Hi gurus,
I hope someone can help here
The freight condition entered on a PO is not correct.
It is 5600 GBP per case on line 1
19600 GBP per case on line 2
5600 GBP per case on line 4
That is far too high because the amount should not be per case – it should be overall
The total amount of the invoice is 38000 Euro
So it should not be more than that.
The GR was made and also the invoice was entered using tx code MIRO.
I don’t know how could adjust that. Any idea?
Many thanks
Lupa

HI  once  u done  miro   u can  not  adjust  frieght  condition
ok
kishore

Similar Messages

  • Issue in maintaining the freight condition in SRM pricing conditions

    Hi All,
    We have maintained the freight condition in SRM pricing conditions But when a buyer try to add the freight condition it does not give any field to add the value.We want the freight condition at the header level.
    Let me know if there is any service needs to be activated or we have to activate any business function to enable this.
    Please find the attached document to check the settings  and actual issue while entering the freight condition.
    This is urgent and please provide your suggestion to avoid this issue.
    Thanks,
    Ankur

    Hi Anil,
    Its not a standard functionality  to get the Header level price condition in SRM PO . I got to know that we need to implement note 1898304 for SRM 7.13 SP01 and activate a Business function.Can anyone let me know how it used to handle in previous versions.
    Thanks,
    Ankur

  • Vendor Invoices - Entered on and parked details not correct

    Hi since we upgraded to ECC6 we have noticed that the dates stored in the Header of both LIV and Direct Entry invoices are not correct.
    If we Park a invoice we have a the corrected Entered on and Entered By details is correct.
    Then when the document is posted the entered on date and user name then changes to the date the invoice was posted on the system.
    We need to be able to see when the document was originally put on the system as a parked document so we can determine how long it takes us to process them.
    I have checked in bkpf and usname and ppnam is the same and nothing in sname.
    I cant see any OSS notes to say this is a known problem.  Does anyone know how to resolve this.
    Thanks

    Hi,
    Unfortunately it is not that simple.
    We need to use the vendor tax date in the document date so this cannot be used.
    We could also do with storing the date we scanned the invoice to workflow but there is no spare fields for this either.
    Thanks

  • How to read the selection conditions entered in Srch help in srch help exit

    Hi Experts,
    I have created a search help to get the list of Change Numbers from table AENR. It is based on Creation date, Created by, Description and Reason.
    Is there any way by which after the user enters text in Description and Reason fields as a selection criteria, I can convert it to upper case.
    In my opinion, there should be some place in Search Help exit where I can code for this.
    Please let me know how to do this.
    Useful answers will be suiatbly rewarded.
    Thanks in advance.
    Regards,
    Himanshu
    Message was edited by:
            Himanshu Aggarwal

    use the command TRANSLATE
    data : descri10) type c value 'abcdefghij'.
    TRANSLATE STR TO UPPER CASE.
    answer; ABCDEFGHIJ
    similarly you can use
    TRANSLATE str TO LOWERCASE.

  • I was asked to verify my Apple ID , but I forgot the answers to my security questions and the email I entered to reset them is not a valid email. What do I do?

    I have changed my password & changed my alternate email I'm not sure what else to do to verify my account

    You need to contact Apple to get the questions reset. Click here, phone them, and ask for the Account Security team, or fill out and submit this form.
    (95538)

  • My iphone 3 keeps giving me the message that my password and username is not correct when i go into my mail. It was linked to my gmail account and had been working fine. All the sudden today it won't connect to my gmail account and this message appears

    my phone has stopped connecting to my gmail account.When I click on the mail button it opens and the a message appears that says the user name and password for "imap.gmail.com" is incorrect. My information is correct under settings I have even deleted account and tried to re-set up my gmail account. Still nothing. It had been set up for months and working with no issues.

    ATtempt to power off your device and power it back on, if that doesn't work reset all settings should resolve it for you

  • The value read by visa read VI is not correct!

    I design a labview program to control Agilent E5072C network analyzer. When I want to get value from this instrument, I use the "VISA read" VI which listed in the block plate. However, the value read by this VI is last time measurement value. For example, last time the read value is 1.0 db and this time the measurement value is 1.2 db. But when I use "VISA read" VI to fetch the value, it is 1.0 db.
    Agilent also provide a VI for this device to read measurement value, and it alway read correct value. so could someone tell me why? do I need do any action before read value from this instrument if I want to use "VISA read" VI instead of Agilent VI?
    Solved!
    Go to Solution.
    Attachments:
    Read.vi ‏23 KB

    You are probably reading it too quickly.  By reading it in NI-MAX, you are doing it by hand, so it takes longer.  When you do it programmatically, it is "instant".  Try using the *OPC? command to turn your command into a query.  It will then return a "1" in the read buffer.  Read the "1" and then do the fetch command.
    To Dennis:
    I've had bad experiences with manufacturer-supplied drivers to the point where I don't even try to use them any more.  But if Agilent is as anal about their drivers as they are about their manuals, they should be no problem. 
    Bill
    (Mid-Level minion.)
    My support system ensures that I don't look totally incompetent.
    Proud to say that I've progressed beyond knowing just enough to be dangerous. I now know enough to know that I have no clue about anything at all.

