Hello All,
We are now going to upgrade from SRM 5.0 to SRM 7.0. I saw from SAP help documentations says "Team purchasing is not available with the application-controlled workflow framework". Further I saw few of the SDN posting says it can work for application controlled workflow also. And I am also have a gut feel that it should work.
Can you please confirm. and will appreciate for your quick response.
Points will be rewared.
Thanks and Regards,
Ram

Hello Ramesh,
I would believe what SAP is saying, they normally don't lie on SAP help or SRM210 ;-). I do know there is a note available that has downported the teampurchasing functionallity for SRM 5.0 system. I don't know whether that solution could be applied to SRM 7.0 systems aswell, thus enabling team purchasing functionallity for application controlled workflow in SRM 7.
Note: 1152797 (it only applies to SRM_SERVER 5.5)
Since SRM 7.0 is set-up with application controlled workflow as standard you could give it a try and see whether team purchasing functionality is available. One thing you do need to expect is that Team Purchasing related things wont be available in defining your application-controlled WF (this might give problems?). In addition you might want to give upgrade/migrating your SC BUS2121 workflow to process controlled workflow the highest WF-upgrade priority. SRM 7 has the ability to change AC/PC WF per Business Object (Note: You can not change back to AC once PC has been activated).
Kind regards,
Tim
Edited by: T. Schuffelen on Apr 14, 2010 5:45 PM
Edited by: T. Schuffelen on Apr 14, 2010 5:50 PM

Similar Messages

  • Issue in Process Controlled workflow for Shopping cart in Quality system.

    Hello All,
    I ahve configured a Process controlled workflow in SRM 7.0  with custom resolver, and I am facing an issue taht the Workflow works well in Development but in Quality the approvers are dropped after SC is ordered in Quality system.
    The SC Workflow drops the approvers picked up from the Interface  method /SAPSRM/IF_EX_WF_RESP_RESOLVERGET_AREA_TO_ITEM_MAP and IF_EX_WF_RESP_RESOLVERGET_APPROVERS_BY_AREA_GUID of BADI /SAPSRM/BD_WF_RESP_RESOLVER. The approvers can be seen in the shopping cart Approval preview Tab until the SC is ordered.
    I have compared the OSS notes relevant for Workflow, all of them have been transported, Also I compared and checked general Workflow settings, BRF Config and  Process level  settings in Dev and Quality, everything is same.
    Also while debugging; the approvers can be seen in the decision set table in the create_process_forecast method of class /SAPSRM/CL_WF_PROCESS_MANAGER.
    Kindly let me know what else i can check to find the root cause.
    Thank you in advance for help!
    Regards
    Prasuna.

    Hello Vinita;
    Thanks for the input and sorry for the not so "ASAP" reply;
    From what I'm seeing in from your 2 screenshot, i strongly believe that the problem is even before the Z implementation /SAPSRM/IF_EX_WF_RESP_RESOLVER~GET_APPROVERS_BY_AREA_GUID (in which the FM i ZSRM_GET_USER_FROM_PGRP is called. I think the problem could be in the process level determination  ZSRM_WF_BRF_0EXP000_SC_APP100. Let me explain:
    In your  cases where not buyer is determined,  in the approval tab there is not even a process level for buyer approval. If the problem were indeed in the implementation  /SAPSRM/IF_EX_WF_RESP_RESOLVER~GET_APPROVERS_BY_AREA_GUID  then the process level would be there, but the system will display, instead of the name of the buyer(if the buyer determination fails) a red label with the message:  "With the strategy "Buyer determination" an approver could not be determined (or something like that..please check the image at the end of the text)".
    I can propose a way to discard this: Implement the method /SAPSRM/IF_EX_WF_RESP_RESOLVER~GET_FALLBACK_AGENTS of class ZCL_BADI_SC_WC (in case you didn't know, in this method you can specify an "default" approver in case that the determination of approver in GET_APPROVERS_BY_AREA_GUID fails). The idea is to specify an default approval and see how it behaves:
    If the user you indicated in the method GET_FALLBACK_AGENTS appears as approver, then yes, the problem is arises from implementation GET_APPROVERS_BY_AREA_GUID, in which case it could be a data problem (peharps in pposa_bbp?). You could also check in TX SU53 with the users with this problem to see if there's a missing authorization objetc.
    If, in the other hand, the "default" approver is not shown, it means that the process level buyer determination is not even called, so you should check in more detail ZSRM_WF_BRF_0EXP000_SC_APP100 and /SAPSRM/CL_WF_PROCESS_MANAGER > Determine process restart –method ----- (i have never used this method, so i could not tell if  it could be the source of the problem).
    Also, you could implement the method GET_FALLBACK_AGENTS in this way so the default approver would be the WF administrator indicated in the customizing (or you could just append directly any user you want):
    METHOD /SAPSRM/IF_EX_WF_RESP_RESOLVER~GET_FALLBACK_AGENTS.
       DATA: lv_admin_expr TYPE swd_shead-admin_expr,
             lv_admin      TYPE swd_shead-wfi_admin,
             lv_admin_type TYPE sy-input,
             ls_agent      TYPE  /sapsrm/s_wf_approver.
       CALL FUNCTION 'SWD_WF_DEFINITION_ADMIN_GET'
         IMPORTING
           default_admin_expr = lv_admin_expr
           default_admin      = lv_admin
           default_admin_type = lv_admin_type.
       ls_agent-approver_id = lv_admin.
       APPEND ls_agent TO rt_agent.
    ENDMETHOD.
    Error of agent determination:
    Please let me know the result of the test with the implementation of method GET_FALLBACK_AGENT. By doing this we could ensure if really the problem is in method GET_APPROVERS_BY_AREA_GUID or before.  I just made the test in our system and I'm almost sure that you wont get the default approver, but i could be wrong. 
    Any question please let me know.
    Best regards
    Cristian R.

