System delivery reaction in Scheduling Agreement

Dear All.
I have created a schedule line agreement with two dates.
01.07.2010  Qty 10
02.07.2010  Qty 10
If I go through VL01N transaction and choose date 01.07.2010 system working properly, and if I choose date 30.07.2010
and press enter system create a log that "Schedule lines were rejected due to differing delivery date/time" or even the same log if I choose date 02.07.2010. The message is correct and accepted,
but if my last date at Vl01n transaction is for say 30.07.2010 and I suppose can run that, and go to VL10C and call the deliveries that due today means 01.07.2010 system shows the agreement number and if I go to delivery from the agreement system give the same log message, it should not be come because now I only choose the 01.07.2010 date in VL10c, but If I will back from that log delivery sytem bring me on VL01N screen where date is 30.07.2010 by default.
Can any of my guru knows why this happen.
Hope the scenario is clear.
Regards

Your requested delivery date in schdule lines comes from.
In T-code VOV8 --> select your order type --> click at details --> in the column "Requested delivery date" --> Lead time in days
But when system confirming the date then it checks several places like as follows
1) Go to MM02 --> On MRP page 1 > In Scheduling Column> System consider
In-house production
GR processing time
Plnd delivery time
2) SPRO --> Enterprise Structure --> Definition --> Logistics Execution --> Define shipping point
Select your shipping point --> click at details --> in the column "Determine times" --> system consider
Determine Load. Time
Det.Pick/Pack Time
3) In T-code OVTC --> select your Route --> Click at Details --> System consider the "Scheduling" column
Hope this can assist you.
Thanks & Regards
JP

Similar Messages

  • Correction delivery in the scheduling agreement.

    Coundnt able to create the correction delivery in the scheduling agreements.
    Where can i see
    Thanks in advance for your assistance.......
    Message was edited by:
            tiru

    To create a correction delivery (document type LFKO):
    Choose Corr. delivery on the delivery schedule tabstrip.
    The system displays a dialog box in which you enter a:
          --> Correction delivery date
                For help on deciding where you want to position the correction delivery, choose Display. The system lists delivery dates in chronological order.
         --> Correction quantity
               Enter a negative correction quantity by placing a minus sign after the quantity.
    Choose Enter and save the scheduling agreement.
    <b>Result</b>
    When you save the correction delivery, the system updates the cumulative quantities in the delivery schedule.
    To display correction deliveries, choose Deliveries on the delivery schedule tabstrip, or Environment --> Display document flow.
    Thanks
    G. Lakshmipathi

  • Delivery issue about scheduling agreement

    Dear experts,
    Case:
    There're 2 delivery dates in scheduling agreement: One is July 28 (delivery quantity 10K), the other is July 30 (delivery quantity 20K). If July 30 is entered in the field "selection date" (VL01N), delivery only captures the second one (quantity 20K). The first one (delivery date July 28, quantity 10K) is not delivered at all.
    Q1: Why the first one (quantity 10K) cannot be captured in delivery? You know, delivery for sales order can capture those items as long as "selection date" is July 30.
    Q2: Any chances to make delivery of scheduling agreement capture the first one (delivery date July 28, quantity 10K) as well?
    Plz help. Many thanks.

    Try tcode VL10A with either following CalcRuleDefltDlvCrDt (By default it is 2-Today and tomorrow) option with relevant date interval.
    (Blank) - Everything Up To Maximum Number of Days
    3 - Due for shipment by the end of next week ( past-due delivs)+
    4 - Due for shipment tomorrow (includes past-due deliveries)
    9 - User Exit
    CalcRuleDefltDlvCrDt is rule for determining default value for deliv. creation date. i.e., rule for determining the default value for the selection interval for the delivery creation date.
    The following are implemented:
    1. All documents due for delivery today
    2. All documents due for delivery today and tomorrow
    3. All documents due for delivery up until the end of next week (includingthose that were due before today)
    4. All documents due for delivery up until and including tomorrow(including those that were due before today)
    Hope this can assist you.
    Thanks & Regrads
    JP

  • Planned delivery time in Scheduling agreement and MRP

    Hello,
    Do you know is it possible to determine system so that MRP run will consider the planned delivery time from the scheduling agreement line instead of material master? Now the system read planned delivery time from material master when creating schedule lines automatically by MRP-run.
    Regards, jaana

    This can be customized in
    SAP Customizing Implementation Guide
    -> Production
    --> Material Requirements Planning
    ---> Planning
    > Procurement Proposals
    > Define External Procurement
    Here you can select the indicator "Scheduling according to purchasing info record or agreement" either at plant or MRP group level.

