T399D - Long-term planning allowed for a plant

Hi gurus,
I was checking the table T399D and it has the "Long-term planning allowed for a plant" field (T399D-SIMPL), but, I do not know where I can customise this!
I was checking OMI8 and OPPQ (Parameters for DS section) transactions, but, I cannot find this field.
Could you help me in order to know where I can customise this?
Kind regards,
Sandra

Hi Sandra,
                 As it is correctly said that there is not much configuration required to Run LTP, but what you  basically need to maintain/configure is as follows-
To carry out an annual planning or a rolling quarterly planning run you require information on the
future stock and requirements situation. This means you need to know how sales and operations
planning influence resources(conceptually)-
In long-term planning you can also plan materials that usually require very little planning in
operative planning, such as, materials planned using reorder point planning, bulk material, and
materials planned using KANBAN. In long-term planning, you can plan these materials as you
would MRP materials. This provides you with an overview of how these materials influence the
demand program.
The materials you want to plan in long-term planning must have already been planned in
operative MRP.Apart from above conceptual knowledge what else you require to configure /maintain is-
Planning Scenario(If you are running wity reference to it)-MS31
And run it through MS02(with reference to planning scenario) where you have to put mandatory  MRP Control Parameters according to your business process eg.Processing key,create MRP list,planning mode,scheduling,firming planned orders.
Hope it fulfils your purpose at some extent.
Regards
Chandra

Similar Messages

  • Excluding storage location from MRP run in Long Term Planning

    Hi,friends,
         In my scenario , i want to exclude storage location from MRP run in long term planning.When i set storage location MRP indicator "2" in SPRO and SLoc MRP indicator "1" MRP4 in material master, i can exclude the storage location after run MRP with MD01/MD02,and i can see the expected result in MD04.But in Long Term Planning scenario the storage location can not be excluded after run MRP with MS01/MS02,and the requirements list in MS04 include the stock in the storage location i want to exclude. i dont know if i miss something.Plz give me some advice.
    Regards
    Joey

    Hi,
    Refer the OSS Note 208017 - LTP: Long-term planning and storage locations
    ==========================================================================
    Symptom
    In long-term planning (Transactions MSBT / MS01 / MS02 / MS03), the MRP indicator of a storage location for a material is not taken into account (material master, view MRP 2 [up to and including Release 3.1I] or MRP 4 [as of Release 4.0A]).
    The storage locations excluded by MRP or planned separately are also planned in the plant segment.
    Additional key words
    LTP, MM01, MM02, MM03, master data, MRP indicator, LGORT ...
    Cause and prerequisites
    The MRP indicator for a certain storage location of a material is only taken into account in operative planning (requirements planning, MRP).
    The long-term planning occurs exclusively at plant level.
    Solution
    This is no error. The system works as intended.
    The individual storage locations should not be distinguished in the long-term planning, in order to perform a comprehensive long-term planning.
    This is important, for example, within the kanban processing where the storage locations with kanban MRP are excluded from the MRP, but in spite of that should be included in the long-term planning.
    ==========================================================================
    Regards,
    Siva

  • Long term planning in ECC for materials planned in SAP APO

    Hi SAP PP and APO Experts,
    I would like to know whether it is possible to plan a material in SAP ECC with Long Term Planning to create Simulative Planned Orders in ECC, when the MRP Type for the material is set to X0 (Planning in SAP APO).
    Warm regards,
    Prem

    Hi Dhaivakumar,
    Appreciate your prompt response.
    My business is MTS. I have made all settings for LTP planning for the material. (M|RP Type is set to X0-Planning in APO). When I execute the transaction MS02, I get the error message "Material 5200000013 J310  is not planned automatically. Message no. 61008". The details of the error message is:
    The material 5200000013 in plant J310 or in MRP area  is not included in automatic MRP because
    either the MRP data for plant J310 or MRP area  has not been created
    or an MRP type has been entered for the material in plant J310 or MRP area  that does not allow automatic MRP.
    Warm regards,
    Prem

  • Datasources for Long term Planning

    Hi Guys,
    Our client is planning to implement Production Planning - Long term planning for next release. I did enough searching to find out different SAP delivered Data sources and different tables that are involved in LTP but was unsuccesful. Can anybody guide me by providing the list of datasources and tables.
    Thank you,
    Regards,
    Vamsi.

