Third party order & Inter copany STO

HI SD Guru's
can anyone tell me please about the configuration steps and the Procedure for "Third Party" & "Inter company STO"
<b><REWARDS OFFER REMOVED BY MODERATOR></b>
Thanks

dear SP
THIRD PARTY SCENARIO
in third-party order processing, your company does not deliver the items requested by a customer. Instead, you pass the order along to a third-party vendor who then ships the goods directly to the customer and bills you. A sales order may consist partly or wholly of third-party items. Occasionally, you may need to let a vendor deliver items you would normally deliver yourself.
Process Flow
the processing of third-party orders is controlled via material types. Material types define whether a material is produced only internally can be ordered only from third-party vendors, or whether both are possible. For example, a material that is defined as a trading good can only be ordered from a third-party vendor. However, if you manufacture your own finished products, you may also want, from time to time, to be able to order the same type of product from other vendors.
Processing Third-Party Orders in Sales
Third-party items can be created automatically by the system, depending on how your system is set. However, you can also change a standard item to a third-party item during sales processing manually.
Automatic third-party order processing:-
if a material is always delivered from one or more third-party vendors, you can specify in the material master that the material is a third-party item. During subsequent sales order processing, the system automatically determines the appropriate item category for a third-party item: TAS. To specify a material as a third-party item, enter BANS in the Item category group field in the Sales 2 screen of the material master record.
Manual third-party order processing
In the case of a material that you normally deliver yourself but occasionally need to order from a third-party vendor, you can overwrite the item category during sales order processing. For a material that you normally deliver yourself, you specify the item category group NORM in the material master.
If, as an exception, you use a third-party material, change the entry TAN to TAS in the ItCa field when processing the sales document. The item is then processed as third-party item.
If address data for the ship-to party is changed in the sales order in third-party business transactions, the changed data will automatically be passed on to purchase requisition and also to the purchase order ,if one already exists. In the purchase order, you can display the address data for the ship-to party in the attributes for the item.
You can only change the address data for the ship-to party in the sales order for third-party business transactions, and not in the purchase order.
Processing Third-Party Orders in Purchasing
when you save a sales order that contains one or more third-party items, the system automatically creates a purchase requisition in Purchasing. Each third-party item in a sales order automatically generates a corresponding purchase requisition item. During creation of the requisition, the system automatically determines a vendor for each requisition item. If a sales order item has more than one schedule line, the system creates a purchase requisition item for each schedule line.
Purchase orders are created from purchase requisitions in the usual way. For more information about creating purchase orders, see the Purchasing documentation. During creation of the purchase order, the system automatically copies the delivery address of your customer from the corresponding sales order. In a sales order, you can enter purchase order texts for each third-party item. When you create the corresponding purchase order, the texts are automatically copied into the purchase order. The number of the purchase order appears in the document flow information of the sales order.
All changes made in the purchase order are automatically made in the sales order as well. For example, if the vendor confirms quantities and delivery dates different from those you request and enters them in the purchase order, the revised data is automatically copied into the sales order
you process third-party items by creating a normal sales order. In overview for the order, you can then overwrite the default item category (TAN in the standard system) with the special item category for third-party items: TAS
Billing Third-Party Orders
If relevance for billing indicator for the item category has been set to B (relevant for order-related billing on the basis of the order quantity) in Customizing, the system includes the order in the billing due list immediately. If, however, the indicator has been set to F (relevant to order-related billing on the basis of the invoice quantity), the system does not include the order in the billing due list until an invoice from the vendor has been received and processed by the purchasing department. In the standard system, item category TAS (third-party order processing) has been given billing-relevance indicator F.
In the first case, the third-party order is considered to be completely billed only when the invoiced quantity equals the order quantity of the sales order item. In the second case, each time a vendor invoice is received, a customer invoice is created for the quantity in the vendor invoice and the order is considered to be fully invoiced until the next vendor invoice is received.
