Time frame

When I preview some transitions, a box pops up telling me that i "don't have enough time frame around the playhead to preview the title, transition, or effect." My friend said that I'm suppose to combine all the clips/images together?
I have about three songs in there, and the total of the slide show is about a little more than 11 mins....
how do i extend the timeframe? or do what i have to do so that the playhead will have more room?
  Mac OS X (10.4.7)  

Hi Signora - I am guessing that you are fairly new to this puzzling (at first) but absorbing world of iMovie.
I would suggest first of all, that you use the iMovie Help menu often, and also have a look at these tutorials:
http://www.apple.com/support/imovie/tutorial/index.html
It sounds as though you firstly imported your music which lasts for about 11 minutes, then you have added pics. That's OK. But before you select any pics from the Photos pane, tick the Ken Burns box, and adjust the duration to what length you feel is satisfactory for the photos - maybe 8 seconds? This becomes the default duration for all of the pics, or until you modify this setting. If you do not want any zoom applied, then move the little slider to the 'Start', adjust the zoom slider to the left hand end; then do the same for the 'End'. Now drag the photos you want into either the Clips View or Timeline.
To add transitions, first choose the transition-style, then adjust the duration of the transition (maybe you are doing this part correctly already), then drag the blue box down to where you want it to go. If you want the same transition-style and duration between all pics, then select all of the pics, and hit 'Apply'.
Apologies if you knew all of this already! We just have to establish that you are using the correct process.

Similar Messages

  • HT201412 After ios7, My iphone4 has gone dead twice in a time frame of around two months...even though its not happening very often but a two month Old phone going dead just after a New update is not acceptable.probably ios7 still has sum bugs dat need to

    After ios7, My iphone4 has gone dead twice in a time frame of around two months...even though its not happening very often but a two month Old phone going dead just after a New update is not acceptable.probably ios7 still has sum bugs dat need to be fixed...Can this bug expected to be fixed in the next update...

    Hi 1283ar.
    Unfortunately, iOS 7 is too hard to push for the iPhone 4 and therefore has a lot of effects turned off to try to get it to run as smoothly as possible.
    However, it becomes better and better with each update coming but it's hard to do anything about the hardware on an already released phones.
    If you still have trouble or think they are too hard. My tip is, if so, to restore your iPhone 4 and make a clean setup with no iCloud backup. But all your photos in a photostream so you can access it later.

  • How can I execute a command every 10 seconds in a specific time-frame

    Hello,
    I would like to create a script which in a specific time-frame collects some outputs and also pings every 10 seconds.
    To collect the outputs every minute from 22:00PM to 22:10PM I have the following:
    event manager applet snmp_output
    event timer cron cron-entry "0-10/1 22 * * *" maxrun 30
    action 010 cli command "enable"
    action 020 cli command "show clock"
    action 030 cli command "terminal exec prompt timestamp"
    action 040 cli command "show snmp stats oid | append bootdisk:show_snmp_stats_oid.txt "
    action 045 wait 5
    action 050 cli command "show snmp pending | append bootdisk:show_snmp_pending.txt "
    action 055 wait 5
    action 060 cli command "show snmp sessions | append bootdisk:show_snmp_sessions.txt "
    acionn 065 wait 5
    action 070 cli command "end"
    To confirm connectivity to the device doing the SNMP polls I would like to execute a ping every 10 seconds in the same timeframe.
    Cron seems only to support minutes. Is it possible to combine a watchdog timer + a cron timer?
    Can this ping function be incorporated in the SNMP output applet or will I have to write a new one?
    Will I need TCL here (I have no experience in TCL)?
    Best regards,
    Tim

    If you wanted the pings to run in parallel, you could have this applet configure another applet to do the pinging, then remove it on the last run.  This will require an amount of programmatic logic, though.  If you wanted to keep things a bit simpler, add another applet that runs at 22:00 that configures a watchdog pinging applet, then a third applet that runs at 22:10 that removes the pinging applet.
    When it comes to embedded quotes when you configure your nested pinging applet, you'll need to use $q to stand for the embedded quotes.  You'll also need to configure:
    event manager environment q "

  • Manuals users should not be able to submit a concurrent program at a specific time frame:

