Tieing material reservation with purchase order

Hi,
     At my client site they make manual reservations to create demand and thus trigger purchase orders to replenish it. Once the PO is GRed then the manual reservations are manually deleted. This is extra work for the planners/buyers. Is there any way to automatically erase the manual reservations once the GR for the PO is done ?
Thanks

Hi,
You can adopt the automatic deletion program for Reservations as follows:
Reservations are deleted as follows:
1. Reservation items that are completed or that are in the system longer than a certain number of days are marked for deletion by the reservations management program.
2. If all of the items of a reservation are marked for deletion, the reservation is physically removed from the file.
The Reservations management program RM07RVER carries out the following activities:
- Marking items for deletion
- Deleting reservations
- Allowing movements for reservation items
Marking Items for Deletion: The reservations management program sets the deletion indicator for reservation items:
- that are completed (final issue indicator has been set)
- whose requirement date is earlier than the date calculated by the system
Consequently, old or unnecessary reservations that no longer represent an "actual" request are deleted (for example, because the material was withdrawn without the reservation being referenced during the goods issue posting).
Calculating the Deletion Date: To allow the system to calculate a date for the deletion of the reservations, you must enter a base date on the selection screen. The system calculates the deletion date using the base date you enter minus a predefined number of days (in the standard SAP System: 30 days).
Example: You enter 10. 01 as a base date. In this case, all reservation items whose requirement date is on or before 09.01 are marked for deletion.
Deleting Reservations: If all of the items of a reservation are marked for deletion, the entire reservation is removed from the file.
Running the Reservations Management Program :
Choose Reservation --> Manage.
The Reservations Management selection screen is displayed.
Enter a range for the reservations to be processed. You can also narrow down the number of reservations to be processed by entering an account assignment as a selection criterion.
Enter the base date:
a.Only reservations whose base date is on or before the date entered are taken into account.
b. Using the base date, the system calculates the date for deletion of the reservation items and the period for allowing movements.
Select the actions to be carried out (for example, Set deletion indicator/delete reservation or Allow goods movement).
If the 'Only completed items' indicator is set, only items that are completely issued or marked as completed are marked for deletion.
If you run the program as a test run, you obtain a list of all reservations and reservation items with the changes to be carried out. You can make the changes by choosing List ® Save.
If you do not run the program as a test run, the changes are carried out immediately. A log of the changes that are carried out is only issued if you selected the issue log indicator.
Choose Program --> Execute to run the reservations management program.
Regards,
Narayana.

Similar Messages

  • DMS link with Purchase order,invoices and material master

    Hi, all,
    Here is my ?
    Can we link incoming material invoice with purchase orders for reference purpose throught DMS.
    rgds,
    ben

    hi
    you can link the objects through object link in dms.
    go to  tcode dc10 select the documnet type, click on define object link. click new entry and select object type as EBAN/EKPO
    this way dms is link  to purchase order.
    thanks ,
    regards,
    nitin
    award point if useful

  • Vendor postings with purchase order

    hi,
    I am learning SAP Fi/co.I have one doubt .what are steps we have to maintain to post vendor transactions with purchase order.if u have any material about mm plz send to me.