  • Back and Forth Logic in process-controlled (BRF) workflows in SRM 7.0

    Hi all,
    I am using the process-controlled workflow in SRM 7.0.
    The approval itself works ok, but now I am trying to set up the back-and-forth functionality (similar to how it worked for the Badi in SRM 5.0) as default:
    This is what happens:
    Requester creates shopping cart.
    Shopping cart goes for approval.
    Approver rejects SC.
    Back at the requester the SC can only be displayed, but not changed.
    As far as I can tell this happens for any kind of decision set (as long as all items are rejected).
    This is what I am trying to set up.:
    Once the SC is back at the requester, he can either accept the rejection OR change the SC and 're-order' it ie send it back to approver again.
    I know if the requester checks the flag 'Work Item to Requester at Process End' this can be done, but I need the system to have this functionality automatically without setting a flag manually.
    I really appreciate any suggestions on this issue.
    Cheers
    Ulrike

    Dear Masa,
    thanks for your helpful answer. I have an better idea now, but I am still not quite able to set it up.
    I have applied note 1296209.
    When i tried to set up this step I did the following:
    level type of that step I used 'Approval with completion'.
    Created Expression of type SAP Formula Interpreter, with return type Boolean, and use formula:
    0V_WF_CURRENT_DECISI = 'REJECTED'
    linked the evaluation id to above expression.
    Task id for the step is: 40007994 - Accept Decision / Adjust Document
    When i do this and create a SC, my system dumps after clicking on describe requirement::
      The following error text was processed in the system SR7 :  The method could not be found at dynamic call.
    The error occurred on the application server SAP01_SR7_07 and in the work process 1 .
    The termination type was: RABAX_STATE
    The ABAP call stack was:
          Method: CALL_RFW of program /SAPSRM/CL_WF_RULE_CONTEXT====CP
          Function: /SAPSRM/WF_BRF_0EXP000 of program /SAPSRM/SAPLWF_BRF_DATA
          Method: PROCESS_SPECIFIC of program CL_CALL_FUNC_METHOD_BRF=======CP
          Method: IF_RULE_COMPONENT_BRF~PROCESS of program CL_EXPRESSION_BASE_BRF========CP
          Method: GET_RESULT of program CL_EXPRESSION_POOL_BRF========CP
          Method: IF_EXPRESSION_BRF~GET_SUBEXPRESSION of program CL_EXPRESSION_BASE_BRF========CP
          Method: IF_FOEV_CONNECTOR~EVALUATE of program CL_FORMULA_BRF================CP
          Method: EVALUATE of program CL_FOEV_FORMULA===============CP
          Method: EVALUATE of program CL_FOEV_FORMULA===============CP
          Method: EVALUATE of program CL_FOEV_FORMULA===============CP
    What I don't understand about your explanation is what you mean by "Acceptance by Contact person". I don't have that option anywhere in my BRF? Is that supposed to show up under Resp. Resolver Name (like RR_MANAGER)?
    Also where did you add that step in Process level configuration? I have 2 approval steps (just approval, without completion) and then i wanted to enter this step after those levels before the automatic system decision.  But i wasn't able as the system doesn't allow you to add a completion step after a 'normal' approval step.
    Cheers for your help
    Ulrike

