Dear Anand,
Try with,
T. Code: ME11 - Create Info Records
Maintain the same condition in the info-record. The price shall be picked up in the PO by the inforecord.
Best Regards,
Amit
Similar Messages
-
Third party order & Inter copany STO
HI SD Guru's
can anyone tell me please about the configuration steps and the Procedure for "Third Party" & "Inter company STO"
<b><REWARDS OFFER REMOVED BY MODERATOR></b>
Thanksdear SP
THIRD PARTY SCENARIO
in third-party order processing, your company does not deliver the items requested by a customer. Instead, you pass the order along to a third-party vendor who then ships the goods directly to the customer and bills you. A sales order may consist partly or wholly of third-party items. Occasionally, you may need to let a vendor deliver items you would normally deliver yourself.
Process Flow
the processing of third-party orders is controlled via material types. Material types define whether a material is produced only internally can be ordered only from third-party vendors, or whether both are possible. For example, a material that is defined as a trading good can only be ordered from a third-party vendor. However, if you manufacture your own finished products, you may also want, from time to time, to be able to order the same type of product from other vendors.
Processing Third-Party Orders in Sales
Third-party items can be created automatically by the system, depending on how your system is set. However, you can also change a standard item to a third-party item during sales processing manually.
Automatic third-party order processing:-
if a material is always delivered from one or more third-party vendors, you can specify in the material master that the material is a third-party item. During subsequent sales order processing, the system automatically determines the appropriate item category for a third-party item: TAS. To specify a material as a third-party item, enter BANS in the Item category group field in the Sales 2 screen of the material master record.
Manual third-party order processing
In the case of a material that you normally deliver yourself but occasionally need to order from a third-party vendor, you can overwrite the item category during sales order processing. For a material that you normally deliver yourself, you specify the item category group NORM in the material master.
If, as an exception, you use a third-party material, change the entry TAN to TAS in the ItCa field when processing the sales document. The item is then processed as third-party item.
If address data for the ship-to party is changed in the sales order in third-party business transactions, the changed data will automatically be passed on to purchase requisition and also to the purchase order ,if one already exists. In the purchase order, you can display the address data for the ship-to party in the attributes for the item.
You can only change the address data for the ship-to party in the sales order for third-party business transactions, and not in the purchase order.
Processing Third-Party Orders in Purchasing
when you save a sales order that contains one or more third-party items, the system automatically creates a purchase requisition in Purchasing. Each third-party item in a sales order automatically generates a corresponding purchase requisition item. During creation of the requisition, the system automatically determines a vendor for each requisition item. If a sales order item has more than one schedule line, the system creates a purchase requisition item for each schedule line.
Purchase orders are created from purchase requisitions in the usual way. For more information about creating purchase orders, see the Purchasing documentation. During creation of the purchase order, the system automatically copies the delivery address of your customer from the corresponding sales order. In a sales order, you can enter purchase order texts for each third-party item. When you create the corresponding purchase order, the texts are automatically copied into the purchase order. The number of the purchase order appears in the document flow information of the sales order.
All changes made in the purchase order are automatically made in the sales order as well. For example, if the vendor confirms quantities and delivery dates different from those you request and enters them in the purchase order, the revised data is automatically copied into the sales order
you process third-party items by creating a normal sales order. In overview for the order, you can then overwrite the default item category (TAN in the standard system) with the special item category for third-party items: TAS
Billing Third-Party Orders
If relevance for billing indicator for the item category has been set to B (relevant for order-related billing on the basis of the order quantity) in Customizing, the system includes the order in the billing due list immediately. If, however, the indicator has been set to F (relevant to order-related billing on the basis of the invoice quantity), the system does not include the order in the billing due list until an invoice from the vendor has been received and processed by the purchasing department. In the standard system, item category TAS (third-party order processing) has been given billing-relevance indicator F.
In the first case, the third-party order is considered to be completely billed only when the invoiced quantity equals the order quantity of the sales order item. In the second case, each time a vendor invoice is received, a customer invoice is created for the quantity in the vendor invoice and the order is considered to be fully invoiced until the next vendor invoice is received.
If you have activated billing-relevance indicator F for item categories in Customizing, billing can refer to the goods receipt quantity instead of the incoming invoice quantity.
You can control whether the invoice receipt quantity or the quantity of goods received is relevant for billing in Customizing for copying control for billing at item level.
