Task List issue

I have two end users in the same plant, with the exact same security roles and user parameters. When one user creates an SM03 the system assigns a general task list created for there plant. When the other user does exactly the same thing, the system displays a pop up to choose the task list, then a pop up to choose the operations. What is causing this? This happens to various users in various plants.

Table TPMUS must be populated with user ID.  No entry needs to be maintained only an entry with user name created. This table has no configuration or defaults in parameters. Steps to be taken by end user: Pull up any SM0x in IW32
1. Extras u2013 Settings u2013 Default values
Order Type field:
1. Enter SM03
2. Click the save icon u2013 DO NOT click the GREEN CHECK
3. Remove SM03
4. Click save icon
5. Exit IW32
Background table is now maintained for user

Similar Messages

  • Inspection with Task List Issue

    Hi Gurus,
    I have a situation where I am creating a "shell" Material. We are taking samples of Blood and just throwing them away. We don't need to have Inventory on them or costing.  I just want to use the QM module to keep the inspection results/data.
    I had my Materials team set up a Material with only the Basic Data 1&2 views and the QM view. I want to use Physical Samples to keep track of how many samples we inspect.
    My issue is... I tried to Inspect with a Task List and it is "Greyed" out on the Material Master. It will not let me select it. I am using the inspection type 15 (Physical Sample).
    Can someone PLEASE help me get this Task List check box not grey?
    Thanks so much

    This field should be defaulted in from configuration.  Change the defaut vales for inspection type 15 in configuration.
    I think someone, at some point, changed this config in your system as I believe this is delivered by SAP as defaulted for inspection type 15.
    You might try using mass transation QA08 to set this for any materials you have already set up after changing the config.
    FF

  • Task list issues in 10.3.1 - Tags

    My Q10 just updated to 10.3.1 and although I like the new look of the task section in the Remember app, I am having some issues. My tasks sync with the company tasks in Outlook but for the life of me, I can't seem to do a few basic things:
    1. Although all of my tasks have tags (and they are visible on the berry when I open up any given task), selecting any given tag in the tag view, comes up as "no entires". ???
    2. How do I hide completed tasks in the task list?
    As my handle suggests, BlackBerry tasks are how I manage most things and the lack of the above two features is making it less than useful.
    Any ideas?
    Dave

    hello,
    my personal opinion is that the Tasks part in BlackBerry10 serves only one purpose: bring compatibility with Outlook/Lotus through BES connectivity.
    If your device is not linked to a BES server, I strongly advise you to look at the dozens of free and paid apps that manage tasks with much more efficiency than the Remember app.
    The search box on top-right of this page is your true friend, and the public Knowledge Base too:

  • CopyApp Migration - Task List issue

    Hi!,
    Migrated App using CopyApp. CopyApp did not take care of loading data and the following:
    1) Business Rules --> Did export/Import (followed by change privileges)
    2) Reports --> Export/Import (created connections with same name and pointed to new app/database)
    3) Task Lists has some URL's pointing to source mid-tier server.
    Is there a relational table that I can update to change references to source URL to target URL?
    Thanks in advance.

    Found it:
    update hsp_task set str_prop1 = replace (str_prop1,'sourceserver','targetserver') where str_prop1 like '%sourceserver%';

  • Issue In Task List, When I select any SP13 task item its updating task status to "Completed" automatically

    Hi Guys,
    A strange issue I am facing in SharePoint 2013 task list. When I just select any task its updated the task status automatically to "Completed". When I unselect task its updated task status to "Not Started" automatically. I don't know
    why its happening.

    Hi,
    It is by design in SharePoint 2013, you can quickly mark tasks as complete by clicking the checkbox.
    If you want to select the item, please check the “select” column.
    Select Items:
    Mark task complete: 
    More information:
    http://blogs.office.com/2012/08/13/managing-tasks-in-sharepoint/
    Best Regards
    Dennis Guo
    TechNet Community Support

  • LCM issues with Workflow, Task Lists, etc.