  • Process Controlled Workflow - Process Schemas

    Hi
    I am configuring Process Controlled Workflow in SRM 7.0 for shopping carts. As per one of the guidance documents, I activated the BC Sets for the shopping cart in order to pull in all the component parts. As none of the three standard Process Schemas created meet my requirements I am going to create my own Schema. Please could someone explain to me how I can ensure my schema will get activated, and not say  -  /SAPSRM/C_SC_600_001_SP04?
    Many Thanks
    Claire

    Hi,
    You can create custom schema definition. If you need only 1 schema, you can use constant type BRF expression.
    1. Create BRF event and Expression in transaction BRF
        BRF Event (ZEVALUATION1)
        BRF Expression (ZEXP1)  = Constant Schema name (ZSCHEMA1)
    2. Link the event and expression
    3. Customize Define Process Level
        Process Schema Evaluation = BRF Event (ZEVALUATION1)
                                                     - linked to BRF Expression (ZEXP1)  = Constant Schema name (ZSCHEMA1)
        Process Schema Definition (ZSCHEMA1)
          - based on your requirements
    Regards,
    Masa

  • Parallel workflow in Process controlled workflow

    Dear experts,
    could you please answer -
    is it possible to use parallel worklow in the process controlled workflow?
    for example, there is a requirement that all the department managers should approve the RFx document or contract.
    Is it possible to simulate this process using the process controlled workflow in SRM 7.0?
    It seems, that in the standard it is possible only via sequential approval - i.e. the first manager approves
    the document, then it goes to the second etc.
    Or all the managers receive the work item, but only one manager in fact approves it.
    Both variants are not suitable.
    Maybe there is another way to simulate the parallel worklow process?
    There is an option called decision sets, but it can be used for shopping cart only.
    Thanks a lot in advance,
    Andrey Averin.

    Hi,
       Yes- This is possible through Process controlled workflow. I am doing a smiler kind of workflow development. like category approvers .. Category approval will split by category...but you have to build the logic such a way that read all the items and send to all the approvers.. But now i have noticed that even through all approvers will receive parallel workitem but Approver A can't open his/her workitem if Approver B is in the process of approve/reject the workitem( Meaning when he double click the workitem in detail) then Approver A will receive a Error pop up message saying that Approver B is working on this document.
    John.

  • Dump on screen when configuring Process controlled workflow

    Hi Experts,
    I am facing 1 problem in SAP SRM 7 ehp1.  I am configuring Process controlled workflow. Previous workflow settings was Application controlled workflow as its been upgraded from SRM 5. If i run a RFX (BUS2200) cycle in application controlled workflow environment, it works flawlessly.
    But when i change my workflow framework to process controlled workflow for all Business Objects. I face a dump when I am creating an RFX. The dump on the portal is:
    http://dl3803.ltisap.com:8040/sap/bc/webdynpro/sapsrm/wda_l_fpm_oif
    DATREF_NOT_ASSIGNED
    No access possible via the 'NULL' data reference
    Method: PARTICIPATING_IN_ACTIVE_WF of program /SAPSRM/CL_PDO_DYN_MDA_WF_ADJ=CP
    Method: EDIT_DURING_WORKFLOW of program /SAPSRM/CL_PDO_DYN_MDA_WF_ADJ=CP
    Method: /SAPSRM/IF_PDO_META_CONF_BO~GET_BO_HDR_ACTION_METADATA of program /SAPSRM/CL_PDO_META_CONF_PROV=CP
    Method: /SAPSRM/IF_PDO_META_CONSUMER~GET_ACTION_METADATA of program /SAPSRM/CL_PDO_META_BO_RFQ====CP
    Method: /SAPSRM/IF_PDO_META_CONSUMER~GET_ACTION_METADATA of program /SAPSRM/CL_PDO_META_BO_RFQ_ADVCP
    Method: /SAPSRM/IF_PDO_META_CONSUMER~GET_ACTION_METADATA of program /SAPSRM/CL_PDO_META_HANDLER===CP
    Method: UPDATE_ACTIONS of program /SAPSRM/CL_CH_WD_MAP_IDENT====CP
    Method: /SAPSRM/IF_CLL_MAPPER~REFRESH of program /SAPSRM/CL_CH_WD_MAP_IDENT====CP
    Method: /SAPSRM/IF_CLL_MAPPER~REFRESH of program /SAPSRM/CL_CH_WD_IDEN_MAP_RFQ=CP
    Method: OVERRIDE_LEAVE_INIT_SCREEN of program /SAPSRM/CL_FPM_OVRIDE_OIF=====CP
    & when i check in st22. I get the dump as:
    Category               ABAP Programming Error
    Runtime Errors         DATREF_NOT_ASSIGNED
    ABAP Program           /SAPSRM/CL_PDO_DYN_MDA_WF_ADJ=CP
    Application Component  SRM-EBP-PD
    Date and Time          17.12.2011 15:46:56
    and get dump at:
      1 method PARTICIPATING_IN_ACTIVE_WF.
      2   " this method returns ABAP_TRUE if the logon user has an active work item,
      3   " i.e. he participates in an active approval workflow process.
      4
      5   DATA lv_curr_workitem_id    TYPE /sapsrm/wf_workitem_id.
      6   DATA lr_process_info        TYPE ref to /SAPSRM/S_PDO_WF_PROCESS_INFO.
      7
      8   " the default:
      9   rv_participates_in_active_wf = abap_false.
    10
    11   " The scenario is not valid for application-controlled workflow:
    12   " Any agents who may edit the document (approver and requester)
    13   " enter "Edit" mode right-away. No special handling possible.
    14   lr_process_info = io_apf_md_context->get_process_info_ref( ).
    >>>   IF lr_process_info->wf_version NE /sapsrm/if_wf_process_c=>GC_APF_VERSION_0200.
    16     return.
    17   endif.
    18
    19   " check if a valid workitem exists
    20   lv_curr_workitem_id = io_apf_md_context->get_workitem_id( ).
    21   IF lv_curr_workitem_id IS INITIAL.
    22     RETURN.
    23   ENDIF.
    the only configuration I change in the system is I changed the workflow framework to process controlled workflow.
    Kindly help.
    Thanks
    Anand