FOR YOUR PROCESS Individual Purchase Orders WELL GIVE THE RIGHT SOLUTION
Individual purchase orders are used when your customer orders goods from you that are not in stock and must be ordered from one or more external vendors.
Process Flow
During sales order entry, the system automatically creates a purchase requisition item. The purchasing department creates a purchase order based on the requisition and the vendor ships the goods directly to you (unlike third party order processing, where the vendor ships directly to your customer). You then ship the goods to your customer. While the goods are part of your inventory, you manage them as part of the sales order stock. Sales order stock consists of stock that is assigned to specific sales orders and cannot be used for other purposes.
Process Flow for 3rd Party Sales
Customize the third party sales in summary:
Prerequisites for 3rd party sales,
Purchasing org,
purchasing group,
assign the Purchase org to company code
assign Purchase org to plant,
should not maintain the stock in material, it should be trading goods,
1. Create Vendor XK01
2. Create Material Material Type as "Trading Goods". Item category group as "BANS".
3. Assign Item Category TAS to Order type that you are going to use.
4. A sale order is created and when saved a PR is generated at the background
5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
7. Goods receipt MIGO
8. Goods issue
9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and, therefore, there is no delivery process attached in the whole process of Third party sales.
10. Billing *--
SD - 3rd party sales order Create Sales Order
VA01
Order Type
Sales org, distr chnl, div
Enter
Sold to
PO #
Material
Quantity
Enter
Save
SD - 3rd party sales order View the PR that is created with a third party sales order
VA01
Order Number
Goto Item Overview
Item ->Schedule Item
SD - 3rd party sales order View the PR that is created
ME52N
Key in the PR number
Save
SD - 3rd party sales order Assign the PR to the vendor and create PO
ME57
Key in the PR number
Toggle the "Assigned Purchase Requisition"
Execute
Check the box next to the material
Assign Automatically button
Click on "Assignments" button
Click on "Process assignment"
The "Process Assignment Create PO" box , enter
Drag the PR and drop in the shopping basket
Save
SD - 3rd party sales order Receive Goods
MIGO_GR
PO Number
DN Number
Batch tab , click on classification
Serial Numbers tab
Date of Production
Flag Item OK
Check, just in case
Post
Save
SD - 3rd party sales order Create Invoice
MIRO
Invoice Date
Look for the PO , state the vendor and the Material
Check the box
Click on "Copy"
Purchase Order Number (bottom half of the screen)
Amount
State the baseline date
Simulate & Post
Invoice Number
*Invoice blocked due to date variance
SD - 3rd party sales order Create a delivery order
VL01N
In the order screen , go to the menu Sales Document , select "Deliver"
Go to "picking" tab
State the qty and save
SD - 3rd party sales order Create a billing document
VF01
Ensure that the delivery document is correct in the
Enter
Go to edit -> Log
Save
STO PROCESS
Stock Transfer Orders comes into picture when the stock is moving / Transferring between two different plants with two Different Company Codes or Stock Transfer between two plants with One Company Code the Difference are given below:
P.O Order types and Delivery Types
STO: - Stock Transfer Order Intra Company
Stock Transfer between Two Plants with One Company code.
The Purchase Order Type is Used in this case is "UB".
And the Delivery Type Used here is "NL".
Goods Movement type: 641
Item Category in delivery is NLN
STPO: - Stock Transfer Purchase Order Inter Company
Stock Transfer Purchase Orders between Two Plants with Two Different Company Codes.
The Purchase Order Type is Used in this case is "NB".
And the Delivery Type Used here is "NLCC".
Goods Movement type: 643
Item Category in delivery is NLC
A. Configure Intercompany Stock Transport Order
Material should exist in both the plants (Delivering & Ordering),
Internal customer should be assigned to the ordering plant ( MM -> Purchasing -> Purchase Order -> Setup stock transport order -> assign the internal customer to the ordering plant and assign the Sales area of the internal customer.
Assign its Sales area to the delivering plant
Assign the document type and Delivery type NB and NLCC
Assign the Supplying plant --> Receiving Plant --> NB
Take the delivering plant and assign the sales area.
Vendor master has to be created and assign the supply source (Delivering Plant).
Create a purchase order ME21N ---> Save
Delivery VL10 G ---> Calculation rule (appropriate) --> Assign the purchase order number here and execute.
Select the Delivery creation line and do the back ground process.
Start the log display and see the delivery document number by the documents button
Goto VL02N --> do picking and PGI --> Then do the MIGO with respect to the delivery document.