    Hi
    Please let me know is it possible to restrict some users to submit a Concurrent program during a selected time frame .
    Eg we have an issue in which Process Lockboxes concurrent Program is submitted by the batch user and is also by the Users manually from Front end .What I want is that during a particular time frame everyday say from 12:00 AM to 6 PM I want to restrict manual users to submit this program ,whereas the Program can be submitted by the Batch user any time  .
    Please let me if its possible to achieve this and how .
    Thanks
    Rishabh

    Please don't post duplicates -- restrict user to submit concurrent Program
    Continue the discussion in your original post.
    Thanks,
    Hussein

  • HT1657 after renting a move and starting viewing I can not stop it and come back to in within the time frame. If i stop it it goes away not able to find it. Just like I did not rent it at all.

    after renting a move and starting viewing I can not stop it and come back to in within the time frame. If i stop it it goes away not able to find it. Just like I did not rent it at all.

    Hi,
    We have rolled out a fix for this issue.
    Please log off and log back in to your machine and the issue should be resolved automatically. In case that does not work, please manually run the msi installer posted here (may require reboot).
    For details, please refer to the KB article here: Multiple RunOnce keys created 11.0.10 and 10.1.13 Acrobat | Reader
    Please let us know if you still face any issues.
    Thanks,
    Ashu Mittal

  • FTP Adapter restrict polling frequency active time frame in a day

    Hi All,
    Is there anyway I can restrict FTP adapter polling frequency to be active during a particular time frame of the day. Say, my service should poll the incoming location for Sales order data for every hour during business hours of the day.
    Thanks,
    AG

    Hi
    SOA Suite 12c will expose Oracle ESS as the scheduler.
    ESS will allow you to schedule soa composites / OSB services etcand allow you to enable / disable them based on jobs, which is what you desire.
    12c SOA Suite is expected later this Summer.
    Cheers
    iain

  • Query to calculate time frames

    hello,
    id like to write a query that will calculate time frames ;
    my source table looks like this:
    company     category     date
    ORACLE     A     1/01/2012
    ORACLE     A     2/01/2012
    ORACLE     B     3/01/2012
    ORACLE     C     4/01/2012
    IBM     A     1/01/2012
    IBM     A     2/01/2012
    IBM     A     3/01/2012
    IBM     A     4/01/2012my desired result:
    company     category     from     to
    ORACLE     A     1/01/2012     2/01/2012
    ORACLE     B     3/01/2012     3/01/2012
    ORACLE     C     4/01/2012     31/12/2999
    IBM     A     1/01/2012     31/12/2999can you please guide me with use of which functions i can achieve that?
    id appreciate any tips
    thank you
    rgds
    Edited by: UserMB on Jan 11, 2012 5:14 PM

    One way...
    ME_XE?with t as
      2  (
      3    select 'ORACLE' col1, 'A' col2, to_date('1/01/2012', 'dd/mm/yyyy') col3
      4      from dual
      5    union all
      6    select 'ORACLE', 'A', to_date('2/01/2012', 'dd/mm/yyyy')
      7      from dual
      8    union all
      9    select 'ORACLE', 'B', to_date('3/01/2012', 'dd/mm/yyyy')
    10      from dual
    11    union all
    12    select 'ORACLE', 'C', to_date('4/01/2012', 'dd/mm/yyyy')
    13      from dual
    14    union all
    15    select 'IBM', 'A', to_date('1/01/2012', 'dd/mm/yyyy')
    16      from dual
    17    union all
    18    select 'IBM', 'A', to_date('2/01/2012', 'dd/mm/yyyy')
    19      from dual
    20    union all
    21    select 'IBM', 'A', to_date('3/01/2012', 'dd/mm/yyyy')
    22      from dual
    23    union all
    24    select 'IBM', 'A', to_date('4/01/2012', 'dd/mm/yyyy') from dual
    25  )
    26  select
    27    col1, col2, min(col3), case when max(col3) = max_company_date then to_date('31/12/2999','dd/mm/yyyy') else max(col3) end
    28  from
    29  (
    30    select col1, col2, col3, max(col3) over (partition by col1) as max_company_date
    31    from t
    32  )
    33  group by col1, col2, max_company_date;
    COL1               COL MIN(COL3)                  CASEWHENMAX(COL3)=MAX_COMP
    ORACLE             B   03-JAN-2012 12 00:00       03-JAN-2012 12 00:00
    ORACLE             A   01-JAN-2012 12 00:00       02-JAN-2012 12 00:00
    ORACLE             C   04-JAN-2012 12 00:00       31-DEC-2999 12 00:00
    IBM                A   01-JAN-2012 12 00:00       31-DEC-2999 12 00:00
    4 rows selected.
    Elapsed: 00:00:00.01
    ME_XE?