    Hello Anand,
    As per standard SAP recommendations the application-controlled workflow framework is only intended to be used if you are upgrading from SAP SRM 5.0 or earlier and you need to continue using your existing work-flows.
    The default workflow framework setting is the process-controlled workflow from SRM 6.0 on-wards and the user will be provided a option to switch to the application-controlled workflow framework.  The option to switch to process-controlled workflows is available only after you have once switched to application-controlled work flows but there will be a big caution that " If you switch from the application-controlled workflow framework to the process-controlled workflow framework; once a process-controlled workflow has been run, it is not supported that you switch back to application-controlled work-flows".
    As per the details given i got a feel that we have tried executing the scenario by switching between application and process controlled workflow and hence the system have become inconsistent and its dumping.
    I suggest you to raise a OSS ticket to SAP to resolve the issue.
    Best Regards,
    Rahul

  • Process controlled workflow - Reject SC approval

    Experts,
    I configured process controlled workflow in SRM 7. My approval process is working fine but i need to send a notification e-mail when the approver rejects the SC approval. The requisitioner will receive this email saying that the SC was rejected.
    Is there any chance to do this with configuration? Do you have to use a new expression linked to an event to perform this ?
    Thanks for your help,
    Best regards,
    Mário

    Hello Mario,
    See IMG path below:
    SAP Implementation Guide -> SAP Supplier Relationship Management -> SRM Server -> Cross-Application Basic Settings -> Business Workflow -> Process-Controlled Workflow -> Business Process Configuration -> Define Recipient of Notifications
    For scenario "Approve Shopping Cart", you can define user role which will receive notification in the event of "Rejection".
    Regards.
    Laurent.

  • Approver not determined process controlled workflow in SAP SRM 7.0

    Hello all,
    I have setup process controlled workflow in SAP SRM 7.0 EHP3 for shopping cart approval.
    I have 4 approval levels.
    I have used item-based Decision for entire document because for some items i want system approval.
    In implementation of BADI /SAPSRM/BD_WF_RESP_RESOLVER, in the method /SAPSRM/IF_EX_WF_RESP_RESOLVER~GET_AREA_TO_ITEM_MAP, i am skipping the items for which i want system approval.
    Also in method /SAPSRM/IF_EX_WF_RESP_RESOLVER~GET_APPROVERS_BY_AREA_GUID of BADI implementation class, i am keeping the approver table empty for the step which i want system approval.
    For example i have 1 item in shopping cart and for 1st step, based on some accouting criteria, i want system approval for 1st level and the workitem should go directly to 2 approval step when shopping cart is ordered. This is not happening.
    But if i have multiple items, and one item should have system approval based on some criteria and the 1st approval level should be system approval and other item should go to the 1st approver. This is happening and showing 'system' approver for item1 and 'appr_xyz' for item 2.
    For shopping cart having only 1 item, If i approve the shopping cart in this state only, it doesn't go to any approver and is not usable.
    am i missing anything in BADI /SAPSRM/BD_WF_RESP_RESOLVER??
    Please let me know.
    Regards,
    Yayati Ekbote