Billing (Intercompany pricing conditions should be set).
AND
1. Customer No. for the Goods Receiving Plant - OMGN
2. Availability Check- Checking Rule (if necessary) - OMGN
3. Assign a Delivery Type for the Delivering Plant - OMGN (for Stock Transport Orders, NLCC)
4. PO type (which i believe you have done) - OMGN
5. Assign Vendor No. to the Supplying Plant (done) - VK02
6. Assign Customer No. to the Purchasing Plant for the Inter-Company Invoice (but you need to assign this to the Sales Organization pre-assigned to the Purchasing Plant),
IMG-SD-Billing-InterCompany Billing-Define Internal Customer No. by Sales Org
***and by the way for the Invoice to work between Cross-Company Plants, you need also to have a Sales Org for the Supplying Plant and a Pricing Determination Procedure
INTERCOMPANY PRICING:
PI01 Intercompany: fixed amount per material unit
PI02 Intercompany: percentage of the net invoice amount
These condition types specify that the price charged by the delivering plant to the sales organization is shown as a statistical value in the sales order and an effective charge in the internal invoice.
The condition records you create and maintain for intercompany billing are the same kind of records that you create for pricing in general.
IV01 Inter-company Price ERLOS Revenue
IV02 Inter-company % ERLOS Revenue
STO CONFIG:
The following steps have to be followed in order to configure stock transport order between two plants.
1. Create a vendor for the Company code of the receiving plant using account group 0007 via T-Code XK01.
2. In the purchasing data view assign the supplying plant and the schema group
3. Create customer with the sales area of the vendor.
4. The shipping conditions, the delivering plant and the transportation zone determine the route in the STO.
5. In the pricing procedure determination relevant to the STO assign document pricing procedure and customer pricing procedure to get the pricing in the invoice.
6. Maintain condition records for pricing condition.
7. Maintain carrier as a partner in the customer master.
8. In OMGN select the supplying plant and assign the company code and sales area. Similarly select the receiving plant and assign the company code and sales area (The company code to which the plant is assigned to).
9. Assign the delivery type and checking rule to the document type.
10. And finally, assign the purchasing document type to the supplying plant and the receiving plant.
11. Create the STO using T-Code ME 21N and save.
12. Check for release strategy if any and release using T-Code ME 28.
13. Create delivery in background using VL10G.
14. If delivery is created, it is an indication of correct configuration and master data creation.
Stock transfer between two plants in different company codes is known as inter company stock transfer.
Material should be maintained in both supplying and receiving plant MM01
Stock should maintain only in supplying plant MB1C
Create receiving plant as a customer in supplying plants company code and sales area XD01
Assign this customer number in receiving plant details OMGN
Assign supplying sales area in supplying plant details OMGN
Assign delivery type NB for in combination of supplying/ receiving plants.
Create STO ME21N
As it is normal there in the item details we should get shipping date i.e. customer number
Go for Delivery VL10B
Shipping point *****
Select PO go for execute
then select the delivery then go for delvy ............create delvy,,,, delvy number generated.
Goods Issue VL02
Delvy doc **********
Click on picking
enter the picking qty
Click on PGI
in the mean time check in the PO history you will get the details
Goods receipt MIGO
Stock overview the stock will be updated....
Check the below link
http://help.sap.com/saphelp_47x200/helpdata/en/4d/2ba31643ad11d189410000e829fbbd/frameset.htm
Stock transfers that include deliveries and billing documents/invoices are only possible between plants belonging to different company codes.
If you want to carry out a cross-company-code stock transport order with delivery but without a billing document, you must set the Relevant for Billing (data element FKREL) indicator in Customizing of the item type to "blank" (Not relevant for billing).
The following applications are involved in this type of stock transfer:
Purchasing (MM-PUR) in entering the order
Shipping (LE-SHP) in making the delivery from the issuing plant
Billing (SD-BIL) in creating the billing document for the delivery
Inventory Management (MM-IM) at goods receipt in the receiving plant
Invoice Verification (MM-IV) at invoice receipt in the receiving
Transfer of goods from one location to another location, it may be between plants within the same company code or in different company code's plants.
within the company code, but plants,
receiving plant will raise the STO in Supplying/issuing plant-ME21n,
Supplying plant will deliver the goods to receiving plants ,
then we need to pick n post the Goods Issue-VL02n,
now when we can observe that the STO qty will be added into receiving plant and reduced in Delivering plant,
To do this, we need do prior customization in SPRO-IMG,-
material should be created in both plants( receiving & Supplying)
-maintain the stock only in supplying plant
-create a dummy customer in supplying plant's sales area(if u have one sales area, create in tat comp code n sales area)
-assign this customer number to receiving plant's details along with the sales area,
-Assign the STO doc type(UB) to Supplying plant, along with checking rule
-Assign the Del type (NL/NLCC) to Supplying n receiving plant.