  • How to set delivery complete in scheduling agreement automatically

    Hi. I would like to request for help on how to flag delivery complete in an scheduling agreement?
    When creating a goods receipt against a scheduling agreement, do we need a user-exit  or how is it configured in order to check the quantity receivedthe quantity in the goods receipt and compare it with the quantity in the scheduling agreement (/- de tolerance) and, in case the full ordered quantity has been received, set the flag Delivery completed in the scheduling agreement.
    Thanks.

    Hi,
    We regret that the functionality  setting of "delivery completed"       
    indicator automatically for a scheduling agreement is not included in   
    the SAP standard system.                                                
    For scheduling agreements, you must maintain the final delivery              
    indicator only in the scheduling agreement item.                             
    A maintenance from the goods receipt is useless for scheduling               
    agreements since the current schedule line situation is generally not        
    final. Even if all schedule lines are supplied, this does not mean that      
    no new schedule line might be added. Therefore, for scheduling               
    agreements,maintenance of final delivery indicator is planned only from      
    the document item.                                                                               
    Regards,
    Edit

  • SD create Collective delivery document against scheduling agreement.

    Dear freinds,
    I have created  scheduling agreements for single material , and updated forecast deliery agaisnt IDOCS,
    now I want to make a single delivery agaisnt four different materials.
    I use Transaction VL 10 for Delivery due list and  selected diff. materials four items,executed  backgroud run,
    system is creating two delivery documents instead of one.
    Please advise me how to get single delivery document against multiple delivery due items.
    in customer master i marked to order combination, partial delivery allowed up to 9 deliveries
    Regards
    Dilip

    Excellent information !
    I understood what you have mentioned .
    Just I need your clarifications for my below queries to fix this issue .
    There are 6 line items in this scheduling agreement .
    For 3 line items , delivery schedule date is 02/08/2008 . for another 2 line items, delivery schedule is 05/07/2008 . due to this different delivery schedules for line items  in scheduling agreement . whenever  user creates delivery , delivery split is happening .
    In order to avoid this problem , can ask user to change delivery schedule for another 2 line items to 02/08/2008 from 05/07/2008 . ?
    If user change this delivery schedule  for this line items , is there any ramification in anyway ?.
    Thanks In Advance

  • Over Delivery Tolerance for schedule agreements

    Hi,
    we have overdelivery tolerance of 10%  in schedule agreement and system is allowing to do GR for more the the over delivery tolerance.
    can any one tell me how to get the error message while doing GR for more than the over delivery tolerance in case of schedule agreements.

    See OSS Note 874264 - MB01/MIGO: Default quantity for goods receipt posting
    3. The basis used for calculating the over or under delivery tolerance is the quantity ordered, in case of purchase orders, and the suggested quantity, in the case of scheduling agreements. If you want the system response to be the same for scheduling agreements as it is for purchase orders (that is, you need more generous tolerances) see also the SAP Consulting Note 741385.
    For items with a confirmation control key, the basis for the calculation of the over or under delivery tolerance is the quantity ordered or the total of the schedule line quantities.

  • Delivery from sales scheduling agreement with one item per schedule line

    Hi all,
    I have a sales scheduling agreement where the same part number has 3 different JIT schedule lines and I need to create a delivery with 3 item lines: every item line of the delivery has to be referred to one schedule line of the scheduling agreement.
    When I create the delivery with transaction VL10E it has only one item line and its quantity is the sum of the 3 schedule lines of the sales scheduling agreement.
    I've tried to change the customizing of the User Role, choosing the Split Schedule Line = 2 ("One item per schedule line") but the delivery is created again with only one item line.
    How can I solve this issue?
    Thanks in advance for reply

