Table linking Plan Requirent No. (Demand Forecast)  & Planned order

Please let me know table that link Plan requirement no. & planned order.

Hi,
Try table joining with PLAF & PBIM and check.
Regards,
Kiran
Message was edited by:
        Kiran Magar

Similar Messages

  • Table Link between the Functional Location and work order

    Hi Gurus,
    I am stuck in a big problem and have to find a way to list down the work order with a specific user status in the system. I am trying to link it based on the functional location as the inputs will have to be functional location and the date. Can any one guide me with the tables to link these two???
    Thanks in advance
    Anoop

    Hi,
    Depending on your exact requirement, you might be able to select from view VIAUFKST_IFLOS. This would allow selection based on order, functional location and various dates. The field IPHAS will give you some system status information - value will indicate which status the order has reached. Example value = 3 indicates order is technically completed.
    To get the exact system status (or user status) you need to read the JEST table. Read this table by OBJNR. The object number will have the format OR005000123456 (where 5000123456 is the order number). It will be available in the order tables.
    Status values in JEST are in the internal format - example I0002 = REL. Check transaction BS23 to see the link. User status values will have the format E0002. If INACT flag is set in a jest record then that status value is not active. If you want to check for a specific status value then call function STATUS_READ.
    -Paul

  • SD-How to find table link of special delivery and sales order number?

    Hi Experts,
    I have a requirement as below.
    In LIPS table (SD document: Delivery: Item data), in this table has one kind data.
    One record has maintianed 2 fields PSPNR(Project definition (internal)) and PS_PSP_PNR(Work Breakdown Structure Element (WBS Element)).
    How to find sales order number of the above record? Could you tell me which table link the delivery item data and sales order number?
    Thanks a lot,
    Frank

    hi,
    check this.
    [https://forums.sdn.sap.com/click.jspa?searchID=20150250&messageID=3784069]

  • How to configure for the give senario where we from APO demand planning, we provide baseline forecast into TPM

    Hello Guru's,
    Request for information on smart documentation on the integration between Trade Promotion Management and SCM-Demand Planning from an architecture perspective how to configure for the give senario where we from APO demand planning, we provide baseline forecast into TPM and from TPM promotions values can be considered in to APO demand planning: can anybody give me some insight on it.
    Thanks in advance.
    Kumar

    Hi Praveen
    There are several ways you can connect a DP system to a TPM. How are your interfaces and systems setup?
    Option1:
    Extract the baseline from APO to a BW cube, extract the data out of BW, may be using infospokes/open hub and pass it on to TPM.
    2. Have a custom program written in APO-DP to extract the selected keyfigure data at the aggregation level into an interface or a .txt file into APO directory and use some data transfer service such as EDI to take this data and send to TPM.
    In my experience it is simple to define an integration process. The much larger and complicated aspects are the date adjustments and the aggregation levels.
    Date adjustments:
    Understand the basis of the data in APO and TPM. APO is usually at the requested delivery date or material availability date ( when the customer like a store wants the product). However TPMs are usually at the consumption date ( when an end customer like you and me but from store shelf). Depending on the product and business style this can mean several days difference. Let's say it is 25 days on average, you need to add 25 days to APO base line date to get the TPM consumption date.
    Aggregation level:
    This can be product or customer. If the planning in DP is at product sku level and the TPM is at packs or brand level, you need to aggregate the data up before loading to TPM. The same with customer.
    To me the most complex part of the integration is to understand and transform the data in a meaningful way and a strategy to sustain this integration by keeping both DP and TPM in sync in terms of master data. Also important to have a process for identifying exceptions and failures. you send baseline from DP to TPM and if it fails, how do you know? how do you trouble shoot?
    Hope these help.

  • DP - Sales and Demand Forecast values in the Planning book were increased.