*Del type=NL is not relevant for billing, where as NLCC is relevant for billing
rewards pls
siva -
Third-Party Order - Cost from PO incl. Freight into Sales Invoice
Hello SD gurus,
Had a question about drop shipments(Third Party Orders). At our company, the third-party order related PO sometimes has Freight/Customs conditions, but they do not come on to the VPRS(cost) condition on the corresponding Sales Invoice. What should I do to make them add up on VPRS?
See sample PO conditions and history tabs below
You can see the correct amount(including freight) shows up as cost of goods sold(in the accounting doc for its GR document) below
But the VPRS line on the sales invoice only shows the GR amount, does not include freight/customs charges as seen below
Is there any way I can get VPRS to include the Freight/Customs amounts as well. Please help me out....
My third-party order copy control VTFA configuration for OR =>F2 for ItemCategory TAS, the billing quantity is currently set to F.
Document Flow for our drop-ship orders is as follows: Creation of sales order triggers creation of a purchase requisition which in-turn gets converted into a PO. Once the GR happens on this Vendor PO the Goods Issue and Sales Invoice is triggered immediately. The Vendor IR comes last.
Thanks and regards,
WayfarerHello
As per the standard Third party process, cost in the billing document will be picked from Invoice receipt of the vendor (MIRO).
Basically here the cost determination happens from below three sources.
1. MIRO (invoice receipt of Vendor)
2.Goods receipts (MIGO )
3.Purchase order
Highest priority is given to the number 1. MIRO.
In your both the cases, kindly check MIRO price & quantitiy.
thank you
Anirudh -
Order related billing for third party. Third party order..
Hi
While we are running batch job for billing system is throwing below error.
Order related billing for third party. Third party order..Dear Nortel,
Can you Please check whether, during the item category configuration for TAS (T. Code: VOV7); you have marked relevant for billing indicator as F?
Also, maintained the copy control (T. Code: VTFA) between OR => IVA (for TAS) as follows:
Copying requirement = '013',
Invoiced quantity = 'F', (*)
Quantity/value = '+',
Pricing type = 'G'.
Best Regards,
Amit
Note: I would recommend you to Please go-through following document in full, atleast fo once. This will definitely help you to review your settings for Third Party Order Process Customization.
[Third Party Process|http://yasosap.wordpress.com/2008/10/22/third-party-scenario/] -
Procurement cycle in third party order and stock transport order.
please provide me in steps the procurement cycle in third party order and stock transport order.
Hi,
STO Process: -
1.Create a vendor for the company code of receiving plant, using account group :0007 using T-Code XK01.
2. Assign this vendor to Delivering plant
Go to XK02 >Purchasing view>Extras>Add. Purchasing data>Plant
3. Create internal customer with the sales area of the vendor. Go To XD01
4. In Pricing procedure determination relevant to STO, assign document Pricing Procedure and customer pricing procedure appropriate for STO to get the pricing in the invoice.
5. Maintain condition records for the relevant pricing condition.
6. Some more setting for STO: Go to MM> Purchasing > Purchase Order > Set up STO > define shipping data for plants > Go to Receiving plant >assign customer here & Supplying SA (for billing) to Receiving plant here
7. Go to MM > Purchasing > Purchase Order > Set up STO > define shipping data for plants > Go to Supplying plant and assign the sales area of receiving plant.
