Tab option for choosing Planned delivery cost in Miro screen

Hi all
I'm a new user in SAP system and I have a question as follows:on Miro screen, I do not see the tab, select Planned delivery cost, I think someone did somthing in  system and made it hidden.it displayed above the layout tab, so  I want to know how displays it on the screen?
Thanks for your help

Dear,
Please go into transaction MIRO
then on item level u can see One option with 3 selection criteria
1) goods/serv item
2) planned delivery cost
3) goods service + planned delivery
please select the 2 option
regards
amey

Similar Messages

  • Planned delivery cost in MIRO

    I have a PO. I have entered the freight condition as FRA1. The vendor for the condition is specified at the time of the GR. I create mnultiple GR for the PO line Item.
    When I book the MIRO for the planned delivery cost the system does not propose the quantity and the amount. The GR based verification is checked in the vendor master data.
    Please suggest me a way to do this? or is it a standard system.

    Hi,
    Please check if condition is defined in M/06 ,ACCRUALS option should be ticked - otherwise system will not create any seprate delivery cost document in system at the time of GR. Check Purchase Order History,seprate delivery cost should be appeared against the Purchase Order History
    Also check ,in Pricing Procedure (m/08) ,accrual key should be available against delivery condition.
    Or else check at the time of MIRO,Goods Items/ Delivery cost/both option should be selected.
    Hope this will be helpful to you.
    Thanks & Regards,
    Sandesh Sawant

  • GR wise Planned Delivery cost in MIRO

    I receive my materials (ordered in a single PO) in several deliveries
    (MIGO). The PO has a delivery condition in it. GR based IV is checked
    in PO.
    When I try to do invoice verification, total unsettled quantity is
    proposed in one line.
    I want separate lines for each Goods receipt for planned delivery cost
    in MIRO.
    For example :
    1. Create a PO(GR based IV checked) for 100 KG/ PO has a delivery cost
    viz. 10 INR per KG
    2. Receive goods in 3 deliveries ( 10 kg, 20 kg and 30 kg).
    3. Go for MIRO for planned delivery cost. here system is proposing 600
    INR for 60kg in one line item.
    We need 3 line line items - each corresponding to one GR.
    (While this happens for MIRO for goods, for planned delivery cost it is
    not happening).

    How ever in MIRO, it will consider the total GR quantity and will propose accrodingly..
    else u can make invoice with 3 different delivery notes, so that u will get 3 different invoices..
    Please refer to this link for further explaination :
    http://help.sap.com/saphelp_47x200/helpdata/en/b0/6cc62efd3311d2b4f3006094192bbb/frameset.htm
    BR,
    Krishna

  • About "planned delivery cost" in MIRO

    Hi all,
    If choose "2-planned delivery cost" in MIRO, I want to know if the credit limit will be applied the same as choosing "1-Goods/service items"? I know these are two different functions, but I want to know if the tolerence limit settings is effective to "2-planned delivery cost".
    Thanks in advance.
    Christina

    yes it will
    if both the vendors are same ie to say in the original document that gets defaulted during MIRO.
    Regards
    Sujoy

  • Defaulting Goods Items/Service Item + Planned Delivery Costs in MIRO

    Hi,
    How to defaulting Goods Items/Service Item + Planned Delivery Costs in MIRO.
    Tks.

    Hi ,
    Create a variant in Tcode SHD0 and assign to the Tcode MIRO.
    Regards
    Ramesh Ch

  • Planned Delivery Cost in MIRO for different freight vendor

    Hi,
    Kindly share, how to get rid of above issue:
    1) PO created with a freight condition (FRA1 with a different vendor assigned to it under item conditions tab)
    2) GR done, & all accounting entries were OK, (including freight costs in FR1 or FR3)
    3) while doing MIRO with selection Planned-Delivery-Cost, Amount & Qty fields are "Blank" and auto flowing from Clearing A/cs
    I found this error in both Domestic or Import POs.
    I've read many threads, but could not find a clear solutions for the same.
    Plz help
    Sankar

    Hi,
    Plz find screens.
    Amount & Qty fields not flowing in MIRO from open GRIR/clearing account balance.

  • Change the sequence of planned delivery costs in MIRO

    Dear Experts,
    In import an import PO the various CVD & ACD conditions are maintained in the PO .
    To enter the bill of entry , MIRO is used where the invoice is booked for planned delivery costs for the PO .
    In MIRO , this planned delivery costs appear by default in certain sequence. I want to change this sequence .
    eg by default the system shows :
    Sec Ed cess on CVD
    ACD
    BCD
    Ed cess on BCD
    CVD
    Ed cess on CVD
    Sec Ed Cess on BCD
    I want to change the seq of appearance in MIRO.
    How is it possible
    Pls guide
    Regards
    Anis

    Dear Anis bazmi
    You will get the conditions as you desire one below another  in PO or MIRO if you have defined them exctly the same way in your calculation schema steps, other wise there is no way in getting the way you want and it can not be changed either in PO stage or in MIRO also.
    Just check, when you are processing MIRO, please select Planned delivery Costs form the menu below instead of the combination of  both.
    Regards

  • Planned delivery cost in MIRO against DC

    Hi All,
    Is it possible to pay Planned delivery cost against the Delivery challan reference. Is there any standard setting for that.
    Helpful answers will be rewarded.
    Regards
    Dhinakar.

