to the Community!
    Here is a KB that discusses that error:
    Article ID: KB33098 BlackBerry Desktop Software displays "CRADSDatabase ERROR (5211): There is an error converting Unicode string to or from code page string." when synchronizing with Windows 7 Contacts
    Unfortunately, it contains nothing useful (unless you consider acknowledgement by BB of the problem to be useful, I suppose). There may also be multiple existing threads on this site that discuss that exact error...your review of those might prove useful, and a search of this site, using the error message, error code, or symptom, should reveal all applicable existing threads to you.
    Good luck and let us know!
    Occam's Razor nearly always applies when troubleshooting technology issues!
    If anyone has been helpful to you, please show your appreciation by clicking the button inside of their post. Please click here and read, along with the threads to which it links, for helpful information to guide you as you proceed. I always recommend that you treat your BlackBerry like any other computing device, including using a regular backup schedule...click here for an article with instructions.
    Join our BBM Channels
    BSCF General Channel
    PIN: C0001B7B4   Display/Scan Bar Code
    Knowledge Base Updates
    PIN: C0005A9AA   Display/Scan Bar Code

Maybe you are looking for

  • Web Application Designer need help ASAP

    Hi All, I have a requirement to customize the analysis item in a web application designer. I have created new templetes and added a analysis with a query view as data provider . in the output I require to hide some rows of the query view and also cha

  • Mutt/Offlineimap Sent mail is showing up in Gmail Inbox

    Hi, I am just starting my journey with mutt and quite like the interface thus far but I am having trouble with sent emails showing up in my Gmail inbox.  It is a little annoying to always have my sent emails appear as unread in my inbox.  In my searc

  • Calendar sync issue on iPhone 4 with iOS 8.1.2

    Hi, Just updated my iPhone 4 with iOS 8.1.2, some of my calendar entries like birthday entries which I marked as an all day event for so many years are not getting updated on my iPhone 4 where my iPad mini with iOS 8.1.2 is showing the missing data.

  • Cannot connect to newly created SQL 2008 R2 instance. Login failed for user...

    I'm not a SQL guy, just figuring my way around here... I just created a new instance on an existing SQL server. The original instance works fine. On Database Engine Configuration > Account Provisioning I selected Windows authentication mode and added

  • How do I recover missing fonts?

    I have Appleworks 6 (original disc for SYS 9 + online update for Panther (6.2.9). Recently I discovered that some of my original fonts are missing, in particular Palantino. How might I go about recovering this font without losing my custom templates,