TBB1 error if immediate settlement

I use TM01 create one fixed term deposit, then immdiately using TM06 settle, the contract activity is settle, then I immediately using
TBB1, but it display below error:
No flows exist for processing
Message no. T0917
how to resolve the issue? thanks

how to check there is payment transaction in TM03?
I don't have workflow for sandbox testing.
This is the first transaction to test
how to check mm1100 is posting related? in my spro, my mm1100 is assigned to transaction management in "assign update type to usage"
in assign update type to flow type, MM1100- is outflow.
in define flow type, I only see the description of MM1100, but no further detail of "posting relevant" check.

Similar Messages

  • Error while  Asset settlement

    as i have transferred last year internal order balance to the new internal order in this year.
    and when i was running th Ko88 for AUC to main asset settlemnt it gave me below error.
    <b>Error during acquisition transfer: Depr. area does not exist
    Message no. AAPO107
    Diagnosis
    According to the specifications for transfer variant 5, depreciation area 02 should be transferred gross. However, the recieving asset 1100 1000008-0 does not manage this depreciation area.
    Procedure
    Check the transfer variant and the receiving asset.</b>
    i am confused wht it is?
    please reply asap
    thanks

    lidia
    i have a below complex situation.
    user has posted value to IO and they settled it to AUC in last year but they did not settle it to Main asset.
    so anyting they have settled to last year to AUC, now it needs to be settled to Main asset but it is not allowing me to do that and shooting me error that ''First settle items from the previous year in the previous year"
    so how can i settle AUC amount to main asset which was settled in last year?
    please help

  • Error while doing settlement from WBS to P&L Account

    Hello
    I am trying to do a settlement from WBS to P&L Account(Expense account). In this case, "Dummy" Prof Ctr is getting derived from 0KE5 (we have maintained a dummy prof ctr). We have set the validations to disallow any postings/settlements to dummy prof ctr. Hence I am getting an error while doing settlement.
    Now I am maintaning a Prof ctr in my WBS master data. I am unable to understand why system is deriving dummy prof ctr and not the one maintained on WBS master data. The settlements are working fine when I do them against Balance sheet accounts and proper prof ctr is getting derived, which is being maintained on WBS master data. I am getting trouble only while doing settlement to my P&lL i.e. expense accounts.
    can anyone throw some light on this?
    Thks
    Sarang

    Dear Sarang,
    You have maintained profit center in WBS master which is not updated at the time settlement to FI that what makes you worried. If you are making FI posting and give WBS as an additional account assignment then Profit center in WBS master will be updated. Here in settlement WBS is sender not the receiver so that profit center will not be updated. In settlement receiver (any) is debited and sender (WBS) is credited so this credit entry will be updated in profit center.
    To your second query that when you carry out settlement to balance sheet account right profit center is updated then please make sure, that balance sheet account is maintained in 3KEH with profit center or OKB9.
    Your P&L account (expense) receives dummy profit center because it is not able to find cost center which can fetch profit center from the master. So, if you can afford, maintain that cost elements (expense account) with profit center in OKB9.
    might help you..........................................................

  • Account Determination Error for Rebate Settlements

    I have question on Account Determination for rebates
    Here are the entries that I have made in VKOA
    ERB - R201051
    ERU - R201051 / R120201
    ERS - R120201
    ERL - R559001
    I am able to accrue the money to right accounts, but I am getting an Account Determination error when processing rebate settlements
    Any input on this would be really helpful.
    Thank you!

    Hi Shailesh
    When you are getting the error in rebate settlements it means you carefully check
    all the combinations for VKOA settings. Whether the Account assignment
    group in all the Materials used in settlement document along with the customer account assignment group
    is maintained or not. Also check in the pricing procedure the account key used.
    For all these account key the settings are made in VKOA or not. Hope it will help you
    Thanks
    sushant

  • Error for ERS settlement of frieght POs

    Hello All
    We have an issue where user is trying to settle Automated Freight POs with search criteria as (company code US20) and GR posting date (From- Blank/ To - till date) through MRRL transaction.
    Errors:
    1.Posting date is initial for few of them
    2."External system returned different number of lines than received" for remaining ones.
    I tried the same in testing client by settling them in batches say for a month and then it did not give an error and were settled as desired.
    Could anyone please help me on both errors. There is no long text available for the same.
    Best Regards

    can anyone please help or share knowledge on above errors?

  • Error in consignment settlement

    Hi,
    I am getting the error for consignment settlement as follows:
    Document 5100000007 MUL does not exist in fiscal year 2009
    MUL is company code.
    Pls guide.
    Regards.