    Dear DP Experts,
    The Sales and Demand Forecast values in the Planning book were increased.  Is there a way to tract who user could have made the changes?  Can we view the last change like in the document flows?
    Thanks,
    Glason

    hi Glason
    if the values have been changed by the user community, I am not sure if there is a way to find out. However if there is technical flaw in data processing, you can check for the steps as posted in the above post.
    We faced a similar issue in our project. We were not able to trace the user ids under which the values were changed. However since we retain the 15 days of back up, we were able to check that the values were changed on a certain date but not the user ids. but we were still able to restore the original values.
    As an additional step, we also developed macros to store (in the form of alerts) the exisitng value and the updated value incase the there was a manual change in the Sales forecast and other editable key figures.  This ensured that there was a check if there was a manul change. we also ensured that these macros were not executed during the background jobs.
    SAP also provides a standard SAP APO Change Monitor add-on which can be used to track chnages to the key figures. Please refer to note 1308968 for further information on the add on.
    let me know if this helps.
    Rgds, Sandeep

  • Use of forecast planning function in Integrated planning

    Hai ,
    Can I Know What is the use forecast planning function in Integrated planning.
    Give me One Example.
    Please tell What i hv to select in aggregation level, Filter, and Planning function for doing forecast.
    Regards
    Kishore.

    Hi,
    Filter is indeed used in IP similar to how planning package was used in BPS. There really is no difference 'conceptually'.
    What you have seen is the different options IP offers compared to BPS regarding planning function execution. You can execute planning function directly or using a planning sequence in an application (although in planning modeler, its only a planning sequence that can be executed, for eg., for testing purpose).
    If you just execute a planning function without specifying any restriction, it will operate on the entire set of planning data. Whether its a planning sequence or planning function, the data it operates on can be restricted by binding the various characteristics (or variables) using various DPs in the application. What kind of dynamic selection are you looking at?
    You can see following links if you have not read them already -
    http://help.sap.com/saphelp_nw70/helpdata/en/43/f0f8dc73b56bede10000000a11466f/content.htm
    http://help.sap.com/saphelp_nw70/helpdata/en/44/33a31fd463060ce10000000a155369/content.htm
    http://help.sap.com/saphelp_nw70/helpdata/en/43/f0f92373b56bede10000000a11466f/content.htm
    These are for WAD; you can find similar links for the BI Analyser.

  • Forecast planning function in IP

    Dear All
    We have a requirement like forecasting future prices for next year on monthly basis.
    Data of prices for the past 3 years on monthly basis is available in the InfoCubes.
    Can anyone please let me know how to use the "forecast" planning function in "Integrated Planning"
    to predict the future prices with stepwise procedure or provide any document explaining similar requirement.
    Any prompt help regarding this will be truly appreciated and awarded with points.
    Regards
    Suresh

    Hi,
    Please visit the link below
    link : [http://help.sap.com/saphelp_nw70/helpdata/EN/a4/42e03fc2269615e10000000a155106/frameset.htm]
    Please update the exact requirement.
    Thanks
    Pratyush

  • Demand management planning strategy

    Hi there,
    I am trying to set up demand management for simple make to stock. I am using standard requirements type LSF which is linked to requirements class 100.(OMP1) The requirements class has a planning indicator (PLNKZ) set to "1" (net requirements planning) in OMPO. This is what I want as we want the warehouse stock to be taken into account when procurement proposals are generated. The planning strategy assigned to the material master has the "1" setting (net requirements planning). However when I run MRP after entering planned independent requirements for LSF (MD61), the purchasing requisitions proposed are just for the independent requirements and ignore warehouse stock. There is a line in the Stock / Requirements list that says "Gross Requirements Planning" Does anyone know where it is picking up "Gross Requirements Planning" instead of Net Requirements Planning (i.e. check what is in stock before creating procurement proposals)
    Any assistance is appreciated.
    thanks
    D

    Hi Suhas,
    I don't want mixed MRP as such but when I cannot get any procurement proposals (requisitions) when the setting is blank. It may be elsewhere that the procurement proposal is - I am still checking.
    However, when I choose "2" for mixed MRP, it does generate requsitions (but gives me the other problem where warehouse stock is not taken into account)
    The requirements class 100 has an entry "1" for planning indicator and "1" for requirements category. All other columns are blank at the moment. I am in the process of experimenting with these next.
    thanks for your help so far.
    Donal

  • Create manual demand in planning book

    Please, can someone tell me how to create manual demand in the interactive planning book. Thanks!!!

