Time Management Operation to Update Absence Quota Used

Hi Gurus,
Is there any standard operation available to update absence quota used. I'm already using UPDTQA to update Absence Quota Entitlement, but is there any standard operation tha i can use to Update Absence Quota used.
Thanks!!
Rajiv
Edited by: rajiv patel on Mar 27, 2008 6:38 PM

Hi,
        I have many doubts about Quota generation with time evaluation. I need to discount two hours,for example,to a certain quota type at one particular situations and employees.
I think I can do it using function QUOTA and operation UPDTQ. To do it I have to select the option "Increase" or "Replace" in table V_556A_B,isn´t it? .But my problem is that I need firstly a quota entitlement generated with RPTQTA00,for example:
•I have to generate a entitlement of 30 hours for all employees of a certain personal division ("No generate" selected in V_556A_B and RPTQTA00 ).
•After that,when I run time evaluation on fridays for example,I have to discount 2 hours of this entitlement of 30 (Increase or replace in V_556A_B,and use then Quota and UPDTQ).
My real problem is to generate the quota by RPTQTA00 because I´ve checked "Increase"or "Replace" (V_556A_B) to permit quota generation (modification) with Time Evaluation.
I hope my explanation was ok and somebody can help me please.
Thanks a lot

Similar Messages

  • Time management: Can we default absence quotas types in IT2006

    Hi Team,
    Kindly can you let me know if we can default Absence quota types with Entitlements in IT2006 without using  RPTQTA00 and  schema.
    Regards,
    Vimal

    Hi Team,
    It's working fine now.
    In the SPRO  node
    Automatic accural of absence quotas i changed the radio button from "Increase " to "No Generation".
    Thanks veyr much for your responses.
    Regards,
    Vimal

  • How to Update Absence Quota with Time Evaluation

    Dear Friends,
    I would like to know how do we update absence quota within time evaluation. Currently i'm using UPDTQAXX, it works but when i search this forum everybody was using this simple code:
    HRS=something
    ADDDBxxxx
    and the quota is updated. I just dont get it, with adddb its only update the daily balance table, how does that enable us to updated the 2006 infotype? Many Thanks

    ADDDBxxxx adds the value of the number of hours field to the specified time type in the table of day balances (TES), it does not update the quota.
    You can use function QUOTA  to accrue absence entitlements periodically based on this customizing: Personnel Time Management>Time Data Recording and Administration>Managing Time
    Accounts Using Attendance/Absence Quotas>Calculating Absence Entitlements>Rules for
    Generating Absence Quotas>Define Generation Rules for Quota Selection.  
    You can use a time type to prorate that accrual

  • Entering absences in CATS and updating absence quotas

    Hello experts,
    Is it possible to enter absences using CATS? In our requirement we are entering time sheet corresponding to a receiver WBS element, the attendence is getting updated but the absence hours we enter is taken as a working hours only and is taken in to billing. any solution for this? pls comment on it

    Hi Mark,
    I think you can enhanced it and feed the message as you like where it will trigger.
    You can prompt the error message but when ever it will trigger it will create a problem it will not allow to save the respective leaves so better is the information message so that the employee gets the exact scenario and understand by their own end other evry now and then you get the ticket to solve the error problem.
    <b>Best way is the information message.</b>
    Minal.

  • Time Management Operation to Query on PA,PSA

    Hi All,
    Can any one Please tell me the Operation used in Time Managemnt to Query on Personnel Area and Personnel Sub Area.
    Regards,
    Vinod

    OUTWPLTSC PSA
    OUTWPPLANT  PA
    Edited by: Sikindar on Feb 24, 2010 6:57 PM

  • Need to carry forward absence quota

    Dear All,
    please help me....
    i need to carry forward leave from last period and generate new entitlement for the next period, by keeping last period remain quotas to a certain time type (ie : 0099),
    the leave period is 26 Dec - 25 Dec next year,
    but why everytime i run function P2006 in PT60, system keep updating the data in 2006 to be zero (0) ?
    ex :
    -i'm running PT60 for period 26/12/2009 - 25/12/2010 in order to generate 26/12/2010 - 25/12/2011 absence quota
    -all employee only have one abs quota data which is last period 26/12/2009 - 25/12/2010 with certain remaining quota --> PT60 always update this period's data to be zero everytime i run func P2006
    thanks alot for any help...