  • CSM ret-code time-frame

    A company I work for has a number of CSM modules (WS-X6066-SLB-APC) installed in 6513 chasis switches. The CSM modules are running version
    4.2(14)
    These CSM modules are configured to load-balance a number of vservers via serverfarms, each serverfarm containing multiple real servers.
    Here is some example configuration:
    vserver SITE
      virtual 10.1.2.3 tcp www
      serverfarm SERVERFARM
      persistent rebalance
      inservice
    serverfarm SERVERFARM
      nat server
      no nat client
      predictor leastconns
      failaction reassign
      retcode-map RETCODE-MAP
      real 10.2.3.4
       inservice
      real 10.2.3.5
       inservice
    map RETCODE-MAP retcode
      match protocol http retcode 503 503 action remove 5 reset 300
    The company is facing a problem with what seems to be related to return code checking. Every once in a while a server will suddenly not receive any traffic for 5 minutes. This always occurs right after the server has sent a HTTP 503 return code. However we cannot see in the CSM logs that the CSM module has actually disabled the real server. For other serverfarms which are running regular HTTP and/or ICMP health checks to real servers we can clearly see in the CSM logs when a real server has been temporarily disabled due to health check failures.
    The return code checking is set to disable a real server for 300 seconds after the CSM has received five HTTP 503 responses from the real server. If we check the real server log however we cannot find more than that single 503 return code right before the server stops seeing any incoming traffic unless we move back at least hours in time.
    I have tried to figure out what time frame those 5 return codes must be received within for them to count towards the maximum allowed return codes, but nowhere in no documentation can I find any information about this time frame.
    For all I know the CSM could keep track of every incoming 503 forever, until the maximum of five 503's is reached, and then the server is disabled for 300 seconds.
    Does anyone have any information about the time frame within which those return codes must be received by the CSM to count toward the maximum configured number of return codes before the configured action is taken?

    Hi Christopher
    EDIT: It might actually be me who misunderstood your reply. You probably gave me the correct answer already, that there is no time limit at all to the counter, and the counter will increase until it reaches 5 even if those 503's are spread out over several months time. Could you please confirm that this is what you meant? I'll leave my original reply down below for you to look at.
    ORIGINAL MESSAGE:
    Thanks for your reply, but I think you might have misunderstood my question, and I don't exactly blame you because I had some difficulty explaining what I meant.
    I know what each and every key word in the following line mean, and I understand the command.
    match protocol http retcode 503 503 action remove 5 reset 300
    We match the protocol http, and look for when/if the server sends a return code 503 back to a client. Each time a 503 return code is returned from the real server a counter is increased by one. When the counter reaches 5 we take the action to remove (disable) the server. 300 seconds after the server was disabled it will be enabled again, and the counter will also be reset to zero at this point.
    But I'm asking about the time frame for the counter, or rather if there is a default timer that resets the counter back to zero after a certain amount of time. Let me give you an example.
    I enable return code checking for HTTP 503 and configure it to disable a server after five HTTP 503's have been seen by the CSM
    1 minute later the server sends three HTTP 503 messages to a client. Now the return code check counter is at 3. This is where the "time frame" that I speak of begins.
    Another 6 minutes later the server sends one HTTP 503 message to a client. The time frame within wich the CSM has seen HTTP 503's is now 6 minutes, so the CSM has seen four different HTTP 503's within 6 minutes. The counter would now be at 4.
    5 months later the server sends a fifth HTTP 503 message to a client. The time frame is now five months and six minutes. Will this fifth HTTP 503 message increase the return code check counter to 5? If it does, then the server will be disabled for 300 seconds, even though it was 5 months since the previous four 503's were seen by the CSM.
    What I'm wondering is basically if there is a limited time frame (like a sliding window) after which the return code check counter is reset back to zero? I cannot find any information about this, and as far as I can see there is no command I can use to see what the return code counter is currently at either, so I cannot manually verify this.
    It would have made sense if the feature worked like this instead, and I'm still hoping that someone can provide documentation that says this is the way it is supposed to work (because if the above example is true, then the feature is broken and useless)
    I enable return code checking for HTTP 503 and configure it to disable a server after five HTTP 503's have been seen by the CSM
    1 minute later the server sends three HTTP 503 messages to a client.  Now the return code check counter is at 3. This is where the "time  frame" that I speak of begins.
    5 minutes later the counter is reset to zero, because no 503's have been seen for over five minutes.
    2 months later the server sends a HTTP 503 message to a  client. This increases the counter to one. The server is never disabled. After another 5 minutes the counter is reset back to zero again.
    I hope that the above examples make it a bit clearer what I meant with my original question.