    Hi Adrian,
    Yes it is possible to display custom workflows in the Universal Worklist,  However, I am not sure what you are trying to do with a routing table.  If the workitems are of type decision, you can use UserDecisionHandler (action handler) configured in the XML file to use the Approve/Reject functionality - we are talking about webflow connector here correct?  R/3 connector?
    Regards,
    Beth Maben
    EP - Senior Support Consultant II
    SAP Active Global Support
    Global Support Centre Ireland
    **SDN Forum Moderator:
    SAP Enterprise Portal: Application Integration
    **SDN Universal Worklist Wiki:
    http://wiki.sdn.sap.com/wiki/x/ehU

  • How to trigger standard task manually in Process controlled workflow?

    Hi All,
    I would like to trigger a task mannually in BRF, process controlled workflow. My requirement is to send an approval notification to the approvers at the current approval level, at any instance by the requestor of the shopping cart. In that case, will it be possible to trigger the standard task 40007953 (SRM Shopping Cart Approval (1)) with the workitem of Shopping cart under consideration?
    I have tried searching for the same in SDN and other forums but most of the information was regarding application controlled workflows. None of those function modules seems to be working in PCW.
    Any pointers on how to trigger a standard task (using FM or code) in BRF(process controlled workflow) environment is also highly appreciated.
    Thanks,
    S.H@ri

    Hi,
    Use this FM [SAP_WAPI_START_WORKFLOW|http://www.sdn.sap.com/irj/scn/index?rid=/library/uuid/bb9100f8-0c01-0010-ac8e-e017351f3fc1].
    Regards,
    Surjith

  • Custom Expression creation in Process controlled  workflow

    Hi All,
    I am working on SRM 7.0 and utilizing process controlled workflow to model my approval workflow scenario. Below are the steps that i have done but still i have not got the desired result. May be i am missing something which the forum members can let me know.
    step 1: i have copied the standard function module  /SAPSRM/WF_BRF_0EXP001 and made chnages in the code  based on the logic to populate the ev_value.
    basically in the coding it is done this way.
    initialize
    EV_TYPE = 'B'.
      EV_LENGTH = 1.
      CLEAR EV_CURRENCY.
      EV_OUTPUT_LENGTH = 1.
      EV_DECIMALS = 0.
      EV_VALUE = ABAP_FALSE. " no processing
      EV_DATA_MISSING = 'X'.
    get event object
      LO_WF_BRF_EVENT ?= IO_EVENT.
    get Context Container from BRF event
      LO_CONTEXT_PROVIDER = LO_WF_BRF_EVENT->GET_CONTEXT_PROVIDER( ).
      CALL METHOD LO_CONTEXT_PROVIDER->GET_DOCUMENT
        IMPORTING
          EV_DOCUMENT_GUID = LV_DOCUMENT_GUID
          EV_DOCUMENT_TYPE = LV_DOCUMENT_TYPE.
      CASE LV_DOCUMENT_TYPE.
        WHEN 'BUS2121'.
    Get shopping cart instance
          LO_WF_PDO_SC ?= /SAPSRM/CL_WF_PDO_IMPL_FACTORY=>GET_INSTANCE(
            IV_DOCUMENT_GUID = LV_DOCUMENT_GUID
            IV_DOCUMENT_TYPE = LV_DOCUMENT_TYPE
            IV_PDO_EVENT_HANDLING = ABAP_FALSE
    custom logic  with the GUID of the shopping cart then populate  value accordingly
            EV_VALUE = ABAP_TRUE.
            CLEAR EV_DATA_MISSING.
    step 2: create an event ZEV_001 linked to expresion ZEX_001.
    step 3: expression ZEX_001 is of type 0FB001. and the xpression is as below.
      ZEX_002 = OB_WF_TRUE.
    step 4: ZEX_002 is of type 0CF001 and output result type is B. the attached function module is the one created above by copying /SAPSRM/WF_BRF_0EXP001
    no parameters provided .
    step 5: the process step level config completed.
    now when i am creating shopping cart  go for approval preview its gives an exception occured  error . i cant see any dump in the system. however  if  in the custom fucnction module code if i do not clear the  EV_DATA_MISSING. then i d o not get the error but my steps is not executed. Inslg1 log i see the  process level executed  but return as space.
    as per other post in the forum we have to clear EV_DATA_MISSING but that casuing  exception eror for me. in the dlg1 log howere the steps  expressin i can see executed  with return =X.
    hope i am made myself clear . feel free to ask for any more info.
    i have below question.
    1) do we need to copy  /SAPSRM/WF_BRF_0EXP001  or  /SAPSRM/WF_BRF_0EXP000 for creating a custom FM expression.
    2)what does the check box "Calculation of Parameter in Function Module/Badi/method" does
    3) how can i do debugging for such FM expression , probably saving the cart and then debugging the expression.
    Thanks in advance for any help provided.
    Cheers
    Iftekhar Alam