  • How to give the header condition type in the CRM Sales Order for freight ?

    Hi,
         We are creating Sales Order(SO) using FM 'CRMXIF_ORDER_SAVE'.And we are unable to track the FREIGHT condition type in the above FM to pass value.
         We want to check this value in CRMD_ORDER tcode.
        Pls let us know how to make it possible of the above issue.
    Thanks,
    Siva..

    Siva,
       I guess you posted in Wrong Thread. You need to post in WAS section.
       check for any BAPI's available in CRM.
    Nagesh Ganisetti.

  • How to give the header condition type in the Sales Order for freight?

    Hi,
         We are creating Sales Order(SO) using FM 'CRMXIF_ORDER_SAVE'.And we are unable to track the FREIGHT condition type in the above FM to pass value.
         We want to check this value in CRMD_ORDER tcode.
        Pls let us know how to make it possible of the above issue.
    Thanks,
    Siva..

    Siva,
       I guess you posted in Wrong Thread. You need to post in WAS section.
       check for any BAPI's available in CRM.
    Nagesh Ganisetti.

  • Reducing the Freight cost on material value for undelivered material

    Hi Experts,
    Summary :  The material supplier vendor needs to be paid for full quantity of material. The freight transport is allowed an under tolearance of 0.5% on the material to be supplied. If the delivered material quantity breaches the 0.5% under tolerance then amount at 1.5 times the cost of material for the shortage is to be deducted from the transporter. A dummy GR will have to be prepared for the undelivered quantity for which we do not want the freight cost to be loaded. The details scenario is mentioned below :-
    We have to make a Purchase Order with material code say ABC for procured of some material. Suppose we make a Purchase Order for 100 nos. at a Unit Price of Say Rs. 10/- for Material Code ABC on say Vendor M/s XYZ. A freight condition is maintained in the Conditions Tab and suppose the Freight is Rs. 10 per unit of the material.
    While preparing the Goods Receipt through MIGO, in the Freight Tab we select say freight vendor say M/s PQR against the freight condition and post the goods receipt.
    While doing Invoice Processing in MIRO, when we enter the combination of Purchase Order and Planned Delivery Cost the system will populate the vendor codes of both the supplier of material and the transporter. On selecting the transporter the freight amount will populate against which the invoice of the tranporter can be processed.
    In the Vendor Master of M/s XYZ GR-Based Invoice Verification is activated.
    The vendor is allowed an under tolerance of 0.5% (i.e. the vendor should deliver at least 99.50 nos. of the Purchase Order). If the vendor delivers 99.50 or more then there will be no deduction in the freight charges.
    But suppose the vendor delivers only 99.4 nos. of the quantity. Then we will prepare the GRIR for 99.4 nos.only. But while processing the MIRO we need to deduct 1.5 times the value of the material from the freight amount for the shortshipped quantity, i.e.
    0.1     no (99.5 u2013 99.4) X Rs. 10/- * 1.5 = Rs. 1.5 are to be deducted from the final payment from the freight amount of the transporter.
    The material supplier will have to be paid in full 100 nos. of quantity and will raise an invoice for 100 nos. A dummy GRIR for the 0.6 nos. of undelivered material will have to be prepared for processing the invoice for the 100 nos. of the material supplier and a dummy issue for 0.6 nos. of undelivered material will be prepared to remove them from the system.
    Hence the freight cost for this 0.6 nos. of undelivered material will also go into the cost of the material and increase the MAP by that amount. Also the goods issue Cost will also have the effect of the freight cost.
    We do not want to load the freight cost for the undelivered material in the value of the material.
    Can any one please suggest a solution for the same.
    Thanks in advance.
    AJ.