    Hi All,
    Is it possible to pay Planned delivery charges using Delivery note reference.
    Regards
    Dhinakar

  • Delivery note wise planned delivery cost

    Hi Experts,
    Please let us know in MIRO we want to pass planned delivery cost bills delivery note wise.
    But while we choosing delivery note option the option to choose planned delivery cost is vanishing.
    Our main motto to get the planned delivery cost grn wise in MIRO, please suggest how that can be achieved.
    Regards

    hi thanks for reply I have found the solution that delivery note only take cares the value part of the material
    I have to use bill of lading to get the delivery cost at IR
    Is there any way or copy control that whatever is being entered in delivery note at MIGO should be copied to the bill of lading field, with a flexibility user can change if he wants
    rgds

  • Issue with reversal of MIRO for Planned Delivery Cost

    Hi Xperts
    We have found out an issue while reversing the MIRO document for Planned Del costs. When we have done the MIRO, the accounting entry got correctly posted with correct account keys.Conditions are not inventoried.
    However, when we had reversed it - the stock account got hit.Do not understand, why that happened.Do you have any clue?
    1. Suppose we have done the MIRO for Del Cost & then performed GR.Now Stock has already consumed & afterwards we have found that the MIRO for Del Cost is wrong & reverse - in this scenario shall the Stock account will get a hit????
    2. I have maintained Price Control "V" in Material Master.However, I have maintained a Standard Price by mistake.In that case shall SAP ignores the MAP & takes Standard Price into account & post PRD??
    Regards
    Soumick 

    Hi,
    Before checking Planned Delivery costs accounting documents in MIRO posting and MIRO cancellation document, 1st check how Planned Delivery costs designed for your procurement process.
    Use t.code:ME23N, check your Purchase order
    Option-1:
    Is Planned Delivery costs added to inventory account and at the same time Planned Delivery costs posted to Separate Planned Delivery costs G/L account.
    OR
    Option-2:
    Is Planned Delivery costs posted to Planned Delivery costs G/L account ONLY
    OR
    Option-3:
    Is Planned Delivery costs added to inventory account ONLY.
    Based the above one setting, system  will post goods receipt and invoice posting document with corresponding accounting entries. Also cancellation of invoice posting document refer to these setting.But account posting depends on price control available in material master.
    NOTE:
    Standard price procedure (price control “S”):The system carries out all stock postings at a price defined in the material master. Variances in price are posted to price difference accounts.
    Moving average price (price control “V”): The system valuates goods receipts with the purchase order price and goods issues with the current moving average price.Differences in price between the purchase order price and the invoice are posted directly to the relevant stock account if there is sufficient stock coverage.
    Regards,
    Biju K

  • Planned delivery cost for the scheduling agreement

    Hi Experts
    1. I have an requirement to post Invoice ver. for the Planned delivery cost (freight,customs duty,CVD etc) against the Scheduling Agreement just like Import Purchases with checking off the GR Based IV Indicator before doing the GR
    I tried it but its giving me that no delivery costs are Planned in the Scheduling agreements it runs fine in case of the PO because PO is a time independent.  Please inform how to post the same for schedule agreement with time dependent indicator on. I tried switching off the time dependent indicator and the system allowed, but my requirement is to Post I.V for the delivery cost with the time dependent indicator on.
    Appreciate if you can suggest something in this case Urgently .
    2. Aother issue is we have some uploaded Scheduling agreement from legacy system with Time dependent conditions. For this we need to post planned delivery cost in Miro. Since the system is not allowing to post, how to about for this. Shall we enter the delivery cost in unplanned delivery cost in Miro and post.  Please suggest if any alternate solution is available.
    Regards
    Arvind

    Hi,
    As you know if the delivery cost document is not posted during GR the
    delivery cost is not proposed during invoice (MIRO). Planned delivery
    cost will be proposed in invoice only when there are records in EKBZ
    table. The EKBZ table will be updated when delivery cost is posted
    during GR itself.
    Please ensure in the PO itself thatr the conditions have been defined
    properly with the relevant amounts and values.
    During GR when planned delivery cost conditions are present in PO,
    system checks for values in amount field. Then only appropriate
    calculations will be done for delivery cost and planned delivery cost
    document will posted during GR and hence updates EKBZ table.
    Solution to this issue is described in below steps,
    1) reverse the invoice document
    2) reverse GR document.
    3) You have to give values in amount field in relevant conditions ZGDS
       in the PO.
       If you face any issues changing the values, delete above conditions
       and put it again manually and give values in amount field also.
    4) Post GR once again, delivery cost document will also be posted.
       You can check it in PO history.
    5) During invoice select Item + planned delivery cost and post the
       invoice. If you need planned delivery cost to be posted separately,
       then you can post individual invoice for item and delivery cost.
    Please note it is not possible to post delivery costs for documents with
    multiple accountassignments. 
    For your second question, I am afraid I can not answer. Please open a new ntry in the forum, so that someone else can answer it.
    Best Regards,
    Arminda Jack

  • Planned delivery cost(in PO), but like to pay other vendor(in MIRO). How?