If you have activated billing-relevance indicator F for item categories in Customizing, billing can refer to the goods receipt quantity instead of the incoming invoice quantity.
You can control whether the invoice receipt quantity or the quantity of goods received is relevant for billing in Customizing for copying control for billing at item level.
FOR YOUR PROCESS Individual Purchase Orders WELL GIVE THE RIGHT SOLUTION
Individual purchase orders are used when your customer orders goods from you that are not in stock and must be ordered from one or more external vendors.
Process Flow
During sales order entry, the system automatically creates a purchase requisition item. The purchasing department creates a purchase order based on the requisition and the vendor ships the goods directly to you (unlike third party order processing, where the vendor ships directly to your customer). You then ship the goods to your customer. While the goods are part of your inventory, you manage them as part of the sales order stock. Sales order stock consists of stock that is assigned to specific sales orders and cannot be used for other purposes.
Process Flow for 3rd Party Sales
Customize the third party sales in summary:
Prerequisites for 3rd party sales,
Purchasing org,
purchasing group,
assign the Purchase org to company code
assign Purchase org to plant,
should not maintain the stock in material, it should be trading goods,
1. Create Vendor XK01
2. Create Material – Material Type as "Trading Goods". Item category group as "BANS".
3. Assign Item Category TAS to Order type that you are going to use.
4. A sale order is created and when saved a PR is generated at the background
5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
7. Goods receipt MIGO
8. Goods issue
9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and, therefore, there is no delivery process attached in the whole process of Third party sales.
10. Billing *--
SD - 3rd party sales order Create Sales Order
VA01
Order Type
Sales org, distr chnl, div
Enter
Sold to
PO #
Material
Quantity
Enter
Save
SD - 3rd party sales order View the PR that is created with a third party sales order
VA01
Order Number
Goto Item Overview
Item ->Schedule Item
SD - 3rd party sales order View the PR that is created
ME52N
Key in the PR number
Save
SD - 3rd party sales order Assign the PR to the vendor and create PO
ME57
Key in the PR number
Toggle the "Assigned Purchase Requisition"
Execute
Check the box next to the material
Assign Automatically button
Click on "Assignments" button
Click on "Process assignment"
The "Process Assignment Create PO" box , enter
Drag the PR and drop in the shopping basket
Save
SD - 3rd party sales order Receive Goods
MIGO_GR
PO Number
DN Number
Batch tab , click on classification
Serial Numbers tab
Date of Production
Flag Item OK
Check, just in case
Post
Save
SD - 3rd party sales order Create Invoice
MIRO
Invoice Date
Look for the PO , state the vendor and the Material
Check the box
Click on "Copy"
Purchase Order Number (bottom half of the screen)
Amount
State the baseline date
Simulate & Post
Invoice Number
*Invoice blocked due to date variance
SD - 3rd party sales order Create a delivery order
VL01N
In the order screen , go to the menu Sales Document , select "Deliver"
Go to "picking" tab
State the qty and save
SD - 3rd party sales order Create a billing document
VF01
Ensure that the delivery document is correct in the
Enter
Go to edit -> Log
Save
STO PROCESS
Stock Transfer Orders comes into picture when the stock is moving / Transferring between two different plants with two Different Company Codes or Stock Transfer between two plants with One Company Code the Difference are given below:
P.O Order types and Delivery Types
STO: - Stock Transfer Order – Intra Company
Stock Transfer between Two Plants with One Company code.
The Purchase Order Type is Used in this case is "UB".
And the Delivery Type Used here is "NL".
Goods Movement type: 641
Item Category in delivery is NLN
STPO: - Stock Transfer Purchase Order – Inter Company
Stock Transfer Purchase Orders between Two Plants with Two Different Company Codes.
The Purchase Order Type is Used in this case is "NB".
And the Delivery Type Used here is "NLCC".
Goods Movement type: 643
Item Category in delivery is NLC
A. Configure Intercompany Stock Transport Order
Material should exist in both the plants (Delivering & Ordering),
Internal customer should be assigned to the ordering plant ( MM -> Purchasing -> Purchase Order -> Setup stock transport order -> assign the internal customer to the ordering plant and assign the Sales area of the internal customer.
Assign its Sales area to the delivering plant
Assign the document type and Delivery type NB and NLCC
Assign the Supplying plant --> Receiving Plant --> NB
Take the delivering plant and assign the sales area.
Vendor master has to be created and assign the supply source (Delivering Plant).
Create a purchase order ME21N ---> Save
Delivery VL10 G ---> Calculation rule (appropriate) --> Assign the purchase order number here and execute.
Select the Delivery creation line and do the back ground process.
Start the log display and see the delivery document number by the documents button
Goto VL02N --> do picking and PGI --> Then do the MIGO with respect to the delivery document.
Billing (Intercompany pricing conditions should be set).
AND
1. Customer No. for the Goods Receiving Plant - OMGN
2. Availability Check- Checking Rule (if necessary) - OMGN
