System shouldnu2019t allow to material movement

Hello SAP gurus,
Below is my concerned
Although the batch was manually allocated to the orders, supply chain was able to move inventory from one plant to others without receiving any warning. Tough it was committed to orders system allows to material movement but it should not.
When batches are committed to specific orders, we shouldn't be able to move the inventory to another location, nor should we be able to ship on other orders.
Could someone please help me on this.
Thanks
Sha

If the stock is in unrestricted, anyone can get it consumed. Even if you use reservation against it, stock can be issued against other reservation.
Only way to block this stock from being consumed is to transfer the stock to blocked stock type and when required transfer it back to unrestricted and then consume. No consumption can take place from blocked stock type.

Similar Messages

  • CO11N-While Goods Movement System Not Allows Column/Field COST CENTER

    Dear Friends,
    While doing confirmation of PP/PM Order and doing goods movement the system not allows the Column/Field of COST CENTER.
    Thanks and Regards,
    Satyajit
    PP/PM

    Dear Thyagarajan,
    1.I think the Planner Gruop will be at order level.
    2.If I assigned the different Valuation Categories then I need to assign no.of G/L accounts.
    Plz look for my senerio->I have a single Mnt.Order in which different operations carried out from different departments like civil,electrical,mechanical.Its like one project in PS.Now I assiged different Workkcenter/Cost Centers to respective operations.Now after confirmation,when I look the Cosing Report system shows the activity Cost departmentwise as its linked to workcenter/cost center,but material cost how it will get posted different departments?
    Manually by 261->Order+Costcenter...I can post it but there is problem in Auto Goods Movement
    Plz correct if wrong.
    Thanks and Regards,
    Satyajit

  • Error: LK047 Material movement could not be posted in the system via IDOC

    I am trying to create an article document (goods movement doc) for an already created purchase order.
    but this is via an IDOC (WMMBXY). after filling the data in WE19, i shoot the idoc in to the system. in we02 i get the following error message: LK047 Material movement could not be posted in the system . Can someone please help.
    the following fields are filled:
    Segment: E1MBXYH
    Document date        20091124
    Posting date         20091124
    Reference            9999999999
    Doc.Header Text      POS/1110
    Transaction code     MB01
    USNAM                user12
    Segment: E1MBXYI
    Processing ind.      1
    Material             832924
    Plant                1110
    Movement Type        101
    Debit/Credit     +
    Currency             EUR
    Qty in un.entry      250
    Unit of Entry        PAK
    Qty OPUn             90
    OrdPriceUnit         KG
    Purchasing Doc.      9100000141
    Item                 1
    Profit Center        11090
    G/L Account          22706
    Movement Type        101
    SLED/BBD             20091231

    Hello Shankar,
    Glad to hear from you!
    In your question, please make sure you use leading zeros for the MATNR field.  In header segment field E1MBXYH-BKTXT, we use header text. Hope you are using inbound posting function L_IDOC_INPUT_WMMBXY.
    Please try with this and it works for us.
    Thanks a lot,
    Venu

  • Not to allow material movements with qty in decimals

    Hi All,
    A material X is having the Basic UoM as PC(piece) and alternate Uoms as kg & EA .
    conversion factor is : 1 PC=1EA  &  1PC=1 kg
    I want to restrict the system from allowing the Goods Receipt / Goods Issue in decimals. eg: 0.6 PC
    Also, in production order if possible.

    Hi
    In Tcode CUNI, ensure no decimal places are maintained for all the PC, KG and EA
    Regards,
    Raman

  • When no material movements.

    Hi Friends,
    I am loading data from one ODS1 to ODS2. In ODS1 I have materilal, plant, calmonth,yr, and total stock is there. While updating  total stock into ODS2 , when there no material movements in a particuler month
    eg.07.2008 has no movements then for the month 08.2008(for the first day of that period) should get last day of period 06.2008.i.e, that is closing balnce of 06.2008 becomes opening balnce of 08.2008.
    I have only material and plant , from this info how can I know no movements for particuler month.
    I would like to routine but no idea how to bring that into picture.
    As I didnt work in stock scenarios before could you please share your knowledge and any code if you suggest.
    Many Thanks for help,
    Points will be awarded for the useful suggestions,
    Anant.

