Third party sales problem

Hi ,
While doing third party process i'm getting error that " Purchase order do not any item" this has come when i hve done MIGO.
help in this matter.
Regards

Hi Singh,
U created PO without items. That;s why ur getting that error.
U create one more PO with reference to PR using the t.code ME57.
Reward points pls.
Regards,
Govind.

Similar Messages

  • Third Party Sales Order issue ! please solve my problem

    Dear all,
               when I am creating third party sales order,system is going to 'Standard Order:Purchase Order Schedule' screen.So,it confirm the quantity after 1 day instead of my particular given date.can anybody tell me why it is showing this screen ? how can I overcome this problem ? Please give me suggestion .
    with regards,
      Rana

    There are two lead times involved -
    1. Purchase Lead time - time reqd. by internal purchasing dept. for processing
    2. Vendor Lead Time - time reqd. by vendor to deliver.
    For vendor lead time check in ME11 (vendor material info record). In the Purchasing Org Data 1 tab - check planned delivery time.
    Also in Material Master - in Purchasing tab - check GR processing field. Also pls. check other fields in purchasing and MRP tabs.
    Also Check - SPRO > MATERIALS MANAGEMENT > PURCHASING > PURCHASE REQUISITION > PROCESSING TIME
    Thanks

  • Problem related to Third Party Sales

    Dear All,
    The problem as per the company's requirement are as follows -
    There are two different Companies X & Y having Company Codes 1000 & 1020 respectively where Company Y is a FZE ( free zone enterprise). Now Company X is selling goods to Company Y where the ship to party is customer 2 under Company Y while the payer is Company Y.In short Company X will not raise any invoice against customer 2 of company Y , it will only send an invoice to Company Y which in turn will raise an invoice immediately against it's customer 2.No GR (Goods Receipt) will take place between the two companies as it will get generated when it is received by customer 2.How to configure this with the help of Third Party Sales in SD Module ?
    Please suggest.
    Thanks & Regards
    Priyanka Mitra

    Hi Priyanka,
    Please go through below step by step procedure...c it might help u to solve your problem
    please let me know ,if u didnt get solution
    Third party order processing is as follows:
    Assume three companies X, Y and Z
    X - The company,
    y - The customer
    Z - Vendor
    When ever X gets a PO from Y to supply some goods, X has an option of either manufacturing those goods or procuring those goods.
    If he is procuring the goods, there are two methods that are generally followed:
    Method 1) After receiving the PO from Y, X creates a sales order against Y.
    Now at the same time he also creates a PO to a vendor Z to produce the goods
    Z produces the goods and supplies to X
    X receives the goods from Z
    Then X delivers the same goods to Y.
    After that X invoices Y and Z invoices X.
    Note : Here there is no direct/ Indirect relation between Z and Y.
    This process is known as Trading Process. and the Material here is created with Material type HAWA.
    The other method is a Third party order processing method:
    Here the glaring difference is that instead of Z supplying the material to X and X in turn supplying the same material to Y.
    X authorizes Z to supply the material to Y on his behalf and notify him once the delivery is complete.
    Now Z supplies the material to Y and acknowledges the same to X.
    Z will send a copy of delivery acknowledgement and invoice to X.
    After receiving the delivery confirmation and invoice from Z, X has to verify the invoice and this process is known as invoice verification and is done in SAP through Tcode MIRO.
    The next step for X is to create an invoice and submit to Y
    Only after the invoice verification document is posted then only X can create an invoice for Y.
    This is the business flow that is followed for third party order configuration.
    There are few steps that have to be configured to enable the system to function as mentioned above.
    Step1)
    If you are always followwing a third party process for a material then you have to create the material using item category group BANS.
    The procument type should be marked as External procurement (F) in MRP 2 view of the material master record.
    if you are not always allowing third party order processing then u can create a material master record with item category group as NORM and the procurement type should be marked as ( X) meaning both types of procurment ( in house manufacturing and external procurement).
    step 2)
    the item category in the order should be manually changed as TAS.
    For that you need to confugure the item category determination
    ord type + item cat grp + usge + Hiv level = Item cat + Manual item cat
    OR + NORM + + = TAN . + TAS
    OR + BANS + + = TAS
    Step 3)
    make sure that during the item category configuration for TAS you need to mark relevnat for billing indicator as F
    step 4)
    The schedule line cateogry for this type should be CS.
    make sure that you mark subsequent type as NB - purchase requisition in this schedule line category as this will trigger the purchase requision order immediately after the creation of the sales order and the PO to vendor is created against this purchase requiesion
    Accordingly you can create documents related to 3rd party sales.
    Please reward with points if it really helps you
    With best regards
    Abhi
    Moderator message:
    LWarning. Plagiarism.
    Source:
    https://forums.sdn.sap.com/admin/moderation.jspa?forumID=0&enableApproved=false#
    Edited by: Csaba Szommer on Dec 24, 2011 10:44 PM

