Test equipment design & Development

Dear Candidates,
We are having an excellent opening for Design and Development of "Test Equipment" for hardware with one of the Leading MNC company in Bangalore. Experience of 2-4 years experience. If interested please send us your updated profile of call us on 9880957399
Srihari
9880957399

Hi,
           Glad to see the relevant opening here. Unfortunately, the provided number is not working for me. Could you provide me your Email address, so that I could send my CV.
Thank you .

Similar Messages

  • Automation test equipment

    I have developed a test equipment to test a unit which manages three power supplies and a dc electric load. These power supplies and load are controlled pragmatically by LabVIEW through R232 interface. There are five voltage and current sensors, and sixteen power relays inside the unit. Each sensors and relays operation has to be checked for the proper functioning in the system for the given command from the system(PXI) .PXI system consist of serial add -on cards and NI PXI-6229 for discrete I/Os connected to the test unit with a interface unit.inputs to UUT are serial/discrete inputs(from relay drivers). This bench level test is achieved through LabVIEW programs with simple VI’s and sub VI’s and built in drivers.
    Now the requirement of the consumer goes to the next level. The above mentioned test has to be automated fully. By clicking one button the whole test has to be performed automatically in a prescribed sequence test and verify each parameter in the test case and display the result and has to written into a document report.
    For example
     Source /Load and VI Checks (Commands through Serial Link)
    Source/load
    Commands
    Parameter
    Expected value
    Obtained value
    Channel  1
    Channel  2
    channel 3
    Channel 4
    Alternator-2
    55F0020000F2CC
    Voltage: 24V
    0x7F ± 0x0E
    0x
    0x
    0x
    0x
    Current: 5A
    0x1A ± 0x04
    0x
    0x
    0x
    0x
    Battery-1
    55F0040000F4CC
    Voltage: 32V
    0xAA ± 0x12
    0x
    0x
    0x
    0x
    Current: 10A
    0x35 ± 0x06
    0x
    0x
    0x
    0x
    Battery-2
    55F0080000F8CC
    Voltage: 32V
    0xAA ± 0x12
    0x
    0x
    0x
    0x
    Current: 10A
    0x35 ± 0x06
    0x
    0x
    0x
    0x
     Hardwired Checks
    Parameter
    Connector Pin for command
    Expected Value
    GPCC/DT
    RFCC
    Channel  1
    Channel  2
    channel 3
    Channel 4
    Battery 1 – ON
    Pin 1 of J2
    0xF0
    0x
    0x
    0x
    0x
    Battery 2 – ON
    Pin 2 of J2
    0xF0
    0x
    0x
    0x
    0x
    Battery Charging – ON
    Pin 4 of J2
    0xF0
    0x
    0x
    0x
    0x
    to start the automation of above mentioned application I searched for the tutorial and found NI teststand is suitable for this. I'm still confused about which NI application software to use and how to start them. So please help me in this and guide me how to start an basic automation.
    Attachments:
    manual test.vi ‏280 KB
    manual test.vi ‏280 KB

    TestStand is meant for these sort of automation requirements only.
    TestStand can reuse the VI's you have already developed to call the tests and automate it.
    You can install TestStand ( trail version) to try it out.
    There are examples for TestStand - Labview interface examples.

  • Can we have two R/3 Source Systems(Dev & Test) in BW Development....?

    Hi All,
    Till now we have only BW Development box..
    Our Landscape for R/3 side is R/3 Development, Testing and Production.....
    Already we have connected R/3 Development with BW Development... It is working fine as now... We have finished our task at Development...
    My doubt is <i><b>Can we Configure R/3 Testing to BW Development</b></i>....eventhough R/3 Development is already configured with BW Dev....
    <b>Can we have two R/3 Source Systems(Dev & Test) in BW Development....?</b>
    Please help me out in this issue....
    Your help will be appriciated...
    Regards,
    Kiran Telkar

    Hi Kiran,
    You can create second source system which will point to SAP R/3 Quality .
    If you have transported all datasource activation requests to QA environment then all datasources are available in R3QA as well.
    After creating source system , replicate datasources.
    Only thing you need to do is to replicate efforts of assigning source system (R3QA)-> creating transfer rule -> Create info package and load data.
    Hope that helps.
    Regards
    Mr Kapadia
    Assigning points is the way to say thanks in SDN.