    Hi
    Changing the status key every time is very cumbersome.. I prefer to do it like this
    1. To Stop Production w/o released cost estimate : I use BADI WORKORDER_UPDATE... It has methods AT SAVE and AT RELEASE.. Write your ABAP code in a way that it reads the Header material of the production order and checks that MBEW-LPLPR is not INITIAL....If it is so, then issue an Error message
    Writing this code in AT SAVE wont allow to save the prod order, and writing it AT REL will allow to save, but wont allow to release
    2. Once you ensure that prod is not done w/o std cost, all other things fall in place themselves.. however, some prod would have happened by now w/o std cost as you said.. In that case, PGI will happen at zero value...
    Also, when you do STO from plant to plant - If the receiver plant has Std Cost = 0, then the entire inventory value goes to NIL
    Both these situations can be checked using BADI LE_SHP_DELIVERY_PROC... Write your ABAP code here to check the same... If your Mat Types are specific to Price Control S, better write this logic at Mat Type Level
    3. In case you also purchase from outside the Materials which have Price control S, in that case the GR from Purch order may be valued at zero price if Std cost is not released.. In that case use BADI MB_MIGO_BADI
    Once you code these BADIs properly, your life becomes easy... there remains no scope for any error and system checks all by itself w/o any manual intervention
    Regards
    Ajay M

  • Order types entered in a Ztable, system will not perform material listing.

    Hi Guys,
    I have a requirement where user will enter the list of order types to be excluded from material listing  through a custom table.
    For all those order types entered in the custom table the  system will not perform any material listing check, regardless if the material is existing in the material listing.
    Can you please tell me how to do this through coding???Any particular exit or where can i code this.???
    Many Thanks in Advance,
    Rajendra
    Moderator message : Requirements dumping not allowed, show the work you have already done.  Thread locked.
    Edited by: Vinod Kumar on Jan 13, 2012 4:08 PM

    Swagat,
          Thank you for your response, what I am still not getting is - even in manual transfers via LT10 shouldn't the system restrict the movements to certain storage types? If you think from the shopfloor perspective the WM material movements are done at WM level only - meaning moving materials from one storage type to another and LT10 is widely used as it is one step tcode.
    I know we can restrict movements when storage class is assigned in search strategy, but this applies only to hazardous materials. The material in question is not hazardous so I am still thinking if there is any way to restrict material movements.
    Do you have any documentation link which mentions search strategies are not taken into consideration during manual transfer? If yes please send that would be helpful.
    Once again thanks for your time.

  • System not allowing to assign the master batch in Equipment

    Dear PM Guru's,
    I am trying to rotables managment process through installation and dismantling process. Material created with different valuation types and serial number profiles. Stock updated for valuation type REPAIRED & NEW. For TOBE REPAIRED, there is no stock updation. Now i want to update the stock by dismantling the equipment from superior equipment through IE4N. In IE4NCGP, i maintained the movementy types are 261(For installation) 262 (Dismantlation) and i am trying to execute IE4N transaction code. When i am trying to save the business transaction system throw following message "material document batch differ from equipment master batch". How we can assign the master batch? if its not in stock and its already installed in equipment i want to bring that one into stock as "TOBEREPAIRED" with movement type "262". I am requesting all the PM experts who ever done this process earlier please share the documents if possible.

    We want to enter only PAN number in XK01/ XK02. But the system is not allowing us to save until we enter all the details.
    Its not necessary that all Vendors will have CS, LST no. or Excise details. This is the reason I am looking for a way how to make these fields optional and I am fine with it as long as system does not give any error. Because system is not allowing us to save the Vendor master, I wanted to deactivate CIN in Vendor Master.
    Kindly suggest how to make the CIN fields optional. Your temporary solution (DOT) is working fine, still we want a permanent solution.

  • In Lightroom 3 I am in Library mode in the Grid View and need to rearrange images, but it is not allowing me to move them.

    In Lightroom 3 I am in Library mode in the Grid View and need to rearrange images, but it is not allowing me to move them.

    I don't do a lot of dragging to custom arrange my images. But the custom order is right at the bottom of the list of sort orders on my computer.
    Added later: But don't worry about the custom order. It doesn't make any difference on my system. Are you sure you are dragging the image itself, and not the border around the image?

  • I recently did a restore to factory settings on my 2009 macbook and now im stuck on the welcome screen where u choose the country my trackpad allows me to move the arrow around but when i tap continue to choose it does nothing. someone please help

    I recently restored my 2009 macbook to factory settings and now its stuck on the welcome screen where u choose your country. My trackpad allows me to move the arrow around but when I tap on it to select continue it does nothing at all. The only thing else it will allow me to do is go thru the voice over tutorial by pressing escape. Please help me fix this I need to use my computer.