8. Go to MM > Purchasing > Purchase Order > Set up STO > assign delivery Type & Checking rule
Assign the delivery type to document type. In this case, Delivery type NLCC is assigned to Document type NB
9. Go to MM> Purchasing > Purchase Order > Set up STO > Assign document Type, One step Procedure, Under delivery tolerance
Assign the document type NB to supplying plant and receiving plant
10. After all settings , Create the STO using T-Code:ME21N and maintain pricing conditions of freight and Save.
11. Create Delivery :VL10G
Click on the Background Button after selecting line item
A message is flashed : See log for information> next Click on Log for delivery creation Button >click on line item>click on document button to get Delivery document No
12. Picking, PGI:VL02N
13. Billing:VF01
Save the document and its done
14. J1IIN - Outgoing Excise Invoice
15. MIGO - Goods Receipt against outbound Delivery
16. J1IEX - Capture & Post Excise Invoice
Pricing configuration for STO: -
In SPRO > MM > Purchasing > Conditions > Define Price Determination Process > Define Schema Determination > Determine Schema for Stock Transport Orders > Here assign Calculation Schema "RM2000" i.e. Stock Transfer Document to Schema Grp Pur. Org, STO Type (For e.g. UB) and Supplying Plant.
Calculation Schema "RM2000" has condition type P101 which will pick up the MAP of supplying plant automatically during creation of STO in ME21N ("Conditions" Tab).
You can create new freight / delivery cost conditions in M/06 and assign in pricing procedure "RM2000" in M/08 and also assign the Accrual Key to this and do the Account Determination for this Accrual Key in OBYC
At the time of PGI, following accounting entry will get generated;
Stock A/c - Dr - 110 INR (Receiving Plant)
Stock A/c - Cr - 100 INR (Supplying Plant)
Freight Clearing A/c - Cr - 10 INR (Supplying Plant)
Third Party Process Flow: -
1) MM01 - General Item category Group should be BANS in basic view of material master.
2) VA01 - Creation of sales order with VA01 transaction in SD module
3) When sales order is created system automatically creates a PR for the material with item category as "S"--> Third Party Item
4) ME21N - Directly PO with item category as "S" and delivery address as customer address
5) MIGO - Statistical GR by MM ( When it is made goods are received and delivered)
6) MIRO - Invoice by MM for vendor
7) VF01 - Billing by SD on Customers -
Third party Order Configuration
Hi Gurus,
In third Party Order Configuration i want to Configure in such a way that PR00 pricing condition type which I have maintained in my pricing Procedure must trigger the price maintained by the vendor in the incoming invoice?
How to do the above configuration?
Regards,
SaroshHi,
In such a scenario, you have only one option of maintaining your PR00 = PB00.
PB00 is vendor's price maintained in the purchasing document.
with this you can have a control over this.
Else i dont think there is a configuration option avaialable if your vendor price is variying every now and then.
Always ensure PR00 = PB00
Hope this will help you out !
Regards,
Syed Nasir -
HI SAP GURUS
CAN ANY ONE HELP ME OUT
1. WHAT IS THIRD PARTY ORDERING? HOW WE CONFIGURE THIRD PARTY ORDERING ? DOES DELIVERY OCCURS IN THIRD PARTY ORDERING? WHEN
2. IF I HAVE GOT 4PLANTS HTEN HOW MANY BILLING CAN BE DONE?
3. AFTER PGI WHAT HAPPENS IN FI ? WHICH ACCOUNT IS CREDITED WHICH ONES DEBITED?
4. IN PRICING PROCEDURE I HAVE NET PRICE AS Rs100 AND TAX IS Rs30 THE TOTAL IS Rs130. WHICH ACCOUNT ISDEBITED AND WHICH ACCOUNT IS CREDITED?
5. HOW STOREGE LOCATION IS DETERMINED? WHAT IS MALA AND WHAT IS RITA
THANKS AND REGARDS
RAMHi ram
this is the process of third party.
process Flow for 3rd Party Sales
Customize the third party sales in summary:
1. Create Vendor XK01
2. Create Material Material Type as "Trading Goods". Item category group as "BANS".
3. Assign Item Category TAS to Order type that you are going to use.
4. A sale order is created and when saved a PR is generated at the background
5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
7. Goods receipt MIGO
8. Goods issue
9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and, therefore, there is no delivery process attached in the whole process of Third party sales.