    Hi ,
       Just put the below code in the FM and try..
        DATA: lo_wf_brf_event     TYPE REF TO /sapsrm/cl_wf_brf_event,
            lo_wf_pdo           TYPE REF TO /sapsrm/if_wf_pdo,
            lo_ctxt_provider    TYPE REF TO /sapsrm/cl_wf_context_provider.
      DATA: lv_document_guid    TYPE /sapsrm/wf_document_guid,
                lv_msg              TYPE string,
                lv_document_type    TYPE /sapsrm/wf_document_type.
      DATA: lx_exception        TYPE REF TO /sapsrm/cx_wf_abort.
    *=======================================================================
    Preset return parameters
    *=======================================================================
      ev_type          = /sapsrm/if_wf_rule_c=>type_bool.
      ev_length        = 1.
      CLEAR ev_currency.
      ev_output_length = 1.
      ev_decimals      = 0.
    get event object
      IF NOT io_event IS BOUND.
    BRF event Object not bound. No further execution possible.
        MESSAGE e089(/sapsrm/brf) INTO lv_msg.
        TRY.
            CALL METHOD /sapsrm/cl_wf_brf_ccms=>send_message( ).
          CATCH /sapsrm/cx_wf_abort INTO lx_exception.
            ev_data_missing = /sapsrm/if_wf_rule_c=>brf_data_missing.
            EXIT.
        ENDTRY.
        ev_data_missing = /sapsrm/if_wf_rule_c=>brf_data_missing.
        EXIT.
      ENDIF.
    *=======================================================================
    Get purchasing document
    *=======================================================================
    get event object
      lo_wf_brf_event ?= io_event.
    get context container from BRF event
      lo_ctxt_provider = lo_wf_brf_event->get_context_provider( ).
    get Content Container from BRF event
      IF NOT lo_ctxt_provider IS BOUND.
    BRF Context Container Object not bound. No further execution possible.
        MESSAGE e090(/sapsrm/brf) INTO lv_msg.
        TRY.
            CALL METHOD /sapsrm/cl_wf_brf_ccms=>send_message( ).
          CATCH /sapsrm/cx_wf_abort INTO lx_exception.
            ev_data_missing = /sapsrm/if_wf_rule_c=>brf_data_missing.
            EXIT.
        ENDTRY.
        ev_data_missing = /sapsrm/if_wf_rule_c=>brf_data_missing.
        EXIT.
      ENDIF.
    get document
      CALL METHOD lo_ctxt_provider->get_document
        IMPORTING
          ev_document_guid = lv_document_guid
          ev_document_type = lv_document_type.
    get instance
      lo_wf_pdo ?= /sapsrm/cl_wf_pdo_impl_factory=>get_instance(
      iv_document_guid = lv_document_guid
      iv_document_type = lv_document_type
    Case lv_document_type.
    When u2018BUS2121u2019.
    Pass the lv_document_guid to get SC details.
    IF THE CONDITION TRUE..
              CLEAR: ev_data_missing.
              ev_value        = c_x.
    ELSE.
              ev_data_missing = c_x.
              ev_value        = c_blnk.
    ENDIF.
            WHEN OTHERS.
              ev_data_missing = c_x.
              ev_value        = c_blnk.
          ENDCASE.
    Make sure the check expression will have check as shown below
    ZEX_002= 0C_WF_B_FALSE
    FYI-
    You don't need to have expression ZEX_001 to check the result of ZEX_002, because both expressios resut is type 'B". you can directly attached the ZEX_002 to main Event ZEV_001
    Regards,
    Saravanan
    Edited by: Saravanan Dharmaraj on Jun 23, 2010 12:25 PM