3. Assign a Delivery Type for the Delivering Plant - OMGN (for Stock Transport Orders, NLCC)
4. PO type (which i believe you have done) - OMGN
5. Assign Vendor No. to the Supplying Plant (done) - VK02
6. Assign Customer No. to the Purchasing Plant for the Inter-Company Invoice (but you need to assign this to the Sales Organization pre-assigned to the Purchasing Plant),
IMG-SD-Billing-InterCompany Billing-Define Internal Customer No. by Sales Org
***and by the way for the Invoice to work between Cross-Company Plants, you need also to have a Sales Org for the Supplying Plant and a Pricing Determination Procedure
INTERCOMPANY PRICING:
PI01 Intercompany: fixed amount per material unit
PI02 Intercompany: percentage of the net invoice amount
These condition types specify that the price charged by the delivering plant to the sales organization is shown as a statistical value in the sales order and an effective charge in the internal invoice.
The condition records you create and maintain for intercompany billing are the same kind of records that you create for pricing in general.
IV01 Inter-company Price ERLOS Revenue
IV02 Inter-company % ERLOS Revenue
STO CONFIG:
The following steps have to be followed in order to configure stock transport order between two plants.
1. Create a vendor for the Company code of the receiving plant using account group 0007 via T-Code XK01.
2. In the purchasing data view assign the supplying plant and the schema group
3. Create customer with the sales area of the vendor.
4. The shipping conditions, the delivering plant and the transportation zone determine the route in the STO.
5. In the pricing procedure determination relevant to the STO assign document pricing procedure and customer pricing procedure to get the pricing in the invoice.
6. Maintain condition records for pricing condition.
7. Maintain carrier as a partner in the customer master.
8. In OMGN select the supplying plant and assign the company code and sales area. Similarly select the receiving plant and assign the company code and sales area (The company code to which the plant is assigned to).
9. Assign the delivery type and checking rule to the document type.
10. And finally, assign the purchasing document type to the supplying plant and the receiving plant.
11. Create the STO using T-Code ME 21N and save.
12. Check for release strategy if any and release using T-Code ME 28.
13. Create delivery in background using VL10G.
14. If delivery is created, it is an indication of correct configuration and master data creation.
Stock transfer between two plants in different company codes is known as inter company stock transfer.
Material should be maintained in both supplying and receiving plant MM01
Stock should maintain only in supplying plant MB1C
Create receiving plant as a customer in supplying plants company code and sales area XD01
Assign this customer number in receiving plant details OMGN
Assign supplying sales area in supplying plant details OMGN
Assign delivery type NB for in combination of supplying/ receiving plants.
Create STO ME21N
As it is normal there in the item details we should get shipping date i.e. customer number
Go for Delivery VL10B
Shipping point *****
Select PO go for execute
then select the delivery then go for delvy ............create delvy,,,, delvy number generated.
Goods Issue VL02
Delvy doc **********
Click on picking
enter the picking qty
Click on PGI
in the mean time check in the PO history you will get the details
Goods receipt MIGO
Stock overview the stock will be updated....
Check the below link
http://help.sap.com/saphelp_47x200/helpdata/en/4d/2ba31643ad11d189410000e829fbbd/frameset.htm
Stock transfers that include deliveries and billing documents/invoices are only possible between plants belonging to different company codes.
If you want to carry out a cross-company-code stock transport order with delivery but without a billing document, you must set the Relevant for Billing (data element FKREL) indicator in Customizing of the item type to "blank" (Not relevant for billing).
The following applications are involved in this type of stock transfer:
• Purchasing (MM-PUR) in entering the order
• Shipping (LE-SHP) in making the delivery from the issuing plant
• Billing (SD-BIL) in creating the billing document for the delivery
• Inventory Management (MM-IM) at goods receipt in the receiving plant
Invoice Verification (MM-IV) at invoice receipt in the receiving
Transfer of goods from one location to another location, it may be between plants within the same company code or in different company code's plants.
within the company code, but plants,
receiving plant will raise the STO in Supplying/issuing plant-ME21n,
Supplying plant will deliver the goods to receiving plants ,
then we need to pick n post the Goods Issue-VL02n,
now when we can observe that the STO qty will be added into receiving plant and reduced in Delivering plant,
To do this, we need do prior customization in SPRO-IMG,-
material should be created in both plants( receiving & Supplying)
-maintain the stock only in supplying plant
-create a dummy customer in supplying plant's sales area(if u have one sales area, create in tat comp code n sales area)
-assign this customer number to receiving plant's details along with the sales area,
-Assign the STO doc type(UB) to Supplying plant, along with checking rule
-Assign the Del type (NL/NLCC) to Supplying n receiving plant.
*Del type=NL is not relevant for billing, where as NLCC is relevant for billing
rewards pls
siva

