Takes place on my built-in HD!

Hi everybody!
I seem to have a problem with Time Machine. Indeed, I think that in addition of taking space on my external HD, it also takes place in my built in Macintosh HD!!
Before I used it today, I had 7 Go of free space on my BUILT-IN HD. And now, after using it, I have only 80 Mo left...
Someone has an explanation?
Thank yoooooou!!

Hello MaKaroon
I am sure there is a way, but, even if you do not damage anything inside, opening your case will likely harm your warranty. I suggest you take it to your retailer or an Apple Service Provider.
EZ Jim
PowerBook 1.67 GHz w/Mac OS X (10.4.10) G5 DP 1.8 w/Mac OS X (10.5)  External iSight

Similar Messages

  • How do I fix Firefox updates so they take place only on a certain date

    I access the internet via satellite (rural SW France!), and have a limit on downloads each month. I want the Firefox updates to happen only on the 5th of each month, not automatically. How can I stop Firefox from updating automatically, and select the date I want the updates to take place?

    There is no built in way to get Firefox to check for updates on 5th of each month. You can disable the automatic updates and manually check for updates. For details of how to do that see [[updating Firefox]].

  • ICal won't let me the period over which an event will take place

    I used to be able to enter a period over which an event would take place in iCal (desktop, not MobileMe) Since converting to Lion, this option is not available. There is no place to enter "from" and "to". Curiously, it is still possible to do so in iCal on MobileMe (via the web.), as it used to be on my desktop iCal (available via the dock). If anyone has any idea what's wrong, it would be appreciated.

    Ferd II, you genius! It worked like a charm. I changed the region from the default Custom to Canada and iCal again works as it should.
    But the bonus that came with your solutuion is even better.
    Lion inexplicably changed every single file-modification date on my computer – including those on files I'd backed up on a hard drive.on backup drives – to January 5 2011. I spent days trying to figure out what was wrong. (An answer is still pending from Apple techs who were also unable to explain what happened.)
    I was despairing of not being able to retrieve the orginal dates. Naturally, when I saw the dreaded January 5 2011 as the example in the system pref for Language and Text, I figured it was another instance of conversion.
    But when I set the region to Canada, every one of the corrupted file dates, all those January 5 2011s, reverted to their proper modification dates! Amazing. The only one that didn't is the example/default in the Language and Text pref box.
    I will let Apple's techies know that Ferd II solved the problem.
    Thank you so much for your help and for sticking with the problem. I can now sync my iPhone without fear of infecting it.

  • How to "select" sth which takes place every n days?

    Hi there,
    I'm developing a JSP/Servlet-based event calendar for young people in a big German city. I recently ran into a problem while implementing a new feature requested by the team which is maintaining the website. Editors can enter events over a web-based form; currently supported are events which take place on a single day or spawn over multiple days.
    I've been asked to provide means of entering something like events which take place every n days, starting at a given date.
    I thought about storing the start date and an integer which holds the number of days after that the event should take place again. This would be very easy to implement on the frontend: A textfield/dropdowns for the date and a textfield/dropdown for the "repeat every n days" thing.
    But I can't think of any reasonably fast way to get those events from the database when my servlet should display all events between, let's say, December 1 and December 24.
    The only thing which came to my mind was selecting every event's start date, taking the "repeat every n days" field an check if the current date is one of those "repeat days" by repeatedly adding the "repeat every n days" value. But this would seriously affect the servlet's performance. Let me explain the above idea with some pseudo code:
    ResultSet rs = stmt.executeQuery("SELECT * FROM events ...");
    while (rs.next())
    Date startDate = rs.getDate(...);
    // don't care about the single-day and multiple-day events here
    int repeatEveryNDays = rs.getInt(...);
    while (startDate <= currentDate)
    if (startDate.equals(currentDate))
    // show event on search results page
    else
    // increase date by "repeatEveryNDays"
    startDate.day += repeatEveryNDays
    }As I knew this forum very well, let me emphasize that this is not some kind of homework assignment. If you want prove, go to http://www.under18.de and look at the site. But I doubt that will keep the trolls away from this topic :(
    Thanks for your ideas,
    Philipp
    PS: For those not so capable of understanding what some call German g, here's a Googled translation into English (ahem... ignore the text, it's colloquial German and Google doesn't seem to like it): http://translate.google.com/translate?u=http%3A%2F%2Fwww.under18.de&langpair=de%7Cen&hl=en&ie=UTF-8&oe=UTF-8&safe=off&prev=%2Flanguage_tools