    I have found several issues with migrating certain artifacts using LCM v11.1.1.3. Note that I have admin rights in all systems, and that there are no special characters involved. So...
    1) Workflow: when migrating Planning Units all of them migrated, including their statuses. But not all PU comments (<annotation>) and logs (<log>) nodes migrated. It happened to almost all users - some who had 1-2 comments in the source system haven't got any in the target one, some got migrated only few (e.g. out of 5 in source, they got 3 in target). Since it happened to all users, it doesn't seem to be security. I have also checked (for those who partially failed) some other nodes, sequence, action, process state - they all seem to be OK. One curiosity I've spotted in few cases, is that in source LCM file (.xml) "priorOwner" node has the name of the user I am investigating, while in the target file (taken after the migration), for that same PU, that node is empty, actually says "null".
    Any ideas why this might be happening?
    2) Task Lists: when exporting TLs (in LCM) on occassion <dataForm> node in XML file would be missing for the task that actually has it attached. Again, no special characters are used, and I am admin. Then I tried to use TaskListDefUtil, and even if that list has required node, when I try to import, the task is still not attached to the form. I had to delete all TLs, then use Util files to reimport.
    Anyone with similar experiences?
    smilo

    I had issues with tasks lists using LCM in instances where parent task name was same as child task or a task has same name planning web forms. You might also find issues with exporting webforms with business rules attached to forms where form is on plan type A and business rule is on plan type B. In this case, after LCM import, plan B business rule will lose location reference to correct plan type and get associated with web form plan type. In this case you will need to attach business rules again.

  • Solman Change Request Management Issue - about create task list

    Dears,
        We are now using Solman ChangeRM. I have created a maintainance project and maintained its logical component and IMG project. when I want to create a task list for this project, a message"The project is not released. Hence cycle can not be created" poped. The message no. is /TMWFLOW/CONFIG_UI017. Where can I release the project?
    Thanks
    Roger

    Hi,
    Pls click the check button(next to activate button)
    see the SLG1 log generated remove the errors shown in red.
    One it is done u press the refresh button & thn u cn create the task list
    chk
    https://websmp202.sap-ag.de/~sapdownload/011000358700000657692007E/ECTS_CHARM_SP12.PDF
    /people/dolores.correa/blog/2008/07/26/first-steps-to-work-with-change-request-management-scenario
    http://help.sap.com/saphelp_sm32/helpdata/en/0c/5b2160f6fa4b83a3674a210b1cdeb0/content.htm
    Regards
    Prakhar

  • Issue linking external URL's in task list

    When I link a URL to a task list, a pop-up at the bottom of the screen saying "Only secure content is displayed" with a button saying "Show all content"
    When I select "Show all content" an Internet Explorer pop-up appears asking to either "Leave this page" or "Stay on this page."
    Selecting "Stay on this page" does nothing, but selecting "Leave this page" logs me out of Planning. When I log back in, the web page appears when I click on the task list.
    When I log off and close my browser, I have to go through the same steps.
    Is there any way to have the URL task list work without having to go through those steps? Is this an IE security setting?
    Thank you in advance for any input.
    Tiffany

    What URL are you using, is that an FR or WA report? If so check this Oracle - Hyperion Labs......: Generate Smartcuts for all objects under a folder
    Regards
    Celvin

  • Issue in task list report

    hi all,
    my user want a report of task list requirement is listed below
    user fills task list in order generated automatically. they want to get the report of task list filled against order no and equipment. is it possible through standard reports or i have to do developments for the same.

    Dear Ansh
    Your requiremnt is  not a straight fit solution coming from SAP provided standard reports like IW38, IW39, IW40,IW37N or IW49 as stated in above replies.
    I remember a blog posted some time ago for a similar requirement. Here is the link, go through the link and u will find the exact solution.
    Long Texts in Plant Maintenance - extraction
    Some posts in similar requiremnts you can refer:
    PM Work order long text to be included to a report
    Long text for Operation in Tranasction IW32
    How can i get order long text?
    Hope this will be helpful..
    Murad

  • Loading Issue on Task list

    Hello Guys,
    I am using LSMW for loading funtional locational task list. Since I have only one operation, I prefer LSMW and also maintain the seprate file for loading the frequencies for maintenance plan as well. I have a situtation as,
    Floc A   - 1M   -   Strategy A
    Floc A   - 1W  - Strategy B
    Floc A   - 1M  - Strategy A
    Now, my plan is to load the task list first and once I get the task list group number, I will load the frequency on it. Since it has the same repetitive floc , I should have 3 different rows in my task list load file as I wanted to have three different task list numbers since I got different frequencies. But if I start loading in system, it throws the error message as soon as the first task list has been loaded. I understand this is correct because I already created the task list once in the system.
    So how do I acheieve the other two lines in the system ? I really dont want to go with increasing counters as it will have the same group number with different frequencies.
    Pls help
    Mahee

    Hello,
    I think you can not go ahead with having same Counter Number for One Group.If you are creating the FL task list it will create the Unique Group Number.after theat If you try to create the FL task List for Same FL it will suggest you the New Counter Number with Same Group Number its standard.So I think so You can create the FL task list with one Group Number and Only one counter number once that FL already have Task list booked under that number.Also process point of view it is confusing having single FL task List with same identical data with more that one in quantity so how you and system identyfies the which of the FL task list is used if all FL task List having same Identification.Thats why counter is necessary.
    Regards,
    Rakesh

  • Which URL to use to open a financial report from a Task list ?