    Dear Alex
    The SAP standard behaviour is that all schedule items with delivery date in the past have to be rescheduled anyway to one date and are combined therefore.
    Partially this behaviour can be influenced in VL10* by 2 parameters in
    the user role : Split per sched.line and Rule (delivery qty).
    Please find below informations about these different parameters
    "Split per sched.line propose you 3 Rule for creating one delivery item
    per schedule line. In a delivery list in item view with multiple
    schedule lines, you can decide for the same document item whether you
    want to generate one delivery item per schedule line or whether you want
    to deliver the cumulated quantity of the last schedule lines selected.
    About rule for delivery quantity, the following rules are currently
    implemented:
    1. No cumulation
    The open schedule line quantity to be delivered is the quantity at which
    the list line is delivered.
    2. Sum of all open schedule line quantities to be delivered that fall
    before the chronologically latest date in the to field (following the
    Deliv. creation date field) of the selection criteria.
    3. Sum of all open schedule line quantities to be delivered whose
    delivery creation date falls within the selection time frame (between
    the dates in the Deliv. creation date and to fields, respectively),
    making the calculation of the quantity to be delivered consistent with
    selection criteria. However, calculationof the quantities delivered with
    the order's schedule line quantities is not affected."
    Hope this helps.
    Regards
    Tonia

  • Delivery notes in scheduling agreements

    Hello,
    we send scheduling agreement (ME38) to our supplier. Now we create delivery notes with vl31n, which should reduce the open quantity of our schedules. Unfortunaly the delivery notes will not reduce the quantity and we send the supplier a wrong open, too high quantity. How can we solve this problem?
    SPRO > Material Management > Purchasing > Confirmations > Set Up confirmation control
    We set already the parameter for "Confirmation is Relevant to Materials Planning".
    Regards
    Andreas

    Hi
    You should use creation profile which has General data "Determine Backlog/Imm. Reqt" ticked for both JIT and Forecast . T.code is OMUP
    Regards
    Antony

  • Delivery date in scheduling agreement

    If delivery date in scheduling aggrement is 20th  and vendor has supplied the material on 15 th iteslf then are we able to do grn on 15th or Not.
    Or we should wait for the date 20th.
    Thanks,
    Kiran

    Hi,
    If you have maintained Delivery Schedule for Scheduling Agreement as 20.05.2011 and Vendor has supplied materials on 15.05.2011 then you can not do GR on 15.05.2011 since Delivery schedule of Scheduling Agreement are firm and have control over dates.
    You need to revise the delivery schedule in ME38 to 15.05.2011 and then do GR.

  • Delivery cost in scheduling agreement having time dependent condition

    Hi experts,
    We have one peculiar requirement.
    We have palnt at indonesia.  We are doing import there from india.
    Our requirement is as follows.
    1. We should use scheduling agreement with time dependent conditions.  Because we want to track the price changes and sometimes we want to retro pricing effect and revaluate it.
    2. We want to add importers vat and import tax.
    3. But those tax amount should not get added into inventory
    4. During MIRO it should get accounted to vendor.
    We could succeed this by removing "Time dependend condition" check in document type config.
    But our client is definitely required the point no 1.
    But when we activate time dependent condition check, during MIRO those conditions are not appearing.  But if you remove that check, it is appearing in MIRO accounting.
    Can any one suggest suitable solution?
    Or SAP MIRO will not permit this scenario?
    regards,
    K.Sundaresan.

    delivery cost will not work if u remove the tick Time dependend condition for SA
    SAP MIRO will not permit this scenario
    so u will have to decide what is more important to u and act accordingly
    Solution will be u ask client what is mor imp for there company
    as SAP will not support MIRO for deliver for time dependent condition
    I had a talk with SAP on this and they have told that
    SAP will not support MIRO for deliver for time dependent condition
    AS in Case of imports in india we need to do MIRO before GR
    hope this hel;sp

  • Wrong delivery date in Schedulling Agreement

    Dear All,
    We maintained scheduling agreements for our Customer's Materials.
    For all tomorrow's deliveries i.e of 05.07.2008 all scheduling agreements are showing today's date i.e 04.07.2008 in VL10e as delivery.
    Delivery Date : 05.07.2008
    Goods Issue Date : 04.07.2008
    Loading Date : 04.07.2008
    Material Availability Date : 04.07.2008
    Trans. Planning Date : 04.07.2008
    Interesting point is that no delivery is showing pending for 05.07.2008 in Vl10e. All the deliveries of 05.07.2008 are appearing in today's date.
    I checked factory & Sales calender of company. Saturday is working day
    Regards,
    Sagar Pande.
    Points will definitely awarded.

