Target sost calculation not considered Current cost estimate in KKBC_ORD

Hi All,
We have an case wherein it observed that target cost calculation on SFG is wrong
in KKBC_ORD where system does not considered the current cost estimate.
We have all the necessayry customisation in place for Target cost version 0 for current cost estimate.
Below is detailsed case.
1 Process Order created in Dec 2011
2 Price Released to Mat master  on 01.01.2012
3 Goods movement,Operation confirmad Material Issues, FG qty delivered @ std cost 0n 04.01.2012
4 Order Technically completed (TECO)
5 KKS1/KKS2 will be done at month end.
We know that In Process order, after deliver of FG the target cost on FG is not getting calculated,target cost will be updated only after calculating variance. it does
not calculate after delivery of finished goods, On Execution of KKS1/KKS2  variance will be calculated the target cost on FG and will be updated.
In process  order (COR3 --> Cost analysis) Target cost ,Actual cost and Planned cost are calculated based on the following:
Total Plan Cost = Std Cost the material required to Produce X Planned Qty of the required material
Target Cost = Std Cost the material planned to Produce X Std Qty of material required to produce, for Produced Actual Qty
Actual Cost = Std Cost the material planned to Produce X Actual Qty of material consumed, for Produced Actual Qty
The variance is calculated on SFG and assemblies based on the difference between actual and target cost in KKBC_ORD. During creation of process order, the plan cost
will be updated with the valid standard cost upon the creation.
The target cost on SFG and Assemblies is only generated when there is good receipt from production order into inventory.
The target cost is generated using the valid / recent costing run for the correspondence SFG in KKBc_ORD.
All other target costs showed in COR3 (Menu Go to > Costs > Analysis) or KKBC_ORD before doing KKS1/2 is only statistical- However in our case Traget cost calculated
on SFG in KKBC_ORD not relevant with current cost estimate.
However Actual cost and Planned cost Calculated correctly.
Actual Cost= Current Standard costof the materilal(5.624,88)X Actual Qty (13.693)=77.021,48
Planned cost= Std Cost the material required to Produce (6.572,12) X Planned Qty (12.415)= 81.592,87
However Target cost is not considering the current cost estimate;It should be - Current Standard cost of the materilal(5.624,88)X Target Qty(13.958,124)=78512.07.
But Errorneously Target cost is showing 67.383,59 which causing unfavorable variance to standard.
It should be 78512.07-77.021,48= 1490.59 favourable var to standard in KKBC_ORD.
Any help,suggestion and input would be highly appreciated.
Thanks with Regards
Subrata

hi
target cost is your standard cost* actual confirmed quantity, not the standard quantity required
the variance calculated will be always  the actual debit to the production order- actual credit of the production order
your actual credit  for the process order is  std cost* actual quantity delivered to the inventory= Current Standard costof the materilal(5.624,88)X Actual Qty (13.693)=77.021,48
actual debit to the process order is total actual cost which you can see in COR3 report .
By the way for which period you have calculated variance, target cost will be calculated based on that months standard cost
krishna

Similar Messages

  • Price calculated in a standard cost estimate

    Hi everyone,
    Would someone know how to recalculate a price in a standard cost estimate that has been released yet?
    Normally, SAP allows you to calculate a cost estimate only once per period but I would like to recalculate it for the ongoing period. Would you have any idea?
    Nb: Although it is possible, I do not want to change it manually. I would like to go through the whole process (CK11N -> CK24).
    Thanks in advance,
    Ronan

    Thanks a lot for your answer. That answers my question.
    By the way, with the transaction you gave me, you can delete a cost estimate that has be validated for the ongoing month.
    Cheers,
    Ronan

  • Diffrence B/w Standard,Modified,Current Cost estimates...

    Hi
    What are the diffrences between Standard(PPC1), Modified (PPC2) and Current (PPC3) Cost Estimate and why is only one estimate allowed to update price. How are these three estimates useful...
    Thanks
    Sivaram

    Hi
    What are the diffrences between Standard(PPC1), Modified (PPC2) and Current (PPC3) Cost Estimate and why is only one estimate allowed to update price. How are these three estimates useful...
    Thanks
    Sivaram

  • Backflush with Prel cost estimate still considering standard cost estimate

    Hi,
    Trying to do back flush with Prel cost estimate . Flagged in REM profile " Post Activities " / Using Data from Preliminary Costing".
    However,  FG rate is considred as per standard cost estimate and not as per preliminary cost estimate.
    Kindly advise whether any other specific setting is needed.
    Regards,
    Mrinal

    HI
    check these links:
    standard / preliminary cost estimate
    Significance of Preliminary cost estimate,
    preliminary cost estimate for product cost collector
    Hope it clarifies.
    Regards
    Anupam Sharma