    Hi
    A PO Will be raised for full quantity of material say 100 nos.
    The material supplier vendor needs to be paid for full quantity of material.
    A freight vendor is maintained at the time of GR for material against the freight condition maintained in the Po.
    The freight vendor facilitates the delivery of the material from the vendor to the purchaser for which he is given an under tolerance limit of 0.5%. Any delivery below this tolerance limit, freight amount to the effect of 1.5 times the per unit rate of material x short fall below 0.5% tolerance will be deducted from the freight amount.
    A dummy grir will have to be prepared for the short delivered quantity for processing the invoice for the full quantity of the purchase order, as the vendor is going to raise the invoice for full purchase order quantity. The client does not want to load the freight cost of the undelivered quantity on the material value as it will wrongly show the MAP of the material. This shortshipped material will be issued to remove it from the system and the stock will remain for the delivered quantity only. The vendor is subject to gr based invoice verification.
    Please suggest a solution.
    Thanks in advance.
    AJ
    The freight transport is allowed an under tolearance of 0.5% on the material to be supplied. If the delivered material quantity breaches the 0.5% under tolerance then amount at 1.5 times the cost of material for the shortage is to be deducted from the transporter. A dummy GR will have to be prepared for the undelivered quantity for which we do not want the freight cost to be loaded.

  • Default vendor not appearing in freight condition type ZVCF

    Hi All,
    After going all the forums I am posting this issue.I have mainatined condition record for the frieght vendor with key combition of vendor, customer(Zfield) and material.
    I have mainatined partner functions for VN with GS partner type.
    When I create PO ZVCF condition type is triggering in the PO but in the condition type details the main vendor is picking. Could you please let me know is this standard behaviur or need to do any cutmisation for this.
    Attched screen shots for your refernce
    Insted of picking GS 831092 it is picking main vendor 830970
    Regards,
    Chand Basha Shaik

    Go to M/06 and input your Frieght condition type and enter the Condition type and in Control Data 2 tab enter Value A against Exclusion and Save.
    Now Maintain conditon record for the required combination in MEK1 or MEK31 and enter the required details along with the rate and choose the line item and click on Magnifier and here you need to enter the Frieght vendor and save.
    Now create Purchase order and see if the required Condition type is automated into the Purchase order. If automated, select the Freight condition and click on Magnifier and here you will be able to see the Frieght Vendor.
    Ensure Manual check is removed from the Pricing Procedure against the Frieght Conditon type. Else the condition record doesnot work.
    Alternately, Maintain the Conditon record with combination Vendor 830970 Customer 137955 Material 902 and choose the line item in MEK1 or MEK2 and input the Frieght Vendor ie.831092 and Save.
    Now Create Purchase order and check once again.

  • Calculate Sales Tax on Freight Condition

    Hi All,
    We have an issue where we need to calculate an additional amount of Sales Tax on the Freight Condition which is entered on the Delivery Document as a manual condition and not on the sales order itself.
    I am unable to configure the system so that the Sales Tax amount calculated for the whole invoice is inclusive of the Freight amount too
    Is there any suggestions as to how I could do this?
    Thank you for you support
    Rukshana

    1. Calculation of sales tax on basic+ ED+ freight charges.
    2. Calculation procedure as basic+ Freight + ED+ sales.
    excise and tax is for a value addition to a product . so excise , tax is on basic value only.
    IF you want it for freight taxes  u need to do transportation  cost ther u can maintain service tax for freight vendors.
    me21n, vl31n,vt01n,vi01

  • Freight condition in altcty and altcbv

    suppose i want to calculate freight on material net weight then what numeric field we will enter in altcty and altcbv.

    Hi
    The best way is to create a new condition type copying the freight Condition type.
    In that you can change the calculation type based as E- Net weight, Now the freight willl be based on the weight of the material.
    If you have more complex requirement , please create the routine in VOFM & assign it to the condition type.
    Award points if useful
    Thanks & Regards
    Kishore