    Hi,
    Go to OMBT, check whether you have maintain number range as year Specific or maintain year 9999.
    if you have maintain year specific then maintain for 2009.
    but basically it not year specific as i think then go to MB03 and check ur doument for which year it is created.
    Now, may be you have posted that stock before april. then change to 2008 and go the settlement.c
    if this is accounting document then go to FBN1 and maintain year specific number range
    Regards,
    Pardeep malik

  • Error while attaching settlement rule for AuC asset

    Getting error "The share to be settled in rule 001 is not unique"  "Enter a unique number (001) (view: Actual settlement) "  when trying to attach a settlement receiver in transaction AIAB  - where to view the duplication of rules, and where to delete the rules ?

    Hello
    Check the transfer variant / receiving asset / transaction type.
    Check all rules again.
    Reg

  • Error While doing settlement for Sale Order in MTO scenario

    Hi,
    In MTO Scenario - when i try to settle Sales Order i am getting the below error. Even i have maintained the settlement cost element for PSG in allocation structure A1.
    Kindly help me
    Define a settlement cost element for receiver type PSG
    Message no. KD506
    Diagnosis
    In allocation structure A1 (controlling area BP01), you did not define which cost element should be used when settling costs/revenues of the sender. Nor did you define receiver type PSG.
    Procedure
    Assign a different allocation structure to the settlement sender (-> Master data -> Settlement rule -> Goto -> Settlement parameters), or maintain allocation structure A1.
    Thanks
    Kishore

    Hi
    Please check your allocation structure , it looks that settlement cost element that you have assigned in the allocation strcuture is not having correct cost element category.
    Go to Allocation structure configuration (OKO6) and check your allocation structure A1.
    check settlement cost elements is it by cost element or you have assigned separate cost element for settlement.
    if you wants to settle with same cost element select By cost element.
    if you wants to settle with different cost element create a cost element and assign settlement cost element.
    http://help.sap.com/saphelp_di46c2/helpdata/EN/9d/1f4b6e5733d1118b3f0060b03ca329/frameset.htm
    hope this helps you.
    Regards

  • AIAB Distribution Rule for Settlement Error, "Asset cannot settle to itself"

    Hello Everyone,
    I have a customer who is getting the "asset cannot settle to itself" error when trying to set up a distribution rule to settle the remaining items of a Line Item Managed AUC to multiple Assets.  The Asset numbers and AUC number do NOT match.  Here are the steps that have been followed.
    Created an Internal Order, #2000####. (1998)
    Created the AuC asset. #600####(2011)
    Created Settlement Rule (Sender – Internal Order, Receiver - AUC) (2011
    Settle Internal Order to AUC.
    Create Assets. (2014). #900###1 - #900##99 etc.
    Create Settlement Rule (Sender – AUC, Receiver – Multiple Assets)  This is where my customer gets the error. 
    They were able to settle other items from this AuC to Assets last October.  It seems very strange to me that the Internal Order was created in 1998 and the AUC was created in 2011 but as I said, this was working at least last October and possibly in March of this year. 
    Thanks for you help.
    Rick 

    Hello Stacy, 
     Sorry I didn't get back to you sooner but I just had a major implementation go live on the 2nd so I've been rather busy.  I opened a ticket with SAP on this and this is what was found.   
    Joachim from SAP Support explained that the AUC had been settled to itself last year, that is the posting the program was throwing the error on.  My assumption is that we were able to settle AUC's to themselves prior to our March upgrade.  This explains the problem and we have a resolution.  We are transferring AUCs that this has happened with to a new AUC and then settling the new AUC as usual.  
    I believe SAP fixed a bug that had previously allowed AUC's to settle to themselves in one of the updates but because this AUC had a record from the past where it settled to itself the program was validating old line items and that is why it throws the error.   
    Ramnik's suggestion was another option but we didn't want to change the message to a warning because we didn't want anyone to settle an asset to itself.
    Hope this helps.
    Thanks,
    Rick

  • Error while AUC settlement

    Hi
    This is with reference to the settlement of assets under construction to final asset.
    We have maintained the settlement rule properly and while settlement thru T Code AIBU, getting following error:-
    Transaction type 345 not possible (posting to affiliated company)
    Message no. AA390
    Diagnosis
    For the current document, you specified either implicitly (via the customer/vendor), or explicitly (with a manual entry), that this posting is to an affiliated company. In this case, Asset Accounting requires you to use special transaction types. This enables the system to separately identify such transactions. Procedure Check the line items that you have already entered, and the transaction type you entered.
    We have tried to resolve the problem thru SAP note no 143410 but not able to settle the AUC.
    Members are requested to look into it and guide us for step by step correction.
    Regards,
    DD

