System time for Java Stack and ABAP Stack of PI

HI,
     We have a scenario in which we have a synchronous flow of data. In the forward flow we have used field UZEIT in an RFC Lookup to register the inbound time and in the reverse flow we have used current time function of SAP PI mapping. PI time is the local time of the server, However UZEIT is 4 hours ahead compared to PI time.
Both the Java and the Abap stack are installed on the same server.
Kindly let us know the reason for the difference in time on both the stacks.
Regards,
            Milan Thaker

Hi,
   Yes I am refering to the System->Status time in ABAP Stack. Could you please tell me where can I check the System time of JAVA stack. I got one XML file in UME which refers to some timestamp in com.sap.security.core.usermanagement but I failed to locate this field. Please let me know where can I find the Java stack time and how can that be synchronized with ABAP.
         Also, is there any time zone settting in JAVA for UTC , the way we have in ABAP
Regards,
              Milan Thaker

Similar Messages

  • How is the interface between the Java Stack and ABAP stack is achieved?

    How is the interface between the Java Stack and ABAP stack is achieved?..Please send me the answer to [email protected]

    Hi,
    By interface, I assume you mean the connection between the ABAP and the Java stacks in a double stack system.
    The connection from Java to ABAP is through JCo connections defined in the WebDynpro section of the J2EE start page. So Java to ABAP requests are processed through JCo.
    The connection from ABAP to Java is through RFC connections defined in TA SM59. The ABAP to Java requests are processed through RFC.
    Refer https://dsd.esco-salt.com/StartPage/documents/integration/3.html for detailed explanation.
    The UME can be maintained in either ABAP or in JAVA depending on the persistence.
    Refer: http://help.sap.com/saphelp_nw70/helpdata/en/5b/5d2706ebc04e4d98036f2e1dcfd47d/frameset.htm
    Check UME data source configuration.
    Some quick FAQs can be found at:
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/ad47eb90-0201-0010-7cb2-ddfa5ed879ec
    Hope this helps.
    Best Regards,
    Srividya.R

  • Java Stack and ABAP Stack

    Hi Experts,
    i am now confused about these two stacks: Java Stack and ABAP Stack.
    for IR objects, like DT, MT, SI, MM, SM, Action, Process Integration Scenario
    for ID objects, like profile agreements, receiver determination, interface determination,
    1. where are these objects stored in? Java or ABAP stack?
    and i know Adapter Engine is run on JAVA Stack while Integration Engine is on ABAP Stack.
    2. how do they call the objects stored in different stack during processing?

    Hi,
    1. where are these objects stored in? Java or ABAP stack?
    These objects are basically developed on the JAVA stack, when they are activated their runtime version is created on ABAP stack, which you can check in SXI_CACHE transaction.
    2. how do they call the objects stored in different stack during processing?
    Runtime versions of these objects are responsible for the execution of the interfaces.
    -Supriya.

  • Installing Java Stack and Abap Stack, same machine.

    Hi all:
    Does anybody installed Java Stack and Abap Stack on the same machine?
    I installed ABAP stack first, and am trying now to install Java stack but it seems like at the end of the process, ABAP stack. (is not working now).
    Any idea?

    Not sure about installing both as I haven't tried either!
    Anyway, in theory if the SIDs and instance numbers are completely different, then you should be OK. If you ahev the same SID or instance number, I can see possible problems,
    Portal only runs on Java, so in theory any Java system will be OK. NWDW would be a good choice.

  • JAVA Stack and ABAP Stack not in Sync

    Hi,
    when i logged into the MI Server(7.0) gonr thru the following navigation :
    Administration-->Mobile Infrastructure---->Mobile components
    which i click on the search button i am getting the following error
    "JAVA Stack and ABAP Stack not in Sync"
    Already i redeployed the sapjra.rar, still i find the error unchanged.
    Any help on this would be great........
    Thanks,
    vijay.