  • Routing is not pickup during cost estimate

    Hi,
    We have created BOM & Routing,  
    Issues During SCE System will not taking  Routing,
    Parameter taken in  consideration
    Configuration & Master data maintenance
    1) In Material master Base UOM maintained  is  EA alternate UOM MLD
    2) Activity rate we have maintained : KG / KW / HR
    2) Routing requirement is MLD.
    In Routing IF i Maintained EA UOM, System will take Routing for SC,
    Client requirement :Mafg production in MLD and EA, Activity should  be MLD Base
    Is their any config missing for UOM
    Could u tel me.
    Thanks in Advance.
    Regards,
    VINU

    Dear Vinutha,
    If my understanding is correct then you have to first define all the alternative unit of measurement(like issuing unit,production
    unit,ordering unit,purchasing unit) in the respective material's additonal data in the material master.( 100 Ea = 100 MLD - For
    example).
    While defining routing,in the routing header for the material mention the unit(MLD) in which you will be defining the
    operation,operation timings.
    Check with settings whether the system is picking the routing during SCE in CK11N/CK40N.If my understanding is correct then
    there is no configuration settings related to the same.
    Check and revert back.
    Regards
    Mangalraj.S

  • CKCPRCH025-A current or future cost estimate exist

    Hi,
    I am getting the error message while doing GR-A current or future cost estimate exist.
    And its saying to follow the procedure that you can set the price of a marked cost estimate through the radio button 'Default planned price' and release it by saving.
    Please help as where to correct this.
    Govind

    Dear,
    I think you have not updated the Cost Estimate. Please check in Costing view 2 tab of Material Master under Future Price any cost exist for the current period.
    Br, Vivek

  • Can I find out, with user has deleted all cost estimates with CKR1?

    Hi Community,
    ich have a major problem: all our standard material don't have a cost estimate any more, because a unknown user has deleted all current cost estimates. Can I find out, with user has used the CKR1 transaction? And much more importend: how can I solve the problem? Do I need to re-calculate all the material?
    Thanks for any idea and help
    PoD

    Hi,
    you have to make the costing run, marking, releasing again but thats not the whole work.
    If there are PP-orders that have been created based on the old/deleted plan cost estimates, the variance calculation will not work as the plan cost estimate is missing (even if the new one is released in the same period).
    Thus variance calculation is not possible for those orders... You have to settle the whole balance to receiver object by removing the variance key in PP-order. Try first for one particualr order to see if there are some other problems that need to be solved during month-end-closing.
    How to find out who has executed CKR1 (SAPCKR1): Check authorizations for (hopefully) a small number of user who are allowed to use CKR1.
    Use T-Code ST03N, in the left upper window double-click "total" (maybe click a day if you can imagine which (possible) date it was). In lower left section open "user and settlement statistics" and then click "user profile". Now go to each possible user and look for T-Code CKR1.
    This can be time-consuming but its worth a try...
    For the future: restrict CKR1 to a very small number of user (and they should be well trained...). I once had a company (with poor authorization concept) but CKR1 was blocked in SM01 and a ZCKR1 was created and in this Z-transaction USER-name was checked (if SY-USNAM...) so only the use names named in this Z-program were allowed to use ZCKR1. Not the best way but sufficient for them...
    Good luck, Christian

  • Sales order cost estimate with GIT account

    Hi,
    Business introduced Goods - in - Transit (Balance sheet account), so PGI will always post to GIT and Invoice it will get reversed.
    For one of the Configuratble material (MTO) scenario we need the Sales order cost estimate to get the Planned cost.
    When i try to execute the sales order cost estimate it says cost element doesnot exist for GIT GL (WHich is right).
    But with maintaining the GIT how to achieve the sales order cost estimate.
    I tried to create CE category 90 for GIT, in Cost estimate am getting error CE 90 not supported for Cost estimate.
    Kindly help this is kind of urgent req for us
    Thanks,
    Sudha

    Hello Ashley
    Yes, if you have done your settings correctly, especially Requirements class set up  (see the documentation link),  then the cost estimate will flow to a condition type in Pricing, usually EK01/EK02 conditions. These conditions are used to calculate sales prices (PR00) in cost-plus (mark-up) scenarios.
    Link: http://help.sap.com/erp2005_ehp_04/helpdata/EN/90/ba6da4446711d189420000e829fbbd/frameset.htm
    However Profit margin  as calculated in a sales order comes from VPRS condition  (which is based in Material Master) and is the difference of net value and VPRS condition value in normal circumstance.
    Hope other more knowledgeable experts will weigh in.