Similar Messages

  • Procurement cycle in third party order and stock transport order.

    please provide me in steps the procurement cycle in third party order and stock transport order.

    Hi,
    STO Process: -
    1.Create a vendor for the company code of receiving plant, using account group :0007 using T-Code XK01.
    2. Assign this vendor to Delivering plant
    Go to XK02 >Purchasing view>Extras>Add. Purchasing data>Plant
    3. Create internal customer with the sales area of the vendor. Go To XD01
    4. In Pricing procedure determination relevant to STO, assign document Pricing Procedure and customer pricing procedure appropriate for STO to get the pricing in the invoice.
    5. Maintain condition records for the relevant pricing condition.
    6. Some more setting for STO: Go to MM> Purchasing > Purchase Order > Set up STO > define shipping data for plants > Go to Receiving plant >assign customer here & Supplying SA (for billing) to Receiving plant here
    7. Go to MM > Purchasing > Purchase Order > Set up STO > define shipping data for plants > Go to Supplying plant and assign the sales area of receiving plant.
    8. Go to MM > Purchasing > Purchase Order > Set up STO > assign delivery Type & Checking rule
    Assign the delivery type to document type. In this case, Delivery type NLCC is assigned to Document type NB
    9. Go to MM> Purchasing > Purchase Order > Set up STO > Assign document Type, One step Procedure, Under delivery tolerance
    Assign the document type NB to supplying plant and receiving plant
    10. After all settings , Create the STO using T-Code:ME21N and maintain pricing conditions of freight and Save.
    11. Create Delivery :VL10G
    Click on the Background Button after selecting line item
    A message is flashed : See log for information> next Click on Log for delivery creation Button >click on line item>click on document button to get Delivery document No
    12. Picking, PGI:VL02N
    13. Billing:VF01
    Save the document and its done
    14. J1IIN - Outgoing Excise Invoice
    15. MIGO - Goods Receipt against outbound Delivery
    16. J1IEX - Capture & Post Excise Invoice
    Pricing configuration for STO: -
    In SPRO > MM > Purchasing > Conditions > Define Price Determination Process > Define Schema Determination > Determine Schema for Stock Transport Orders > Here assign Calculation Schema "RM2000" i.e. Stock Transfer Document to Schema Grp Pur. Org, STO Type (For e.g. UB) and Supplying Plant.
    Calculation Schema "RM2000" has condition type P101 which will pick up the MAP of supplying plant automatically during creation of STO in ME21N ("Conditions" Tab).
    You can create new freight / delivery cost conditions in M/06 and assign in pricing procedure "RM2000" in M/08 and also assign the Accrual Key to this and do the Account Determination for this Accrual Key in OBYC
    At the time of PGI, following accounting entry will get generated;
    Stock A/c - Dr - 110 INR (Receiving Plant)
    Stock A/c - Cr - 100 INR (Supplying Plant)
    Freight Clearing A/c - Cr - 10 INR (Supplying Plant)
    Third Party Process Flow: -
    1) MM01 - General Item category Group should be BANS in basic view of material master.
    2) VA01 - Creation of sales order with VA01 transaction in SD module
    3) When sales order is created system automatically creates a PR for the material with item category as "S"--> Third Party Item
    4) ME21N - Directly PO with item category as "S" and delivery address as customer address
    5) MIGO - Statistical GR by MM ( When it is made goods are received and delivered)
    6) MIRO - Invoice by MM for vendor
    7) VF01 - Billing by SD on Customers

  • Automatic po creation third party order

    Hello Gurus,
    In case of automatic po creation from third party order we have attach purchase organization and vendor to sales organization. This restrict only one vendor against sales organization.
    Is any BADI available which we can use which to change vedor dynamically ?
    Best Regards,
    Vasant