10. Billing *-- Seema Dhar
SD - 3rd party sales order Create Sales Order
VA01
Order Type
Sales org, distr chnl, div
Enter
Sold to
PO #
Material
Quantity
Enter
Save
SD - 3rd party sales order View the PR that is created with a third party sales order
VA01
Order Number
Goto Item Overview
Item ->Schedule Item
SD - 3rd party sales order View the PR that is created
ME52N
Key in the PR number
Save
SD - 3rd party sales order Assign the PR to the vendor and create PO
ME57
Key in the PR number
Toggle the "Assigned Purchase Requisition"
Execute
Check the box next to the material
Assign Automatically button
Click on "Assignments" button
Click on "Process assignment"
The "Process Assignment Create PO" box , enter
Drag the PR and drop in the shopping basket
Save
SD - 3rd party sales order Receive Goods
MIGO_GR
PO Number
DN Number
Batch tab , click on classification
Serial Numbers tab
Date of Production
Flag Item OK
Check, just in case
Post
Save
SD - 3rd party sales order Create Invoice
MIRO
Invoice Date
Look for the PO , state the vendor and the Material
Check the box
Clilck on "Copy"
Purchase Order Number (bottom half of the screen)
Amount
State the baseline date
Simulate & Post
Invoice Number
*Invoice blocked due to date variance
SD - 3rd party sales order Create a delivery order
VL01N
In the order screen , go to the menu Sales Document , select "Deliver"
Go to "picking" tab
State the qty and save
SD - 3rd party sales order Create a billing document
VF01
Ensure that the delivery document is correct in the
Enter
Go to edit -> Log
Save
Please Reward Points. If you feel this answer add value to you
Thanks & Regards
Mubeen. -
Automatic po creation third party order
Hello Gurus,
In case of automatic po creation from third party order we have attach purchase organization and vendor to sales organization. This restrict only one vendor against sales organization.
Is any BADI available which we can use which to change vedor dynamically ?
Best Regards,
VasantDear Vasant,
For automatic PO at the time of GR following are the prerequisites:
1) In Customizing
a) Auto PO generation must be activated in Mov. Type 101 & 161
b) the plant for which GR is entered must be assigned to standard Pur. Org.
c) Default Document type for PO must be specified in GR ( MB 01)
2) Application - Front end side
a) material must be valuated material
b) Purchasing Info record must exist for vendor , material & standard Pur Org.
c) Conditions in Info Records must be valid.
d) Applicable for stock items & not consumable items
e) you cannot enter any movement in GR block stock
f) Material Master & vendor master records must.
If you ensure all above settings then it is possible to have auto PO during GR.
Please try,
Vivek -
Tax issue in third party order related intercompany billing
Hi,
I have one isseu related to tax determination in third party order related billing document.
Ordering sales organization : Germany
Delivering sales organization: France
In billing document the Delivering country: FR (France)
Receiving Country: DE (Germany)
The tax condtion type: MWAS, Application of that condition type: TX.
Sytem is picking the A1 tax code from country FR and through tax procedure TAXEUR.
But the actually client requirement is system should pick upt he tax code from country DE (Germany). I.e., system need to pick up from receiving country.
I tried through SD tax condition records, it is not working.
I maintained the tax rate through VK11, like
Departure country (FR) - Destination country (DE) - Cust.taxclassi - material tax classi - Tax code (XT), the XT is belongs to France, When i maintained this system is not picking the tax amount from FTXP.
Please let me to come out from this issue.
Regards
LakshmikanthThanks to all
-
Reg Third party order processing.
Hi Gurus,
Please help me on the following questions.
1. In third party order processing how costing is updated?
2. How automatic purchase requisition will be generated in third party order processing?
3. Explain about Third party returns process step wise?
Thanks in advance,msi.
Regards,
Vamsi PHI vamsi
Customize the third party sales in summary:
1. Create Vendor XK01
2. Create Material Material Type as "Trading Goods". Item category group as "BANS".
3. Assign Item Category TAS to Order type that you are going to use.
4. A sale order is created and when saved a PR is generated at the background
5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
7. Goods receipt MIGO
8. Goods issue
9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and, therefore, there is no delivery process attached in the whole process of Third party sales.
