Synchronization of serial no and Equipment no

Hi,
I have a serialized material and generate equipment master whenever I do Goods posting.
Requirement: I like to set the serial number to be assigned automically and it should be the Equipment number which is going to be generated.
Kindly advice.
DP

Hi DP,
I have actually used the same functionality in one of my project, what you have to do first is to define the serial number profile (which you must have already done) go to SPRO->Plant maint. and customer service-> Master data in plant maintenance and customer service and technical object->Serial number management -> define serial number profile. In that you can find your serial number profile if already craeted then selecton it and then from the right hand bar double click on serialisation procedure.
in the next screen check the entries and created the processes you want serialisation for. If you are saying its for good reciept then select MMSL and the in the field SerUsage put the entry from the drop down depending upon your requirement to make the serialisation as required or optional entry, next the EqReq is the main field where you can define if the Serial number and the equipment number will be synchronised, select 02 from the drop down.
Now make sure that for all the material for which you want the serial and equipment synchronised int he material master in the Sales:General/Plant  tab , Under general plant parameters , select the serial niumber profile and give "Ser Lev : as 1 . this will allow the syschronisation for all the equipment recieved.
But make sure that the  02 entry is made in the EqReq field in the serial number profile in spro that the key.
Hope this is helpful.
Regards
Anoop
Edited by: Anoop Sharma on Jan 21, 2010 11:09 AM

Similar Messages

  • In which table of CRM the Serial number and Equipment information stores.

    Hi Experts
    Recently I have downloaded all the serial numbers and Equipment numbers from backend system by doing the initial download of the object SERIALNUMBER and EQUIPMENT.
    I can see the BDOC monitor in which all BDOC are in green ststus and R3AM1 the object ststus is also green.
    My problem is I am unable to find the downloaded information in CRM system.Can anyone help me in finding out where can I get these information.
    Thanks
    Subhabrata

    Hi Subhabrata
    If I understand correctly your Serial number is not linked to any equipment which can be opened using IE03.
    "Serial number download functionality allows you to replicate pure serial numbers (serial numbers that are not associated with equipment) along with their associated business partners and configuration from SAP ECC to SAP CRM as objects."
    See this link:
    http://help.sap.com/saphelp_crm70/helpdata/EN/ad/bc673f19299d51e10000000a114084/frameset.htm
    In that case you should not download object EQUIPMENT. You just need to download object SERIALNUMBER. Check the number of entries in table COMM_PRODUCT before and after download. Search for Equipment number in field PRODUCT_ID. Check table COM_TA_R3_ID with the product guid from previous search.
    I hope it helps
    Regards
    Rupesh

  • Batch no. , Serial no. and Equipment no.

    Hi Gurus,
    Can anybody explain me What is the difference between Batch no. Serial no. and Equipment no.?
    And how the three are related to Sales order , Delivery and Billing?
    Thanks in Advance,
    Manu

    Batch : The primary purpose would be to track your products if they are manufactured in Batches. Any kind of chemicals would be an idle exmaple. After production when the GR for the material is done it has to done for plant-sloc-batch combination. Similarly before doing PGI during the delivery processing an appropraite batch has to be selected. SAP has a standard solution for auto batch determination as well. Plenty of times batches are used for some other purpose as well. e.g. for a MNC produces the same product in different countries and want to track where a particular product has been made then Batch management can be used to identify the Made in country
    Serial no & equipment: This would be used for example in electrical industry or automobiles where individual item can be tracked using the serial number. The combination of material plus serial number makes and equipment . Equipments could be used to manage repairable products . So if you are into servicing then you can maintain equipments which would show the entire history ,warranty information etc 
    There is no relation between batches and serial numbers .They can be used independently or in conjunction depending on the products and the business
    Hope this information was useful

  • Serial numbers and equipment

    Hi,
    We have a setup where materials are managed with serial numbers (through serial number profile).
    An equipment record is created automatically together with each serial number.
    The serial numbers are assigned manually at the time of goods receipt. The equipment master is created in background.
    The problem is that the serial numbers are unique: I cannot for example not assign serial number 100000000 to both material A and B.
    Is there any solution to this? Is it possible to somehow allow the same serial number/equipment number created for 2 different materials? Or is it impossible with equipment requirement at serial number profile?
    Thanks,
    Lars

    Yes thats what i am saying...
    i will explain you in detail:
    First follow this path:
    Spro-Plant Maintenance and Customer Service-Master Data in Plant Maintenance and Customer Service-Technical Objects-Serial Number Management-Define Serial Number Profiles..
    Now check the "Indicator: Serial Number Existence Requirement" infront of your Serial number profile.....
    Now maintain master data in IQ04 for both materials.
    Utsav

