Tables for routing (for work center)
hi friends,
I am doing report on routing but i did not get value for work center i got tables CRHD CRCA CRCO CRHH CRHS CRTX KAKO KAZY .
i try to get result by using link with PLPO and PLKO.
in TCode CA03 when i see the technical attributes it stors the dat ain structure PLPOD but i am unable to use it.
kindly can anybody tell me how to work center.
thanks & regards
Bhupinder Singh Kaler
Hi Bhupi kaler,
try to link CRHD and PLKO with WERKS ( Plant ) field ane get the ARBPL ( Work center ).
Best regards,
raam
Similar Messages
-
Fields for Super BOM, Work Center & Super Routing for Variant Config
hi! gurus,
Please can you give me mandatory fields & values for Super BOM, Work Center & Super Routing for Variant Config
thank youHi,
In the Super BOM you need to maintain the object dependencies.
Workcenter fields are as usual for other production processes.
Also you can use search option in the forum to view the threads posted in the past. There are many posts related to variant configuration.
Regards,
Senthilkumar -
Is it possible to find the Equipment for given PP work center?
Hello PM Masters,
Is it possible to find the Equipment for given PP work center?
Please tell me which table will lend me the EQUNR when I have the PP work center (ARBPL).
Thank you.Yes,
Provided you maintain this value in Equipment master Location tab like this.
And then query by this field in IH08
Jogeswara Rao K -
FM for List of Work Center.
Dear Friends,
I am looking for the functional module which give me list of work center ;
Like Customer will provide the product requirement and depend upon product specification i should get the specific work center where the product will manufacture.
RegardsCheck with Below FM's :
CR_WORKSTATION_READ
CR_WORKSTATION_CHECK
Search in SE37 like CRWORK and thereis no BAPI
Table name is CRHD
Thanks
Seshu -
User exit/Badi for changing operation work center based on service product
Hi,
I have an requirement to change the operation work center based on the service product in IW31/IW32 transaction. I am using the BAdi 'IM_SM_BADI_READT399A' for changing the main work center. It changes all the operation work centers except the first one. But I need to change it all the operations.
Thanks in Advance.I am using the enhancement spot 'IWO1_TL_INTEGRATION2' for changing the first operation work center
-
SAP Code to Return Production Order List for a Given Work Center
We are looking for native SAP code (BAPI, BADI, FM, ...) that would take a work center value as a parameter and then return all the production orders that have been assigned to that work center.
We are running 4.7 and do not have access to BAPI's BAPI_PRODORD_GET_LIST or BAPI_PRODORD_GET_DETAIL.
I believe we could write our own BAPI for this but was hoping that SAP had something natively embedded that we just can't find at this point.
Thanks in advance for any information you might share!!!
ChadThanks, Srini
This was very helpful.
We're looking for an SAP object that we can interface into xMII. So the logic in this report is useful but a BAPI, BADI, or RFC would be ideal.
Thanks again,
Chad -
Read Routing and work center details from transfer order
Hello
I am using transaction LT31 to print a form for the transfer order.
The customer wants me to print a field that is in the work center details of the routing for this material and plant.
I can see this data with transaction CA02 where i enter material and plant,and then the work centers are beeing displayed.From here i can double click on the work center and see the field Supply area that i have to print.
My answer now is,how to read details on the work center starting from my transfer order number.Which is the table connection between transfer order table LTAK and the tables where i can find the work center details.
Thank youI have found the solution:
ltak-tanum = mseg-tbnum
read aufnr from mseg and go to afko
mseg-aufnr = afko-aufnr
read plnnr from afko and go to plpo
afko-plnnr = plpo-plnnr
from plpo read arbid and go to crhd
plpo-arbid = crhd-objid
from here,we can find the arbpl and the field that i was looking for PRVBE -
My Friend,
What tables and fields I can user to create a report with link ( Work center X Routing X machine times X labor times) I need of list with this information to analysis.
I need comparete the times SAP information(Routing) verses Real Operation ( production line) by list.
Thank you for any help.
Best regards
ArmandoHi,
You should have searched or posted your question in production planning forum.
For example, check the link [Labour time and Machine time - production order table |Labour time and Machine time - production order table]
Regards -
Table to find maintainence work center in equipment
Please let me know where maintenance work center data for an equipment is stored ...I searched in EQUI/EQUZ ..but could not find ...PP workcennter is there but Maint workcenter is not found in these tables
Hi,
EQUZ-GEWRK is the work center on organization tab
ILOA-PPSID is the work center on location tab
In each case the work center is stored in a internal format. To find the actual work center / plant, find the CRHD record where OBJID field contains that internal number.
-Paul -
Work Center and Quality Notification
Hi
Can any one help on linking Quality table (QMFE / QMEL) with work centre info from COOIS .
We have to get the work center from the above Tcode in to our quality data source. When I checked in this field and table it is derived from a structure (AFVGD - ARBPL). Is there any other place or table I can get this work centre data ? We need this in to Quality for control Key (AFVGD-STEUS) ZZ40 only.... Thanks in advance for the help!!!Hi ,
Please check in table CRHD
Also check this thread for more info
Table linking Routing and work center.
-Mayuri -
Actual hours done against a work order for a Work Center by non-maintenance
Hi All,
I have below question with respect to work center.
-If there is this actual work hours done on a work order by non- maintenance personnel for a certain work center and same is not reflecting under operation tab of work order, then where & how this hours (done by non- maintenance personnel) for a work order is maintained for that work center?.
-In which database table these hours done by non- maintenance personnel for a work order is stored by work center wise.?