    Hi Vamsi,
    This blog will give all list of  all Infocubes, Infosources and Datasources which are relted to Production Planning.
    http://help.sap.com/saphelp_nw70/helpdata/EN/12/c770376ec62c7ee10000009b38f8cf/frameset.htm
    Hope it helps you
    Nagaraju.V

  • Long Term Planning for Quotation

    Hi
    My client wants to plan Long term Planning w.r.t to sales quotation and not with demand planning.Kindly provide me the details steps.
    Regards
    P.Srinivasan

    Dear shankar,
    I'm not sure whether LTP can fulfill your requirement completely,but for such requirements generally LTP run for an inatice version
    can show the capacity required for meeting such a demand for the mentioned period and also the procurement analysis.
    For checking the split of requirements into multiple production line try by creating different production versions and maintain quota
    for the same.
    Check this link to explore more,
    [Quota Arrangement in LTP|Re: Quota Arrangement in LTP]
    Regards
    S Mangalraj

  • Capacity requirement for long term planning and make to order planning

    hello,
    anybody please guide me.
    my client using make to order scenarion and we are doing regulaly MRP run is MD50 with refernce to sales order.
    sales orders planning will follow for 2 to 3 months.
    at the same time my client wants to do long term planning also. to analize the capacity.
    for that he is creatind planning scenario and multi level planning with MS02 also.
    But the problem is when they are checking capacity requirement in cm38 it is showing only planning scenario load only. my client wants existing load and longterm planning load also. so they can plan the planning is sutibale in existing plan.
    so how can i get both plan in CM 38or is there any other T.code to get that data.
    please suggest me
    Thanks & Regards
    Bhakta

    Hi Pierre and Rajesh,
    When we create the simulation version, you have the possibility to choose the short-term planning. My point of view is, you can use the LTP fonction to do your scheduling for ex the next 3 months.
    I think it's what Pierre did. Am I right ?
    between to scheduling scenario to deliver my customer. With the simulation mode I can do my scheduling + use the MRP simulation to check if the raw material are available or not. Then use the MD04 to do the comparaison (or MS04 to compare between 2 scenario).
    But I found 2 problems :
    First : I don't find the parameters to show in the graphic MFS0, the planed fix order (I can only see the process order)
    Second : When my scheduling is finished, I want to update my operational planning with the simulation version. But I don't want to do article by article : when you have 400 references (raw mat, packaging, finish goods)  it's impossible (same issue like Pierre)
    Have you found a solution for this 2 points ?

  • Long Term Planning Issue - Transaction MS04

    Hi Experts,
    I have two problems looking for solution from you.
    1. Transaction Code MS04 -> After entered Planning Version, Material and Plant... I can see list of orders in the report.  If I click Production Order, Planned Order, Inspection Lot document Element Details (on left hand additional function) and I am able to double click and display these documents.  However If I double click Material Reservsation document It is not allowing me as I can't see "Display element (F7) Icon.   How do I get the display element icon for Material reservation document also.
    2. We have a lot of Quality Inpsection lots documents when we display in MS04 report but the problem here it is peggeging as requirements in Long term planning report.  We want to just display the document here not as requirements. 
    Please let me know the solution for above two.
    Regards
    Rc Gopi

    Dear NNeeti,
    1.In CM38-->in the top menu --->under Planning ->Profiles->Overall Profile.
    2For this over all profile check the Details in OPA6 T Code and find out the option Profile assigned to this over all profile.
    3.Edit the details of this Option profile in OPA3 (change the number of days as 730 instead of 365 in the finish date).
    Check with this setting in CM38 and proceed.
    Check and revert
    Regards
    S Mangalraj