    Hi,
    I've got a big issue in Hyperion Planning : I do not know which URL to use to open a financial report from a task list.
    If I use the Smartcut (given when you do a right-click on the report, then Properties), a tab is opening (normal behaviour), but another tab is opening under the tab, which is very ugly, and moreover which prevent from using the PDF/HTML display icons !
    Is someone know which URL to use to display correctly a financial report when opening it from a task list ?
    It's an emergency, please help !
    Thanks very much.
    Virgile.
    PS. : we use Internet Explorer 8 and we use 11.1.2.1 Hyperion Planning version
    Edited by: 808808 on Jan 5, 2012 3:41 AM

    Hi,
    OK, thanks, it almost works !!
    I've just a problem. 2 tabs are opening.
    One is opening correctly and displays my report. I can display it in PDF/HTML.
    But another tab is opening with this message : This window can now be closed since the application has been launched in a separate window. Note: Popup blockers may prevent this application from working properly.
    Do you know why this tab is opening ?
    Thanks very much for your help.
    Virgile.

  • User POV does not pop up from Report in task list

    Hello,
    I've created a report within Related Content in HFM and added it to a task list--the problem I'm experiencing is when I run the report the User POV does not pop up, rather it simply uses the default POV (ie, whatever is set up in data grids or process management)--this happens if I try to run it directly from Related Content or from the task list. My preferences within Financial Reporting have already been updated to 'On' to preview the User POV and if I run the report from Financial Reporting (ie, Explore) the User POV works fine--so, it seems like adding a report to Related Content disables the User POV from popping up. I'm running on Financial Reporting v11.1.2.1 and HFM v11.1.2.1.104.3701. I can't find anything about it within this forum, knowledge base or as a known issue in the ReadMe for the .104 patch set for HFM.
    Can anybody fill me in on if this is functionality by design or a defect?
    Best regards,
    Jason Call

    Financial Reports do not work as you might expect when they are used as a related content item. As you already have realized, you will not be able to adjust the FR POV items from inside of HFM.
    A 'work around' would be to link to the report and put that link in the Tasklist. This will then open the report 'normally' and you will get the POV functionality that you expect.
    To find the link to a report, open the report's properties and look at the 'smartcut' value. (That is a URL directly to the report)

  • Error while creating configurable task list

    Dear Expert,
    I am trying to create configurable task list for equipments and I want to use this task list for preventive maintenance cycle. In following steps I will tell you what i did in the process.
    Step1:- Characteristic is created and different values are assigned to this.
    Step2:- Class with class type 300 is created, characteristic is assigned to this class
    Step3:- Equipments are created and class created in above steps is assigned to them and character values are set for them
    Step4:- General maintenance task list created
    Step5:- Configuration profile for task list with same class is created
    now while creating the object assignment in the task list operation, in the dependency basic data I am getting error ' No source code entered'. Please guide me what data do I need to enter in this basic data and where I am doing wrong.
    I try to follow the previous discussion regarding the same topic, but unable to create this object dependency assignment.
    Thanx in advance, for your help.
    Regards,
    Parag

    Hi Parag,
    See this document.Configurable Tasklist
    I hope you will be able to connect and correct your process accordingly.
    Step3 here (CU01) is related to your issue.
    You are expected to give a code shown like that in the Editor above Assignments  in the Tasklist Extras menu (Takes to CU01)
    Jogeswara Rao K