  • Cost Estimate Deletion Problem

    Hi,
    I have executed the cost estimate for the material.Now i wanted to delete it in CKR1 as it is incorrect.So that i can execute a new cost estimate for this.
    but my doubt is - if we execute cost estimate,then it will update in material master costing view.If i delete and then execute new cost estimate for the same material.will the new rates will be update? or the old incorrect rates are not deleted?
    Kindly advise me
    Thanks
    Supriya

    From the time you run a cost estimate, till the time it reaches the material master, there are three stages.
    First run and save the cost , Second mark the cost estimate, Third release the cost estimate.
    There is no change to the material master for the first two stages with respect to material value. When you mark, it just updates the future price. Only at the third stage, the material price changes with the new cost estimate value.  For any quantity that is in stock, the change in vaule is journalised.
    Hence, if you have just run the cost estimate, you are only in the first stage. You can comfortably delete CKR1. But please exercise caution, any wrong deletion can take away the cost estimate stored in the material master. This does not take away the standard price, only the estimate gets removed. As a result, you may not be able to get the cost component report for production order etc.
    When you are in CKR1, open up the small plus icon, which will give you more selection option to help you pinpoint the cost estimate that you want to delete.
    You can also check details of the current cost estimate in the costing view to find out which cost estimate has got updated in the standard price.

  • Std. cost estimate

    Dear Experts,
    We have ROH, HALB & ZMAT as materials.  The question is with respect std. cost estimate.
    The cost estimate are run for HALB & ZMAT  items created  on day to day basis. However cost estimate is executed for all the  HALB & ZMAT on alternate months.
    I would lke to know the best practice or industry standard on this issue on the frequency of estimates. I appreciate any other points rellated to this point.
    Thanks in advance.
    T.S.Shankar

    hi read the following basics of CO-PC        
    1)A material cost estimate used to calculate the standard price in the 
    material master record.                                                                               
    2)The cost estimate must be executed with a costing variant that updates
    the material master, and the cost estimate must be released.                                                                               
    3)Forms the basis for profit planning or product costing where the focus 
    is on determining the variances.                                                                               
    4)Typicall, a standard cost estimate is created for each product at the  
    beginning of the fiscal year or new season or BEGINING OF THE PERIOD /  MONTH.                                                                               
    5)Standard cost estimates establish standard prices for semifinished     
    products and finished products. The costs calculated in standard cost  
    estimates are used to valuate materials with standard price control.   
    A costing type that calculates the cost of goods manufactured for a   
    product during the course of a planning period.                                                                               
    It differs from the standard cost estimate in that it uses the quantity
    structure that has changed during the planning period as the basis for
    calculating costs.   (  WHEN EVR YOUR PLANNING WILL BE CHANGED    )
    CURRENT COST ESTIMATE                                                                          
    1)A cost estimate that can be created at any time to valuate the current   
    quantity structure with the current prices.                                                                               
    This cost estimate serves the following purposes:                                                                               
    A)  You can compare its results with the results of the standard cost    
         estimate to support decision-making in production.                                                                               
    B)You can transfer the results of this cost estimate to the material   
         master and use them to valuate the goods receipt when working with   
         materials that use the moving average price.                         
    Regards
    Mala K Reddy

  • Cost estimate w/o scrap quantities

    Hi Experts,
    Our customer has a requirement to estimate material cost of a product w/o any scrap, although there are component scrap or assembly scrap percentage maintained for some materials. Can it and How to configure to fulfill this requirement?
    Regards

    Hi Sadashivan Natarajan,
    The indicator in MM02 means do not cost the material as semi-finished/finished product, while as raw material instead, which does not means not to cost the scrap. And I tested that even if I tick the indicator for the materials, the scrap quantity will still considered by cost estimate.
    What I expect is as in below example,
    Suppose to produce one X needs one raw material A and one raw material B. A's price is 10 and B's price is 5. So one hundred X has material cost 1500 (10 x 100 + 5 x 100). Suppose B has component scrap rate 1%. Now the standard cost estimate of one hundred X will become 1505 (10 x 100 + 5 x 100 + 5 x 100 x 1%). The scrap rate is just for MRP purpose and our Finance do not wish the cost took the scraps, which should still be 1500 as in above example. How to do please?