    Dear Vasant,
    For automatic PO at the time of GR following are the prerequisites:
    1) In Customizing
    a) Auto PO generation must be activated in Mov. Type 101 & 161
    b) the plant for which GR is entered must be assigned to standard Pur. Org.
    c) Default Document type for PO must be specified in GR ( MB 01)
    2) Application - Front end side
    a) material must be valuated material
    b) Purchasing Info record must exist for vendor , material & standard Pur Org.
    c) Conditions in Info Records must be valid.
    d) Applicable for stock items & not consumable items
    e) you cannot enter any movement in GR block stock
    f) Material Master & vendor master records must.
    If you ensure all above settings then it is possible to have auto PO during GR.
    Please try,
    Vivek

  • Billing in Third party order process

    Hi,
    In the last stage of TPO Process we need to do billing.kINDLY inform what is the reference document when we want to do billing for a third party order process in VF01, Is it sales order?

    Hi,
    In the Third Party processing,
    You refer the Sales order for creating the Billing document to the end customer
    In the Item category level of the Third party, one field which control the Billing relevance
    If you check the BILLING RELEVANCE for TAS item category, it is F which says, the billing will be based on the MIRO ( vendor invoice)
    In general for Third Party, Vendor will directly send material/Goods to the customer and that notification will be sent to the company.
    If say, out of 10 PO items, Vendor has send only 5 quantity to the customer and we have to bill the customer for only 5 quantities so once the billing is generated it will refer to the invoice quantity of the MIRO
    Hope it is clear,
    regards,
    santosh

  • Tax issue in third party order related intercompany billing

    Hi,
    I have one isseu related to tax determination in third party order related billing document.
    Ordering sales organization : Germany
    Delivering sales organization: France
    In billing document the Delivering country: FR (France)
    Receiving Country: DE (Germany)
    The tax condtion type: MWAS, Application of that condition type: TX.
    Sytem is picking the A1 tax code from country FR and through tax procedure TAXEUR.
    But the actually client requirement is system should pick upt he tax code from country DE (Germany). I.e., system need to pick up from receiving country.
    I tried through SD tax condition records, it is not working.
    I maintained the tax rate through VK11, like
    Departure country (FR) - Destination country (DE)  - Cust.taxclassi - material tax classi - Tax code (XT), the XT is belongs to France, When i maintained this system is not picking the tax amount from FTXP.
    Please let me to come out from this issue.
    Regards
    Lakshmikanth

    Thanks to all

  • Third party order process- tolerances

    Hi
    our client is facing a problem.
    Normally a SO will be issued and then the PO is created with ref. to
    SO (and with same quantity). GR and IR-L will be booked, then SO will appear
    in billing due list  and customer
    invoice will be created.
    But now If PO quantity and GR quantity are not identical, SO is not appearing in billing due
    list. do we set up any tolerances for these in custozmizing.
    what would be the probable reason for this
    can any one please throw some light on this.
    Regards
    GP

    Hi GP,
    Check the billing relevant of Item category used in Sales order item  . This should tell you what is happeneing in your scenario.
    If PO qty and GR qty missmatch occurs , MM config has to be checked to see if any tolerance has been set.
    If SO is not appearing for billing , then you need to check is SO dependent on your GR or IV for billing.
    Assuming it as TAS item category and BANS item category group and third party ordering process.
    Billing Relevance:
    F     Order-related billing doc. - status according to invoice qty  ( Bill after IV done with IV qty)
    G     Order-related billing of the delivery quantity       ( Bill after GR with GR Qty)      
    Thanks,
    Sudhi

  • Third Party Order Processing

    Dear All,
    1.Can anyone explain me the term 'Statistical GR' in Third Party Scenario & also why & how we do it (also the Config settings required for the same).
    2. In third Party Scenario we have order acknowledgement & confirmations so how we do this ??
    Do we use the confirmations tab in the third party PO?? ( If yes wat we have to select - inbound delivery or rough GR)??
    Appreciate all the helpful answers.
    Regards,

    hai
    The account assignment category X in the Customizing system of Purchasing determines whether a goods receipt can be posted for a third-party item. Here you define whether a goods receipt is possible, not allowed or compulsory.
    If a goods receipt is possible, the GR indicator in the purchase order item is changeable. When you enter the purchase order, you decide if a goods receipt is to be posted or not.
    You can only enter a goods receipt for a third-party order if the goods receipt indicator is set in the order item
    we are specifying the account assignment category in the third party po as well as the itemcategory
    so the effect of the gr will be to just like consumption
    we will do the gre just like normal gr to post it to the gr/ir account to verify and to settle the invoice to the vendor
    you can use confirmation key as usual to have the confirmations and acknowledgements