  • Error in executing process from the UWL task list

    Hi,
    I have created a process and assigned different users to different steps. For administrator, Overseer and Owner, i have kept role as initiator only. For the actions of the process, set the value as Initiation defined and in Default Roles tab, have assigned different users to each of the actions. From the URL generated on instantiation, i created a web dynpro iview and assigned it to a role R.
    The UWL has also been configured. The initiator of the process is assigned the role R.
    Now the issues are:
    1. When the process initiator opens this role R, an error is displayed " Page not found or not available", but the process gets initiated since an entry for the same is made in the UWL task list.
    2. Even when I click on the task entry in the UWL task list, i get the same error message.
    3. Presently if i click on the role R, then only entry is displayed in the UEL task list. Is there a way in which task may automatically appear in the task list of the initiator of the process without him/her having to click the role and then initiate?
    I am not able to figure out why this is happening. Can anyone please help me in this regard.
    Thanks & regards,
    Anupreet

    Hello Anupreet,
    Refer to these SAP notes
    1104652, 1131403 or 1026119.
    This should fix the issue.
    Let me know if this works.
    Cheers,
    Mandrake

  • Web Form in Task List and Security

    Hi,
    I have a couple of specific questions regarding Task List; below is a simplified example of my questions
    1. Say, I have a 2 web forms (X,Y) that are part of a Task List 1. Group A has been given access to both web forms X and Y. Group A also has access to Task List 1. Group B has been given access to only web form X. Group B also has access to Task List 1. Now, everything is good for users belonging to Group A. However, users belonging Group B has a specific issue. They still see the "Web form Y" in the Task List Selection on the left. However they cant open the web form Y on the right side which is good.
    My question is, is there a way to prevent users from even seeing this "Web Form Y" in the selection list? The problem is they shouldnt even see that particular web form as a choice and moreover this web form that they havent been given access to becomes part of the Task List completion status, forcing them to click on "Complete" for an empty web form.
    Is there some setting that could prevent unassigned web forms based on security from showing up in the Task List for various groups (similar to security restricted members not showing up in web forms)? Or is creating several different Task List the only work around?
    2. I have started a WorkFlow via FILE->WORKFLOW->MANAGE PROCESS and defined required Scenario and Version members. This seems to work just fine for my created Task Lists with Web Forms. Is there another intermitent process to connect the WORKFLOW with the created Task Lists? Or does Hyperion Planning automatically assume the Task List belong to available WorkFlow?
    Another question I have is in the Task List creation menu, when creating an individual Task, there are several options for "Task Type", one of which is WorkFlow. What is the difference between this WorkFlow option and the WorkFlow under the File menu? Is is that the WorkFlow created as Task becomes part of a Task List? Is that the only difference, ie make WorkFlow creation part of Task List versus not part of a Task List?
    Appreciate all your inputs
    Thanks

    Hi,
    1. Probably you may try "Manage Security filters", but im not sure. If it doesnt work then no way other than creating two tasklists.
    2. FYI, workflow will not promote either tasklist nor the webform. it only promotes the "DATA". u shud be careful creating forms for different level users ex: A basic user entry form cant be created for Next level user say manager. he l want to see only his entity level data not the level 0 in our terms.
    3. File->Workflow : will be used to start the workflow by the administerator.
    Tasklist Type-> workflow : Will be used by the "users" to promote their subsequent data entered or loaded at their level
    Regards

Maybe you are looking for

  • Nikon Capture NX2 crashes when opening image

    Hi Experts, Nikon Capture NX 2 version 2.4.7 crashes when I attemt to open an image to edit on my iMac, 27-inch, Mid 2011, running OS X 10.9.3 (13D65). The same application versions runs sweetly on my MacBook Pro - I therefore suspect a problem somew

  • Limited drop down list in selection criteria in Crystal Report

    I have designed a Crystal Report to produce Item Labels using Crystal Reports for SAP Business One. The design has a Dynamic parameter for the selection of Item Code, linked to the OITM table in the database The customer database has 5000+ items. Whe

  • Will Photoshop Elements 12 Allow me to Format a Page with a Photo in a certain spot on the page?

    Hello, I am a new user and wondering if I bought the wrong software.  I bought Photoshop Elements 12.  I am trying to set up a page that is 8 1/2" by 11" with a 6" by 6" photo near the top with 1 1/4" blank/white page at the top, left, right and the

  • Email Bursting only Sending First Delivery

    We are using the standalone version of BIP (10.1.3.3.2), and when I try to test burst a report using email delivery BIP consistently sends the first delivery, but fails on each subsequent delivery. I suspect it has to do with my bursting SQL, but it'

  • Develop settings lost after re-importing folder of DNG files

    I've been using LR for several months, and - after getting accustomed to its peculiararities - love the program. This evening I re-imported a folder of DNG files that I had previously removed from LR - using the "add" import option. When going to the