  • Freight condition on pallet level

    Hi Guys
    Iu2019m stuck with a problem for a condition for freight. Sorry if it's answered somewhere else in the forum, but I haven't found it yet.
    Currently there is a freight condition working for this which basically is using KG and there is a scale, which identifies the freight cost.
    The freight condition in KG is created as an item condition and as a group condition, i.e. when more than one material in the order then the freight cost is distributed to every material line.
    This works excellent, but does of course face some problems in the scale values.
    We now want to create a new freight condition, which basically is basing the freight determination upon the number of pallets.
    I have then created a new condition, which is created as an item condition and as a group condition and the relevant master data.
    I have a scale which says:
    0-1 pallet 50u20AC/pallet
    1-2 pallet 49u20AC/pallet
    2-3 pallet 48u20AC/pallet
    etc.
    If a material for instance is 100 cartons per pallet then the condition determination for an order will be:
    Order 1:
    Pos.nr 10 100 cartons = 1 pallet = freight 50u20AC
    Order 2:
    Pos.nr 10 50 cartons = ½ pallet
    Pos.nr 20 50 cartons = ½ pallet
    Result = freight 50u20AC
    Order 3:
    Pos.nr 10 50 cartons = ½ pallet
    Pos.nr 20 50 cartons = ½ pallet
    Pos.nr 30 1 carton = 1/100 of a pallet
    Result = freight = 49u20AC + 1/100th of 49u20AC = 49,49u20AC
    Order 4:
    Pos.nr 10 50 cartons = ½ pallet
    Result = freight = 25u20AC
    Order 1 + 2 would be OK u2013 but only because it matches a full pallet
    Order 3 + 4 would not be OK. For order 3 the result should be 2x49u20AC and for order 4 the cost should be 50u20AC
    I have been trying to use the Alternative formula for condition base value (to round up the number of pallets to a whole number), but as this is only calculated on position level I canu2019t see what to do. Additionally I think I have also tried every combination in the book for the customizing of the condition, butu2026u2026.
    Can anyone please give me a hint as this would be highly valuated??
    rgds
    Steff

    Hi Raghu
    I have also had my ABAP'er experimenting a bit with AltCTyp to determine the number of pallets, but unfortunately not something succesfully yet.
    The problem with the AltCTyp was that I could easily have an alternative calculation, which would use this to determine the number of pallets and thereby the scale, but it wouldn't give me the correct value back.
    If I can use the example of a full pallet in line 10 and a sample carton in line 20, then the total number of pallets is 1 pallet and one carton, i.e. it will be sent on two pallets.
    When using AltCTyp I got two options:
    [1]: line 10 (the price of one pallet) + line 20 (the price of one pallet / no of cartons in pallet * 1
    [2]: line 10 (the price of one pallet) + line 20 (the price of one pallet)
    When using AltCTyp it's my understanding that it's calculating per item line - handling all lines and group values - and distributing the values to each line.
    I miss the option of SAP providing me the sum of all lines. This sum should then look in the scales where it identifies that it's above 1 pallet but below two, identify that it should be 2 pallets. Then it should take this freight cost of two pallets and distribute the amount to the lines according to the quantity, so the result of sending an extra pallet for this one line 20 would have an impact on both lines.
    Basically I had thought that the scale formula could provide this for me, but..............
    I will have my ABAP'er have a look at your suggestion for the user exit
    rgds
    Steff

  • Freight Condition on Contract is copied to Release PO Header

    Hello,
    We have a contract for raw materail with freight condition (value) attached to the line item not the header.    When release purchase order is created the freight condition is copied over to the HEADER not the line item and Is distributing the freight cost to all line items.    We expect the total value of the freight condition to be applied to the Po  line item.    Can anyone explain why this happens and how to fix?
    Best regards,
    Diane

    Hi Diane,
    how did you set up the freight condition in your customizing? Is it a group condition? Please test the issue when it is NOT a group condition. The settings in the customizing should be for a fixed amount condition:
    Cond. class   A Discount or surchar
    Calculat.type B Fixed amount      
    Cond.category B Delivery costs  
    X item condition
    or for a percentage condition:
    Cond. class   A Discount or surcharge
    Calculat.type A Percentage           
    Cond.category B Delivery costs       
    X item condition
    Regards,
    Edit

Maybe you are looking for

  • IMac 24" GT130 - Issues with Duke Nukem Forever?

    Hi all, I have a 2009 24" iMac Core 2 Duo, 3.06Ghz Nvidia GT130 512mb & 1GB of ram running 10.6.8. However Duke Nukem Forever does not run well and i was wondering if anyone else has had this gmae running on a similer Mac? What is the issue here, is

  • Windows 7 Back up

    Trying to Back up my Windows 7 using Windows "Backup & Restore" I can backup files but, whilst telling me I need 75GB for a System Image, System also tells me that my external Hard Disk with 900GB free space has insufficient space!Help

  • HT1572 the charging light won't stay on - I have to close and re-open the I Tunes app

    I have a new HP laptop. I don't know if it's a coincidence, but my charging light won't stay on. I have to keep closing and re-opening the I Tunes program. Is the battery shot or what? Thanks.

  • Saving Down from CS3 to CS2

    I can't seem to save my CS3 document in a way for a CS2 user to open. I go to export and save as indesign interchange. What am I doing wrong. Thanks for any help!!

  • Recurring Time Machine backup error

    I have a 750-gig external hard drive that I have used as my Time Machine backup source for about year without problems. (I have a Macbook Pro that I bought in late 2008.) A few weeks ago, when I plugged in the USB cable and the backup process had aut