  • Third-Party Order Fulfillment Process Scenario

    Hello,
    I would like to know if any of you have come across a use case where the Third-Party Order Fulfillment is  Not  based on the Supplier/Manufacturer shipping out the material directly But the Buyer (and in some cases even end User/customer) arranges this themselves. This is very common in International Trade where the Buyer/Business arranges the shipment themselves by using the services of a Freight Forwarder who Ships the material to the end user/customer after the Supplier/Manufacturer has made the Material available. In such cases the actual Shipment could take days or weeks from when Material is made ready by the Suppliers.
    Currently the Third-Party Order Fulfillment Process assumes only one scenario and that is the Supplier will ship the material and inform their Buyer of Delivery. But in International Trade this is not the case and the Incoterms in the Purchase Order can be different to the Incoterms in the Sales order example in the PO the incoterms could be Ex-Works and in the SO CIF.
    This leads to requirement of ASN and separate Inbound and Outbound Delivery and their separate Release in this Process as well.
    These are not currently supported in the Third-Party Order Fulfillment process thus the Third-Party Order Fulfillment process in ByD has a very limited use in its current form.
    If there are other users who have come across this as well then it would be nice to have your comments and possible workaround.
    Best regards
    Nick

    There is no standard SAP solution for this requirement.
    You can trigger output from inbound delivery document to generate EDI output and send delivery information to customer.
    You will require to define custom output type , partner profile and link with custom fucntion module.
    FM should have logic to pick information from 3rd party sales order and inbound ASN and generate IDOC
    Hope this solution will work for your requirement

  • Third Party order which was closed is appearing in Customer open credit

    Hi,
    We had earlier closed the status for a partially Invoiced Third party Sales order ,where Goods Receipt quantity was more than the PO and Customer Sales order quantity from Being Processed to completed through a Z transaction.
    The payments for all the quantities delivered to the customers have been received for this particular third party order,but the value of one of the sales order item is showing as an exposure in the customer credit account.
    Since there is no outstanding amount for this Sales order,How can this be resolved so as to this Sales order item amount should not appear in Customer credit account?
    Inputs regarding this would be appreciated.
    Regards
    Mohammed Roshan

    Hi
    Kindly run program RVKRED77 to update the credit value correctly.
    Some times there will be inconsitancy in the credit value updation. So above program can be used to overcome such issue.
    thank you
    regards
    Anirudh

  • Third Party Order processing in case of multiple vendors

    Hi,
    With the third party order processing; purchase requisition gets created automatically based on the scheduling item category. This process works fine when there is only one vendor. In case if we have multiple vendors for the same product; purchase requisition gets created with out any vendor reference. These orders needs manual intervention to assign the source of supply.
    In stead of this; we would like to automate the process of the selecting the vendor automatically? Is there any by means? Currently we do populate the corresponding vendor partner function in the sales order item level. Can this be used as reference vendor during purchase requisition creation process? Is there any configuration or customitization?
    Have any one come across this?
    Thanks for the answer..
    Regards,
    Nagarjuna

    There's a default vendor in source lists.

  • Third-party order processing issue

    Dear,
    In the Third-party order processing,i have finished  SO-PR--PO successfully.
    But when i  Posted Invoice Receipt  for the Purchase Order using T-CODE:MIRO after finishing  Posting the Goods Receipt,it could't work.
    It showed the message'Invoice document still contains messages'.
    I can't find the problem.
    Buy the way it is just in the IDES system,and the data is the std.
    How can i resolve it ?
    TKS!

    hi,
    When doing Miro , There is Tab on top named  Messages. Click on it and assigned to your output type and enter communication method.
    You ll be able to complete your MIRO.
    Revert if not resolved
    Regards
    Amit Gupta

  • Third Party order processing- PR creation

    Hi
    In Third Party Order processing , system creates single Purchase requisition for the all line items in the Sales order. Our requirement is to create individual PR for each line item in the sales order. For Example , if the sales order is having two lines items (10 and 20) with item category TAS, system should create two purchase requisition against line 10 and 20. Is there any customization available to control this ? if not how can we achieve this functionality.
    Thanks in advance for your immediate response.
    With regards,
    Joseph Anand B