    Hi
    Refer this link
    Need to Configure MI Server 7.0
    As explained by veeraragavan in this link follow these steps
    Following are in brief the roles required, just forward the same to your BASIS administrator.
    In the ABAP Stack -Under Transaction SU01:
    End User:
    SAP_MI_SERVICE
    Administrator / Critical Developers:
    SAP_J2EE_ADMIN
    SAP_MI_ADMIN
    In the J2EE Stack - Under Identity Management:
    End User:
    No role required. You can give a role for display: SAP_JAVA_NWMOBILE_ADMIN_READONLY
    Administrator / Critical Developers:
    SAP_JAVA_NWMOBILE_ADMIN_SUPER
    regards
    Manohar
    Edited by: Gouri  Manohar Gadhamsetty on Jan 19, 2009 7:17 AM

  • Difference java stack and abap stack

    hello experts,
                          Difference between java stack and abap stack

    Hi
    ABAP Stack
    The application data in the SAP system is accessed in
    the ABAP stack via platform-independent ABAP programs.
    ABAP stack is used to run ERP applications mainly MM,SD,FICO etc
    Currently in most of the installation you can found mixed stack(ABAP+JAVA)
    JAVA Stack
    The Java side of the SAP Web AS is often referred to as SAPWeb AS Java or
    as the Java stack.
    This central SAP Web AS Java instance consists of two separate
    instances plus one special application, the Software Deployment Manager (SDM).
    These two separate instances that build the central SAP Web AS Java instance are
    a standard SAP Web As Java instance, offering a Java dispatcher process and one
    or more Java server processes and the so-called SAP Central Services instance
    (SCS). The SCS instance offers two processes, exclusively used by the Java side
    of the SAP Web AS: the enqueue services and the message service. These two
    services only work for the Java side of the SAP system.
    Java Stack is mainly used for SAP Portals and you can host Internet/Web based application written in JSP/EJB ,Java Stack uses Java Threads to run application,
    Also, Xi requires Double stack
    ABAP + JAVA Stacks
    Bcoz some components are developed on JAVA
    Some components are developed on ABAP Based.
    JAVA:
    Integration Builder
    SLD
    Adapter Engine
    Runtime Workbench
    ABAP:
    BPE
    Integration Engine
    Integration Engine and the Integration server reside on the ABAP Stack. All the Execution of the IS part will be done on ABAP Stack. we can monitor the processed XML messages also in SXMB_MONI( ABAP Stack)
    Adapter Engine will reside on the JAVA Stack. All the IR, ID, SLD, RWB Application are developed on JAVA Stack, so thats why we need JAVA Webstart to run these Applications
    All the Adapter related Errors we can see in RWB, Communication channel monitoring( Developed and sits on JAVA stack)
    Hope this clears your doubts
    Thanks
    Saiyog

  • PI 7.30 dual stack - different time in rwb, pimon and ABAP stack

    Hi @all,
    I am working with the client on a PI 7.30 dual stack system.
    During monitoring of message processing I saw that there are differences in the time displayed while monitoring the processing of identical messages
    e.g. channelmonitor (mdt/channelmonitorservlet and rwb) is 1 hour behind pimon
    The time displayed in the ABAP Stack (Menu System - Status) differs also 2 hours ahead of pimon.
    Are there java parameters to configure the used time zone and which could be reason for this behaviour.
    For me it seems strange that there is a difference between to tools (channelmonitor and pimon) I was supposing are based on the same technical stack
    Would be nice to have the same time throughout the whole system.
    Any help appreciated.
    Best regards
    Jochen

    Hi Jochen,
    I did not found the option to change the time zone for pimon. Please refer the below wiki it might helpful
    PiMon_TroubleshootingGuide - Technical Operations - SCN Wiki
    PiMon_Frequently Asked Questions - Technical Operations - SCN Wiki
    regards.
    Harish

  • Doubt about JAVA stack and ABAP Stack

    Good day!
    Hope can help me with my next doubt. I understood that BI JAVA or JAVA has been embedded in the Java support package stack for portal. But for BI7 the installation for JAVA is by sps. We only use pure support package for BI7, we don't use support package stacks and we don't use JAVA. I'm not sure because i don't made the sap installation in our enterprise, how can i be sure if we have installed java in BI7 and if we don´t have installed, should I install Java in our sap system? what are the benefits and consequences if I decide install it? and what is the difference about BI java (portals) and JAVA stack for BI7?
    I try to find some information but I found some information  about bi Java for portals, but not for BI.
    Ramón Sánchez