  • Approval preview process controlled workflow

    Hi,
    We are using process controlled workflow (N step) for the shopping cart workflows.
    While sending the reminder mails to the approvers, we would like to include the approval preview in the email.
    In application controlled workflows we could use FM BBP_WFL_DIN_APPR_CONTAINER_GET to get the approval preview details.
    Is there a similar function module to pick the approvers/approval status/step name etc for the process controlled workflows so that we can simulate the approval preview?
    Thanks
    BR
    Swetha

    Use class /SAPSRM/CL_WF_APV_FACADE. This is used by standard SAP WF Analysis.
    Methods - RETRIEVE_PROCESS_HISTORY, GET_CURRENT_PROCESS_STATE, CREATE_PROCESS_FORECAST.
    To analyze more, check the program /SAPSRM/WF_CFG_ANALYSIS_002. Check lines 209...216 (These Lines pull Previous Approved Steps, Current Process Step & Gets the approval forecast). However the REJECTED Items (Accept Decision) work little different (which is not captured by this report).
    To Identify the current approval process awaiting decision by the requester of the cart, use method GET_CURRENT_PROCESS_STATE, return parameter structure /SAPSRM/S_WF_PROCESS-PROCESS_LEVEL_LIST-DECISIONSET_LIST-ITEM_STATUS_LIST gets you the current status of the item (ACCEPTED, REJECTED, OPEN, INQUIRED). If ITEM_STATUS_LIST-ITEM_STATUS EQ 'REJECTED', then the WF is waiting for acceptance/resubmission from the requester.
    To your specific need, pass DOCUMENT_GUID to the class /SAPSRM/CL_WF_APV_FACADE=>GET_CURRENT_PROCESS_STATE get the return parameter /SAPSRM/S_WF_PROCESS. It will give you PROCESS_LEVEL_LIST. Then loop through DECISIONSET_LIST. It contains Table Types of AGENTS_LIST, ITEM_STATUS_LIST, WORKITEM_LIST. At /SAPSRM/S_WF_PROCESS level, you can get all the details of the current process level details
    Thanks,
    SC

  • SRM Process Controlled Workflow - Re-start using FM BBP_PD_SC_UPDATE

    Hi All,
    We are upgrading from SRM4.0 to SRM7.0 SP07 in classic scenario. We switched to Process Controlled Workflow.
    We have a CUSTOM application where the requisition items are entered and a Shopping Cart is created in SRM through Function Module BBP_PD_SC_CREATE. When the Shopping Cart is created in SRM , the Process Controlled Worflow is triggered successfully.
    In the custom application , we allow users to do changes to the requisition that are awaiting approval.The changes are updated in SRM Shopping Cart through function module BBP_PD_SC_UPDATE. It is noticed that the workflow process levels are not re-started after the shopping cart is updated through FM BBP_PD_SC_UPDATE.
    However , the process levels are re-started when the change is directly done to the Shopping Cart in SRM POWL. We want the process levels to be re-started even when the changes are done through BBP_PD_SC_UPDATE. The users are used do changes to the requisition through the custom application. We also noticed that system does not go through BAdI /SAPSRM/BD_WF_PROCESS_RESTART when changes are done to the SC through BBP_PD_SC_UPDATE.
    Is there any way that we can trigger process level re-start when SC is changed through FM BBP_PD_SC_UPDATE
    Thanks
    Sukumar

    HI ,
           This is not the correct way of updating the SC. please check the below process...
           first you try to get the SC document in Edit mode and this can be done only SY-UNAME should requester of the SC or( user who are changing the SC should be in the Org structure ).  ( This point why i mentioned is you mentioned that your editing through custom application ). 
      note : use try and endtry and catch the exception when u get the SC document in Edit mode.
      DATA: lo_pdo_sc             TYPE REF TO /sapsrm/cl_pdo_bo_sc_adv.
          "Instance SC PDO Layer
          lo_pdo_sc ?= /sapsrm/cl_pdo_factory_sc_adv=>get_instance( iv_header_guid   = p_guid "ps_shopping_cart-guid
                                                                    iv_mode          = /sapsrm/if_pdo_constants_gen_c=>gc_mode_edit ).
       now you do what ever changes to the document. I mentioned points below.
            "Get Item Details
          lo_pdo_sc->/sapsrm/if_pdo_bo_sc~get_item_detail
    do changes to the items of the SC.
           "Update SC Items
          lo_pdo_sc->/sapsrm/if_pdo_bo_sc~update_items
           "Submit Update
          lo_pdo_sc->/sapsrm/if_pdo_base~submit_update
           "Save SC
          lo_pdo_sc->/sapsrm/if_pdo_base~save    
          or  order  the SC again.
          COMMIT WORK AND WAIT.
    regards,
    Devi

  • Mitigation control workflow for AC10

    We are configuring the Mitigation control workflow during the implementation of AC 10.
    I would like to know whether its mandatory to have the workflow for Mitigation approver and monitor. As per the implementation team there is no requirement for them as this is not covered during the rampup.  But I think this should be mandatory to have the mitigation approval worflow so all the mitigation risk should be approved before mitigating. Otherwise, security admin can mitigate any risk and complete the request.
    Please advice.