10. Billing *--
In Details:----
SD - 3rd party sales order Create Sales Order
VA01
Order Type
Sales org, distr chnl, div
Enter
Sold to
PO #
Material
Quantity
Enter
Save
SD - 3rd party sales order View the PR that is created with a third party sales order
VA01
Order Number
Goto Item Overview
Item ->Schedule Item
SD - 3rd party sales order View the PR that is created
ME52N
Key in the PR number
Save
SD - 3rd party sales order Assign the PR to the vendor and create PO
ME57
Key in the PR number
Toggle the "Assigned Purchase Requisition"
Execute
Check the box next to the material
Assign Automatically button
Click on "Assignments" button
Click on "Process assignment"
The "Process Assignment Create PO" box , enter
Drag the PR and drop in the shopping basket
Save
SD - 3rd party sales order Receive Goods
MIGO_GR
PO Number
DN Number
Batch tab , click on classification
Serial Numbers tab
Date of Production
Flag Item OK
Check, just in case
Post
Save
SD - 3rd party sales order Create Invoice
MIRO
Invoice Date
Look for the PO , state the vendor and the Material
Check the box
Clilck on "Copy"
Purchase Order Number (bottom half of the screen)
Amount
State the baseline date
Simulate & Post
Invoice Number
*Invoice blocked due to date variance
SD - 3rd party sales order Create a delivery order
VL01N
In the order screen , go to the menu Sales Document , select "Deliver"
Go to "picking" tab
State the qty and save
SD - 3rd party sales order Create a billing document
VF01
Ensure that the delivery document is correct in the
Enter
Go to edit -> Log
Save
reward if helpful.
Regards,
Prashant -
helo all.
There is a third party purchase order created from a sales order.
I have marked deletion flags on all the line items in purchase order, but in sales order it is not reflecting.
kindly guide me.
Thanks in advanceHi,
Just to share with you, in my previous R/3 4.6C implementation for standard third party order processing, once I changed the quantity in PO related to 3rd party SO, it will automatically copied into SO. However NOT for DELETION item in PO.
In this case, MRP and Purchaser are still can see the deleted item as open requirement. It was matched with our requirement.
Regards,
Gumanti -
Cutomizing of Third Party Order
Hi All,
Can any help me in the process of customizing of Third Party Orders in SD and MM.
Regardshi
in third party processing the material should have item category group as "BANS" and the item category should be "TAS" which results in schedule line category "CS" which should have "NB" as document type.
first create a vendor with "XK01"
should have maontained purchase info record "ME01"
should have maintained source list "ME11"
now create a sales order using VA01 which will create the purchase requissition automatically as soon as you save the order.
now goto VA02 and schedule lines data make a note of purchase requisition number and now create a purcjhase order with ref to PR
goto ME57 or ME58 create a purchase order
goto MIGO for goods recipt
goto MIRO for invoice receipt
now do VF01 to your customer
http://help.sap.com/saphelp_46c/helpdata/en/70/a7853478616434e10000009b38f83b/frameset.htm
1. Create Vendor XK01
2. Create Material – Material Type as "Trading Goods". Item category group as "BANS".
3. Assign Item Category TAS to Order type that you are going to use.
4. A sale order is created and when saved a PR is generated at the background
5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
7. Goods receipt MIGO
8. Goods issue
9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and, therefore, there is no delivery process attached in the whole process of Third party sales.
10. Billing
SD - 3rd party sales order Create Sales Order
VA01
Order Type
Sales org, distr chnl, div
Enter
Sold to
PO #
Material
Quantity
Enter
Save
SD - 3rd party sales order View the PR that is created with a third party sales order
VA01
Order Number
Goto Item Overview
Item ->Schedule Item
SD - 3rd party sales order View the PR that is created
ME52N
Key in the PR number
Save
SD - 3rd party sales order Assign the PR to the vendor and create PO
ME57
Key in the PR number
Toggle the "Assigned Purchase Requisition"
Execute
Check the box next to the material
Assign Automatically button
Click on "Assignments" button
Click on "Process assignment"
The "Process Assignment Create PO" box , enter
Drag the PR and drop in the shopping basket
Save
SD - 3rd party sales order Receive Goods
MIGO_GR
PO Number
DN Number
Batch tab , click on classification
Serial Numbers tab
Date of Production
Flag Item OK
Check, just in case
Post
Save
SD - 3rd party sales order Create Invoice
MIRO
Invoice Date
Look for the PO , state the vendor and the Material
Check the box
Clilck on "Copy"
Purchase Order Number (bottom half of the screen)
Amount
State the baseline date
Simulate & Post
Invoice Number
*Invoice blocked due to date variance
SD - 3rd party sales order Create a delivery order
VL01N
In the order screen , go to the menu Sales Document , select "Deliver"
Go to "picking" tab
State the qty and save
SD - 3rd party sales order Create a billing document
VF01
Ensure that the delivery document is correct in the
Enter
Go to edit -> Log
Save
with regards to auto PO, tick the item category control at VOV7 for the field create automatic PO, and at schedule line category mention the material account assignment, maintain Purchase Order type, MM item category. -
Third Party Order Billing Date
Dear Group,
Can someone assist me on the issue i am having on Third Party Orders. I have my system set up for Billing Relevenace = B (order related) so that i can create the billing document based onthe goods receipt. We are doing goods reciept with inbound delivery.