  • Long Term Planning-Planning File Entry

    Hi Gurus/Friends
    In the long term planning after PIR with inactive version and creating Scenario, assinging versions, Plants,....then
    during Release+Save it is giving the Result of Planning File Entries
    Logically the system has suppose to give the Number of Planning File Entries in Propotionate to the Specific Planning Scenario number and materials inside
    But it is giving for all the Materials inside the Plant
    Is there any settings to restrict the Planning File Entry creation w.r.t Planning scenario during Release+Save
    other than the solutions through Transaction MS20,MS22 and MSAB
    (Because during Release+save logically it has to call the MS22 t.code  and do planning file entries for the materials in that scenario)
    Awaiting for reply
    thanks
    K.Prabakaran

    Hi,
    Please Refer Below SAP help .
    *Releasing a planning scenario*
    You first have to release a planning scenario before you can plan it in the long-term planning run. When you release the planning scenario, the system creates planning file entries for all materials in all the plants allocated to the planning scenario. There is a separate planning file entry for this purpose. This guarantees that your operative planning is kept completely separate from your simulative planning. This long-term planning file contains all the materials that are also contained in the operative planning file. After the release, every change relevant to MRP triggers an entry in the planning file as in operative planning.
    Pradeep
    Edited by: Pradeep Kumar on May 9, 2008 4:22 PM

  • Implementing Long-Term Planning

    Dear Guys,
    Is that possible to implement Long-Term Planning (LTP) in SAP when there is no SOP module in the system. Would you please inform me the basic requirements or basic setup to implement LTP in SAP system.
    Thank you in advance!

    Hi Payam,
    This is always recommended to implement LTP if you have long lead times for some procured parts, bottle necks in capacities for work centers and most important to plan about budget required for the production of those parts.
    The above things you cannot check with STP/MTP and perform changes after the STP/MTP runs. But this you can do with LTP with diffrent scenarios and compare it till you satisfy.
    You can do the precosting of the parts and check what would be your future costing and plant budget.
    You can transfer the requireemnst of the critical parts to vendors well in advance after LTP run and before running the actual planning for the entire year, so the vendors will be well prepared to supply you the parts.
    You can also checks the capacities required for the production before the STP run.
    If this is OK then please close this thread.
    Regards
    TAJUDIN

  • I can't see planned order in Long Term Planning Stock/requirements list.

    Hi
    I am trying to use Long Term Planning in SAP.
    I created scenario dates from 01.03.2011 to 03.09.2011. Between those dates i entered planned independent requirements as 300.
    When i went to Long Term Planning Stock/requirements list, i can see all planned independent requirements but i run Multilevel single-item planning and then when i went to  Long Term Planning Stock/requirements list again, i couldnt see planned order for planned independent requirements.
    So what is the problem? Can anyone help me please?
    Thank you.

    HI
    check the planning scenario in MS31 and the PIR assignment in MS31 also check the plant assignement.
    Check In MD61 you have enter PIRs in simulation version and the same version is to assigned in planning scenario
    Also check T code OPU5 for LTP setting for planned orders
    Regards
    Anupam Sharma
    Edited by: anupam sharma on Sep 3, 2010 2:33 PM

  • Re: Long term Planning

    Dear All,
    I am trying to do Long term Planning. In my case I am not using SOP. Demand is entered into SAP through PIR (i.e. PIR).
    I want to see how much load is there on all the resources available.
    Please advice me how to proceed in this direction.
    Regards,
    Vivek Sharma

    Dear Vivek,
    Check with these steps,
    1.A plannig scenario has to be created for a plant in T code MS31 & for the same Planning scenario
    configuration settings has to be made in OPU5 for the planned orders for LTP.
    2.Requirements has to be given in MD61 in an inactive version and also after giving the requirements
    kindly remove the tick mark against version- active check box.
    3.Assign this plan to the planning scenario in MS32,release it and ensure the planning file entries are
    entered or created,the same can be checked using MS21.
    4.After taking LTP simulation run in MS02(individual material) or MS01 you can see the simulated
    planned orders obtained in MS04 T code.
    5.These Simulated planned orders can't be converted into production orders or it cant be used for any
    business confirmation purpose.
    6. For capacity planning analysis,use T Code CM38,
    Before that Ensure for all the work centers in CR03 which are used for operation under capacity header
    you have included the check box for Long term planning,otherwise in CM38 you can't see any capacity
    requirements data.
    7.Before executing CM38,ensure under settings---> general you are giving the period settings properly.
    Revert back incase of any more clarifications required.
    Regards
    Mangalraj.S