  • Serial number and equipment

    Hi,
    I want to create refurbishment order,for that i am dismantaling 1assembly from equipment while doing dismanteling IE4N systen asking for serial number. I have given serial no to matrial bt till it is showing following error.
    "Equipment view not activated" and also when i entered equipment then shows following error
    "Invalid equipment number (Serial number does not exist)"
    Please help me out from this problem.
    Regards,
    Pravin
    Edited by: pravin chougule on Jan 3, 2009 1:33 PM

    There are activities that need to be done before doing the refurbishment,
    - Serial no. profile to be created
    - In the profile select PPAU as one of the serializing procedure
    - Assign this profile in the material master
    - Activate the serial no. view for the eq. category.
    - Create serial no. for the material and activate the equipment view.
    - Now when you create Refurbishment order for the material system will display a special object list in the order itself, where you can select the serial number.
    - rest are as usual.
    Hope this helps.
    Seran

  • COMPONENT and equipment serial number

    Hi all,
    In past thread  COMPONENT and equipment scenario
    i want to know like 100000301 this equipment have two component i understand the serial number vise
    but,i don't understand that 2nd component how can we serializes.
    Equipment--  100000301
    and under that two components
    219269
    219270
    i added 219269 material in serial no. but not 2nd one plz tell how can we add in 2nd one in same equipment
    BR
    Atul

    Hi
    we have equipment 100000300 technical object
      Technical object         
    (Mechanical Equip)     
        100000300  
    Technical object                 pump*  / motor*                  
    (Mechanical Equip)       Component / Component          component Bom / component Bom
        100000300                  200213     / 200256                       200213       /    200256
    Technical object         
    (Mechanical Equip)     
        100000300
    Note *----In mechanical equipment both Motor and pump component are attached.
    so that's why i am confused how can solve. (in mechanical equipment Electric
    and mech component are joined there is nothing electric equipment).
    In first case Pump or motor is Totally over then we will create a scrap
    material code and sale it to the purchaser.
    In 2nd case our pump Or motor 200213/200256 for repair and we know our
    plant is in running and we assembled new pump Or motor 200213/200256.
    now our pump Or motor 200213/200256 are repaired now that repair one
    go to store now the big question is this when change or replace our code
    is same how can we change or replace (in first case so simple just create a
    scrap, In 2nd step i am confused).
    now i think all guru's will clear very efficently.
    BS
    Atul

  • SWAP Equipment using IE4N, without serial number and material, it is possible?

    Hi PM Experts, I´ve been reading about the way to SWAP equipments from his functional location without using serial number and material, I think if it is not possible, but to be honest, I cannot find any logical answer for it, since equipment number is unique for a plant. Does anyone have found any work around for it?.
    I don’t want to use serial numbers and materials, because I think the process is really simple, since the client does not want to implement the refurbishment process. If there is a break down, here is what I do:
    Case 1:
    Dismantle damage equipment (Say PM01 Order Type)
    Install new equipment (same PM order)
    TECO the actual PM order
    ...Later
    Case 2:
    Create a new PM orden (say PM01 Order Type)
    Repair the break equipment
    TECO this new PM Order
    Here are the inconsistencies:
    What happen with the MTTR and MTBR reports?
    In case one, I´ll create the material as equipment, while I´m installing, starting date for his master data is the installation day, and the MTTR and MTBR will start to run. This is ok.
    What happened in case 2?, I need to stop the “clock” for the MTTR and MTBR of the dismantle equipment.
    This is the reason why, I would like to use IE4N, but since there are no serial number and material, I cannot.
    Can anyone please suggest a workaround for this scenario?.
    I´m thinking in use INAC (Object Deactivated) system status, can this status help me?, Does this status “stops” the clock for MTTR and MTBR report?. If I change the status to ACT, I´ll get the clock back running?.
    How about dismantle the equipment?, It will get the AVLB Available status, but the problem is, this equipment will be “floating” in the whole PM structure and I do not want it. I want to have it in a specific Functional Location but with this status, is this possible?. I woul like to use IE4N to SWAP UTs and later change the status to AVLB Available status, with and exits.
    I thinking in an Equipment Status and a “Z” MTTR and MTBR report, based on this status. But to be honest, I´d like a standard solution for it.

    For find my iPhone to work, the device has to be powered on and it has to be connected to a network (Cellular or WiFi).  Find My iPhone uses your AppleID as the account to search for.  Maybe the "guys" you were talking to were referring to a 3rd party application that essentially lo-jacks your device.  But even then, it would still require Power and a network. 
    I don't believe that there is currently a way to flag a specific serial number for location.
    Best of Luck.