    I just thought about this one: Assume I have an event
    starting on Nov 2 taking place every 7 days. Now I'd
    search for events between Nov 3 and Nov 11. The
    difference of start date - STARTDATE would be
    1, divided by 7 would be 1/7 (about 0.142857).
    Adding 1 to 0.142857 would be rounded to 1 (using
    integers), resulting in Nov 4 if I'm right. Well, Nov
    4 falls between start date and end date
    but there actually is no event on Nov 4 according to
    the 7-day period defined above. I don't get any
    further with your "calculate the next event based on
    that number plus one".Taking your example, the difference between start date and STARTDATE is 1 day, which means that the first event is after start date. Now the first occurrence that is after start date is (0+1)*7+STARTDATE, which is (Nov 2 + 7).
    All you have to do with this number is to make sure it isn't after the ENDDATE value (to verify it is in your repeating schedule), and doesn't fall after the end date that you are comparing for.
    Some math major can probably explain the calculation better than I have, but the basic idea is figure out what the first occurrence is that is after your start date and then make sure it's not greater than end date.

  • When there are several tabs open, why does the search always take place on the 2nd tab (the first tab seems never to change from the home page) despite my selecting a different tab in which to do a google search?

    I have Mozilla Firefox 10.0. When I open it, it correctly opens on the homepage in the first tab. Once I have another, or several, tabs open, no matter which tab is active, any google search I do immediately takes place in tab No 2. It doesn't seem to matter how many times I go to e.g. tab 4 to do a search (because I wish to compare with the webpage open in tab 2), yet it always now does the search in tab 2. This is very irritating. There must be some setting that has gone pear-shaped, but where/which? Any suggestions? Thanks.

    Try the Firefox SafeMode to see how it works there. <br />
    ''A troubleshooting mode, which disables most Add-ons.'' <br />
    ''(If you're not using it, switch to the Default Theme.)''
    * You can open the Firefox 4.0+ SafeMode by holding the '''Shft''' key when you use the Firefox desktop or Start menu shortcut.
    * Or use the Help menu item, click on '''Restart with Add-ons Disabled...''' while Firefox is running. <br />
    ''Don't select anything right now, just use "Continue in SafeMode."''
    ''To exit the Firefox Safe Mode, just close Firefox and wait a few seconds before using the Firefox shortcut (without the Shft key) to open it again.''
    '''''If it is good in the Firefox SafeMode''''', your problem is probably caused by an extension, and you need to figure out which one. <br />
    http://support.mozilla.com/en-US/kb/troubleshooting+extensions+and+themes
    ''When you figure out what is causing that, please let us know. It might help other user's who have that problem.''

  • "Assignment to feature PINCH did not take place"

    HI i got a Error like
    "Assignment to feature PINCH did not take place"
    il  Assign APPL return value to applicant data using transaction class B.
    and the administrator table T526  updated with the same.
    also maintain Numap Feature,,,,,
    but still the Error coming please Guide me what to do ,,,,

    Hi,
    Have u maintained the feature like this-
    PINCH Administrator groups
            TCLAS Transaction Class for Data Retention
                B Applicant Data
                    APPL
                otherwise
    &  in the table -T526
    APPL     P01     Pers Officer - HO
    Pl. check it properly as this is the way to maintain the fetuare & table for Personnel officer in Recruitment module.

  • How to count the number of Rows to be Updated before Update takes place..

    Hi all,
    I have a requirement, where i have to count the number of rows to be updated before updating it. SQL%ROWCOUNT gives the no. of rows updated ( after update takes place). How do i get to know the count of no. of rows to be updated/inserted/ deleted. I was looking for a simple solution, as above SQL%Rowcount. But i couldn't find any. I can use a Function and Return the value which will give me number of rows to be updated, But is there any Simple Logic other than this.. or any count function. Your Help is Appreciated. Thanks!