    Commitment
    Definition
    Identifies costs that will be incurred in the future for materials and services that you have requested or ordered. Commitments reserve funds that will become costs at a future date.
    Use
    On the account assignment objects, Commitments Management portrays the cost side of the procurement process for MM Purchasing. The costs incurred are assigned to business objects, such as orders, cost centers, or projects.
    In Commitments Management, you can specify which object the costs are to be assigned to (for example, purchase order costs). In this case, this is known as an Initial Account Assignment.
    Commitments Management distinguishes between three types of commitments, depending on the account assignment object:
    Order Commitment:
    The commitment is initially assigned to an order.
    Cost Center Commitment:
    The commitment is initially assigned to a cost center.
    Project Commitment:
    The commitment is initially assigned to a project, or to a work breakdown structure element.
    For more information, see the SAP Library:
    For Internal Orders
    Financials ® Controlling ® Internal orders ®  Manual Actual Postings On Internal Orders.
    For Cost Center Accounting
    Financials ® Controlling ® Cost Center Accounting ®  Manual Actual Postings.
    For Project System
    Financials ® Controlling ®  Commitments/Actual Updates Of Transaction Data
    Integration
    Commitments occur
    In Purchasing, due to:
    Purchase requisitions (purchase requisition commitment) define the internal requirement for a material or a service. Purchase requisitions have a control function and you change them at any time.
    Purchase orders (purchase order commitment):
    Purchase orders are contractual requests to a vendor, to supply certain goods or services according to the agreed conditions. No short-term, unilateral changes can be made.
    due to funds commitments (commitment for funds commitments):
    - You can use Funds Commitments to reserve funds for costs you are fairly certain to incur, but you cannot yet assign to a specific business transaction (such as, a purchase order or a purchase requisition).
    Regards,
    SUbha

  • Print document type Q02( technical delivery terms)  with Purchase Order

    Hi all
    1) I have activated the QM procurement for a certain material and I have assigned the control key that makes mandatory the technical delivery terms on the material master (standard control key 0002).
    2) I have created a Document Info Record Q02 to hold the Technical Delivery Terms assigning a PDF file. Document is released.
    3) I have assigned the DIR to the material master (object link in the DIR).
    I would like to know how to print the this DIR with Purchase Order. I am testing this scenario in IDES system and the form does not get printed.
    Could anyone please advice how to get the PDF file printed with the purchase order?
    Thank you

    Hi Sappmqm,
    There is no internal way, you would have to create an ABAP program to handle this function, where it would search the material record to pull the DIRs linked and then open them on user's screen for printing.
    Additional SAP add-ons are available as 3rd party apps, can click my name and contact me for more detail if you like.
    Good luck.

  • How to link asset with purchase order and PO Item.

    Hello,
           I have to generate a report which contains columns
    Asset No , po no(ebeln) ,PO Item(ebelp),Material no etc
    My query is how to link asset with purchase order and      PO Item.
    I am selecting asset and po no. from anla  but how to get
    po item no(ebelp)?
    po line item is important in this report because every line item has differrent asset and material no.
    i tried to match asset no in mseg table but i am not getting asset no in mseg .
    how should i proceed ?

    Thanks Thomas & Srimanta for the quick response.
    When I checked EKKN table by entering PO there is no asset no. in anln1 field.
    Also I would like to add that, In me23n for a PO, account assignment category we are entering 'F' for internal order settlement.
    Where can i find the link between asset and po no(ebeln) and po item(ebelp)?
    Regards,
    Rachel
    Edited by: Rachel on Aug 11, 2008 7:23 AM

  • No Update FMIOI and KBLP tables with purchase order

    Hello,
    We have un serious problem : No Update FMIOI and KBLP tables with purchase order
    System :  SAP ERP 6.0 /7.0 - EHP 4
    Note 965633 was read.
    1) First case: The purchase order 4510000673 does not reduce the funds reservation.
    Purchase order 4510000673 should consume the funds reservation 1200000193 because all post of the PO charge the funds reservation 1200000193.But the consumption history of the funds reservation 1200000193 donu2019t show this consumption.
    In table FMIOI, we do not have lines with amount type 0200 (reduction) but whe have the lines with the post of PO with amount type (0100).  The Purchase order 4510000673 should consume the funds reservation 1200000193.
    In table KBLP, the fields are :
    Total amount (LC) - HWGES  = 53.409,40
    Amount used u2013 WTABB = 0,00
    Reduction amount u2013 HWABB = 0,00
    Open amount u2013 CWTFREE =    53.409,40
    Reduced amount u2013 WTABG = 0,00
    Reduced amount u2013HWABG = 0,00
    To solve the problem, we executed the transactions : FM4N et FMN5 and the program RFFMRC20 but no result.
    2) Second case : Delete a item of a purchase order does not release the budget
    The single item of the purchase order 4510000597 is deleted but in the display of consumption History of the funds reservation 1200000137, the amount of the purchase order is not to zero.
    To solve the problem, we executed the transactions : FM4N et FMN5 and the program RFFMRC20 but no result.
    Somebody already had a similar problem ?
    Thank you
    Fabian