  • Bapi for association with Equipment serial number and return order

    Hi,
    I wanted to know if there was a BAPI which has an association between
    Equipment serial number and return order .As I want the association between Euipment serial number and return order to show in the Equipment Serial history.
    Could you please help with this.
    Thanks & Regards,
    MJohn.
    Edited by: mjohn02 on Feb 15, 2012 10:38 AM

    Hi Sandeep
    I want create a return delivery  for the material with the same serial number  for which i have created original delivery but the system is not allowing it is giving me error message as return delivery not possible with same serial number.How do i go forward.
    Regards
    T.Srikanth

  • Hi!!I have some problems with the synchronization of my system, and I don´t know how I can solve this!

    My system consists of differents vi´s.Some of them are used to read analogic inputs and digital inputs, using the serial port.
    The values that I read, go through differents vi to be proccesed, and at the end, these values are written in a file, all the values in the same file.
    My problems of synchronization are:
    1. I have one vi per input, and all of them use the same serial port. How can I synchronize them to avoid serial port conflicts? (using queues??) And how can I do, to get differents number of samples/sg with every vi? I have to introduce them in differents loops?
    2. The other problem is that, for example, I want to read 8 samples/ s but I only want
    to write two samples every second. How can I do to avoid stoping the data flow?
    Maybe, my problem is that I want to see the system like
    one block, and I am ignoring that, although all the system works like a block, every part works using a different "speed". I don´t know how tools can I use to combine two ideas, working like an only system( data dependence, some vis need the data of others vi to be able to work) and working getting differents numbers of samples/s.
    I have seen that there are synchronization vis. I am going to glance at them, maybe I find something interesting but I amsure that your help will be very useful?
    Thanks in advanced!!
    Graci

    I think you are pretty much on the right track with Queues. I have implemented a very similar system myself using queues. I have even different systems connected to the serial interface, but I can synchronise them all easily using the following method:
    1) Make a VI for opening the serial port and reading the data. The data (parsed to extract the numbers required) are then stored in an array (Shift register). If the pre-determined time delay is reached (say 5 seconds) the values are averaged and written to a Queue with a defined data type. Save the VI as a VI template.
    2) Make a VI which starts an instance of this template VI for every channel you require. You can use VI Server to set values on the new front panel before you set it's property to "running". Setting a timer value for all can help ensure that the X-Axis of your timing values (if you require) are synchronised. The clue here is to define and initiate a QUEUE per channel. (RS-232_1, RS-232_2 and so on). The QUEUE name needs to be passed to the VI Template before running so that each VI running in the background has an individual link to the main program.
    The second part of this VI simply uses an array of QUEUES, polling them one after another with a timeout of, say 5 ms. If data is found, append accordingly to an XY-Graph.
    I also add in some "Auto termination" in the VI template (MAx number of values allowed in the QUEUE for example) to allow for the background processes to find out if the front-VI is still running or not. There are many different ways to do this, shoose the best for your application.
    With this approach, it's not even important what instrument is connected as long as data is written in a specified format into a known QUEUE. I have also developed systems where I can transparently (almost) drop in VI Templates for instruments with similar functionality (output data) from different suppliers.
    I would post an example, but the time it would take me to clean it up is too large. Sorry. If you have any further questions, don't hesitate to ask further questions.
    Shane.
    Using LV 6.1 and 8.2.1 on W2k (SP4) and WXP (SP2)

  • Lenovo X131e doesn't work with Prolific PL2303 based USB to Serial Adapter and Windows 7 x64

    This is sort of a bug report. A Lenovo X131e with Windows 7 x64 and the PL2303 driver including 1.6, 1.61 and 1.7 will not successfully install the driver - Windows always reports "Driver Install Failed" on plug in to USB 3 or USB2 ports. However, putting a USB2.0 hub inbetween the USB to Serial Adapter and either USB port type makes the adapter work fine. This was not the case with the X130e. I'm not sure where to report this beyond this posting, but more of an FYI.