  • Short, medium and long term planning in SNP

    Hi,
          can somebody explain me what Short, medium and long term planning mean in SNP?
    Lets, say I have this scenario:
    If I have a product with SNP horizon of 35 days, which means that the product is planned in SNP only after 35 days from today.  Only PPDs deals with orders in these 35 days.
    I have a 3 planning books
    short term with 30 days from today
    medium term with 7 months from today and
    long term with 2 years from today.
    When I say short, medium and long term planning in SNP what exactly happens in these ?? What do users usually do in these books?
    SNP horizon is 35 days and the short term book is 30 days long, in which SNP does nothing. What's the use of this book?
    Thanks.

    When I say short, medium and long term planning in SNP what exactly happens in these ??
    Nothing much from a technical stand point.
    What do users usually do in these books?
    Check the Time Bucket Profile for the different books. The short Term Book will be in days, the mid term in weeks and the long term in months/quarters etc. The different books allows users to see the keyfigures in different time-based aggregate level.
    But if Heuristic is executed then behaviour will be different. Remember SNP Location Heuristic run uses the bucket of the data view to compute the Net Requirement and then try creating Receipts in each bucket within the time horizon of the data view using suitable master data. So if you run Location Heuristic in the short Term (daily) view then you will have many receipts one per day most likely. If you run in mid-term Weekly view then there are less number of receipts one receipt per week till 7 months. likewise for the long term view.
    SNP horizon is 35 days and the short term book is 30 days long, in which SNP does nothing. What's the use of this book?
    Maybe just to see the data. Location Heuristic run will not generate any new receipt.
    Thanks,
    Somnath

  • Query on Long Term Planning (MS31)

    During the creation of long term planning the following steps i followed before i am stuck at one point.
    1)T code MS31
    2)Planning Scenarion and detail
    3)Long term Planning Radio Button selection
    4)Planning period +Use Gross Lot Size (EX)
    5)BOM Selection ID 01
    6)Tab Planned Independent requirement details filled
    Now in Plant TAB when i give my plant id  the message is REQUIREMENT PLANNING IS NOT ACTIVE FOR MY PLANT CODE.
    Message no. 61139
    Please tell me how to make it active.
    Thanks in advance
    Rupesh Jha

    Dear Rupesh,
    Plz Refer to Mr. Mangalraj inputs on LTP
    1.A plannig scenario has to be created for a plant in T code MS31 & for the same Planning scenario
    configuration settings has to be made in OPU5 for the planned orders for LTP.
    2.Requirements has to be given in MD61 in an inactive version and also after giving the requirements
    kindly remove the tick mark against version- active check box.
    3.Assign this plan to the planning scenario in MS32,release it and ensure the planning file entries are
    entered or created,the same can be checked using MS21.
    4.After taking LTP simulation run in MS02(individual material) or MS01 you can see the simulated
    planned orders obtained in MS04 T code.
    5.These Simulated planned orders can't be converted into production orders or it cant be used for any
    business confirmation purpose.
    6. For capacity planning analysis,use T Code CM38,
    Before that Ensure for all the work centers in CR03 which are used for operation under capacity header
    you have included the check box for Long term planning,otherwise in CM38 you can't see any capacity
    requirements data.
    7.Before executing CM38,ensure under settings---> general you are giving the period settings properly.
    Revert back incase of any more clarifications required.
    Regards
    kumar

  • Use Reorder Point Planning and see VSE Requirements in Long Term Planning

    Hello,
    I would like to use reorder point planning short term and something similar to MRP planning long term. I am trying to drive actual production off of consumption and plan long term for capacity, inventory and BOM components.  Our plan is to delete the near term forecast and leave the long term forecast in to show requirements for LTP.
    I'm configured for Reorder Point Planning as follows:
    MRP type V1, Reorder Point Planning with External Requirements
    Planning Strategy 52
    HB Max Stock Level
    For the longer term forecast requirements I'm configured with:
    Independent Requirement Type VSE, Planning without final assembly.  This is creating non convertible planned order independent requirements.
    The reorder point planning is executing perfectly, but how do I get the VSE planned order independent requirements to show up in long term capacity and inventory planning? What am I missing?  Is it something with MRP type, am I missing an option in the long term planning setup?
    This has been a tough issue and I would greatly appreciate any advice on this.
    Thank you,
    Wes
    Edited by: weslaney on Jul 21, 2009 11:40 PM