    If you really want to do this (I have no clue why you would need it), then you can piggy back on any existing pessimistic locking you may already have in place.
    However, it would require two loops through the records of which you want to know the count before you update, and a second pass to update them.
    I would really re-think the need for this, though.
    SQL> create table t0304(c number);
    Table created.
    SQL> insert into t0304 select rownum from all_objects where rownum <= 10;
    10 rows created.
    SQL> commit;
    Commit complete.
    SQL> select * from t0304;
             C
             1
             2
             3
             4
             5
             6
             7
             8
             9
            10
    10 rows selected.
    SQL> declare
      2    cursor mycursor is select * from t0304 where mod(c,2) = 0 for update;
      3    i number := 0;
      4  begin
      5    for r in mycursor loop
      6      i := i + 1;
      7    end loop;
      8    dbms_output.put_line(i);
      9    for r in mycursor loop
    10      update t0304 set c = c + 20 where current of mycursor;
    11    end loop;
    12  end;
    13  /
    5
    PL/SQL procedure successfully completed.
    SQL> commit;
    Commit complete.
    SQL> select * from t0304;
             C
             1
            22
             3
            24
             5
            26
             7
            28
             9
            30
    10 rows selected.
    SQL>Edited by: Steve Howard on Mar 4, 2011 5:57 PM

  • Accounting Entries when Invoice Verification takes place before GR

    Hello All,
    I have some difficulty in understanding the accounting entries when Invoice Verification takes place before Goods Receipt.
    The scenario is as below: - (It is taken from one of the SAP documentation - AC530 - Actual Costing & Material Ledger- pg.No.2-8)
    1) Stock of material available u2013 50 units / Value Rs.125 /Moving average price in the material master Rs.2.50 per unit
    2) Invoice receipt takes place before goods receipt u2013 100 pc @ Rs.4.00 pc
    3) System does internal stock coverage check. As per SAP document, the stock shortage is 50 pieces.
    4) So the price difference arise i.e.Rs.100 (How this amount is arrived at? u2013 Not understood)
    5) The price difference of Rs.100 is only partially debited to the material (Rs.50). The rest is posted to price difference account (Rs.50)
    The accounting entry u2013
    GRIR A/c Dr                      300
    Inventory A/c Dr.                 50
    Price Diff. A/c Dr.                50
    To Vendor A/c                   400
    Question u2013
    -     I have not understood how Rs.100 is calculated & on what Moving average price the calculation takes place.
    -     As per the calculation in the document, the moving average price of the opening stock is Rs.2.50.the stock is 50  units. (50*2.50=125)
    -     The Invoice receipt happens at 100 pcs @ Rs.4.00 (100*4=400)
    -     So the new moving average price will be Rs.3.50 (Rs.125 + {100*4=400})=Rs.525. Rs.525/(100+50)pcs = Rs.3.50
    -     So how the price difference & posting to Stock account is calculated in the accounting entry?
    Please help,
    Thanks & Regards,
    Gov

    Hi,
    Check below mentioned thread to understand posting to price difference account..
    Logic of price difference  posting
    you missed one aspect of this and that is PO qty and PO price.
    GR/IR will get debit at IR Qty * PO Price.
    rest all calculations are in the link provided..
    - So the new moving average price will be Rs.3.50 (Rs.125 + {100*4=400})=Rs.525. Rs.525/(100+50)pcs = Rs.3.50
    Moving avg. will be calculated on stock value / qty in stock. new MAP will be stock value = (125 +50) = 175 and stock qty = 50 units so MAP will be 175/50 = 3.5.
    Since, GRN has not been done yet stock value (100*4) will not be there..
    Regards,
    Sayujya

  • How does Avilability check and TOR  takes place in SD

    How does Avilability check and TOR  takes place in SD? if you have any Tax configuration notes please send it to my mail ID?
    [email protected]
    Gopal