    To someone who knows planned delivery cost very well:
    I have 3 points.
    1. Planned delivery cost(in PO), but like to pay other vendor(in MIRO). How?
    2. Condition type for Planned delivery cost, like FRA1, FRB1,ect, have Acc. key& Accrual key like FRE, FR1 in PO pricing procedure(calculation schema), it controls dlv cost value into Mat. stock value, but we like to post those value into a expense account, it is possible by cond. type FRA1 or FRB1, how?
    3. I did testing, I have impression, for cond.type of planned dlv cost, FRA1 or FRB1, SAP always credits the dlv cost value into Accrual/provision clearing account(after GR) and debit to clear the account after MIRO.  Is it correct? If yes, why in condition type configuration, it has an indicator Accrual , this indicator seems to have no difference whether it selected or non-selected.
    Thanks,
    [email protected]

    1)while doing the miro,in the details tab give Inv. Party as ur other vendor code.
    also at the right hand side where u can select the layout,just above it choose planned delivery cost and proceed with ur miro.
    regards,
    indranil

  • Tax code error while posting Planned delivery costs in Import Scenario

    Hi!!!!!
    I am getting on error while posting Planned delivery costs in MIRO for Import Purchase Order with zero value tax code v0. The error is
    "Tax code V0 country IN does not exist in procedure ZAXINN"
    For Import I defined a pricing procedure which contains all condition types for CVD, Ecess, SEcess, Additional Customs Duty and Others.
    While making Import PO im putting V0 tax code. I assigned the Tax Codes to the Company code.
    Please let me know what config is missing.
    Regards,
    Durga

    Is you ZAXINN assigned to the country India
    and is your taxcode (created in FTXP) created for country India?
    kr
    hakan

  • Condition category B,F and planned delivery cost indicator in MIRO

    hi,
    i would like to clarify the linking between condtion category and planned delivery cost indicator in MIRO.
    1) if in PO, i have condition type where category is B(delivery cost) or F(freight), then during GR, system will credit freight/customs clearing account. subsequently in MIRO, i have to choose planned delivery cost indicator when create invoice, correct?
    2) if my PO has no condition type where category is B or F, i do not have to choose planned delivery cost indicator during MIRO as no freight/customs clearing account to be set off. correct?
    thanks

    Hi Eliana,
    I think you are on right track.

  • G/L Account assignment - Planned delivery cost

    Hi,
    Is it possible via customizing to determine an other G/L Account for a planned delivery cost condition?
    Currently when I want to post the IR I can see two lines for the PO item. One for the cost of the material and one for the delivery cost. However both are having the same G/L Account.
    This planned delivery cost has an other transaction key assigned in the pricing schema and account determination for this key is setup in OBYC (automatic postings). So I supposed the system will use an other account but that's not the case.
    In case that's not possible. Can I give the condition type an other condition category to obtain this result? The cost of material and the cost of delivery should both go into separeted accounts.
    Thanks in advance for your replies!
    Regards,
    Steven

    Hi,
    Freight clearing (FR1), provision for freight charges (FR2)-These transactions are used to post delivery costs (incidental procurement costs) in the case of goods receipts against purchase orders and incoming invoices. Which transaction is used for which delivery costs depends on the condition types defined in the purchase order.
    Or you can create Z condition type and for same you can assign different GL in OBYC which system trigger during GR to post the value in to different GL
    Rg

Maybe you are looking for

  • Messages take a long time to open after EHP1 upgrade

    hi, We have recently upgraded our PI 7.0 to EHP1 and we find that it takes unusually long time in sxmb_moni to open up(view) messages, has anyone seen this before . Thank you Jonu Joy

  • Problem with multiple instances of same module

    I want to call the same module in several different viewstates. Based on a variable for each viewstate the module returns different results. Here is a shortened version of my code: private var lm:linkModule; private function moduleHandler(promotion:S

  • Upgrade from Xi 3.0 to PI 7.1

    Hi, I have document tracking application for XI 3.0 system developed in Web dynpro Java..Now we are planning to upgarde XI 3.0 to 7.1. Can anyone please tell me what all things i have to take care in my Web dynpro application while upgrade. Thanks..

  • Server Log for SLD / IR / ID

    hi, While in SLD you can keep track of user activity using the 'server log' link. This basically shows you who logged in and what function were performed. Wanted to find out if there is a similar log for repository and directory as well in XI. If so

  • What are the benefits of VAL?