Tables for PROJECT SYSTEM
hi all,
Which are the tables for Networks(Orders) and Activities and how can i link these tables to the corresponding WBS Element (table PRPS) ?
Thanks in advanced.
Regards
Geeta Gupta
Hi,
these r the tables
Basic Data
PRHI Work Breakdown Structure, Edges (Hierarchy Pointer)
PROJ Project definition
PRPS WBS (Work Breakdown Structure) Element Master Data
RPSCO Project info database: Costs, revenues, finances
MSPR Project stock
also
Equipment
EQUI Equipment master data
EQKT Equipment short text
EQUZ Equipment time segment
thanks
ravi
Similar Messages
-
Tables for Project System Component
Hi,
I hve the list of standard DS from Project System component. Currently these DS are not active in our ECC system. Now I need to find the Source table for all these DS. Can any one please provide the table name if you have. I searched in sdn/help.sap but I couldn't find any.
Master Data DS:
0ACTIVITY_ATTR
0ACTIVITY_CUST_ATTR
0ACTIVITY_TEXT
0ACTIVITY_USR_ATTR
0ACTY_ELEMT_ATTR
0ACTY_ELEMT_CUST_ATTR
0ACTY_ELEMT_TEXT
0ACTY_ELEMT_USR_ATTR
0CASHDETAIL_TEXT
0CASHTYPE_TEXT
0CLAIM_ATTR
0CLAIM_TEXT
0DATE_EVENT_TEXT
0DATE_SRCE_TEXT
0MILESTONE_ATTR
0MILESTONE_TEXT
0MLST_USE_TEXT
0NAE_INH_ATTR
0NETWORK_ATTR
0NETWORK_CUST_ATTR
0NETWORK_TEXT
0NTW_INH_ATTR
0NWA_INH_ATTR
0ORD_INH_ATTR
0PROJECT_ATTR
0PROJECT_CUST_ATTR
0PROJECT_TEXT
0PS_APPLNO_TEXT
0PS_CHANCE_TEXT
0PS_COMPONT_ATTR
0PS_COMPONT_TEXT
0PS_HERKZ_TEXT
0PS_OBJ_TEXT
0PS_OPPNT_TEXT
0PS_PRJTYPE_TEXT
0PS_RESPNO_TEXT
0SCOPE_TEXT
0STATUSCLM1_TEXT
0STATUSCLM2_TEXT
0STATUSSYS0_TEXT
0WBS_ELEMT_ATTR
0WBS_ELEMT_CUST_ATTR
0WBS_ELEMT_TEXT
0WBS_ELEMT_USR_ATTR
0WBS_ELEMT_WBSH_HIER
0WBS_INH_ATTR
Transactional DS
0PS_CLM_CST
0PS_CLM_ECP
0PS_CSH_NTW
0PS_CSH_NWA
0PS_CSH_ORD
0PS_CSH_WBS
0PS_DAT_MLS
0PS_DAT_NAE
0PS_DAT_NTW
0PS_DAT_NWA
0PS_DAT_PRJ
0PS_DAT_WBS
0PS_KAP_NAE
0PS_KAP_NWA
0PS_NAE_ECP
0PS_NAE_EVA
0PS_NTW_EVA
0PS_NWA_ECP
0PS_NWA_EVA
0PS_ORD_EVA
0PS_WBS_ECP
0PS_WBS_EVA
Regards,
Jackie.Try to search it at Help.sap.com web page (use search for BI content)
For example for your first extracotr:
http://help.sap.com/saphelp_nw70/helpdata/en/4f/4bc739e033417ae10000000a114084/frameset.htm
Regards,
DL -
Pricing Schema for Project System
Dear Sappers,
I'm configuring Pricing Schema for Project System(PS) module.
The requirement is, the schema will be in such a way that it supports both excise, CST, VAT and service tax.
In PS module the user raises a Purchase Order having procurement of material as well as taking service from Vendor.For this in PO he will maintain both material as well as service.
I'm configuring the Pricing schema in MM - Purchasing - Condition.
My question is for materials procurement, everything is working fine.But for service respect to activity number I want to maintain service tax and other cess in condition record.