    Hi,
    Yes. It will be a manual process. In some of the organizations, risks identification and mitigation will be performed manually by the Business process owners, which means in reality there will not be any risks that pop-up in CUP or RAR since they are already mitigated for the user.
    If you don't want to enable the mitigation process in the workflow, you have to do it and record the evidences manually.
    Hope this answers.
    Regards,
    Raghu

  • Fundamental Process Controlled Workflow Questions

    I have the following basic questions when it comes to process controlled workflows:
    1. Everyone generalizes over this question, but what is the specific difference between 40007953 (SC approval 1) and 40007954 (SC approval 2). Under what circumstance would I choose one over the other?
    2. What are all the functions you are allowed to edit during approval, when you're in Approval completion? I know Inquire is one of the functions. It seems like you can't add/delete items.
    I'm aware of Note 1277921 - Allow/Disallow to edit fields for approver/reviewer

    Hi,
       If you are using the level type as "Approval with Completion" then you must be used '40007952'. if you are using only "Approval" then you must be used '40007953'.
       This is how system works when you choose "Approval with Completion" Approver can see edit button and also change the SC.. keep in mind WF will not restart when the approver change the SC in this process level.
       If you choose only "Approval" then you can't make the fields or events visible until you follow the instruction in the OSS notes..
    1277921 - Allow/Disallow to edit fields for approver/reviewer
    Saravanan

  • Process Controlled Workflows VS Applicaiton Enabled Workflows-What to chose

    G'Day All,
    We are upgrading from SRM5.0 to SRM7.0
    There are these bespoke shopping cart approval workflows developed previously. I have to do some sort of assessment to include
    1) Why would we go for PCWs instead of just migrating the old ones in SRM 7.0 as business is pretty happy with the functionality they have got and are not interested in revising the workflow processes. Answer :  Application enabled workflows are in maintainence mode so newer functionality would be delivered using PCWs.( is there any other justification ? )
    2) Would we be able to map the existing workflow process to PCWs, here i need some pointers. I understand the PCWs are based on BRF though i don't know much about BRF( updating myself ). The key question i have is, whatever is there in bespoke workflow templates would i be able to  replicate that using this i.e. a different technology. Since my exposure to either PCWs or BRF is not great so as a general rule i am asking, is it possible or are there any sort of technical limitations on what you can and what you can't do using PCWs which you could design using a normal workflow template?
    I am sure this would be a common analysis which many of you might have done or are doing if you are involved in an upgrade.
    An Interesting Fact : There is no documentation available on existing SRM 5.0 workflows as what differently they have done to standard. The only thing i know at this stage is they have a bespoke level 1 template which call different standard templates for n level approval process. The apporval process( agent determination ) is based purely on custom logic. I am not that worried about the agent determination as i know i could get that as rule evaluation in BRF. The crux for me is to understand how BRFcontrols or connects to workflow templates in this particular case and what permutation conbinations are possible.
    So, i want to have a discussion on this and if possible some insight on all this new PCWs.
    Hope to see some valuable comments.
    Regards
    Praveen

    Hi everyone:
    My question is the following.
    We will implement SRM 7.01 with Process Controlled Workflow.
    However in the manual is the following note:
    Note: Even if you decide to use Process-Controlled Workflow in general,
    there are a few workflows still on the old technology:
    WS10400022 . Contract Alert Workflow
    WS10000192 - Approval Workflow for Internal Users
    WS10000209 - Approval workflow for new bidder/supplier     
    WS10000093/WS10000100 -Procurement Card Approval
    Probably We will required some of this.
    My question is if we are planning to configure process and application the correct strategy will be:
    1.     Start the configuration with the application controlled workflow and then
    2.     Follow with the change of the configuration application to process controlled workflow
    3.     And configure the workflowu2019s in process.
    u2022     Is there any problem when if we change the check  application to process?  Are there any chance that we loss the configuration?
    u2022     Is there any problem in the functionality that both kinds of workflow (application-process) work at the same time?
    u2022     If is possible to make change or maintenance of the application workflow?
    Thanksu2019 a lot for all the help
    Best Regards