    ATP
    Types of Availability Check in Sales and Distribution
    Processing
    There are three types of availability check:
    _ Check on the basis of the ATP quantities
    _ Check against product allocation
    _ Check against planning
    The following SD-specific control features need to be maintained in Customizing:
    _ Checking group
    The checking group controls whether the system is to create individual or collective
    requirements in sales and shipping processing. In addition, a material block for the
    availability check with transfer of requirements can be set here. The checking group can
    also be used to deactivate the availability check. This option was created especially for
    the assembly order so that when the bill of material is exploded in the assembly order,
    the individual components, if necessary, can be classified as non-critical parts as far as
    procurement is concerned.
    The checking group specifies in combination with the checking rule the scope of the
    availability check. It is proposed in the material master record on the basis of the material
    type and the plant, and copied into the sales and distribution documents.
    _ Checking Rule
    You use the checking rule to control the scope of the availability check for each
    transaction in sales and distribution. You also specify whether the check should be
    carried out including or excluding replenishment lead time. The individual checking rules
    define by transaction, which stock and inward and outward movement of goods should
    be taken into account for the availability check.
    _ Schedule line category
    You can control with the schedule line category whether an availability check and
    transfer of requirements should be carried out in the sales documents. The possible
    settings for this at schedule line level are dependent on the settings in the requirements
    class which is determined from the requirements type of the material.
    _ Delivery item category
    The delivery item category can be used to control whether an availability check takes
    place in deliveries.
    Requirements type
    The various requirements are identified by their requirements type. The requirements
    type refers to the requirements class and its control features.
    _ Requirements Class
    The requirements class contains all control features for planning such as relevance for
    planning, requirements planning strategy and requirements consumption strategy. In
    addition, it is specified at a global level whether an availability check is to take place for
    the material in the sales and distribution documents on the basis of the ATP quantity
    (ATP = available to promise) and whether requirements are to be passed on. A finer
    degree of control can be obtained for sales documents using the schedule line category.
    Replenishment lead time is only included in the check performed on the basis of the
    ATP quantity.
    Prerequisites
    An availability check can only be carried out if the following prerequisites have been fulfilled:
    _ The control elements described above for the availability check must be maintained in
    Customizing for Sales and the relevant assignments made to the sales transactions
    _ The availability check must be switched on at requirements class level and - for the
    availability check in the sales documents - at schedule line category level
    A requirements type must exist by which the requirements class can be found
    _ A plant must be defined. It can either be proposed from the customer or material master
    record or can be entered manually in the document.
    _ A checking group must be defined in the material master record on the Sales/plant data
    screen in the Availability check field
    Configuring entries of the Availability Check
    IMG&#61664;SD&#61664;Basic fncs&#61664;Availability check and TOR&#61664;Availability check&#61664;Availability check with ATP logic or against planning&#61664;Define checking groups
    You can use SAP std checking groups of 01 for summarized reqts or 02 for daily reqts or u can create ur own.
    The columns total sales and total deliveries are selection options whereby u can configure a checking rule to sum up reqts to post to MRP either individually or by day or week.
    Column 5, Block qty; set this block if u want several users to be able to process the material simultaneously in different transactions without blocking each other. The No Check indicator is used when u want a material to not be relevant for an ATP check.
    Defining a material block for other users. The Block checkbox is an indicator that enables u to block the particular material from being checked for availability if it is already being checked at the same time by another user.
    Defining the default value for checking groups. However should no entry exist for the checking group in the material master record, one can set a default value per material type and plant.
    Controlling the availability check. In this section, u tell the system what stock on hand and what inward and outward movements of stock it must take into account when performing the availability check. These settings are based on the checking group that is assigned to the material master record and the checking rule that is predefined and assigned to the sd transaction. The carry out control for the availability check must be maintained for both the sales order and delivery.
    TOR
    IMG &#61664; SD &#61664; Basic fncs &#61664; Availability check and TOR &#61664; TOR
    A line item in the sales order creates a schedule line. The schedule lines in the sales order transfer the requirements through to MRP. You can select the docs on which you want the TOR to happen. For ex, not for quotations.
    The TOR aims to ensure the ordered materials are available for the requested delivery date. The TOR can be set for individual or for collective requirements (materials master&#61664;sales/plant view).
    The TOR is dependent on the following data:
    The reqts type, reqts class, checking group and schedule line category.
    The reqts type and class are determined in the strategy group (material master&#61664;MRP3)
    For TOR to be carried out, a few criteria need to be met:
    Plant assigned to line item level, schedule line category should be switched on at TOR, TOR must be switched on at the reqts class level, checking group must be defined and allocated to the material master record (sales/plant view in the availability check field)
    The reqts class is the controlling factor for the availability check and the TOR for all sd types.
    Configuring the TOR:
    1) Use std 041 reqts class or copy and rename it. Use the indicators to select if this reqts class must carry out an availability check and/or a TOR.
    2) Define the reqts types. A reqts type is allocated to a single reqts class and not vice versa. It is based on the item category and the MRP type of the material.
    3) Assign the rqts type to the relevant item category in the sales order and the MRP type found on the material master record.
    You can select an alternative search strategy where u assign the reqts type to item category and MRP type. Can select source as 0, 1 or 2. (1 = Item type and MRP type strategy).
    4) The TOR and Availability check can be selected/de-selected at the schedule line category level.
    5) Block qty confirmation in delivery blocks. This is used to block the reservation of the TOR from MRP.
    6) Maintain requirements for TOR. Requirements can be used to determine that the TOR to MRP is not carried out unless a number of conditions are met.
    Availability Overview = CO09 &#61664; order qty, sd doc no, item no, requirements class.
    Stock requirements list = MD04 &#61664; sd no or dly no, line item, schedule line placing the demand
    Stock overview = MMBE &#61664; total stock per company, then plant followed by storage location, and finally a breakdown per batch
    this is the customising as weel as the knowledge part.
    PLease award pints if helpful
    thanks