But to maintain service tax & other cess for activity number, I want the access sequence of sevice to be in Purchasing.I've taken the standard table for Plant, Vendor, Purchase Organinzation and activity number combination from External Service management and making a new access sequence in MM - Purchasing.All fields are coming but for Activity number, it not taking the document structure and showing error.
How to overcome this??
Any suggestions will be highly appreciated.
Warm Regards
PKBHi Pankaj,
Thanks for your suggestions.
As per you reply, the access sequence is already maintain in External Service Management.But I want to bring the same combination Plant, Vendor, Purchase Organizartion and Activity number that is Table 97 to MM - Purchasing - Conditions- Access Sequence.
I've tried to do it, but when I'm creating in MM - Purchasing, all document structure is copying except activity number.What I analyse the error is due to application area.Activity number is MS (External Service Management) area but i'm trying to do in M(Purchasing)
Even though when I enter manually MS for the access sequence system is not taking.
Suggest me.
Warm Regards
PKB
Edited by: Pranaya Barik on Dec 11, 2009 12:09 PM -
Changing the data in DataSource in R/3 System for Project System
Can we change the data of DataSource which is extracted from R/3 sYSTEM for Project System Module?
Hello Rajesh,
You can modify it in PSA. Or write the routines or rules logic as per your requirement.
Could you please elaborate more on what kind of changes you are interested for.
San. -
Report Painter Drilldown on Cost Element for Project Systems
I am currently working on a report for Project Systems. I am trying to copy the functionality of the Internal Order summary (60I2-001) into report group 6P3. I was able to copy the whole layout and also the values of 6oI2-001 into a copy of 6PP4-001 but when I double click on "Balance" it is bringin up the ALV report that 6PP4-001 is using. I would like to call another report which looks like 6LS0-001 but contains Project System info made in report painter when I double click on Balance. Is this possible? Please let me know how.
Hi Avinash,
See my replies below.
1 a & B: You are planning Qty on NWA and capturing costs - labor & Equipment on NWA elements.
When you are having elaborated to NWA-Element level, split your total work on each NWA-element and post labor cost. Thus you will have planned Vs actual costs at one place.
coming to equipment cost - are you capturing using PO through GR?.
2.a : Option1- create a separate WBS elements for materials and plan cost at WBS level. That value would be your total planned cost of material procurement as estimated. Under this WBS elements create NWAs and assign the materials. With this set up you can assign material and procure so that will have actual costs coming from GR.
Option 2: Create a one General Cost activity and assign the total planned cost of material on this NWA.
When you assign the material components, diligently you have to reduce the equivalent amount from the general costs activity. Also note that on component screen, you have to check box "Cost relevant" so that material cost will add to Cost NWA. Let the different materials have their own valuation class and have default CEs accordingly. that would not be big issue.
Please discuss with your MM team to get more information. Also my suggestion is to leave blank CE field in configuration.
The option2 is very cumbersome and high risk but one have to be very cautious to reduce the value from Cost NWA in order to sustain the planned material costs whenever they added.
3. I have answered the relevance of Cost relevance check box in above.
Hope above makes sense.
Thanks,
Sudhakar -
Planning Profile for Project System
Dear All,
In planning Profile (T Code OPSB) for Project System we can find RElem.f.billing plan ..field, in this field which cost element we have to assign wheather it is sales revenue or secondary cost element cat.31 or else..plz adives me..
Thanks and regardsMr. Sridhar,
Thanks for ur reply, here my querry is, i have types of sales revenues like domestic, export, industrial etc.. there is only option is there to maintain revenue cost element, so which revenue cost element i have to maintain in planning profile.
Regards
Ramesh -
Business packages for Project systems
i,
I wanted to know if there is a business package for Project systems which include transactions like CJ20N, CN33, CN41N, DP81,VA23, VA25. I checked in SDN Portal content portfolio and found there is a BP for Projects 5.3 and BP for Project self service. I checked out the content which is present but not sure whether it suits my requirements.
Appreciate if any one can point to the right Business package.