  • Problem in third party sales

    HI ALL
    CAN ANY ONE GIVE ON THE BRIEF INTRODUCTION ON THIRD PARTY ORDER / INDIVIDUAL PURCHASE ORDER.
    PLS GIVE  ME REPLY ASAP.......
    REGARDS
    RAO

    THIRD PARTY SCENARIO
    in third-party order processing, your company does not deliver the items requested by a customer. Instead, you pass the order along to a third-party vendor who then ships the goods directly to the customer and bills you. A sales order may consist partly or wholly of third-party items. Occasionally, you may need to let a vendor deliver items you would normally deliver yourself.
    Process Flow
    the processing of third-party orders is controlled via material types. Material types define whether a material is produced only internally can be ordered only from third-party vendors, or whether both are possible. For example, a material that is defined as a trading good can only be ordered from a third-party vendor. However, if you manufacture your own finished products, you may also want, from time to time, to be able to order the same type of product from other vendors.
    Processing Third-Party Orders in Sales
    Third-party items can be created automatically by the system, depending on how your system is set. However, you can also change a standard item to a third-party item during sales processing manually.
    Automatic third-party order processing:-
    if a material is always delivered from one or more third-party vendors, you can specify in the material master that the material is a third-party item. During subsequent sales order processing, the system automatically determines the appropriate item category for a third-party item: TAS. To specify a material as a third-party item, enter BANS in the Item category group field in the Sales 2 screen of the material master record.
    Manual third-party order processing
    In the case of a material that you normally deliver yourself but occasionally need to order from a third-party vendor, you can overwrite the item category during sales order processing. For a material that you normally deliver yourself, you specify the item category group NORM in the material master.
    If, as an exception, you use a third-party material, change the entry TAN to TAS in the ItCa field when processing the sales document. The item is then processed as third-party item.
    If address data for the ship-to party is changed in the sales order in third-party business transactions, the changed data will automatically be passed on to purchase requisition and also to the purchase order ,if one already exists. In the purchase order, you can display the address data for the ship-to party in the attributes for the item.
    You can only change the address data for the ship-to party in the sales order for third-party business transactions, and not in the purchase order.
    Processing Third-Party Orders in Purchasing
    when you save a sales order that contains one or more third-party items, the system automatically creates a purchase requisition in Purchasing. Each third-party item in a sales order automatically generates a corresponding purchase requisition item. During creation of the requisition, the system automatically determines a vendor for each requisition item. If a sales order item has more than one schedule line, the system creates a purchase requisition item for each schedule line.
    Purchase orders are created from purchase requisitions in the usual way. For more information about creating purchase orders, see the Purchasing documentation. During creation of the purchase order, the system automatically copies the delivery address of your customer from the corresponding sales order. In a sales order, you can enter purchase order texts for each third-party item. When you create the corresponding purchase order, the texts are automatically copied into the purchase order. The number of the purchase order appears in the document flow information of the sales order.
    All changes made in the purchase order are automatically made in the sales order as well. For example, if the vendor confirms quantities and delivery dates different from those you request and enters them in the purchase order, the revised data is automatically copied into the sales order
    you process third-party items by creating a normal sales order. In overview for the order, you can then overwrite the default item category (TAN in the standard system) with the special item category for third-party items: TAS
    Billing Third-Party Orders