    Hello Fabian
    There are two known notes dealing with missing update on reference Earmarked Funds, I am listing them for future references:
    1376800  Earmarked funds: Incorrect open amount         
    1438487  RFFMRC20: Missing KBLE records are ignored     
    These notes correct some errors within the Standard.
    However, in your scenario, problem has to do with an incorrect execution of a Commit work inside a customer user-exit. After elimination of this commit work, new Po's are working correctly.
    Remaining task is the correction of old PO's. Manual correction via small changes with ME22N (for instance, adding a '.' to the line item text/s) will force the correct update and fix your database
    If you agree, we can close this thread (?)
    Kind regards
    Mar

  • Can SAP get material number in Purchase order in external processing?

    I have a question that:
    As I know, Exeternal processing is a service, so that Material number can not be shown in purchase order converted from PR for external processing. Here, PR can be automately generated from transaction CO01 to create an external processing production order. Meanwhile, for external processing, purchase info record is created without material number only with material group.
    So, I want to know that if there any solutions to show material number in purchase order generated for external processing?
    thanks,
    best regards,

    If therer are no production order, How can I get finished products from internal activity and external processing?
    Now, external processing in our company like this:
    1.create an purchase info record. (type:subcontracting, with material group, but not material ID)
    2.Maintan external processing data in external operation where external processing happens.(control key: pp02, external processing data: info record, purchase org. net price, cost element etc.)
    3.create a production order for the material.(one of the operations is an external processing operation described like step 2)
    4.Purchase requstion is changed into Purchase order. (Purchase requestion is automately created with the production order)
    5.MIGO to receive goods from the purchase order.
    6.finished the production order and delivery goods.then the production order is DLV.
    In step 4, purchase order can only get the production order ID, but there are no material ID shown in it. Only method to show material is that maintaining a description text in the external operation, then, purchase order item could show material in material text(but, here, there is no material ID derectly from info record or production order).
    this is the big problem now for our company. No material ID can be automately carried into the purchase order.
    Hope you help..
    thanks...

  • Revision level not appearing in material tab of purchase order

    hi
    I have matained revision level in material master but it is not appearing in material tab of purchase order and print preview of purchase order
    regards
    Badari

    Hi, If u have created proper change no in CC01 with assigned object material with proper validity period u can give revision level to material.
    In order to reflect the current revision level on PO printout, the coding in PO print program should be designed accordingly to pick the latest revision level. PO output needs to be re-issued so that the new output can pick the latest information like PO revision level from the master.
    Refer below link also for more information,
    [Revision level in purchase order|Revision level in purchase order]

  • Printing Drawing with Purchase Order

    Hi,
    Can any one tell me how to print a Drawing attached to Material while printing Purchase order.
    Thanks
    Sivaram

    Hi
    Attachment will not be printed alongwith the PO in transaction ME9F.
    You will have to print it seperately & send alongwith the PO to Vendor.
    but This can be achived with DMS(Document management system) where u can print attachment but i don't have any idea about that
    Reward if usefull
    Vishal....

  • How to deal with purchase order purchased with sale order

    Hi,
    I know we can produce with sale order, and the finished products can be priced in their own sale order and line item even when the  finished product master data is set 'S' in its price control field. But how to deal with purchase order purchased with sale order if its price control is 'S' and the purchased material can be priced differently with its own sale order?
    thanks.

    Hi,
    That is to say, we want to get these results:
    1. material purchased must match its sale order and its item
    2. the purchased material  is valued by sale order and its item when it is put into the stock.
    3.  the purchased material is set "valued by standard price' in its material master data.
    How to practice?
    Thanks.