  • CPROJECTS - How does the calculation take place ?

    Hi,
    I am wokring in cprojects. I have done the following entries
    <u><b>cost revenue rate - defined</b></u>
    amount costs - 50 US dollars /Hrs
    amount revenue 10 US dollars/Hrs
    different revenue - 1.0 US dollars / Hrs.
    <b><u>resource assigned and staffed for 20 hrs</u></b>
    <u><b>After calculate costs the value shown are</b></u>
    proj defn -
    20 hrs----
    costs 89.80 USD
    projet role -
    20 hrs -
    costs 39.80 USD
    responsilbe person - 20hrs - costs 39.80 USD
    Can anyone please explain me how this calculation takes place in cprojects 3.1.
    Please do the needful
    Regards,
    Amit

    Hi Amit,
    don't understand how this calculation result can be caused. In general it should be:
    for a role: (hours - hours already assigned to resource) * role rate
    + hours assigned to resource * resource rate (is assigned in the business partner)
    Regards,
    Thorsten

  • Assignment to feature P0001 did not take place

    Hi Friends
    please help me the problem
    Generate Absence Quotas
    RPTQTA00
    E00001012 Personnel number rejected as infotype P0001 is missing
    In PA30 When I have enter 0001 Organization Assignment Displayed
    Below menu bar displayed  Assignment to feature P0001 did not take place
    Regards
    Jagan

    does he have a valid IT0001 for the period you are trying to generate the absence quota?

  • Purchase Change Message when Goods Receipt takes place

    Hello,
       Is it possible configure a Purchase Order Output determination when Goods Receipt is posted? We want to send ORDCHG IDOC message to a third party system when Goods Receipt takes place.
      Thanks,
      Venu

    USE the message type WMMBXY.. its sends the material document each time it is posted

  • Assignment to feature ANSAL did not take place

    I am getting the error as assignment to feature ANSAL did not take place. Could you guide me how to fix it

    once you check the Feature ANSAL, and activate it  and  check table T539J
    Regards
    Divnnr