  • Transporting an object from testing client to development client

    Hi,
                 This is Sekhar . My question is
      If i transported an object from development client to testing client .After transporting object to testing client i got a bug so that ABAP developer should work on that and how could i modify that bugs in testing client .Is it possible to modify in testing client? Is their any reverse transportation from testing client to development client?
    please give me reply for my question.
    Thanks & Regards
    Sekhar Rao

    Hi Ankesh,
    You said that
    "        If there is a bug then make appropriate changes in DEV and transport the object again.
            Reverse transports are not needed and such paths are not created.   "
    I am asking that my object is in TES client and i need it in my DEV client again to make appropriate changes for bugs i got.then what i had to do.
    please reply  me
    Thanks & Regards
    Sekhar

  • Which is better for a designer/developer?

    Hello, I do the following :
    Graphic Design
    Web Design/Development
    Programming (Windows)
    Amateur video editor (hoping to be more advanced)
    I use nearly all of the Adobe programs all the time
    Going to use all the advanced and basic programs I can on Mac OS X (from iMovie to Final Cut)
    Become an Apple developer
    And play lots of hardcore games (Crysis 3,BF3 etc.)
    So should I buy a Macbook Pro (retina) or the iMac ?
    I can't afford to buy a Mac Pro since I am 13 and live in Turkey so the money I get from these jobs aren't enough for that. Especially with the high prices here.
    I am not a really social person so I don't really care about portability. Which one do you guys suggest ?
    Arsan

    Definately the iMac. That is what i use for 3D design and i have never had a problem. Not to mention that iMacs provide a 21.5 or 27 inch screen, which really pays off in intricate graphic design.  The iMac has a more avanced ventilation system to cool the system down.  The only problem i could see with BOTH of these options is web design. Web design on a 21.5 inch screen must be designed with a 15 inch screen in mind,   and designing on a retina display can become tricky when using unit sizes to size things.  With either of these options, remember to use the unit "em" instead of "px" to size your elements.

  • Trying to run Accutest 1000 manufactured by Physical Testing Equipment with Labview

    We have an Accutest 1000 which is manufactured by Physical Testing Equipment and we would like to run the equipment and gather data thru Labview.
    Does Labview support this type of activity? Is there a 3rd party that would contract to set-up this configuration?
    Thanks

    National Instruments doesn't officially support interacting with this board. Do you have more information about it? Can it communicate via serial? If so, you could try to use NI-VISA to communicate with the board.
    Ravi A.
    National Instruments | Applications Engineer

  • Test Equipment for calibration

    Dear Experts,
    Is it necessary to create Calibration Orders against Test Equipments only ?? or we can do the same against Machines also??
    As in some cases there is preventive & calibration plan against same equipment then if we create Test equipment,, there is going to be doubling of equipment??
    Plz guide
    rgrds
    DM

    Dear DM,
               For the same Equipment U can distinguish one is M - Machine     , and Q- Test Equipment  categories.
    So u can do  preventive maintenance and caliberations plan also
    If u not clear pls come back
    Regards
    SMC

  • Error during usage decision for Test Equipment

    Hi,
    I have completed results recording  for Test Equipment using QE51N (results closed and confirmation completed). When I tried to make usage decision (QA11) for the lot the pop-up message shows as "Not all equipment is valuated! Do you want to force inspection completion. I also noticed that in equipment tab of qa11 code valuation column shows as Not  Valuated.
    I request you to help me to solve this problem.
    Thanks & Regards
    V.Devaraj