  • How do i set the time frame of a waveform chart programmatically to be a 30 sec window or a 24 hour window

    i'm using LV7.0 and what i need to do is to be able to set the time frame or range of a waveform chart programmatically before i start taking and plotting data. sometimes this window needs to be 30s wide and sometimes it needs to be 24 hrs wide. (in the first reference, i need the chart to fill up with 30s of historical data then the whole chart scrolls with each new data point). the data acquisition records data at a rate of once per second. i've tried to use the chart properties of XScale.offset, XScale.Range.Minimum and XScale.Range.Maximum but no matter what i do the time-stamp on the x-axis is always "00:00:00 PM" and "MM/DD/YYYY" even though values are seen being plotted on the right side of the chart as expected.
    Attachments:
    BX0265 ShelfLife DAQmx.vi ‏120 KB

    Okay, there seems to be some confusion here -- the X axis values are of type double, but they can be represented in the HH:MMS MMD:YYYY format if you want in which case it interprets the floating point as the number of seconds since 6pm Dec 31, 1903. 
    You can programmatically set this value using the XScale.Minimum and XScale.Maximum properties, but note that if you wire a waveform to the chart after setting these values the t0 parameter will override what you set using the property node for XScale.Minimum.  If instead you leave the t0 parameter empty you can use the XScale.Offset property and wire the same value in that you wire to XScale.Minimum.  Changing the amount you add to XScale.Minmum to obtain what you wire into XScale.Maximum will determine the time window size.
    Doug M
    Applications Engineer
    National Instruments
    For those unfamiliar with NBC's The Office, my icon is NOT a picture of me

  • Any time frame for when we will be getting the Android 5.0 upgrade on the Verizon G3?Type your question

    Any time frame for when we will be getting the Android 5.0 upgrade to the G3 on Verizon?

    No one from Verizon can or will give you a timeline. They have no idea. Verizon can't even test 5.0 until they get it from LG first so perhaps you should be asking them.

  • Time frame for SAP implementation query

    Hi guys,
    I am a university student and am currently trying to collect some information for my paper on development of ERP systems in industrial companies, particularly SAP. I'm meant to do some field research, but it is proving to be rather difficult, which is why I wanted to ask for some help from people who have experience in the implementation of the SAP system.
    What I'm looking for is the time frame that the SAP system takes to integrate into an industrial firm. Also, the scope of integration (ie how many and which modules were added on top of the core SAP system) and the number of users after the full implementation of the system.
    I don't need the name of particular companies, as I understand that that may be disclosing too much corporate information, but it would really help me if someone could give me a realistic time frame of the implementation process for SAP.
    Thank you, in advance!
    Anya

    Anya,
    Update to your queries:
    size of the company that this SAP implementation took place at:
    Answer : In terms of revenue $200 million +
    Interms of employees 6000+
    HR module in particular - whether it can be fully implemented separately and how long would it take?
    Answer:
    Definately, it can be fully implemeted and other modules may not be used
    Time period - 3+ months as Business packages are available in SAP.
    Regards,
    Ganga