Regards
PNHi,
Chk out this link, it points to Project Self Service.
http://help.sap.com/erp2005_ehp_01/helpdata/en/3f/a197422836c76ae10000000a155106/content.htm
You can find the prerequisites & the configuration required in the above link.
For this Business Package you have to install the following software components:
SAP PSS 600
BP ERP05 PROJ SELF-SERV 1.0
Regards,
Abhishek -
BTE's used for project systems master data.
Hi ,
Can anyone tell me what are the BTE's used for project systems master data.
Tcode used are CJ01, Cj02, CJ20N, CJ12, CNMASS
When master data is changed or created BTE should trigger.
Regards
SubinI don't think there are any open_fi BTE available for PS master data.
you can use classic subs/vals using GGB0 and GGB1 transaction codes. -
Result Analysis for Project Systems
Hi all
Does any1 have any documentation relating to Resut Analysis for Project Systems incl POC calculation and other basic concepts. Any help would be highly appreciated.
Regards
HrishiHi,
Please follow the link below: it has all the details for the POC methods:
http://help.sap.com/saphelp_46c/helpdata/en/90/ba6f37446711d189420000e829fbbd/content.htm
Hope its useful.
Reward points if found useful.
thanks.. -
Table for network system status
Hi All,
Can anyone tell us , what are the tables of Network system systems.
Regards,
RavindraAmit has provided you table..... you can achieve the same result in most lf the SAP standard report.......
For the list of Network status go to CN41
on the Nework no. input line click on multiple selection--> give the netwrok no. list for which you wanted to see the status. -->enter --> Excute.
Report will open in screen. in that report go to toolbar and click on 'choose filed' button.(F5) -->one pop up window will open -->right handside scroll down in that window >select 'status' field and move it to left side>enter
Network status will be shown against you newrok list. you can verify the same in maintenance txn.
If you have activated user status the same will also get populated.
You can downlaod the same in Excle file path is : Evaluation menu>export>save to file. ( via filtering in Excle you call do all the analysis realted to network status how amny are in clised status etc. )
And spearate the same from other project objects via filtering.
Regards
Nitin -
In which tables this Project system 'CJ20N' Data has been stored.
Dear Guru's
Please help to fullfil my requirment.
In Project System we are creating 4 levels WBS structure in CJ20N; we are assigning deferent machine types and deferent Personal nou2019s to deferent WBS elements.
Here I want a report against this project what all the Machines & Employee No that we have assigned, and against Employee Network we are booking the time sheet for Employee and we are transferring the same to Controlling, we are Preparing the Sales Order by using the WBS element and than we do u201CDP91u201D to create Debit Memo request with reference to sales order for that employee for his working approved working Hrs.
From which tables we will get this required information to prepare u201CZ-Reportu201D
Are there is any link to get the document flow from Project to Debit memo request.
Regards,
KalyanU have to refer multiple tables for this.
Fot CATS time entry u can get the date from table CATSDB.
Refer below link.....
SAP Project System - A ready Reference ( Part 2 ) -
Technical spec for Project systems report
Hi all,
My requirement is to create technical spec's on this Project Systems monthly and yearly budget and actual tracking with drill down capability
And the char and KF are:-
Char
Project Definition
WBS Element
Cost Element
Vendor
Purchase Order No.
Purchase Order Item
Requester
Created On
PO Description
Final Delivery
KF
PO Value
Value - Quantity Delivered
Amount Invoiced
To be invoiced - Value
To be Delivered - Value
Can anyone help me that which standard query is suitable for this requirement.Hi,
Check the below business content queries:
0PM_MC01_Q0001 Budget Comparison (Actual Costs)
0PM_MC01_Q0002 Budget Comparison (Planned Costs)
0PM_C06_Q0002 Budget Proposal (Periodic)
0PM_C06_Q0003 Budget Proposal (Objects)
Check this might be useful:
http://help.sap.com/saphelp_nw2004s/helpdata/en/e8/858f40f5767d17e10000000a1550b0/frameset.htm
Hope this helps.......
Rgs,
Ravikanth -
Release strategy & EBAN for project systems, purchasing
Hi
We have 2 different scenarios for which we use same account assignment category "Z".