    If relevance for billing indicator for the item category has been set to B (relevant for order-related billing on the basis of the order quantity) in Customizing, the system includes the order in the billing due list immediately. If, however, the indicator has been set to F (relevant to order-related billing on the basis of the invoice quantity), the system does not include the order in the billing due list until an invoice from the vendor has been received and processed by the purchasing department. In the standard system, item category TAS (third-party order processing) has been given billing-relevance indicator F.
    In the first case, the third-party order is considered to be completely billed only when the invoiced quantity equals the order quantity of the sales order item. In the second case, each time a vendor invoice is received, a customer invoice is created for the quantity in the vendor invoice and the order is considered to be fully invoiced until the next vendor invoice is received.
    If you have activated billing-relevance indicator F for item categories in Customizing, billing can refer to the goods receipt quantity instead of the incoming invoice quantity.
    You can control whether the invoice receipt quantity or the quantity of goods received is relevant for billing in Customizing for copying control for billing at item level.
    FOR YOUR PROCESS Individual Purchase Orders WELL GIVE THE RIGHT SOLUTION
    Individual purchase orders are used when your customer orders goods from you that are not in stock and must be ordered from one or more external vendors.
    Process Flow
    During sales order entry, the system automatically creates a purchase requisition item. The purchasing department creates a purchase order based on the requisition and the vendor ships the goods directly to you (unlike third party order processing, where the vendor ships directly to your customer). You then ship the goods to your customer. While the goods are part of your inventory, you manage them as part of the sales order stock. Sales order stock consists of stock that is assigned to specific sales orders and cannot be used for other purposes.
    Process Flow for 3rd Party Sales
    Customize the third party sales in summary:
    Prerequisites for 3rd party sales,
    Purchasing org,
    purchasing group,
    assign the Purchase org to company code
    assign Purchase org to plant,
    should not maintain the stock in material, it should be trading goods,
    1. Create Vendor XK01
    2. Create Material – Material Type as "Trading Goods". Item category group as "BANS".
    3. Assign Item Category TAS to Order type that you are going to use.
    4. A sale order is created and when saved a PR is generated at the background
    5. With reference to SO a PO is created (ME21N). The company raises PO to the vendor.
    6. Vendor delivers the goods and raises bill to company. MM receives the invoice MIRO
    7. Goods receipt MIGO
    8. Goods issue
    9. The item cat TAS or Schedule line cat CS is not relevant for delivery which is evident from the config and, therefore, there is no delivery process attached in the whole process of Third party sales.
    10. Billing *--
    SD - 3rd party sales order Create Sales Order
    VA01
    Order Type
    Sales org, distr chnl, div
    Enter
    Sold to
    PO #
    Material
    Quantity
    Enter
    Save
    SD - 3rd party sales order View the PR that is created with a third party sales order
    VA01
    Order Number
    Goto Item Overview
    Item ->Schedule Item
    SD - 3rd party sales order View the PR that is created
    ME52N
    Key in the PR number
    Save
    SD - 3rd party sales order Assign the PR to the vendor and create PO
    ME57
    Key in the PR number
    Toggle the "Assigned Purchase Requisition"
    Execute
    Check the box next to the material
    Assign Automatically button
    Click on "Assignments" button
    Click on "Process assignment"
    The "Process Assignment Create PO" box , enter
    Drag the PR and drop in the shopping basket
    Save
    SD - 3rd party sales order Receive Goods
    MIGO_GR
    PO Number
    DN Number
    Batch tab , click on classification
    Serial Numbers tab
    Date of Production
    Flag Item OK
    Check, just in case
    Post
    Save
    SD - 3rd party sales order Create Invoice
    MIRO
    Invoice Date
    Look for the PO , state the vendor and the Material
    Check the box
    Click on "Copy"
    Purchase Order Number (bottom half of the screen)
    Amount
    State the baseline date
    Simulate & Post
    Invoice Number
    *Invoice blocked due to date variance
    SD - 3rd party sales order Create a delivery order
    VL01N
    In the order screen , go to the menu Sales Document , select "Deliver"
    Go to "picking" tab
    State the qty and save
    SD - 3rd party sales order Create a billing document
    VF01
    Ensure that the delivery document is correct in the
    Enter
    Go to edit -> Log
    Save

