System status in ECM

Hi,
I am not familiar in ECM . In ECM , while setting the system status which order to be followed
case1:
Check Request
Request Checked
Approve Request
Convert Request
Close Order
Release Order
if i follow this , i am not able to release the change requset.
case2:
Check Request
Request Checked
Approve Request
Convert Request
Close Order
Order Incomplete
Order Complete
Release Order
if i follow this , i am able to release the change requset.
can any one help me, which case i have to follow in ecm.
Plz help me.
Regards,
Rani.

Hi,
Based on my past experience, I can say that the steps should be
Check Request
Request Checked
Approve Request
Convert Request
Close Order
Order Complete( When all the changes to the objects are carried out)
Release Order(The green tick automatically moves to this step if all the changes to the objects are done)
Let me know if you have any questions.

Similar Messages

  • Change names from ECR/ECO system status screen (cc01, cc02)

    Hi all,
    I’m working with ECM main screen (CC01, CC02…) and the names assigned in the Standard process are not meeting tour needs and some steps are missing in order to cover all the specifications.
    If in a easy way I could change the name of the system status steps ( for instance change “Convert ECR” into “Start modifications”) will be great and, if this change could be link to a type of ECR would be like a dream because this will meet all the client requirement.
    Any comment or suggestion in how to do that? User status are not valid :S
    Many thanks in advance
    Alberto

    Hi alberto,
    I think you can't change it from "Convert ECR" to "Start Modifications" but you can use create your own Statuses as required and can be control through Status Profile where in you define this. and in first screen of CC31 or CC01 you need to make this "Profile" Field as Mandatory.
    Change type can also be linked to Profile, this way your client requirement will be fulfiled.
    Hope this will solve the problem
    Regards
    Rehman

  • ECR/ECO Authorization on system statuses - Coding help requested

    HI PLM Gurus,
    Unfortunately ( or that ,,,Iam not aware of)There is no SAP standard Authorization object to control a user setting a particular system status in ECR/ECO. This means by SAP's standard functionality any user who is authorized  with authorization objects  ECM_REQ and ECM_ORD  in their role  and all activities allowed, can set any statuses in ECR /ECO.
    But typical business requirment in any change management requires the control status wise and so do we have one.
    We knew this can be achieved by a custom authorization object. We have created a manual object  but need help with coding to get the current status of the object for matching the authorization (allowed) values .
    Any help is appreciated.
    Thanks,
    Satya

    Thanks Pranav,
    Just to clarify ,I knew about the exit  and  Iam using the same exit, I was trying to get help on the coding part . Identifying Exit is not a problem .( we have used this exit a number of times for different requirements in ECM, like checking the lab/office field for an object before setting a system status , defaulting a  new version of document  etc)
    Update : Got a parameter ( a dynamic field value)which helped us code very easily
    ,,,,Can share with you .
    For system level authorization checks ,one can use Digital signatures and this might be the reason for not having(SAP not providing) a standard authorization object for "system status check "in Standard SAP ECM Authorizations.
    Thanks a bunch for the response.
    Rgds,
    Satya.

  • I can change system status without canceling lot,,"CRTD CHCR SPRQ"

    HI
    A insp lot have (System status) "CRTD CHCR SPRQ" system can not allow for any recording at the lot,, But Question is that i want to change status without cancleing this lot, Have any idea for this lot status.. "CRTD CHCR SPRQ"
    thanks Expert
    regards
    kazz

    Hi kazz, i can't tell if your issue was resolved but if not then you should check the 'valid from' date on the ECM used to setup the inspection plan.  this is assuming that you are using ECMs to create inspection plans and maintain revisions on the material.  the valid from date on the ECM used to create/assign the inspeciton plan to the material must have a date that is equal to or before the valid from date on the ECM used to assign the revision to the material.
    for example,
    ECM 123 has a valid from date of 01.01.2013 and was used to assign revision A to the material
    then the ECM used to create/assign the inspection plan to that same material must have a valid from date of 01.01.2013 or prior...otherwise SAP will not find a valid inspection plan that's valid on the date for the inspection lot and revision of the material in the inspection lot.
    hope this helps!
    nicole land

  • Why not all fields dimmed or show in display mode after system status TECO and CLSD for Project

    Dear All,
    When Sets the system status TECO or even CLSD all fields for WBS Elements are not goes to Display mode. User can still edit them or change then.
    The fields are:
    1. WBS Element Description, technical name: PRPS-POST1
    2. Person responsible number, technical name: PRPS-VERNR
    Other Progress and Customer enhancement tab pages for WBS Element all fields there also editable in TECO and CLSD system status.
    The client do not want to set LOCK system status for master data option.
    Is there any enhancement or standard way of doing that?
    Regards
    Saqib Usman

    Dear Saqib,
    Its a standard behavior of the system. In CLSD status, transactional data like Procurement gets restricted along with WBSE no and its scheduling details. But it allows to you change like WBSE desc./Responsible person.
    Also go thru the below link for clarification of WBSE system status:
    http://help.sap.com/saphelp_470/helpdata/en/ee/41f82246ee11d189470000e829fbbd/content.htm
    For locking all master data, as above experts suggest, you should use MDLK/LKD.
    Regards
    Shishir