    Hi David,
    Follow the below steps to enter manual demand in planning book.
    1) Use transaction /sapapo/sdp94
    2) Either you can use selection window or selection profile to load your data(product location combination in a version) for uploading demand.
    3) In selection window, select the product, location and version and enter
    4) Once your selected items are seen, double click on the location product combination for which demand needs to entered.
    5) The data will get populated into the planning book
    6) Meanwhile, select your planning book and data view which contains the relevant key figure for which manual demand needs to be entered (say like forecast, demand, dependent demand etc.,) 
    7) Goto change mode
    8) Then enter the suitable demand values in the key figures in the planning book
    9)  Once the data are entered, save the changes.
    Regards
    R. Senthil Mareeswaran.

  • Demand /LT Planning - simulated demand?

    Up to now I have done the production side - MRP feedling into production and process orders.  Now my client would like to look at Forecasting/Planning so I'm new to this so hope the question isn't too basic.
    their scenario is that they have one semi-finished material, MAT A, that feeds into a lot of finished product. They have a forecast for MAT A for the next twelve months. 
    If I create PIRs in MD61 with MDfor MAT A, is this creating actual demand or simulated demand for MAT A and its components? 
    What is the best way to run the simulated demand rather than the actual demand.   What is MD73 used for?
    Thanks for your help.

    Hi,
    PIR for MAT A will create real demand in MRP - NOT WHAT YOU WANT!
    You could use LTP (long term planning) with an inactive PIR version, for simulation purpose.
    MD73 is a report that shows all PIRs and customer requirements, consumption, and allocation. It helps to see a wholistic picture on the planning-sales requirements situation.
    Regards,
    Mario

  • Supply and Demand Collaborative Planning

    Is it possible to upload data via Demand collaborative planning?  I understand how to download the data to a spreadsheet.  The download funtionality is controlled by the user parameter.  Is there a user parameter for uploading data via this tool?
    Regards,
    James

    Hi James ,
    Not sure on the upload of the data from upload option of excel but yes you can exchange data from external system.
    refer help document on link [Requesting data (pull activity)|http://help.sap.com/saphelp_scm50/helpdata/en/c8/0aad39010abd21e10000000a114084/frameset.htm]
    Regds,Digambar

  • How to plan in characteristic based forecast in BOM level

    Hi experts,
    How to plan in characteristic based forecast in BOM level
    Can explain me elaborate about this.
    Regards,
    babu

    Hi Harsh,
    Remember that the tree table is a Master-Detail relationship between VO. So in your case, you are applying a VO Criteria to your Master, wich will allow you to filter data a Master Level. If you want to filter the Child VO, you need to create a ViewCriteria for it and apply it in your AM -> YourMaster -> YourChild VO :: Edit -> Shuttle the VC to the right.
    But following this approach the Filter you use in the ChildVO, will be applied to all Childs independently of the MasterVO.
    Hope it is clearer now, but let me know if you need more help or if you think I didn't understand your main issue.
    Regards

  • Forecast Planning Function

    Hello,
    Please can anyone will help provide me the steps for creating the Forecast Planning function for IP. ( Any planning forecasting model is ok).
    I would like to create the forecast planning funtion in IP, sould like to know the steps.
    Thanks in advance.

    There are many documents around SDN about forecasting and the basic ideas are the same as for BPS and for IP. There is just something that I don't understand from your request. Forecasting is not a trial, and it depends by many statistical reason to use a model or another . Before to do my model, we did a deep study involving also some of my past remembering about statistic and regression at university, and we used other econometric software to check if my model was good. Anyway the forecasting function in SEM were not good enough so I had to use FOX.
    Maybe u are just running a demo ?
    Cheers
    Walter

  • Forecast planning function BPS x BI IP

    Hi,
    I solve issue with reimplemtation BPS to IP, for now I solve how to recreated forecast planning functions. In BPS we use forecast method Automatic model selection and under condition, we have  key figure Entry conditions, but in IP I can´t find some conditions for key figures...
    Any help?
    Regards
    Petr

    Hi.
    Could you please ellaborate about which forecast process you wish to implement ?
    Regards.