    HI,
    You may try changing the valuation mode in IA06. In the inspection characteristic overivew, click on details -> operation, scroll down, you will find Quality management inspection points  -> maintain automatic valuation based on inspection points.
    The changes if made will be effective only for the next inspeciton lots.
    Regards,
    M.M

  • Test Equipment Management

    Hi Experts,
    Please can any one brief me about the cycle of Test Equipment Management in QM.
    Pls provide with T codes.
    Thanks in Advance.
    Vishal

    hi
    IR01
    IE01 with category Q,
    IA05 - task list , in header data you need to selct the inspection points 300. and assign the Strategy (IP11) alonfg witth assing MIC(QS21) to the operations.
    IP42
    IP10
    IW38 or Iw32 if you know the order number. then relase the order you get the inspection lot no,
    then goto QA32 to do results recording and usage dessicion.
    pl try
    -ashok

  • Best practices for "designer - developer" interaction in Flex Mobile

    Hi,
    I'm starting development of a mobile software application and Flex Mobile is the platform I've chosen for that.
    What is the best practice / recommended workflow for designer-developer interaction? For example in web application the designer provides HTML/CSS templates to the developer which integrates them in the Web Application. What is the analogue in Flex Mobile? What should I request as input from the designer?
    I'll appreciate any hints, links, advises or previous experience on the topic.
    Thanks!
    Best Regards,
    Dinko

    If you're using Adaptive Web Design (CSS3 media queries), you can maintain one site with CSS Layouts optimized for different device widths.
    http://www.adobe.com/devnet/dreamweaver/articles/introducing-media-queries.html
    jQuery Mobile
    http://jquerymobile.com/
    If you're actually running separate web sites for mobile and non-mobile devices, have a look at this recent discussion:
    http://forums.adobe.com/message/4177360#4177360
    IMO, there is nothing wrong with providing links for mobile and non-mobile users to choose which site they would prefer to use -- especially for tablets who may have an interest in both.
    Nancy O.
    Alt-Web Design & Publishing
    Web | Graphics | Print | Media  Specialists 
    http://alt-web.com/
    http://twitter.com/altweb

  • SVG to JavaFX code Converter for Designer-Developer-Workflow

    I created an SVG to JavaFX code Converter while working on a project. Although its still a work in progress, it has been so useful for me ever since. Its available at convfx.codebase101.com for anyone that is interested in the Designer-Developer workflow (similar to JavaFX 1.x, which was the inspiration). [url http://www.codebase101.com/convfx/dist/convfx_dl.php]Download
    Hope someone finds it useful.
    Edited by: Burabari55 on Mar 22, 2012 6:41 PM, added download link.

    That is very nice Burabari, thanks for sharing it.

  • Error while result recording for test equipment

    Dear Gurus
    My scenario is to do unplanned maintenance for test equipment and recording the result.
    For that I have done the following steps
    1)     Created Notification for the test equipment (customized notification type TE).
    2)     For that notification I created order.  (customized order type TE01).
    3)     Attached General maintenance task list for that order. Task list has inspection point 300.
    4)     Released the order and saved.  Inspection Lot is created.
    5)     In QE51N / QA32 when I tried to do results recording, it shows the following error.
    "Equipment VERN01 do not exist in the object list for order 4001214"
    Please help me to correct this error.
    Regards
    Babu R

    Hi
    I applied oss and today I got reply. When 1278254 notes is implemented it is solved. 
    I have one more question, now in QE51N, I did result recording and when saved it is asking for order confirmation, I have given all data and came back to the same screen.  There is one more option for Valuate Inspection Point.  In that I have selected Can be used option and saved. Now if I goto maintenance order and TECO the order, it is saying that A usage decision has stll to be made. 
    Whether I want to take UD once again in QA32 ?
    Also is there any settings to TECO the notification automatically when the maintenance order is TECO'ed. Now the notification is not TECO'ed when order is TECO'ed.
    Babu R