  • Problem in Partial Billing for Third Party Sales with Shipping Notification

    Hello Guys,
    There is one issue related to a scenario of Third party Sales with shipping notification. Here the basic process that runs
    are : Sales order --- > PR -- > PO --> MIGO --> Billing document --> Vendor Invoice Verification.
    In this specific scenario, partial billing is not happening and the billing relevance for item category "B" and in copying control data
    from sales order to billing doccument, the biling quantity field is "A".
    Could anyone throw some light on the configuration part so that partial invoicing can happen ??? Please make a note of the fact
    that billing documents are generated after MIGO is done.
    Regards,
    Sarthak

    Finally resolved

  • Capture cost of procured materials in a third party sales order scenario

    Dear Experts,
    I'm developing a third party sales order solution to my company following the recommended third party scenario by SAP.
    Everything is working fine from creation of sales order, automatic creation of purchase requisition, create purchase order using the purchase requisition ect...
    The problem I have is the in the Sales order, the cost of the material is not getting captured correctly. The condition maintained in the sales order is VPRS and it is deriving the material cost from the material master record. Ideally it should be deriving the material cost from the invoiced value or else from the purchase order(which is the actual amount we are spending to buy the items). Deriving the cost from material master depicts an incorrect profit in the sales order.
    Can someone please advice me how to derive the cost(to be shown in the sales order under VPRS condition)from the invoice or the purchase requisition and Not from the material master.
    I'll be grateful if you can describe in a step by step proceedure.
    Thanks in advance

    Hi Lakshmipathi
    Thanks alot for your response.
    As u mentioned, at the point of sales order creation the price does gets picked up from the Material Master.
    But during Billing, it does NOT get updated to reflect the purchase order price. If that happens, then its perfect.
    I did a complete testing cycle and the material master price remains unchanged throught the process upto billing.
    Is there any special parameter that I should maintain in VPRS condition for this to happen?
    Anyway thanks again for ur reply, appreciate it alot. Let me know your views on this.
    As u advise I'll post it on the sales forum as well.
    Regards,
    Randika

  • Issue in third party sale

    Dear All,
    Issue is that i m doing third party sale.
    Made sales order with Item Catagory TAS.Quantity 10.Linr item 10.PR created.
    Then i've made PO with refrence of line item 10,quantity 5 EA.Quantity 5 remains open.
    Then with the refrence of PO i've made invoice .
    Then i've bill the line item 10 in sales oreder with va02.
    The problem is that it selecting the quantity 10 even only 5 quantity is invoiced and 5 in PO is
    still open.
    The requirement is that only envoiced quentity should be avilable for billing.
    Provide ur feedbacks.
    Sukhveer.

    Dear Sri,
                 Billing relevance is F, Order related billing subject to invoice quantity.
                 PO is created w.r. to PR but MIGO is not to be done coz its third party E1 sale and MIRO
                 is completed for 2 quantity ,so only 2 quantity should be avilable for billing.
                 Needs ur feedback.
    Sukhveer.

  • Payment Terms in Third Party Sales Invoice.