    Hi, teezbreezy64.
    I found a couple of resources to help troubleshoot the issue you are experiencing. The first is this article named Intel-based Mac notebooks: Troubleshooting unresponsive trackpad issues found here http://support.apple.com/kb/TS1248.
    Try disconnecting the MagSafe connector from the computer and check the trackpad function. If the trackpad becomes responsive again, improper grounding may be the issue.
    If a two-prong AC plug is being used with the power adapter, try using the three-prong power cable that shipped with your computer and plug it into a grounded outlet.
    If the issue persists, make sure the third prong is present and do not use an adapter to enable the three-prong adapter to be used in a two-prong outlet. Note that the ground in the three-prong outlet may not be connected. This is common in older homes or buildings with replaced outlets. In these situations, the three-prong power cable will not improve trackpad responsiveness.
    If a grounded outlet is not available, rest your palm on the palm rest when using the trackpad. This should enable the trackpad to function properly.
    If that does not resolve the issue then I recommend resetting the SMC on your computer. Here is an article on how to do that:
    Intel-based Macs: Resetting the System Management Controller (SMC)
    http://support.apple.com/kb/ht3964
    Regards,
    Jason H. 

  • Link of material movement with inspection type

    Hello Masters,
    I have scenario where component at shop floor will be segregated for inspection. The requirement is to do result/defect recording for those parts and if required then those parts need to be scrapped. So one way of doing that can be to move those parts to either blocked stock or QI stock (ideal option) or to specific storage location so that planning can be taken care of (if material are still in unrestricted then planning will consider those part as OK part and planning may fail). And to record result/defect we require inspection lot, which can be created by using above mentioned material movement.
    But problem is how to create inspection lot so that we can do result/defect recording for those materials and scrap those material.
    Please note that material master will have QM setup active (inspection type 01 - Goods Receipt Insp. for Purchase Order) and hence we can move material from unrestricted stock to QI stock only through QM.
    I am not sure if we should use inspection type 08 - Stock transfer inspection, as there can be many instances of material transfer within plant. And with inspection type 08 active, system will create inspection lot every time there is any material transfer.
    One way can be to create new goods movement only for this kind of transfer and new inspection type and link both together. So that when ever material is transferred using that particular goods movement, system creates inspection lot as well as material will be in QI stock. But I am not sure how this is possible or not and if yes then how this can be done.
    I know query was too long to read and I think I was clear enough to explain what the requirement is.
    It would be great if I can get some guidance from you masters at the earliest convenience as it is bit of importance.
    Thanks and regards,
    Devang

    Hi Devang,
    I guess this is Line rejection scenario. Correct me if understanding goes wrong. You have okayed the material against 01 inspection lot and UD has been given. Now you find this material defective on shop floor.
    I think the 2nd option suggested by marwadi sounds better. I suggest one more possibility, just check whether feasible.
    1.     Create quality notification Q2 type through QM01. While creating you can give references of original PO and material document, which fetch vendor name and material code automatically.
    2.     Record defects and all other required information in notification.
    3.     After this, you find an option in action box, transfer post unrestricted - >block . Click there. This will transfer the stock from unrestricted to block.
    4.     If you want planning persons should not consider this stock as OK, remove block stock from MRP stock availability check. As a result of which stock lying in block will not be considered as available stock.
    5.     From block stock you can send this material back to vendor through MIGO. Otherwise you can create return delivery from notification through action box also. Check what is feasible in your case.
    Here you need not create inspection lot, no need to use any user exit.
    Regards,
    Anand Rao

  • In previous period posting system is allowing less qty for goos issue

    Dear All,
    I am doing goods issue in previous period.Though in material master previous period system is showing 0.125 MT of material ,in MB5B same quantity of material in previous period is available also I checked in MB51 for all material document and transactions ,still system is allowing me to issue only 0.046 MT not
    0.125MT. What may be the reason--but it is allowing 0.125 MT for current period.
    Thanking you in advance
    Mrinmoy Chakraborty

    Hi,
    Please check your stock detail for your material with MB5B in back date.
    And check in back date the stock is available for your requirement.
    Regards,
    Mahesh Wagh

  • System message:Procurement of material&blocked for quality reasons(0006 883

    Hi Greetings!
    I have the following issue.
    I need to make the message "Procurement of material & blocked for quality reasons" as Error message . Message number - 00 06 883.
    This will not allow to create PO , if the "Blocking Function" - 02 "Block Request and Purchase order " is set in the QM info record.
    Even though i ahve set this message as "Error" in the configuration ( Materials Management --> Purchasing --> Define Attributes of System Messages), i am getting only warning message during PO creation.
    Can you please let me know if am missing any setting.
    Gobinathan G