What i need to know is how can i have billing date updated? In the initial sales order the billing date is getting set based on the requested delivery date. If the goods are shipped early the billing document is not coming up on the billing due list till the billing date on the sales order and thus will not be billed until the original bill date.
How are others dealing with this issue?
Another question, if we want to pass freight charges on to customer invoice how can we do that based on the inbound delivery? I am adding freight to header delivery docuement for standard deliveries, but not able to get pricing procedure for inbound deliveris.
Thanks in advance.Why would you do an inbound delivery and goods receipt on a 3rd party order? The point of 3rd party order is so you don't have to bring the inventory into the distribution center and process it in and out. Your billing should be based on the statistical goods receipt on the purchase order, which is when the factory should deliver the goods to the customer.
-
HI SD Gurus,
I would like to know the process (mainly the list of documents), how is followed for Third party order processing in Indian scenerio.
When the vendor is supplying the goods to the customer, what are all the documents needs to be carried along with the consignment?
When the Business raising Invoice to customer, what are all the documents needs to be sent to customer?
In particularly, who will pay excise duty and sales tax etc,.
Expecting your valuable response.
In case, if you need more clarity, please feel free to ask me...
Regards,
ManiHi Swamy & SD Gurus,
Let me explain more on my question.
In Third party order processing, Vendor is supplying the goods to Customer on behalf of Business. Here is my doubts :-
1) What are all the documents to be sent to Customer by the Vendor?
2) Who will pay the excise duty (Whether the Vendor or Business)? (as per my knowledge, Excise duty is on Manufacuruing)
3) Who will pay the Sales Tax? (to my knowledge Sales Tax is only at the time of Sales) - In this case, whether the sales tax is applicable or not
When the Business sends the Invocie to cutomer -
1) What are all the document will be sent to customer by Business?
2) When Business raises the Invoice to customer, how is Pricing , Excise duty, Sales Tax are calculated?
Here I don't like to know the setting in SAP (however this is later stage), at least, would like to know the business process...
Hope you understand the questions......
Thank you
Regards,
Mani -
Order Related Intercompany Billing - Third Party Order
Dear all,
I have configured intercompany billing that is based on the delivery and i have done that successfully, then I tried the third party process but after billing the third party order then the intercompany billing doesn't show up in the vf04, I have searched the SAP Notes especially SAP Notes 63459 but I really haven't got the clue how to do that clearly, if somebody can help me how to configure the intercompany billing for my requirement. I'm using SAP 5.0. I believe something missing in the copying control between sales document and billing document and also for the output type.Please help me very urgent.hi,
Customizing settings are reported in notes 338922, 109254 and 308989.
During delivery creation the LIKP fields VKOIV/VTWIV/SPAIV/FKAIV/PIOIV/FKDIV/KUNIV must be filled in program FV50XFLK_LIKP_FUELLEN_IV_UML. If you checkt this table and not all of these fields are filled, you have the wrong the customizing. If the error is in your pruduction there is a report with which you can correct the relevant deliveries (of course after correcting your customizing): see note 176476.
Balazs
Maybe you are looking for
-
Migrating to new macbook air with Lion, entourage 2008 doesn't work
I bought a new macbook air with lion installed. trying to migrate data from my old macbook with snow leopard. Got most data across, and installed my most frequently used applications: - office 2008: most office apps 2008 work, if buggily. entourage
-
Error: Cannot save DataSource 3.x
Hi All, We are on BI 7.0 support pack 20. I am getting the below error while running the program RSTCC_ACTIVATEADMINCOCKPIT_NEW to intall/activate the Admin Cockpit. Cannot save DataSource 3.x 0TCTBWOBJCT_ATTR(STG-010) Message no. RSAOLTP077 Diagnosi
-
How to undo the changed record!
Hi I have edit a record in my form (haven't been saved). Now, I want to undo the changes on my record. How can I do that? Thanks null
-
Register RG23C not getting updated
Dear Frirnds, Hello! Pl guide me in the following case: I am transfering the <b>excisable goods</b> from plant 1 to plant 2 under the same company code by using <b>STO without delivery.</b> I did goods issue with 351 mvt in plant 1 m
-
How do I to add a calendar in a dropdown
How do I to add a calendar in a dropdown