    HI
    check the planning scenario in MS31 and the PIR assignment in MS31 also check the plant assignement.
    Check In MD61 you have enter PIRs in simulation version and the same version is to assigned in planning scenario
    Also check T code OPU5 for LTP setting for planned orders
    Regards
    Anupam Sharma
    Edited by: anupam sharma on Sep 3, 2010 2:33 PM

  • Long term Planning in SAP

    Hi Gurus,
    I am new to SAP,this my 1st query in SDN.
    I have been given sales figures of last 5 years of particular organization and i have been told to create a long term planning report in SAP please tell me the detailed methodology of create a long plan for the next 6 months in SAP.
    Regards
    Krish

    Dear Krish,
    LTP is a planning tool,where simulated planned orders's are obtained for an inactive plan.
    It will be more helpful from production perspective.
    To carry out an annual planning or a rolling quarterly planning run you require information on the future stock and requirements
    situation. This means you need to know how sales and operations planning influence resources. That is, whether the results
    of sales planning can actually be produced with capacity on hand. If such information is available it is possible to decide at an
    early date whether extra work centers will be required to cope with bottlenecks, or whether additional machinery will have to
    be purchased to reach the sales target.
    Steps for LTP:
    1.A plannig scenario has to be created for a plant in T code MS31 & for the same Planning scenario
    configuration settings has to be made in OPU5 for the planned orders for LTP.
    2.Requirements has to be given in MD61 in an inactive version and also after giving the requirements
    kindly remove the tick mark against version- active check box.
    3.Assign this plan to the planning scenario in MS32,release it and ensure the planning file entries are
    entered or created,the same can be checked using MS21.
    4.After taking LTP simulation run in MS02(individual material) or MS01 you can see the simulated
    planned orders obtained in MS04 T code.
    5.These Simulated planned orders can't be converted into production orders or it cant be used for any
    business confirmation purpose.
    6. For capacity planning analysis,use T Code CM38,
    Before that Ensure for all the work centers in CR03 which are used for operation under capacity header
    you have included the check box for Long term planning,otherwise in CM38 you can't see any capacity requirements data.
    7.Before executing CM38,ensure under settings---> general you are giving the period settings properly.
    8.Use T Code KSPP to transfer the planned activity requirements for production.
    Revert back incase of any more clarifications required.
    Regards
    Mangalraj.S

Maybe you are looking for

  • Does music have to be stored on my PC in iTunes after downloading to iPod?

    I restored my PC because it was running slowly and had some error messages. I saved all my son's music from iTunes (burned it to a CD) and reinstalled iTunes. When he connected his iPod, and opened iTunes, all the music on his iPod was deleted. Does

  • IWeb 08 can't see my MobileMe galleries

    When I go to Insert/MobileMe Gallery, it is greyed out and states "No albums or movies available". I have 6 unrestricted MobileMe galleries on my account. Why can't iWeb see them, any ideas? Paul

  • Reporting Service chart image switch issue in Outlook

    Hello~ I'm receiving report as email everyday. That email is send by Reporting Service of MS-SQL. I receive several report similar format as one RDL. There are chart , table, image. All objects in Report Mail was rendered MHTML.  However, some Chart

  • Issue in ALV reporting

    Dear All, I have an issue in ALV reporting. Pls look at the follow table. <u>Duty Post</u>      <u>Date</u>          <u>Time</u> jurong                   12/06                3.45 jurong                   13/06                3.50 jurong             

  • Reader 11.0.9 crashes when using side bar (tools, forms & sign)

    I recently updated my company's Adobe reader to 11.0.9 via GPO. I followed instructions here: http://community.spiceworks.com/how_to/show/37467-how-to-create-a-slipstreamed-adobe-acrob at-reader-msi-for-gpo-deployment I downloaded the MSI for the 11.