    Dear sir,
    GO to material master of that item go to .. PURCHASING VIEW there is a Plant specific material status chk if that is 01- blocked for production 02- blocked for BOM chk and change it then system will allow you to purchase the parts.
    Kaustubh

  • Material movement types

    dear gurus,
    want to know the relation of material movement types with posting

    http://help.sap.com/saphelp_47x200/helpdata/en/4d/2ba31643ad11d189410000e829fbbd/frameset.htm
    The Movement Type Concept
    What Is a Movement Type?
    When you enter a goods movement in the system, you must enter a movement type to differentiate between the various goods movements. A movement type is a three-digit identification key for a goods movement. The following table contains examples of movement types.
    Goods Movements and Movement Types
    Goods movement                                                          Movement type
    Goods receipt for a purchase order                                101
    Goods issue for a cost center                                          201
    Release from quality inspection stock                              321
    Control Functions of the Movement Type
    The movement type has important control functions in Inventory Management.
    For example, the movement type plays an important role in
    updating of quantity fields
    updating of stock and consumption accounts
    determining which fields are displayed during entry of a document in the system

  • Procurement Key 'F' - System will allow to create production order

    Dear All,
    Pls help solve below issue
    Sub-assembly (HALB) material type with Procurement Key is 'F' - but System will allow to create production order, our management don't want to allow this. how to activate the error messges
    I checked the system messages CO 046, 047, 048 - it will not help for these messages
    Any way to control this (except user exit, badi)
    Regards,
    Sankaran

    Hi Sankaran,
       What I infer from your statement is that user is able to convert planned order into Production Order (MD04 or CO040). You want to issue a warning message during this converion.
      You can configure warning messages through OPJB.
       Whether this material with procurement type F was setup initially with a different setup? Please check whether any routing details exist for this material and also check whether there is any special procurement indicator. One more check is with your MRP Group settings.
    Hope this helps.
    With Best Regards,
    Srinivas

  • STO to allow if material blocked for Purchasing

    Dear All,
    I have blocked material for purchasing at plant level by selecting blocking indicator 01 at MRP1 view in Material Master.
    So sytem doen nto allow me to create PR and PO.
    Now while creating Stock transfer PO, system is giving me the message "The material is blocked for purchasing"
    I want system to allow STO though material is blocked for purchasing. But should restrict while creating PO against supplier.
    Is ther any way around ?
    Regards,
    Rakesh

    Remove the material status at plant level first then try with following options
    Option 1:
    1) In material master activate 'Source List'. Maintain required procurement type as F / Special procurement key as Stock Transfer.
    2) Maintain the source list for the receiving plant with supplying plant as source.
    3) In this case you will be able to create POs with stock transfer only.
    option 2:
    Implement badi ME_PROCESS_PO_CUST....here write a code that if document type (BSART) is not equal to your STO document type for planr (WERKS) XXXX then system should give a customized error...take help of your ABAP person and see if this works
    Edited by: Raja Ramasamy on Apr 16, 2010 2:34 PM

Maybe you are looking for

  • OS X 10.8.4 Flash Player locks up OS in Firefox 27.0.1

    Flash Player locks up OS in Firefox 27.0.1, Flash is ok in Chrome. I go to Youtube and play a video in Firefox and the image is scrabbled; pixelated shows a lot of green and screws up the whole system, if I use chrome flash is fine. The Firefox versi

  • Query to exclude just one day from a month/months.

    I'm sorry if a thread about this already exists i tried searching for it but couldnt find it. My question is as follows: I want to write a query which would fetch all the data from the month of Jun and July excluding Jun 29th. Is there a way to write

  • Computer still on

    I was turn off my computer but I look the broadband router light was on from my computer, turn on my computer, router stay on. I pull the power plug, went off. plug in the power, still off. turn on my computer,turn on. It still on when i turn off my

  • Re: dataload validation

    Hi Everyone, I developed a cube with 5 dimensions like agent,measure,time,value,agency etc.and i have data file to load the data into cube.when i tried to load the data first time it is loaded partially because of someof agent members are no there in

  • Info to Projects Department Reg. Sales Order

    Hi Experts, We are working on a New Product Development project where we get revenue at the end of the project. So we treat this as an Investment project. Am not assiging the project to sales order. Is there any way by which SD can inform the Project