  • Can I create 6i designer/developer tables on local 9i database

    I recently installed a new 6i developer on a P4 xp pro system. The 8i database wasn't installed, but a lot of 8i files were. When I tried the same install on my home Win2000 system a fully populated 8i database was installed.
    On the xp system I have a 9i personal Oracle database. Can I install the 6i designer/developer scripts on the 9i database or do I have to create an 8i database? Are there any pitfalls?
    I have recieved conflicting opinions on this. I am hoping someone can confirm this - one way or the other. If possible, could you refer me to a document on how to do this.
    Thanks
    Glenn

    Sorry, the documentation included with the developer software has dates of 2001. I just found the newer Nov 2003 docs on the web.

  • Cfalibration of test equipment.

    Hi,
    My clinet is working on calibration scenario.Here calibration of some equipment is done by maintenance department . So I would like to know what are the different setting i have to do before creating calibration order(PM06). I konw for that i have to create master data for testing equipment (Q).
    I am facing problem in QM point of view.So it is integration of PM-QM so i would know how
    Expecting for reply.
    Regards,
    Pravin

    hi
    check the link
    http://help.sap.com/saphelp_46c/helpdata/en/f4/e0e869af9911d29a250000e8a529f3/content.htm
    http://help.sap.com/saphelp_46c/helpdata/en/bf/b9b3341a933f50e10000009b38f83b/frameset.htm
    IE01:Equipment
    IP11: Maintainence Strategy
    IA05: Task List
    IP42: Maintainence Plan
    IP10: Scheduling Of plan
    IP30: Job Planning
    Create Measuring inspection characteristics....QS21
    Create Task list by assiging ispection point as 300 /310...IA05
    Assign MIC & Strategy to the task list....IA05
    Create PM order for calibration order which should have ...IW31 (inspection type assigned as 14 as std)
    Assign Task list to PM Order...IW32
    Release PM order....IW32
    You will get inspection lot
    Provide readings against the inspection lot...QE17/QE51
    Provide Usage decieon for the FL/ EQ...QA11
    If you aregoing for Maint plan then crete maint item...IP41
    Assign this to maint plan & scheduling paramertes
    Schedule maint plan...IP10/IP30
    Get PM Orders Release it Get Inspection lots..IW38
    -ashok

  • Testing a portlet developed in JDeveloper.

    Dear All,
    I am using JDeveloper to build the portlets with the help of PDK Software patched to JDeveloper. I want to test the portlets developed by me on the Standalone OC4J Server. Currently i dont have the access to the OracleAS application server, so i have to do all the testing on the OC4J itself.
    Any little help would be of very use.
    Thanks in advance.

    A portal server such as OracleAS portal is required to run portlets.

Maybe you are looking for

  • Office 2013 with OneDrive Desktop sync conflicts

    I am using Office 2013, and I am on Windows 8.1 with OneDrive setup. I keep some files Offline and OneDrive syncs it for me which is cool. But when I installed Office 2013, when I edit Excel files, I notice that there's an Uploading to OneDrive messa

  • How do you change the ont size

    How do you change the font size for one word ?

  • Loading local content using AJAX in AIR

    Hello All, I've got a techinical question regarding loading local html5/Css/JS files into AIR's HTMLComponent. I'm very much aware that Safari's webkit implementation can handle this effectively and AIR's Webkit Implementation boasts about having nea

  • ITunes 8.2.1 cannot see the podcasts in iPod touch

    I upgraded to iTunes 8.2.1 now. Then iTunes downloaded some new/recent podcasts. When I synced my iPod touch, iTunes showed this message: The iPod "<my iPod name>" cannot be synced because there is not enough free space to hold all of the items in th

  • Why does my xperia Z2 doesn't run wifi?

    I'm having problems with the wi fi of my xperia z2, I recovered the system to have it like new, and when i did it, the wi fi did't run, i don't know why, it keeps like plugin the wi fi but it never runs