    Hi Experts,
    We are facing the problem in third party sales process.
    Suppose X is our customer and Y is our vendor, here Y is supplying the material directly to X and Y sending us the bill of entry and other documents to us, and then we create the sales invoices to X, we are following all process like first we create SO to X then with the PR we create PO to Y then we do migo and miro of vendor invoices then creating the sales invoice to X.
    The main problem is that we want that the payment due date to our customer invoice starts from the vendor bill of lading date which we enter at the time of migo and miro (document date), but in our system, in sales invoice to X, system is calculating payment terms which we have entered in the customer master of X.
    How to get above functionality activated in sap.
    Regards
    Rajeev Gupta
    Message was edited by: Rajeev Gupta
    Please somebody reply.

    Can somebody reply this query.
    Thanks

  • No CO-PA document on Third party Sales Order

    We are doing Third Party Sales orders with Purchasing and Invoice REceipt, via the following process.
    1 Sales order, 2) automatically creates the req via sales order, 3) delivery of sales order, 4) create the purchase order from the req. 5) post goods issue on the delivery, 6) Post goods receipt on purchase order, 7) bill and 8) invoice via miro. 
    the issue we have is that the variance(cOGS-PPV) account on the Miro does not go to CO-PA .  
    I believe that it is due to the Third Party sales order .  re- oss 322497 and 772345.
    Has anyone found a solution or have a similar problem.
    I know that this is different from normal third party which does not deliver and receives PO and MIRO before the billing.

    Hi Jeffrey,
    If the corresponding purchase order belongs to a third-party deal,     
    please have a look at note 322497.                                     
    This would explain the behaviour that you are describing.                                                                               
    As explained in the note, during goods or invoice receipt for a        
    third-party transaction, as of Release 4.6, the system no longer       
    writes a line item in the costing-based profitability analysis.                                                                               
    Unlike the processing of a third-party deal in front of release 4.6 the
    update of the goods receipt or the invoice receipt is not therefore    
    anymore required from the release 4.6 in the costing-based profitability
    analysis.                                                              
    You may find further information on the topic in SAPNET            
    (intranet.sap.com/co-pa):                                          
    within "Actual Data","third party business/business background"    
    Regards,
    BC

  • Cost value for third party sales order scenario

    Greetings, I have a cost question involving the Third Party Sales Order (Item category TAS).
    At billing (VF01), the cost being picked up by the system are the value from the PO (PBXX condition type). I would like the system to pick up the entire  COGS value (inclusive of freight values) posted at MIGO.
    Ex. If Purchase price is 100 and freight is 20, I want 120 (the COGS value) to be shown in the cost field. It currently shows 100.
    The steps I follow are
    1) Create OR sales order (item category TAS)
    2) Create PO referencing PR
    3) Goods Receipt  D 120 COGS/ C 100 GRIR /C 20 freight
    4) Outbound Delivery (Confirmation only)
    5) Billing (Costs showing 100?!)
    Again, only the PBXX condition type value (From MM Calculation Schema) is being picked up.
    How can I get the system to pick up the freight value as well?
    Regards
    Ken

    Hi,
    If you bring the Freight condition after PBXX and include in the net value, your problem will be solved.  so it will be 120 in MIGO, MIRO, Dellivery and VPRS in billing.
    We have the same situation and its working fine for us. 
    Thanks
    Krishna.

  • Third party sales order close

    Hi Experts,
    How to close the open quantity in third party sales order if Purchase order is already generated from that sales order.
    i am unable to update the reason of rejection field in Sales order.
    It is giving message "Delete purchase order 8300000013, item 00010'.
    but my require ment is if third party order is generated and vendor has supplied less quantity than Sales order quantity
    then i want to close the open quantity in sales order,
    Regards,
    Talwinder

    Dear All,
    Thanks for the replies,
    I have checked that we cannot reject the sales order item ,until some subsequent process exits for it(SAP NOTE 403524).
    so rejection is ruled out.
    But problem remains that is lesser quantity is shipped than order quantity,than what to do with the open quantity in sales order.how to close them. any other workaround is there.
    Regards,
    Talwinder

  • Error miro posting in third party sales order

    error in miro posting in third party sales order occured i.e, level F1 belongs to cash position(source symbol BNK)....
    pls solve the problem it is very urgent...