    Hai,
    BI-7.0,JAVA:BI-Java is used to provide the Java runtime for scenarios such as Enterprise Reporting, Query, and Analysis as well as Business Planning and Analytical Services.BI-Java requires AS Java and Enterprise Portal Core and EP in the same system. Optionally, you can combin with other usage types in one system. Usually, scenarios running on usage type BI-Java also require usage types BI and AS ABAP. While installing BI-Java, AS Java, EPC and EP get installed automatically. Usually, when running on usage type BI-Java also require usage types BI and AS ABAP, you should be aware that no matter if you run BI and BI-Java in the same or in separate systems, both BI and BI -JAVA should be kept in sync in terms of Support Package Stacks.
    BW 7.0 is now called as BI 7.0. There are many differences between them in areas like extraction, EDW, reporting, analysis administration,etc.,
    http://www.ittestpapers.com/articles/987/2/SAP-BI-70-Features/Page2.html
    Advantage of having Double stack Instance: Where AS ABAP provides the complete technology and infrastructure to run ABAP applications and AS JAVA provides Java Enterprise Edition environment for developing and running Java programs.
    Regards,
    Yoganand.V

  • Communication between UME on the Java Stack and ABAP Stack

    Please look for the thread
    Unable to log on to IR, ID, SLD....
    before going any further. This thread follows.
    The prob in brief is that,
    On XI homepage, I am not able to get into anything after I entered the user name and pw.
    I have some roles SAP_XI_ADMINISTRATOR for my user. I have checked in SU01 on ABAP Stack.
    I thought that the error could be that the UME on the Java Stack is not able to communicate with the ABAP stack.
    Any direction on this would really help me.
    Regards,
    -Naveen.

    Can any one help me in this.
    -Naveen.

  • Relation and Difference between Java Stack and ABAP Stack

    Hello,
    This is harsha, i am new to XI.
    i want to know the details of<b> java stack</b> and <b>ABAP stack</b> ?
    how they are <i>related</i> to each other ?
    which plays a major role at which time, can any one give a details explanation on this
    thanking you with anticipation
    regards
    harsha
    Message was edited by:
            harsha vardhan

    Hi ,
    Integration related will be done in Integration Engine ,, it means in ABAP Stack..
    I mean ..
    Integration Engine and Business process Engine on ABAP Stack..
    Rest of all components are on JAVA Stack..
    see the below links
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/30f8bd90-0201-0010-dd9a-c8a7f52c47aa
    Regards
    Chilla

  • Java stack and ABAP stack in upgrading SP

    Hi,
    pls pardon if it appears silly question. I dont have much knowledge in Basis
    I am on XI3.0 with SP 09 and upgrading SP to SP20 from SAP service market place.
    How can I identify which is java stack and which is ABAP stack in evrery SP because Java stack can be directly upgraded to SP20 but ABAP stack has to be upgraded one by one (like sp 01..10..11..finally sp20).
    Could you pls let me know, from the list of files how can I identify which is ABAP stack and which is java stack ? so that I can first update the ABAP Stack one by one and then move to javastack
    thanks,
    Dushanth

    This was answered yesterday:
    Upgrading SP 09 to SP 20

  • Java Maping and ABAP Mapping

    Hello,
    Pls let me know about Java Maping and ABAP Mapping
    Also pls provide good simple scenario blogs for Java Maping and ABAP Mapping.
    Regards

    Hi Ranchit,
    Check these links for Mappings
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/9202d890-0201-0010-1588-adb5e89a6638
    https://websmp102.sap-ag.de/~sapdownload/011000358700003604872004E/MappingXI30.pdf  (Need Service Makrket place ID)
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/8a57d190-0201-0010-9e87-d8f327e1dba7
    JAVA Mapping BLOGS
    /people/prasad.ulagappan2/blog/2005/06/29/java-mapping-part-i
    /people/prasad.ulagappan2/blog/2005/06/29/java-mapping-part-ii
    /people/prasad.ulagappan2/blog/2005/06/29/java-mapping-part-iii
    /people/stefan.grube/blog/2006/10/23/testing-and-debugging-java-mapping-in-developer-studio
    ABAP Mapping Blogs
    https://www.sdn.sap.com/irj/servlet/prt/portal/prtroot/docs/library/uuid/e3ead790-0201-0010-64bb-9e4d67a466b4
    /people/sameer.shadab/blog/2005/09/29/testing-abap-mapping
    Sachin
    Message was edited by:
            Sachin Dhingra

  • SMSY for ERP JAVA and ABAP Stack

    Hi Folks - I have installed SAP ERP 6.0 EHP5 in one database called T12. Now there is a need for a Java stack and I have installed the Java stack in another database called J12.
    I was able to define the ABAP stack on system landscape and MOPZ is working fine. However, I am not sure how I should go about the Java (J12) instance definidstion on SMSY.
    I am using Somlam 7.1 on Oracle Linux system.
    ABAP stack is on ERL 6.0 EHP5 and Java stack is Netweaver 7.0 EHP2.
    J12 and T12 systems are connected via JCO.
    SLD has been defined for both stacks and they are using the local SLD for the SolMan.
    Your help is much appriciated.