    Joseph,
    1. First you need to maintain ZTA1 and ZTA2 two item categories.( Replica of TAS)
    2. Proceed with Item category determination for ZTA1 and Keep ZTA2 as Manual Item Category both the item category should have same details.
    3. Proceed Creating Schedule line categories ZTA1 + MRP type = C1 (Replica of CS - LEG)
        Similarly create another ZTA2 + MRP type = C2 (Replica of CS - LEG)
    Now when you raise a third party order enter the material ( 2 line items) and price and press enter. The first line item will have ZTA1 and second line item also will have ZTA1 change it manually to ZTA2.
    save the document.
    Try this i hope it should work
    Note: But like one of our friend likely pointed out what if it were to be more than 2 items.... just check it out. Does it sound perfect....
    Regards
    Sathya

  • Third-Party Order - Cost from PO incl. Freight into Sales Invoice

    Hello SD gurus,
    Had a question about drop shipments(Third Party Orders). At our company, the third-party order related PO sometimes has Freight/Customs conditions, but they do not come on to the VPRS(cost) condition on the corresponding Sales Invoice. What should I do to make them add up on VPRS?
    See sample PO conditions and history tabs below
    You can see the correct amount(including freight) shows up as cost of goods sold(in the accounting doc for its GR document) below
    But the VPRS line on the sales invoice only shows the GR amount, does not include freight/customs charges as seen below
    Is there any way I can get VPRS to include the Freight/Customs amounts as well. Please help me out....
    My third-party order copy control VTFA configuration for OR =>F2 for ItemCategory TAS, the billing quantity is currently set to F.
    Document Flow for our drop-ship orders is as follows: Creation of sales order triggers creation of a purchase requisition which in-turn gets converted into a PO. Once the GR happens on this Vendor PO the Goods Issue and Sales Invoice is triggered immediately. The Vendor IR comes last.
    Thanks and regards,
    Wayfarer

    Hello
    As per the standard Third party process, cost in the billing document will be picked from Invoice receipt of the vendor (MIRO).
    Basically here the cost determination happens from below three sources.
    1. MIRO (invoice receipt of Vendor)
    2.Goods receipts (MIGO )
    3.Purchase order
    Highest priority is given to the number 1. MIRO.
    In your both the cases, kindly check MIRO price & quantitiy.
    thank you
    Anirudh

  • Delivery address of PO in third-party order processing

    Dear sir,
    The delivery address in PR&PO of  third-party order processing will auto take the 'Ship-to-party' from the SO, but in my company due to special process we want the delivery address default in 'Sold-to-party' of SO.
    Can someone tell me how to cinfigure that or enhancement exit should be used?
    thanks!
    Joseph

    There's a default vendor in source lists.

  • Should Third party order items appear in mD04

    Dear experts,
    We create third party orders where material is directly shipped to our customer from our vendors, material does not come to our inventory, why such orders appear in MD04 , not only orders the PO created for such delivery also appears, we use planning strategy 40 for the material.
    I will appreciate If any one can explain why such orders should appear in MD04 and affect planning.
    Thanks in advance.
    Anand Tripathi

    They should not be, self answered

Maybe you are looking for

  • "Page not found" error after 5 minutes of see "processing" on the screen

    We are using WebLogic 8.1 server and also the WebLogic proxy as our front end. When a user runs a process that takes over 5 minutes using the Proxy URL they receive an IE "Page not found" error after 5 minutes of seeing "processing" on the screen. If

  • I keep getting connection timeouts

    Intermittently, I my MacBook loses its internet connection and I have to restart the computer to get back online. It happens every so often, not at set intervals, but enough that in an hour, I can have to restart everything several times. Read: ANNOY

  • Oracle Text word count in 10g?

    Given a clob column full of text in 10g and a particular word, is there a way to return the frequency (word count) of this word in the documents search? Not a count of the records returned but an actual count of the number of times the word is in the

  • SAP Best Practices --- is it available for mySAPErp 2004 ECC5.0

    Is it possible to implement SAP Best Practices on mySAPErp 2004 ECC 5.0? Also, is best practices available with the Discovery Box? Thanks Devendra Koppikar

  • BinScope 2014 not accepting target path in command line.

    I entered the following in an administrator command prompt: C:\Program Files\Microsoft BinScope 2014>binscope.exe /target "\Release" Microsoft BinScope 2014 BinScope: The path "\Release" did not exist or was a directory. BinScope accepts only paths t