    Hi,
    If you have maintained Delivery Schedule for Scheduling Agreement as 20.05.2011 and Vendor has supplied materials on 15.05.2011 then you can not do GR on 15.05.2011 since Delivery schedule of Scheduling Agreement are firm and have control over dates.
    You need to revise the delivery schedule in ME38 to 15.05.2011 and then do GR.

  • GR qty is updated in future delivery date in Scheduling agreement

    Dear All,
    In one of our Scheduling agreement  delivery schedule, the Goods receipt qty got updated in  future delivery date (ie., 30.07.2011 & 19.10.2011). Any idea how this got updated wrongly? or is there any standard functionality that controls this GR qty field.
    Thanks in advance
    Benny

    HI,
    Both  Planned delivery time and GR processing time are having 1 day , please let me know any other factor influencing this data.
    Thanks
    Benny

  • Setting final delivery indicator on scheduling agreements (ELIKZ)

    Hello ALL,
    Based on note 199749 SAP does not set the delivery complete indicator for scheduling agreements during goods receipt processing.   We're employing thousand line scheduling agreeements where new schedule items are added to the scheduling agreeement items via MRP.   When the delivery complete indicator is manually set MRP proposes requisitions instead of schedule lines which is our desired processing but we need the final delivery indicator to be automatically set.  Does anybody know the user exit to set this indicator during goods receipt processing including any other helpful information.
    Thanks so much for your time.

    Hello Walter,
    this should be possible in BADI 'MB_DOCUMENT_BADI' ,
    method MB_DOCUMENT_UPDATE.
    Regards Wolfgang

  • Correction delivery configuration in scheduling agreements.

    Can any body explain the required configuration for correction delivery in scheduling agreements.
    Regards,
    Tiru

    Hi Tiru
    Check for the following things
    1. Create scheduling agreement - ME31L
    2. Create stock transport scheduling agreement - ME37
    3. Change scheduling agreement - ME32L
    4. Display scheduling agreement - ME33L
    5. Maintain scheduling agreement supplement - ME34L
    6. Recalculate scheduling agreement prices - ME3R
    The detail you may find from the following link.
    http://help.sap.com/saphelp_46c/helpdata/en/75/ee0f7455c811d189900000e8322d00/frameset.htm
    Regards

Maybe you are looking for

  • SSRS 2008 Column Chart with Calculated Series (moving average) "formula error - there are not enough data points for the period" error

    I have a simple column chart grouping on 1 value on the category axis.  For simplicity's sake, we are plotting $ amounts grouping by Month on the category axis.  I right click on the data series and choose "Add calculated series...".  I choose moving

  • How do i use my HP 4500 as USB and wireless?

    Hi I have my printer set up as wireless. This is fine for mobile devices like my tablets but only 50% of the time it works from my Windows 8.1 PC. How do i change so it works for USB on PC and wireless for tablet etc? I tried to resinstall set up cd 

  • Desktop Manager Wont Backup Word Substituti​on

    I'm using Desktop Manager 6 with OS6, and my Desktop Manager won't backup my Word Substitution list (formerly called autotext in OS5).  I have about 200 of the word substitution entires in my phone, but when i try to back them up, the desktop manager

  • Sticky Notes

    Hi. I need to add hyperlinks to sticky notes, but I cannot seem to find a way. I can past a link into a sticky note, but then the link doesn't work. Please Help, Much rage has ensued :|

  • Vendor's/manufacturer's QM system only valid to 06.05.2010

    Hi Team, Please help how  to correct following error. Vendor's/manufacturer's QM system only valid to 06.05.2010 Message no. QB301 Diagnosis The quality assurance system of the chosen vendor/manufacturer is no longer valid. You cannot, therefore, ord