    Hi,
    Process
    VA01 - Create sales order (Schedule line CS and item category TAS) >> ME52N - PR is generated after save of sales order >> ME21N - Convert PR in to P.O >> Then vendor will send goods to customer and will send invoice to our company >> MIRO - Invoice receipt from vendor >> VF01 - Final invoice to customer
    When you enter vendor invoice then you come to know that vendor sent qty. same will be billed to customer(Billing relevance in item category should be F)
    Kapil

  • Incorrect delivery date for third party sales order

    Hi,
    When I create a Third party sales order, the delivery date refers as todayu2019s dates, but when I save the order the same is getting copied in to Purchase requisition and subsequently to Purchase Order and is not recalculating based on the Planned Delivery time maintained in the Purchase Info Record.
       Is there any configuration setting to enable re determine the delivery date in PR?
    Regards
    Raj

    Hey babu,
    I understand ur problem. First check that you have maintained all the time durations that would be taken into consideration when the sales order will do the scheduling. E.g.
    !) GR processing time
    2) Planned delivery time
    3) Purchase dept processing time ... etc
    Now you need to check if scheduling is taking place on the sales order. That means, does it show you the date that can be confirmed for delivering that 3rd party item when you press enter after entering its material number and the order quantity.
    1) If yes you need to check the box that says  "Fix time/quantity" on the availability check screen that pops up when you place the order.
    Now the system will pass this new scheduled date to the production order, but it will show the requested date as the one determined from the lead time in the order type. so no need to worry.
    also if it is not showing you the availability check screen and automatically using a date scheduled in the future based on the values you set in PIR, in that case yo need to go to the item details > schedule lines > and check the box that says "Fix time/quantity" for that 3rd party materials and the confirmed date will be passed to the PO automatically.
    2) If no then you have to make sure that availability check is turned on for that material and then try placing the order.
    Regards,
    Vinit Parkar

  • How Billing doc.created from purchase invoice in Third Party Sale

    Hi All
    Our client requirement  has been mapped as sap third party sales process .
    But if the vendor is delivering less qty .  than the qty. for which Sales ordered  has been  created, How to create the  Sales billing Doc.  according to the purchase invoice so that Sales Billing  Doc. should be created for the delivered qty. only .
    Please suggest the configuration  & how the data is flowing from the Purchase Invoice to the Sales Invoice.
    Thanks in advance
    Ashok

    Hi
    you can achieve your requirement by following
    T-Code  VTFA (copy control Order to Billing)
    use you Third party order type and billing type
    Go to Item category (if Standard use TAS)
    there is a option "BILLING QUANTITY"
    user there "E" Goods receipt quantity less invoiced quantity"
    Hope it will solve your problem
    Cheers
    Shambhu Sarkar

  • Third Party Sales Incorrect Status Update at the order level

    Hi,
    We follow a third party sales in our system
    Sales order > PR> PO> MIGO>MIRO>VF03
    Howeevr, the status of the sales order is being processed.
    The quantity is same, item relevance for delivery is unchecked at schedule line and item category.
    Our users want the invoice to be genereated after the MIGO, so at the item category level bliing relevance is G, and at VTFA billing quantity is E.
    It is working if the biling relevance is maintained as f, the status shows completed but i want this for G
    Over all status is being in processed and order related billing at item level is partially invoiced.
    Please help
    Many thanks,
    Shashidhar Reddy

    Hi Santosh,
    Thanks for clearing it out.
    I did not understand what do you mean when u say"MIRO" process, write now our business requires the customer invoice to be created after the MIGO is done for PO, for which we have put billing relevance as G.
    The problem now is, since the relevance is G which is order related billingof deliveyr quantity, even though the invice is completd and the accoounting document is cleared the ordder status still shows "being processed"
    You have already mentioned it very clearly that this can be changed it using the user exit, but i just wanted to confirm that again.
    Sincere thanks for taking time out for this.
    Thank You
    Shashidhar Reddy

Maybe you are looking for