  • Shell command - making Director continue whilst shell takes place

    Hi
    a quick question on Shelling -
    on a pc if i use Buddy API to Shell a command or run a bat file then i can have the Director app continue whilst the utility that I called takes place.
    However, that function doesn't work on the mac
    so i use Valentin Schmidt's shell.xtra
    which is great, and also seems to have a Callback function so I'd imagine that it allows for things to continue whilst the shell command takes place.
    But it doesn't seem to at least not when I try to create a disk image with the hdiutil command
    eg.
    tscript="echo -n $pw | hdiutil create -srcfolder '$src' -encryption -stdinpass -fs HFS+ -volname '$imagename' '$destimage'"
    shell_cmd(tscript)
    Since creating a disk image can take a while I'd rather Director continue and then I can at least monitor the size of the image as its created. Or let the user get on with using the app.
    At the moment Director is just frozen and if the image is large enough (eg 4GB) then it freezes entirely and needs a force quit.
    Has anyone had any experience of this?
    Presumably another option might be to write a script with the appropriate extension (like a bat file in Windows) and then open it with the open... with... command (beacuse then its running outside of Director) but I thought I'd try the neater method first.
    Thanks

    Hi Mike
    yes, asynchronous is what I'm after!
    unfortunately that asynch cmd (i've just looked at the windows readme and its called shell_cmd_thread) doesn't seem to be available in the Mac version. (v05, ie for Dir 11, which is I think the latest)
    all i get (according to the readme) is
    INTERFACE
    *shell_cmd string, *
    *shell_cmd_list string
    -- Utilities for path conversion
    *shell_hfs2posix string
    *shell_posix2hfs string
    He doesn't list it as a difference to the Win version but I've tried shell_cmd_asynch and I've tried shell_cmd_thread and that handler isn't defined on the mac.
    Thanks for the tip anyway. i will go down the batch file route, whatever that may be on a mac...

  • AS3 - 1) Countdown Timer to the designated Date for Live-Broadcast-Event yet to take place; 2) Detect End of Live Stream on FLVPlayback with FLVPlayback.isLive = true - ActionScript 3 - flash cs3 cs4

    Hi folks,
    Ronny's here again on forums, having particularly 2 (two) questions/problems to resolve:
    1) Countdown Timer to the designated Date for Live-Broadcast-Event yet to take place
    2) Detect End of Live Stream on FLVPlayback with FLVPlayback.isLive = true
    attached is the .zip file (as3_Countdown Timer_ver 1.0.1_by Ronny Depp.zip) with all flash source files containing:
    a) The FLash Source (file: timer_module.fla) - (FLA flash source file - Flash CS3 Professional, Flash Player 9, actionscript 3.0)
    b) com.othenticmedia.utils.dateAndTimeManagement package including 2 .as actionscript 3.0 Class files.
           i) com.othenticmedia.utils.dateAndTimeManagement.DateAndTimeManager Class in the said package. (file: DateAndTimeManager.as)
           ii) com.othenticmedia.utils.dateAndTimeManagement.CountdownTimer Class in the package. (file: CountdownTimer.as)
    c) The compiled SWF file version of this Application's blueprint. (file: timer_module.swf).
    What i need to confirm is: ........................................................ see the next post of mine. (for Problems  need to be Resolved)