  • Expecting a response within a specified time frame

    I need urgent help please.
    I am expecting some data from the server within 20 seconds.
    If I dont receive this data within the time frame,I exit from
    the application else If i receive this data I will display it.
    Please can any write a small example for this threading concept.
    I am very new to this.
    Ajay

    Let suppose this is your communication dialog window:
    call createTimer(int sleep) after you send a request to the server
    class MyDialog  extends JDialog implements ActionListener
        private javax.swing.Timer   m_timer    = null;
        public MyDialog(*********)
            super(*********);
            addActionListener(this);
        private void createTimer(int sleep)
            m_timer = new javax.swing.Timer(sleep, this);
            m_timer.setRepeats(false);
            m_timer.start();
        public void actionPerformed(ActionEvent e)
            if(e.getSource() == m_timer)
                // check your "response flag"
    }lic void actionPerformed(ActionEvent e)
    if(e.getSource() == m_timer)
    // check your "response flag"

  • Expecting a respone withing a specified time frame

    I need urgent help please.
    I am expecting some data from the server within 20 seconds.
    If I dont receive this data within the time frame,I exit from
    the application else If i receive this data I will display it.
    Please can any write a small example for this threading concept.
    I am very new to this.
    Ajay

    Say, you wouldn't want someone here to do something so unethical as to do your homework assignment now would you?
    see java.util.Timer and java.util.TimerTask

  • Default time frame for ICAL events

    Ever since I upgraded to Lion, the default time frame for ICal events has been set to "entire day".  Is there any way to change this?

    Hi,
    If you add a time to the event description, like "meeting  11am tomorrow", it should create an event (with the title "meeting" on tomorrows date at 11am with a duration of 1 hour.
    Best wishes
    John M

  • Time Frame for Costing

    Hi
    Can any one tell me "What is the time frame for configuring the complete product costing"
    and majority of the events and its time consumption.
    thanks in advance.
    regards
    Adi

    Hi There,
    Consider using a structure of key figure to arrage you data, with the time characteristic on top of the structure for flexibility.
    John Hawk

  • Wait activity does not expires after giving time frame

    Hi all,
    We are using SOA suite version 11.1.1.5. In our process, we use a wait activity so that the process will wait for a certain time frame (say 1 min) and again proceeds when the wait activity time expires.
    The above process was running successfully for some months. But suddenly the instances are getting stopped in the wait activity and they are not proceeding after the given time.
    The audit trail shows wait activity pending. And the wait activity does not expires even after the respected time.
    Kindly suggest the possibilities of this scenario.
    Regards,
    Gopi

    Hi Gopi,
    You can look at the logs to see if there are for any errors/warnings during the wait activity execution.
    A possible explanation can be due to an error in a later on activity (like invoke or assign). If you have an error that you didn't catch, the process will try to rollback to the last dehydrate point (in your case the wait activity) and stuck there.
    Thanks
    Arik

Maybe you are looking for

  • My G4 forces me to shut it down when I copy files.

    Hello, yesterday I tried to copy some files and as the transfer was about to be completed, I got halted and a screen message appeared in 4 languages forcing me to shut down the computer. A similar message had only appeared twice in the last couple of

  • Gradient adjustment layer

    Hi, I'm new to adjustment layers.  I'm able to make such layers now, but when selecting gradient and selecting "align with layer" option, it actually aligns with the whole document, not just the layer.  When I click between the adjustment layer and t

  • Right Mouse Button Under Windows?

    without the use of an external mouse? Is it possible? Also, is there a 2 button (or anyother) scrolling under windows? Too bad Apple did not build the MBP with a 2 button mouse. If so, it would be an almost PERFECT machine for me. (btw, a week 6 mach

  • Questions about Reverting Back

    Okay, I upgraded to Lion when it came out and I've loved it, but I need to revert back to Snow Leopard because I need Adobe Reader to work for school. I've found instructions about reverting back in other threads but I have some other questions that

  • Export causes audio levels to change

    New weird problem... When I export from the timeline and just save the video with all current settings and 'self-contained' - the video works perfectly except that one tiny bit near the end, the volume changes in a way that is not present in the time