ThanksHave a look at the document flow button in the order header.
The confirmation data resides in table AFRU
PeteA -
BAPI for getting Equipment and Resources for a WORK CENTER
Hi All,
I have a requirement where i need to get all the equipment list for a given work center. So its Interface should be like
Input -- Work center
Output -- Table filled with Equipment list
Table filled with Resource(Person) list
Please let me know if i need to provide other additional information also.
Thanks ,
AbhishekHello,
I think What you providing input is right.Just would like know how will you get Person Responsible out put list??
Please Use The table ITOB to fetch the Equipment List according to Work Center as Input.
OBJID=Put work center ID in CRHD Table you will get the OBJID then you have use the OBJID in table ITOB for getting the equipment data.
Regards,
Rakesh
Edited by: RAKESH ASHOK MANE on Oct 1, 2010 9:13 AM
Edited by: RAKESH ASHOK MANE on Oct 1, 2010 1:20 PM -
Automatic release of production order for perticular work center
hello,
any body please help me how to set automatic release of production order when creation for a particular work center. please suggest me.
Thanks & Regards
BhaktaDear,
Use T Code COHVOMRELEASE here select work center as ZPACK then in header menu Program--Schedule in background here define as perodic job and set ferquency as Hr.
Or Use Transaction SE38 to create the variants for program PPIO_ENTRY and schedule it through SM36 or use standard variant as SAP&RELEASE.
Please try and come back.
Regards,
R.Brahmankar -
BAPI for reading capacity of a workplace/work center?
Hi,
I'm looking for a BAPI/RFC using SAP MII to read the capacity of a workplace/work center in a given time period (eg. one or more days/weeks/...). I would like to use the import parameters plant ( WERKS ), date from, date to, workplace/work center (eg. CRHD-ARBPL ) and capacity category (eg. KAKO-KAPAR ). As output I would like to get a list of (planed/used) capacities as the working time for the given time period at the specified workplace/work center.
In theory the BAPI CBP_EXC_WC_CAPACITY_REQUEST nearly does what I want. The only drawback is, that it outputs the "wrong" time.
Let me give an example: The work center uses at a given day a capacity from 6 to 22 clock, including one hour break. This gives us a working time of 15 hours for this workplace and day. And "15h" is the time I need. But as there are working 5 worker at this work center the BAPI CBP_EXC_WC_CAPACITY_REQUEST returns 75 hours (which is 5 * 15). But the result "75" is useless for me as long as I don't additonal get the number of workers.
I've searched in our SAP system and in this forum, but wasn't able to find another BAPI that gives me the correct time. As an alternative I would need another BAPI to get me the number of workers for a workplace/work center at a given time. But I also was out of luck finding one.
Looking out for help,
SimonThanks for your fast reply!
I have looked to both functions before. Beside that they are both not remote enabled (which is not such a big problem as I could copy them or build a custom BAPI around them) I'm not quite sure how they could solve my problem.
If I got it right, I would first use CR_CAPACITIES_OF_WORKCENTER to get the KAPID and using it as input for CLOI_WC_CAPACITY_READ. But I have problems to understand the output of CLOI_WC_CAPACITY_READ. The data type of the capacity is a float ( FLTP ) and the number seems to be to big, eg. 9.800000000000000E+01= 98h for one day.
Could you try to explain your solution once again?
Thanks,
Simon -
Capacity planning for Work Center
I programmed time for a Work Center on internal activity, for 40 hr using 100% of one resource, the work center it has a capacity of 8 hr each day, the activity gets a duration of 5 days and I indicated that it has to begin the first day of the next month.
When I executed transaction CM01, I notice that the 40 hours are planned for the actual day and don´t respect the dates of the internal activity, I think it is a problem with the work center but do not find the error.
Any suggestion where to look for?
The data used for creating the Work Center on Capacities:
- Capacity Category : 002 Person
- Other formula: SAP008
The data used for capacity:
- Base unit of meas.:H
- Start: 08:00:00
- Finish: 17:00:00
- Capacity utilization: 100
- No. of indiv. cap.:1
- Unit: H
- Relevant to finite scheduling: active
- Can be used by several operations: active
- Long-term planning: active
The data used for creating the Work Center on Scheduling:
- Capacity Category: 002 Person
- Other formula: SAP004
- Work dimension: Time
- Work unit: H
Best Regards...Hi,
Please activate the capacity requirement in Capacity tab in CNR2.
Thanks..
Maybe you are looking for
-
Macbook Pro (Retina mid 2012) going to sleep on its own
Did some web searches here and elsewhere and saw no list of affected users. This wasn't happening before Yosemite, and pretty sure it was happening before latest update (10.10.1). I'll be using my MBP (2.3Ghz i7, 16GB RAM, 256GB SSD) and the screen w
-
Ever since upgrade to Mavericks I have been having problems which are too numerous to mention. I finally found a program from a UCBerkley professor called Pacifier which indicated 4000+ of 400,000+ files and folders did not install. I was unable to g
-
Java error while opening Batch Scheduler in Hyperion Workspace
Hello Guys, I get this error while trying to open the Batch Scheduler in Hyperion Workspace. Please assist. Error: ; nested exception is: java.lang.NullPointerException
-
Jdeveloper - setting default window geometry under x-window
Hi When I run JDeveloper (9.0.4) it creates its main window (of some size) in the center of the screen. It's fine, but... I'd like to have JDeveloper create its main window of different default size and located at different position when I start it.
-
Does the ios7work with Logitech wireless keyboard? It worked until upgraded
Does IOS7 work with the Logitech wireless keyboard. After installing IOS 7 it is not working now