  • How to get system status and user status of service order

    Hi,
    I want to show user status and system status for service order in my report and i am using CRM_ORDER_READ function module to read the status, but it is returning lot of status records, could anyone please suggest how to get the system status and user status for service order.
    I did not find any clue for how to get user status, i can see the user status when i open the transaction using CRMD_ORDER.
    Regards,
    Kamesh Bathla

    Hi,
      Go to CRM_JEST table give your service order guid and get the status, pass this status into TJ02. You will get the status of your order.
    Regards
    Srinu

  • MR11 error message system status CLSD is active

    MR11 fails with error message system status CLSD is active . How to clear the PO line item which gives error message in MR11 system status CLSD is active .

    If you are using an account assigned PO then possibly the order(PM order, internal order etc) to which your PO refers might have status as CLSD.
    Check and reverse the status.

  • Report to check the WBS "system status"

    Hello friends,
    Would anyone know for a standard report where I can check for the WBS "system status"?
    i.e.: I want to know everything I have in AVAC status
    Thanks and Regards
    Alex

    You can get the system status of WBS in CN41, Execute the report , after it use the change layout option, select status.
    System will display you user / system status for all the PS Objects.
    With Regards
    Nitin P.

  • System Status at WBS level

    Hi friends.
             I have an issue in my report, my requirement is I have to fetch all the WBS Elements which are having System status as TECO . But in the selection screen i have given date range. Now i have to fetch all the WBS  having TECO as system status with in this date range . I have used JEST table also for checking this status .I have used  prps table for wbs elements.
    when i give the date range i am not getting all the wbs with in tht range.
    how can i validate date in this case.
    Is there any table which gives system status based on date .
    i want table with system status and date.
    please have a look over this .

    Hi,
       Try the fm STATUS_TEXT_EDIT.
    Regards
    Kiran Sure

  • System status INCM is active while doing the confirmation from SRM

    Hi,
    User is getting the below error while trying to create confirmation in SRM for some of the PO's.
    Partner XXX not found
    System status INCM is active (Confirmation XXXX)
    Partner not found XXX (Item 1)
    The version is SRM 4.0 (Classic scenario). We have already checked the user profile and it is consistent in the system. The BP record for this user in table BUT000 is all fine. User is able to create the confirmation for other PO's. Also we have checked the G/L account for any posting period issue. Everything is fine. The error is coming while user is trying to do the confirmation for some of the PO's.
    Any help is highly appreciated.
    Warm regards,
    Aswini

    The error is coming while user is trying to do the confirmation for some of the PO's.
    Check these POs to see if any of the partners are invalid. You could do this through "process purchase order" transaction. Sometimes this error occurs when one or several of the PO partners no longer exist, e.g. left the company, etc.

  • Error IW351-------System: Status object does not exist

    Hello,
    I am getting bleow error while saving service order.
    System: Status object does not exist. Message Numner IW351
    Actually I have done one enhcement in the User exit of the Sales order in the form Routine...
    USEREXIT_SAVE_DOCUMENT_PREPARE  in MV45afzz.
    When i Try to save the service order i get the error messages which is coming from my validation
    After the error messgae i press ENTER and then try to change the order by clcicking on the advance shipment.
    As soon as i click on that i get a STOP messgae.
    Which i as below.
    System: Status object does not exist
    If I comment all my code and write only error message then it comes.
    but it does't come for information and warning message.
    actually steps are
    1. go to IW51
    2. create notification then service order then sales order
    3. if product hierarchy is different for material then it should display error on saving
    4. it is giving error message(my error message)
    5. if i press enter and then click on advance shipment icon(truck) for change it display standard message.
    which turn me out of transaction.
    but if i click on advance shipment icon without pressing enter its working fine..
    my error message is a normal error message .
    message e038(zcrm)
    " service line must be same".
    pls suggest.
    Regards
    LOKESH

    Hi,
    After MESSAGE add STOP. :
    MESSAGE ixxx(xxx) with param1 param2 param3 DISPLAY LIKE 'E'.
    STOP.
    or If ambiguity with usage of  STOP being obselete use EXIT after message.
    MESSAGE ixxx(xxx) with param1 param2 param3 DISPLAY LIKE 'E'.
    EXIT.
    BR
    Dep

  • How to find out System Status of WBS Elements?

    Hi PS Experts!
    Please help me on my query.
    I want to get a list of WBS elements whose status is Released and can be used.
    If I try to search the table PRPS, it can only help me in finding WBS elements without deletion flag, with RA Key and so on.
    But the System status (such as Blocked for use) etc. is not present in the table.
    The one way I know is to get Object Number of WBS element from PRPS Table and insert it in JEST Table to get system status.
    Or alternatively, I give the WBS element no. in CJ20N t-code, and then check for System Status.
    These 2 methods work, if I do it one WBS Element at a time. If I need to get thousands of WBS elements in such a fashion, it's tedious.
    So could anyone help me on this issue?
    Thanks in advance,
    Vinitha.