    Sunny - I checked the SLD and It is working fine. There were couple of issues that I fixed. Since I defined the Java system manually I delete it. Hopefully SLD will populate the definition.
    In same note, Would it be possible that installing ERP java and ABAP stack on different hosts (stand alone) is causing this issue, especially they are using different Sid's?
    I was reading SAP Note 1344564, It states
    III.Some Main Instances include other Main Instances (E.g., in SAP
    ERP 6.0, Main Instance SAP NW - Enterprise Portal includes SAP NW -
    EP Core.). If the including Main Instance is installed, it's not
    necessary to mark the included Main Instance(s) for relevance.
    Is this mean in SMSY I do not have to define any product for the Java engine? When installing the Java, I had to create the product manually to be able to generate the installation key.
    Your input is appreciated.
    Edited by: kourosh Ghouchkhani on Nov 22, 2011 1:20 AM

  • Communicate link between Java and ABAP Stack for https

    I have configured https in both the java and abap stacks (we have a double stack configuration).  Due to our future configuration I have changed the hostnames to fully qualified hostnames per SAP instructions. 
    The question I have is does anyone know what RFC destinations or JCo settings I need to change to make https complete?
    I have the problem where when I fire off the Integration Builder from within the ABAP stack (SXMB_IFR) I get a straight hostname (no domain name).  Where is this configured?  Any help is appreciated..

    Check the exchange profile (Administratio tab in /rep/start/index.jsp page; you will have to enter it manually since it is throwing error from SXMB_IFR).
    Regards,
    Henrique.

  • JAVA and ABAP stack support pakages

    Hi,
    I am new on installation of solution manager server.
    I just install solution manager server EHP1 on windows 2003. Now I want to patch my server.
    I have abap and java stack on my server. Can I use jspm to upload my new patches for both Java and ABAP stack or I should use SPAM for abap stack and jspm for java.
    Thanks Reza

    Hello Reza,
    Just to clarify, Best practise is to update your kernel to the latest before you start patching in your system.
    So download SAPEXE.SAR (Database independent kernel package), SAPEXEDB (Database dependent kernel package) and IGSEXE.SAR (IGS Package) from the SMP. kernel is dependent on your operating system and database and therefore make sure you download the right package otherwise you'll end up in messing up the system.
    follow SAPnote # 19466 for help.
    Once you are done with the kernel update then patch you Abap stack by SPAM and JAva stack by JSPM.
    I hope that makes things clear.
    Best Regards
    NIraj

Maybe you are looking for

  • APEX 4 Interactive Report set font color of negative values to red

    I have an interactive report with several columns containing numerical values. If the value is negative, I want the font color to be red. Can someone help me with this process please. Application Express 4.1.1.00.23 Thanks! Chris

  • Stock & Non stock item

    Hi Experts, Could you please tell me how to recognised the stock material. Like if we consider material type NLAG it is purely non stock item.Like wise which are the material type is consider for stock item. How can we identified the stock material.

  • Multiple Input Ports on BAPI to submit at the same time

    Hi I have looked at previous threads and still not getting this right. When I click the submit button I need it to all go to the BAPI at the same time. I'm using BAPI SalesorderCreatefromdat2, I need to use at least three input ports. I have done the

  • MBP boot up issues............

    Howdy, Looks like I actually have a issue with my MBP It's a 15" 2.2Ghz It seems that maybe something is loose inside, as the problem will come and go. When I start the machine, it comes up with the grey screen, telling me to reboot. I thought it was

  • MBP with New Apple LED Cinema Display

    Does anyone know whether it will be possible to use an early-2008 MacBook Pro with the new Apple LED Cinema Display? I know that the new display is made specifically for the latest MacBook, MacBook Pro, and MacBook Air with the mini-display port, but