  • Selecting the Planning Level for Statistical Forecast in S&OP on HANA

    Hello together,
    we currently face an issue regarding the statistical forecast in S&OP on HANA:
    The customer wants to implement an S&OP process containing the two steps statistical forecast (automatically calculated) and sales forecast (manually determined). The planning level of the statistical forecast should be higher than the planning level of the sales forecast, i.e. the statistical forecast is calculated on a higher planning level and then disaggregated to be an input for the manually determined sales forecast.
    Since it doesn't seem to be possible to disaggregate any key figure below its base planning level we need to have the lower sales planning level as base planning level in all key figures, including the input and output key figures of the statistical forecast.
    When running a statistical forecast with a defined forecasting profile, the planning level used for the forecast seems to be the base planning level of the input/output key figures defined in the forecasting profile.
    However, we need to define a higher planning level for the statistical forecast in order to have a better data base for recognizing trends and sesonality. In APO DP it is possible to define the planning level for the forecast when running/scheduling the forecasting job. Is this also possible in S&OP on HANA? Can we define the planning level for the forecast in the forecasting profile or when running the forecast from the Excel AddIn? I tried to use the field "Filter" in the forecasting profile as it listed all the planning levels (as well as a lot of other things, we don't know where they come from), but the forecast was still carried out on the base planning level.
    Do you have any other idea where to define the forecasting planning level that is different from the base planning level of the input/output key figures?
    Thank you in advance,
    Jonathan

    Hi Bert,
    thank you for your fast answer. I checked the forum again and found this post:
    Question about Statistical Forecast
    However, I don't really get how the disaggregation is meant to work; the suggestion seems to be to calculate a forecast on an aggregated level, i.e. with input and output key figure with an aggregated base planning level, and then disaggregate it "somehow".
    Do you have any idea how this disaggregation might work and what other steps I have to consider?
    It seems as if I'd have to define a whole bunch of new key figures and have more than one output key figure but no input key figure for the statistical forecast, which doesn't make sense in my eyes.
    Actually I was looking for a solution where I can define my forecasting profile with both input and output key figure on the lower planning level and then insert the level I want the forecast to be done at either in the profile as well, or even more flexible when running or scheduling a forecast. Defining more key figures any time I need another forecasting level does not appear very comfortable. Is it meant to be like that or is there another way to reach the goal mentioned above?
    Cheers,
    Jonathan
    Edit: The mentioned thread contains some valuable information on how to disaggregate key figures. However, the really tricky decision is how to define the disaggregation ratio.

Maybe you are looking for

  • I recently downloaded illustrator but I can not open the app

    how do i open the illustrator after i downloaded it. There is no icon on my desktop and it won't come up when i search it in my files

  • Problem in serialization of an element

    Hi, I'm facing a problem in sending out message for document style webservice. I have tried to explain the sceanario below as much as possible. I'm writing Bpel process to invoke a wsdl . The input variable to the operation has 2 parts - header and b

  • How to make a script to convert RGB to CMYK as black 100%?

    Hi guy my customer sent me a book (144 pages) for print but all of them are RGB and Tiff, she scan them. there are on the page some texts and pictures. The text are R=30 G=30 B=30.I think if I can make a script I will do it very soon to black 100%, b

  • T61P DVI output

    I have a T61P and get DVI out of the docking station... are there any cards small adapters so I can get DVI out ( while on trips ) and not have to drag around the docking station?

  • Trouble - Installing Adobe InDesign

    Just received my new MacBook Pro, and it's great. I am having an issue with installing Adobe InDesign 2.0 Is anyone experiencing this issue? Could the problem be intel chip related? However I am able to install Photoshop 7 and Ilustrator 10 (the ones