    Hi Bala
    Yes, you have put it rather correctly.
    We use WBS elements for booking and posting time (client requirement). So what I am looking for is WBS Elements with the system status TERL (Time and Expense Released).
    I talked of the deletion flag also, because a WBS element flagged for deletion can't be used. It's one of the criteria to screen the WBS elements.
    I hope it's clearer now.
    Vinitha.

  • Change System Status of SO item dynamically based on Reason for Rejection

    Hi ppl,
    Our SAP user has raised a requirement as described below:
    In sales order (in creation mode (VA01) or change mode (VA02)), if at the item level, the reason for rejection is mentioned, then the system status for that item should be automatically set to Technically Complete SET (TECO); and if the user removes the reason for rejection for the item, then the system status Technically Complete should be RESET automatically.
    We are looking for any user-exit or BADI available which would be allow this dynamic change of system status based on the reason for rejection field. (No manual interaction for setting or resetting the system status).
    Technically, the functionality is based on the below fields:
    Reason for Rejection: VBAP-ABGRU
    System Status: JEST-STAT
    Please provide suitable inputs.
    Thanks,
    Dawood
    Edited by: Dawood.S.Ghasletwala on Jun 29, 2009 3:14 PM

    program: SAPMV45A
    User exit: USEREXIT_SAVE_DOCUMENT_PREPARE.
    loop at xvbap where updkz NE 'D'.
      if not xvbap-abgru is initital.
        "set your system state here.
      else.
       "reset your system state here.
      endif.
    endloop.
    hmmm you can as well try if you got all you need to know already in userexit: USEREXIT_CHECK_VBAP.
    Edited by: Florian Kemmer on Jun 29, 2009 11:53 AM

  • Change system status from PDLV to DLV

    Hi All
    Please help me with this error. Already tick the delivery compeleted in Goods Receipt Tab but then system status won't change from PDLV to DLV. Is there any other way wherein I could change it?
    Thank you
    Jesielle

    Hi Jesielle,
    We're facing the same issue with you. The status remains at PDLV even though we had set the "Delivery Completed" indicator. This only happens to Production Orders that having multiple Items.
    Please share on how you resolved this issue?
    Thanks.
    Regards,
    Hooi Chia

  • BSP: Use of dynpro services is not possible in the current system status

    Hello,
    in the component SRQM_INCIDENT_H i created a own button and eventhandler on the overview view.
    Here in this eventhandler i´m calling an own method from an own class. This method is doing a RFC in our ERP system.
    If i test the method this works fine.
    If i call this method in my eventhandler i get BSP error:
    Calling the BSP page was terminated due to an error.
    SAP Note
    The following error text was processed in the system:
    Use of dynpro services is not possible in the current system status
    Exception Class CX_SY_MESSAGE_IN_PLUGIN_MODE
    Error Name
    Program ZCL_CRM_CS_DATA_SERVICES======CP
    Include ZCL_CRM_CS_DATA_SERVICES======CM001
    ABAP Class ZCL_CRM_CS_DATA_SERVICES
    Method CREATE_CS_ORDER
    Line 54
    Long text -
    Error type: Exception
    Any ideas?
    thank you
    Best regards

    Hi,
           Web-UI cannot handle MESSAGE statements. if it's your own program, you should use the web-ui( view_manager->get_message_container or cl_crm_bol_core's global message container) alternatives to display the messages. If the message statement is being issued by a standard program, it's most usually deliberate attempt to fail on unrecoverable error. You can catch it by usin the try...catch CX_SY_MESSAGE_IN_PLUGIN_MODE ..where you call the standard functions.
    Regards,
    Arun Prakash

Maybe you are looking for

  • ORACLE.FDK.ServerError while creating document and assigning category

    Hi, I try tro create a new Document in Content Services and assigning an existing category here is the code snippet: public static Item createDocumentWithCategory(Item parent, Item category) throws FdkException, RemoteException // get the Manager ins

  • Can I boot from an external drive with a "Virtual CD"

    I just purchased a Hitachi LifeStudio external hard drive for use as my Time Machine backup. When I plugged it in to my MacBook running 10.6.4, I realized that it had one of those "Virtual CDs" that contained the manufacturers crapware, similar to We

  • ORacle 11g RAC setup on linux RHEL 5

    Hi all, I have 2 server class machine but not having separate disk array. In both server machine i have local disk array with 3 Gbps Reading/Writing speed. Can i use one local disk array as shared storage for both server? If anybody have idea please

  • IPad2 using iOs 8 passcode problem

    I updated my iPad2 to iOs 8.02 and now I am having a problem.  It crashed and I got a message that it needed to be restored on iTunes.  I did and now I can't get into it again because it says that I am using the incorrect passcode.  I have tried so m

  • How to Connect to my Aperture Library, which is on a Different Hard Drive?

    In FCP X, the only option I get when I click on the still camera icon is iPhoto, which I don't use. In order to avoid conflicts between FCS and FCP X, I have installed them on different start up drives.  My Aperture software and library are on the st