  • Confuguarable Material Cost Estimate

    Hi All.,
    It is an urgent requirement.......
    My client having both configuarable & non configuarable materials.....
    with regarding to the configuarable material cost estimate i don't have good grip on this.
    Can anybody please share some guidlines for how to create the cost estimate.....
    Thanks one and all.,
    Raja

    Configurable materials can only have a cost estimate when there is a sales order bom to define the build.
    We use configurable material and the cost estimate is configured in the same manner as standard material (Costing variant,costing dates, transfer control, etc. but some of the details differ), but it is only Saved within a Sales order. You can use CU50 for a trial cost - the configuration will have to be created in CU50 before it will cost.
    When costing configurable materials in sales orders or for sales orders the valuation variant is different from standard cost variant in these points:
    1 - The costing type is different. 18 - Sales order costing vs. 01 - Standard cost est. (mat.)
    The Costing type for Sales order does not allow updating of the standard price in the Mat Mstr
    The Costing type for Sales order also controls the use of Labor overhead for the costing variant.
    2 - Valuation Variant can be different - Valuation for Prod Costing specifies the rules to build a cost estimate. For Sales order, you may want it to use ONLY the standard price for a material/component, and NOT build a cost estimate.
    3 - Date control - The default “from” date for the Config Mat in a Sales order is “Today” while for product costing it is “first of next month”
    Our Prod Cost Est. is valid until the end of the Fiscal year when a new cost estimate is released. Our Config Material on a Sales order is valid until the end of time.
    I cannot explain “why” we chose one over the other, most of the decisions were made before I arrived. But the Costing Type Difference is very important to us, because there is no chance that the cost estimate will interfere with setting of standards and it allows “searching” for a Sales Order Cost estimate.
    You have to analyze how each part of the costing variant could impact the business and decide how to set it. If circumstances change, you can review the settings later. (I fully intend to review some of ours directly after this conversation.)
    Sales Order Costing Variants are on OKY9 while product costing is at OKKN
    Sales Order Costing Variants are assigned under SD “Maintain Requirements Classes for Costing/Account Assignment (table T459K)
    Hope this helps.
    Althea

  • Reorganization of Cost estimates

    Dear All,
    Please help in knowing the difference between "Reorganization of Cost Estimates" & "Revaluation" of a product having standard price in material master.
    In a nutshell, why "Reorganization of Cost Estimation"(CKR1) is to be done before "Price change" (MR21).
    Hope that my query is clear.
    Thanks
    Nikesh Patel

    Nikesh,
    1. Reorganization of cost estimate means deletion of cost estimate, by using the transaction code CKR1 you can delete the current cost estimate, marked (future) cost estimate. It is advisable to do the CKR1 before any goods movements for that material.
    Generally this will perform when the business realized that released cost estimate is wrong.
    2. MR21 will use to update the standard price for the materials. when you update the price as per the new standard price your inventory will evaluates at that time there is an accounting entry if your new standard price is greater than old standard price.
    Inventory dr to Revaluation inventory cr.
    The above GL accounts will trigger as per the OBYC--> UMB settings.
    Please let me know if you need any further help.
    Regards,
    Ravi

  • No standard cost estimate found for the material

    Hi,
    When we are trying to generate the bill systems throws the error as "no statandard cost estimate found" whereas the material is a kmat material.
    Actually as per the requirement we should not Run standard cost estimate for any material,we will update the standard price in MR21
    What are the settings that i need to do  to avoid the above error message while doing billing?
    Following error msg is appearing:-
    No standard cost estimate could be found for material "300000"
    Message no. K/834
    Diagnosis
    In Profitability Analysis, an attempt was made while valuating with material costing to read for material "123456" a standard cost estimate released on posting date "02.10.2008".
    The system has discovered that there are no error-free standard cost estimates released in plant "BP01" on the specific date "02.10.2008" for material "123456".
    The material cost estimate is accessed according to the CO-PA Customizing settings for costing key "YG1" under Define Access to Material Costing.
    Display Cost Estimate for Material
    Display Material Cost Estimate without Quantity Structure
    System Response
    It is not possible to process the document further.
    Procedure
    Check your system settings.
    Thanks
    Kishore

    Remove the Costing keys assignment in the step "assign costing keys to any
    characteristics" in COPA Configuration settings.

  • How SAP use transfer control or material cost estimate

    Hello!
    I have strategy "3-Previous standard cost estimate" in transfer control material cost estimate.
    I have cost estimate for product AAA with status KA and costing date from 01.01.2014.
    Product AAA produced from component BBB.
    Component BBB has two cost estimates with costing date from 01.01.2014 and 01.02.2014.
    I run cost estimate for product AAA with costing date from 06.03.2014.
    Cost estimate not use existing cost estimate for component and create new cost estimate.
    In help.sap.com contains next information about transfer strategy 3 - The system searches for existing previous cost estimate.
    why my system does not use the existing cost estimate for component?
    Thanks for attention.

    Thanks, Szymon!
    I use russian interface and read russian help. Where stragegy 3 has name "Прошедшая плановая калькуляция" which means "The last planned cost estimate".
    This led me astray.
    In english help i read next:
    Previous standard cost estimates
    The system searches for an existing previous standard cost estimate.
    You are completely right!
    two more questions:
    - We can not use strategy 3 if we not realesed cost estimate as standard price?
    - What strategy we should use for transfer material cost estimate with status KA?
    Thanks