    Problems to Resolve:
    Problem#1) - Countdown Timer to the designated Date for Live-Broadcast-Event yet to take place.
    Problem#2) - Detect End of Live Stream on FLVPlayback with FLVPlayback.isLive = true;
    Problem#1 Description:
    I need to pinpoint the Logical TimeSync Exception, i am still unable to figure out. That is I'm using a webservice in my Application to Synchronize the Time with the actual ET (eastern time) with accomodation of auto-adjustment for EDT GMT-4 (eastern daylight time) & EST GMT-5 (eastern standard time), times. I am using the zipcode: "10012" to pass it to the Web Service in urlRequest object, to retrieve the Current ET eastern time according to EDT & EST time settings for Manhattan/Brooklyn areas or others within  New York, NY 10012.
    Currently the Web Service is returning accurate date/time based on local EDT GMT-4 daylight time.
    Is there some defined set of dates for EDT & EST times for New York region that I can check for to ensure the correct Dates/Times for Eastern Time in New York area ??? I am using NY zipcodes because i am sure to get correct ET values.
    The Major Problem Part: is I need to correct the time by 2 seconds or approx. 2 secs, some millisecs.
    When I retrieve the Time Value from WebService, it lags behind for 2 seconds as compared to DateObj i create using computer's local time, on my Windows XP Service Pack 2 with Automatic Updates turned-on. And I'm sure about my Windows will be having latest updates for Time Management already installed. I also added the 2 secs. to the TimeSync(ed) Date to make correction to this Date obj.
    I call my custom fucntion addSeconds(dateObj:Date, secs:int) to add 2 seconds to the Date by Converting Seconds to Milliseconds.
    Please comb through the as code in files attached and Help Me Out !!!
    Problem#2 Description:
    Secondly I need to Detect the End of Stream state while using FLVPlayback component, an rtmp:// live Stream from FLASH MEDIA SERVER.
    I need to Play a YuMe Post-Roll Ad when Steam Finishes/Ends.
    Live Broadcast Stream Event starts every night on Wednesdays & Saturdays exactly  at 10:59 PM EDT GMT-4.
    Live Events only Streams/Broadcasts the stream for 50secs. exactly. When [playback stopped] it plays a PostRoll Ad and after the CountdownTimer again comes back to life. The Next upcoming Event is calculated & the Countdown begins until Next Event's time/date is reached.
    Here is the  code on the frame 1 on the MainTimeline: (rest of the params like source, volume, skinAutoHide are Set using Property Inspector for FLVPlayback instance on Stage)
    //myStream instance of FLVPlayback is on the Stage
    myStream.isLive = true;// Frame 1 Actions in the FLA
    myStream.addEventListener(VideoEvent.COMPLETE, onEndOfStream);
    myStream.addEventListener(VideoEvent.STATE_CHANGE, onState);
    myStream.addEventListener(String(VideoError.NO_CONNECTION), onStreamError);
    myStream.addEventListener(NetStatusEvent.NET_STATUS, netStatusHandler);
    /*if(myStream.stopped){
         trace("tracy: "+myStream.state);
    } else if(myStream.state == VideoState.STOPPED){
         trace("tracy: "+myStream.state);
    function onStreamError(event:VideoError) {
         trace(event.code + "\n\t" + event);
    function onState(event:VideoEvent) {
         trace(event.state + "\n\t" + event.toString());
    function onEndOfStream(event:VideoEvent) {
         trace(event.state + "\n\t" + event.toString());
    function netStatusHandler(event:NetStatusEvent):void {
         switch (event.info.code) {
              case "NetConnection.Connect.Success":
                   //connectStream();
                   break;
              case "NetStream.Play.StreamNotFound":
                   trace("Stream not found: "/* + myStream.source*/);
                   break;

Maybe you are looking for

  • Java EE 5 SDK & Aplication Server 9

    i installed JEE (java-tools-bundle-update3-beta-windows) but in my menu start -> program ---> sun macrosystem -> Java EE 5 SDK --> Applicatiob Server 9 who in the differrence between both ?? sorry but my English.

  • Invoking PageTemplate Bug?

    Hi folks,    I'm using jdev 11.1.2.4.0 by with that i h've been created fusion web app. it comprise  of model-viewcontroller projects. In VC i h've been created a custom pagetemplate.jsf then i try to invoke that in all my .jsf. it's fine. but i'm tr

  • Apps reverting to old versions.

    My iPhone 5 automatically updates applications but once they've finished downloading they revert to their old version? Also my emails will not delete, they keep on re-syncing not matter how many times I put them in the trash. I'm talking thousands of

  • How to lock the keypad with a code in Nokia E5?

    Hi, I have recently purchased E5 and even after entering lock code I am unable to lock my phone. If anybody knows how to then please tell me too? Thanks Solved! Go to Solution.

  • TOOK AWAY "SEARCH" FUNCTION IN iMIX???

    How are we supposed to search iMixes if there's no "search" field anymore??? Did it get moved or is there a new way of searching the iMixes in the iTunes store?