    Hi Paul
    Thanks for reply. yes I start the resolve the problem with note no 143410. But did not got result. then only I start looking other solution.
    I wrote to SAP and got following reply:-
    VBUND is either filled in the master data of account to be posted or it is filled in a substition or an exit. Please check this two cases.
    In transaction AIBU the VBUND information can´t be filled. The transaction type 345 therefore is delivered in Table TABW without VBUND info (XAVERB / XABERBN) so error AA390 is correctly displayed
    when field VBUND is filled.
    The only exception in transaction AIBU is explained in note 718533.
    The logic of a normal settlement from AUC to a normal fixed assets is always without a trading partner. Therefore the message appears in AIBU.
    We hope this helps you. For more information please contact your Local SAP Consultant. Kindly close the message at your comfort.
    But from above reply I am not able to conclude the solution. If you can understand the same pl convey to me
    Request you and other member also to help me the resolve the problem.
    Regards
    DD

  • Error when reversing settlement back to Auc - Balance in transaction curren

    Hi,
    We get following error when reversing a settlement from asset back to Auc (using AIST):
    FI/CO interface : Balance in transaction currency
    Message No. RW022
    This error only occurs when we settle a portion of the amount sitting in AuC and not the full amount. (When we settle full amount in AuC to final asset we can reverse no problem).
    When we do a partial settlement to final asset, SAP creates a document and in that document it posts a debit and credit for the unsettled amount e.g. 50k in Auc and we settle 45k to final asset with 5k remaining in Auc -  the document looks as follows
    AuC     5,000.00-
    Auc      5,000.00
    AuC    45,000.00
    Final Asset    25,000.00-
    Final Asset    20,000.00-
    The 5k above is the unsettled amount still sitting in AuC
    When we try reverse we get error message RW022 and detail is as follows:
        The balances in transaction currency must be zero for each logical
        transaction when transferring to the FI/CO interface. A balance of "
        5,000.00-" "CAD" was determined for the logical transaction "AZVZ".
    System Response
        The FI/CO interface does not process any transactions which have a
        balance in transaction currency other than zero.
    Procedure
        This is a system error of the calling application.
    Note:  We do use line item settlement in asset classes
    Much appreciate any help..

    Hello,
    You may need to check SAP notes below regarding this issue:
    1523814   Transaction AIST ends with error RW 022
    1514384   Error message RW 022 after Note 1444750 implem
    1444750   Postings without transaction currency
    I hope it helps.

  • Error while creating settlement rule

    We are trying to create a Settlement Rule for a Production Order for material 900010001 with following details:
    Cat:MAT
    Settlement Receiver:900010001
    % :100
    Settlement Type:FUL
    System is giving an error msg. no.KD063 'Distribution rule for an Article can only be created automatically'.
    Can anyone help us in analysing the same.
    We want that while creating a Production Order Settlement Rule shall be created by default for Cat:MAT & Settlement Receiver:900010001 (Material of Production Order).Can anyone guide us how the same can be achieved.
    With Rgds.,
    Rakesh Kumar

    Hi..
    please try this....Goto KSR2_VBP.
    THere are two strategies.. 01 and 02.
    01 for manual creation of settlement rules
    02 for auto creation..
    first check whether 01 and 02 are in your plant.
    Sales and distrib....basic functions......auto gen. of settlement rules.......
    here you ll find two activities.
    (1)maintaining the settlement strategies and
    (2)activating one among them.
    If you activate 02, your problem will be solved..
    Also check this..
    http://help.sap.com/erp2005_ehp_03/helpdata/EN/a9/ab777d414111d182b10000e829fbfe/frameset.htm
    The settlement profile is to be defined for thee particular Order Type to generate automatically.
    Define Production Order Type in OPJH
    Under Cost controlling check the settlement profile .
    If not create the same in OPJH.
    Settlement Profile: Create settlement profile - SPRO > Controlling > Product Cost Controlling > Product cost by Order > Period End Closing > Settlement > Create Settlement Profile
    Enter Settlement profile from OPJH or Choose one for production order
    and configure Settlement profile. Indicators
    with wishes
    karthick.

  • Error while doing settlement

    Hi,
    I am getting the below error while doing the settelment
    Program Errors: no COBRB found 001
    Kindly advice me
    Thanks
    Supriya

    Hi Supriya,
    COBRB is table for Settlement Rules for Order Settlement. Debug if the Table itself is missing or table contains no entries to be picked up for settlement...
    Pls revert back with update...
    Srikanth Munnaluri