  • MIRO: posting to G/L Accounts with purchase order reference

    hello
    our company want to post an invoice for other expense in MIRO through the tab "G/L Acconunt" and don't through the tab "PO reference".
    our problem that when we post through "G/L Account" how we allocate the "purchasing document" to the line of G/L Account?
    in miro there is an option to create a posting line with purchase order reference to a g/l account and i read the documentation that says proceed as follows:
    1. choose miro
    2. enter header data as required
    3. allocate the invoice to a document and check the items to be settled - i don't underdand what i need to do in this step?
    4. choose the tab page g/l account
    5. enter data as requierd.
    thanks
    meir

    hi
    in the table below your MIRO screen you will see PO Reference on this tab select the item of the PO that you need post for this PO, in the tab G/L account you can make manual post aditional to the PO, also you can in the tab PO reference modify amounts and quantity if you need, but it is not recommended

  • Invoice Verification without GR and with Purchase Order

    Hi all
    During the Logistic Invoice Verfication (MIRO) without GR and with Purchase Order, I want to exclude "Invoice to be received" account (WRX) from the posting. How can I do it?
    Let me know
    Thanks

    it doesn't work. Can you explain me better the solution?
    Thanks

  • KO22 explain with Purchase Order

    Please explain, how KO22 (Original Budget related  with Purchase order, Using Internal Order)

    Hi,
    When you create an budget for 1000 and a PO for 500. (say you have set up a max from 10 %) You make a new PO for 600 there is no problem but it is not possible to create a new one for 601.
    The rule is Budget - postings - PO = ammount to go.
    It is possible to exclude som g/l account. and create fases,  Like budget is on:
    100 procent message and send a Mail
    110 error
    Paul

  • Reference with purchase order

    Hi,
    This is emanuel from hyderabad SAP SD consultant, well can we do billing with reference with purchase order. for exampl.:-
    One company code -1000, and two plants one is 1000 and another one is 2000
    suppose 1000 plant raise the purchase to plant 2000 to do service. once the service is completed by 2000 plant is going to rasie the bill to 1000 plant. is this can be possible it or not please tell me.

    HI,
    You can Frame your Requirment As like STO with billing with in COmpany code.
    For STO with billing search in Forum.
    If any Specific Req Let us know...
    Regards
    raj.

  • Issues with Purchase order change documents

    Hi Gurus,
    I have some peculiar issues with Purchase order. The PO line item has deletion indicator set but I can't find who set the deletion indicator. The PO change documents doesn't show anything related to deletion indicator.
    Please help to fix the Issue.
    Regards,
    Senthil

    Hi
    Check it in Tcode SE16
    Table Name CDHDR and CDPOS
    Regards,
    Raman

Maybe you are looking for

  • MacBook Pro issues connecting to Gmail, Facebook, and other websites

    Hi, In the past week or so, I have had problems connecting to Gmail, Facebook, and other websites on my MacBook. When I try to open Gmail, I get the following message "Safari can't verify the identity of the website "accounts.google.com". The certifi

  • How to use facebook  + skype with new Ipad? it needs flash player it seems...

    how to use facebook + skype with new Ipad? it needs flash player it seems...

  • External LCD monitors stopped working

    I have used external LCD displays connected to my MacBook2 for a few years. Recently it stopped sending a picture to external monitors (I've tried a couple.)  The ColorSync utility can not repair a damaged profile: Adobe RGB 1998 I think. There is so

  • Incorrect number of emails displayed

    Hello, I've found that when I open Mail, the amount of emails displayed in the title bar is vastly inaccurate. It varies from telling me I have billions of emails to saying I have hundreds and in reality that figure is nowhere near being right. Does

  • Handling Multiple Result Sets

    Hi I have a problem while handling multiple result sets. To fix that problem i need to upgrade my JDBC version2.0 to 4.0. My Problem is that i dont know which jars need to be downloaded to upgrade my JDBC version.