1) Purchase Requisitions for capital expenses (Account assignment category "Z") - this is part of project systems requisition attached to WBS elements
2) Purchase Requisitions for expensed items (Account assignment category "Z")
I have configured release strategy with classification with following characteristics
1) plant
2) cost centers
3) total amount in PR
4) account assignment category
all 4 characteristics are same in both areas (capital and expensed)of purchase requisitions, account assignment category Z decides whether it is capital purchase or expense related purchases. Z uses order number that is internally tied to WBS element.
my question is - if some one has similar scenario then what is the best solution to handle invocation of release strategy.
how release strategy can be determine, do I need to use user exit and if yes what best user exit is available.
EBAN fields, I have researched and I cant use fields like "requisitioner" for determining release strategy.
I would like to invoke different release strategy for capital projects and different release strategy for expensed items in PR. there is a workflow attached to this later.
Please reply
Thanks and regards
UmeshUmesh,
Well, there needs to be some way to differentiate the 2 types of purchase requisitions for you to use 2 different release strategies.
I am not sure if you have the option of using a different document type to differentiate the 2 requisitions. I would definitely look at this possibility and include the document type (CEBAN-BSART) as a characteristic in the release strategy.
Other options would be to look at using the purchasing group (CEBAN-EKGRP) or the requirements tracking number (CEBAN-BEDNR) as characteristics in your release strategy.
Hope this helps.
H Narayan -
Str Loc Mandatory Setting for Project System PR
Hi
How can i make mandatory setting for a PR getting generated by project system thro the trans CJ20N.
Since its not an mandatory field the PR s from project based are not hv str loc in PR.
Also we are not able to edit the same. All the fileds are in PR in ME52N in grey colour whr the PR s from project based.
Vijayif your material is not inventory managed, then you cannot have a storage location in the PR.
If it is inventory managed, then you can set the defautl storage location in material master MRP view field Storage location EP -
Best practices for Project Systems
Hello Experts,
I am working from BI side to integrate Project systems to BI for reporting purposes.
On the sdn, I have seen the term 'Best Practices guide'.
1) What is this 'Best Practices mean'
2) Where can we find it from
3) How is that going to be useful if I am working from BI side.
Kindly advise on above questions
Regards
ShanthiHi
Bc set is avilable on service market place you download this file and than you found the method and i am sending you a link its give you help This link is for retail.
http://help.sap.com/bp_retailv1500/Retail_IN/html/Retail_toc.htm
http://help.sap.com/bp_retailv1500/Retail_IN/index.htm
Reward point if helpful
Thanks
Pankaj Kumar
Message was edited by:
Pankaj Kumar
Maybe you are looking for
-
Date contructor deprecation : Parsing a String to Date
Hi All, In Java 1.5 the Date() constructor Date(String s) is deprecated. As per the API Documentation DateFormat.Parse() method is used. The following code from Java 1.4 version has to be upgraded to Java 1.5. Existing Code: Date dDate = new Date(sDa
-
XMLDOM-package has a bad performance
I am using the XMLDOM-package for reading XML-documents. The performance however is very bad +/- 1 second for 200 attributes. How Can I boost up this performance ? Is it possible to recompile the java-classes behind the xmldom- package with NCOMP ? R
-
FROM FCP X TO COMPRESSOR 4 HD FILE SETTINGS HELP!
Hello everyone. I just created my account out of dispair. I have been trying for over a week to find a solution but nothing... I need your expert help. The situation is as follows: I have a 135 min hd project in fcpx, with many effects and transition
-
DSL Modem- Fujitsu Speedport Router- Linsys BEFWS4 V4.0 Router worked fine for months and suddenly I lost my LAN. 1. Disconnected router and connected PC directly to modem and had good internet connection. 2. RE-flashed router with latest firmware a
-
Why is spotlight indexing not starting?
In spotlight, it states that it is estimating index time. This message never disappears. In a similar thread, somebody was advised to post the following code into terminal; syslog -k Sender mdworker -o -k Sender mds | grep -v boxd | tail | open -f -a