  • Error during automatic settlement rule creation

    Hi Gurus,
    For the investment project, I maintained as follows, first level WBSE - Only planning element - no settlement. 2nd level WBSE - settled to AuCs. For level three & below settled to Superior WBSE. I had created the Settlement type with '5'. When I am executing CJB2 to create the Settlement rules automatically, I am getting the following error message for level 3 & below WBSE.
    Enter a valid value for the settlement type :
    Message no. KD199
    Diagnosis
    The system found a settlement type settlement type in the settlement rule which either does not exist or is unsuitable for the sender.
    Procedure
    If possible, enter a suitable settlement rule.  Remember that the rules for preliminary settlement ("PRE") of capital investment measures are different from those for period settlement ("PER") of other settlement senders.  Periodic settlement only makes sense for capital investment measures.  They must not have any "PER" rules.
    To enter an investment profile (in the control data for an order or WBS element) or to remove it.  However, first delete the PER or PRE rules (in the settlement rule) and er zu in internal orders, you can first change the investment profile and then adapt the rules before you save.
    Error(s) during creation of settlement rule :
    Message no. ORB509
    Diagnosis
    Errors occurred during the check on settlement receivers.
    System Response
    Processing stopped.
    Procedure
    Check whether the:
    Specific receiver Account assignment e actually exists
    Settlement profile Z7 permits account assignment to the specified receiver
    can anyone help me where I am making mistake or what is the procedure to be adopted for such scenario.
    somebody else also had discussed the same issue in this forum but there is no answer for this.
    thanks in advance
    Vinodh

    hi Sreenivas,
    Thanks for your reply,
    I tried this, system is giving the following error now
    Could not find a superior WBS element for WBS element
    Message no. CJ115
    Diagnosis
    The system could not find a superior element for a WBS element while it was executing the function 'Derive structure'
    System Response
    Processing stopped.
    What  could be the reason ?
    thanks in advance,
    Vinodh

  • Balance in transaction currency error for AUC settlement

    I was trying to perform AUC settlement and hit Balance in transaction currency error. When i open up the line items I found that there are 2 sets (duplicate) of data posted to the depreciation area. The second set is with value 0 except depreciation area 01 posted as 100000EUR.
    so now i have 2 line with 100000EUR for depreciation area 01. I guess this is the main culprit of generating the error Balance in transaction currency.
    I'd glad if someone can tell me why they are 2 sets of data generated in line items? I only post the vendor invoice against the AUC once.
    Or perhaps am I heading to the right way in identifying the root cause of this issue?
    This is part of the AC010 course part of asset accounting that teaching on AUC aasets.
    Any positive reply is welcomed!
    I attached the line item image. Please note that there are some lines hidden for dep area beyond 03. and all are with amount 0.
    [Line Item Image|http://www.bnl.com.my/photos/aucsettle.jpg]
    Edited by: Kam Weng Leong on Dec 13, 2009 5:00 AM

    I was trying to perform AUC settlement and hit Balance in transaction currency error. When i open up the line items I found that there are 2 sets (duplicate) of data posted to the depreciation area. The second set is with value 0 except depreciation area 01 posted as 100000EUR.
    so now i have 2 line with 100000EUR for depreciation area 01. I guess this is the main culprit of generating the error Balance in transaction currency.
    I'd glad if someone can tell me why they are 2 sets of data generated in line items? I only post the vendor invoice against the AUC once.
    Or perhaps am I heading to the right way in identifying the root cause of this issue?
    This is part of the AC010 course part of asset accounting that teaching on AUC aasets.
    Any positive reply is welcomed!
    I attached the line item image. Please note that there are some lines hidden for dep area beyond 03. and all are with amount 0.
    [Line Item Image|http://www.bnl.com.my/photos/aucsettle.jpg]
    Edited by: Kam Weng Leong on Dec 13, 2009 5:00 AM

Maybe you are looking for

  • Shuffle loading problem

    can anyone help me? i tunes and my shuffle were working fine up until today, but now when i try to load music from i tunes onto my shuffle it comes up with a message saying "cannot read or write to disk" has anybody got an answer to this????????? I h

  • Volume control buttons not working with new usb keyboard

    Hi all, I recently replaced the bluetooth keyboard that came with my iMac with the usb keyboard (the long aluminium one, with the number block). Typing is no problem, but the volume control keys dont seem to work with this keyboard as I was used to w

  • Server Error in '/' Application - The resource cannot be found

    Using VS 2008 with Framework 3.5, I built a web-service that runs perfectly on the development PC.  When I build and run the web service, it runs in a virtual port as "ASP.Net Development Server Port 49259".  All the methods will invoke no problem. 

  • After F110 run in the payment file the account holder details are missed

    Hai After running the F110 pament run, In the payment file the ACCOUNT HOLDER name is missing . The ACCOUNT HOLDER details must picked up from VENDOR MASTER. This  is happening when ACCOUNT HOLDER and VENDOR  are different. When ACCOUNT HOLDER and VE

  • Bootcamp Issues: XP Frozen with New Hardware Found screen

    I've installed bootcamp on an Imac with MacOS 10.6.4. This went fine. Then I installed XP. This went fine as well. Then I inserted a Mac OX X Snow Leopard 10.6.4 disk to install the Boot Camp Drivers for Windows. But XP is just frozen with the "Found