    If the USB can be used for other equipment,
    That may be compatibility issues for USB and Prolific PL2303.
    Don't plug Serial Adapter when installing the driver,
    Ofter installation, Connect serial adapter to see whether it is working normally.
    I am a volunteer, don't work for Lenovo. I am a software engineer.
    thinkpad x61t, os:win7 Awavo Software com port monitor serial port monitor

  • Synchronisation of assets and equipment

    Hi All,
    I'm busy trying to link our assets to our equipment. In SPRO, i am trying to add two more fields for synchronisation.
    I went to SPRO> Financial Accounting> Asset Accounting> Master Data> Automatic Creation of equipment master records> Assign Master Data Fields of Assets and Equipment
    I enter the two new fields, but when i save it, it gives me the error " Consistency check for TAAPM2 resulted in error"
    I did this before and never got this error. I tried searching on this forum, but nothing for this error.
    Any advice on what to do?
    Kind Regards
    Emanuel

    Hi Emanual,
    In u2018specify conditions for synchronize master datau2019
    I entered Equipment category as M (Machines), Object type as 2113 (Vehicles)
    In Edit Asset Master Records I selected u2018Direct Synchronization After savingu2019 for create equipment and change equipment.
    In u2018Assign Data Fields of Assets and Equipmentsu2019 I did not do any changes
    In u2018Develop Enhancement for field and class assignmentu2019 I did not do any changes.
    Still it does not create  any equipments when I'm creating assets.
    Thank you,
    Raneetha

  • Send command to modem using serial port and capture the response in the labview

    hello.
    I am doing my shool project.
    I want to send command to modem using serial port and get the response in the labview.
    When i run my program and enter"AT", only messy code will be displayed.
    can anyone help me? thanks 

    Dora0512 wrote:
    Thanks for you all. My partner got it already.
    I am doing send sms part.
    Can anyone tell me why my program is not so steadily?
    It means this program can run. But somtimes I cannot receive sms. sometimes can
    Basically, it is not well-written from both a LabVIEW and a communications point of view.  Unfortunately, I can't elaborate because today is an exrtremely busy day at work.  I'm hoping this bump will prompt someone to help you with your problem.  If you could also provide us with the programmer's guide or the manual for your equipment, that would be extremely helpful.
    Bill
    (Mid-Level minion.)
    My support system ensures that I don't look totally incompetent.
    Proud to say that I've progressed beyond knowing just enough to be dangerous. I now know enough to know that I have no clue about anything at all.

  • Serial number in Equipment BOM component

    Hi Experts,
    Can we attach a serial number for a component in the Equipment BOM?
    My requirement is we sell an equipment with components to customers. Each component has got a serial number when it has gor produced (at the time of GR to FG store), when we issue we refer to the serial number and issue it to customer. Later all components are assembled at customer place. After job is completed we generate a serial number intern an equipment master is created. Now I create the equipment BOM with all those components. Here for the tracking purpose, can I maintain those components serial number in the equipment BOM????
    Regards,
    praveen

    Hi,
    You can do the hirerchay by using Ibase. I am not sure we can assign serial numbers in the BOM. Or alternate is to create subequipments with all those serial number and Material number combination. And here you can pass on warranty too. Which I think you can not achieve in IBase. Even I base can be generated with reference to production order.
    Hope it helps.
    Regards,
    N.Nagaraju
    Edited by: NAGARAJU NANDIPATI on Feb 5, 2011 3:26 PM

  • Everything on my macbook 5.1 was erased and then the person who erased it could not find start up disc to reinstall. i called apple and gave them the serial number and they sent me leopard os 10.5 which is what originally came with the computer. not work

    i was given a macbook 5.1 by my mom, being nice, she erased everything on it, but then could not find the original start up disc. i called apple and had the serial number and said that leopard 10.5 was the operating system that orginally came with it, so i bought it. when i got it,i turned on computer, put in dvd, and immediately shut it off, then turned it back on while pressing letter c. (they told me to do this) i can hear the disc turning but alls i get is blank screen then it shuts down, and restarts. nothing ever shows up on the screen. did i get a wrong disc? should there be something different than just the mac os x leopard 10.5 to get this computer to work again?? thanks for your help!

    It means what it says. The "computer person" formatted it wrongly/ unsuitably. it needs to be formatted again.
    Error "Case-sensitive drives not supported" or similar install error | Mac OS
    Mylenium

  • Hi.  My new computer had Acrobat on it.  Suddenly, I was unable to open any PDF's.  and then I tried to update and was forwarded to the Adobe site that said I had to buy a monthly subscription.  I do not have the physical box with a serial number and was

    Hi.  My new computer had Acrobat on it.  Suddenly, I was unable to open any PDF's.  and then I tried to update and was forwarded to the Adobe site that said I had to buy a monthly subscription.  I do not have the physical box with a serial number and was going to buy the one advertised on the website until I discovered it's only for students and teachers, which I am not.  What should I do next as I need to use PDFs on a daily basis.  Thanks!  I would like to be able to download this and pay online.  Possible? I currently have Adobe Acrobat XI Pro.  I have a Windows 7 system.  Please help!

    As long as you know your serial number you can download PSE from here:
    Download Photoshop Elements products | 11, 10
    If you don't know your serial number:
    Find your serial number quickly

Maybe you are looking for