    For Quota Carry forward, please refer the
    consulting note nr. 411854.
    In this note you will be able to find a very detailed description of
    the solution for your issue. More precisely the:
    "Scenario 1): a positive remainder exists at the deduction end date
    of an absence quota.
    An example for this is an absence quota of type 'Annual leave' the
    employee has not used up completely.
    Possible procedures:
    1.1) The remaining quota should be transferred to a new quota"
    1.you can also review the on-line  documentation in the following IMG:
      Personnel Time Management -> Time Evaluation -> Time Evaluation
    w/clock times -> Special Solutions for Time Account Accrual ->
       Transfer Remaining Absence Quota.
       Check the rule TQTR in pe02.

  • Time management status and Payroll

    Experts,
       We are using TMS as 9 (Time evaluation of planned time) in IT0007. What does it mean in TM?
       What is it's impact in Payroll.
    Regards
    Sk
    Edited by: s k on Nov 17, 2008 10:24 AM

    You can assign the following Time Management statuses in the Planned Working Time infotype (0007):
    Time evaluation with planned times (0): Employees with this status are not selected for time evaluation. They cannot therefore be processed in time evaluation. The employeeu2019s time wage types are determined in Payroll time data processing.
    Time Management Status for processing time data in Time Evaluation and passing on time wage types formed there to Payroll
    Time evaluation of actual times (1) and Time Evaluation PDC (2): Employees with these statuses have all their actual times, that is, all attendance and absence data, recorded*. It makes no difference whether attendance times are recorded at time recording terminals or in the Attendances infotype (2002).
    Time evaluation with planned times (9): These employees have only the deviations from their work schedule recorded for them. The employeesu2019 planned working times from their personal work schedule are used as the basis for time evaluation.
    Time Management Status for processing time data in Time Evaluation without passing on time wage types formed there to Payroll
    Time evaluation without integration with Payroll (7): You use this status to run time evaluation to handle special time accounts u2013 to accrue absence quotas, for example. It makes no difference whether all of the employeesu2019 actual times are recorded or only the deviations from the work schedule.
    The system stores the results of this time evaluation run in cluster B2, which enables you to run reports on the data, for example. The results are not passed on to Payroll. The time data processing part of Payroll treats the employees as if they had the time management status No time evaluation (0).
    External services (8): Status for external employees. It makes no difference whether all of the employeesu2019 actual times are recorded or only the deviations from the work schedule. The results of time evaluation are transferred to Materials Management (MM-SRV), and are not passed on to
    and also check the feature TMSTA once  in peo3
    Edited by: Sikindar on Nov 17, 2008 3:01 PM

  • Issue while creating Absence Quota for one employee

    Hi Friends,
    Our customer has a weird issue. When time evaluation is run, One Absence Quota type (Leave in Bank) is not getting generated for Only One Employee.
    This leave type has been updated with quota in IT 2006 after running PT60 for all other employees in the PA. The issue is only with one employee.
    This absence quota is assigned "Increase" in table V_556A_B (Permit Generation of Quotas in Time Evaluation)
    Can any one please suggest how to generate the missing quota for this employee. Thank you !!

    Hi
    Thanks for your replies !!
    Please find the screenshots attached.
    Leave in Bank Absence type which is valid for 2014 is missing in IT 2006 instead This absence quota valid upto 31.12.9999 is present.
    Current requirement is to remove the quota which is valid upto 31.12.9999 and replace the quota which is valid upto 31.12.2014.
    I have checked for some PERNRs with same EG/ESG/PA/PSA combination. They have the absence quota valid upto 31.12.2014 Only.

  • Time management status "0"and "7"

    Hi Team,
    Kindly can you let me if we  can use Time management status "7" when there is no TE instead of "0"?
    My client is using "7" as Time management status and they don't have TE.
    Regards,
    Vimal

    Hi Vimal,
    The Time Management Status plays an importnat and effets as to how u want the time Process in ur company.
    Time Management Staus 0 : No time Evaluation which means no PT60 or RPTIME00 all u have to do is run The Quotas with the report RPTQTA00 if any.
    And Time Management 7 is Time Evaluation without Payroll integration.But u said that u dont have Time Evaluation then why 7? It should be 0 but the other possibilty to have Time Management Status 7 is you can use RPTIME00 with schema TQTA for generation of time quota and that is without time evaluation.
    So its better to have TMSTA 7 as u can use RPTQTA00 and RPTIME00 with TQTA both for generation of time quota.
    Regards
    Swati

  • Time Management - Time Recording System

    Hi,
    I want to connect time recording system to sap hr- time management for payroll. According to actual time overtime, leaves & payroll has to run.
    I have used TMS is 9. Please anybody guide me in this ASAP.
    Thanks in advance.

    Sunitaos,
    Read the following steps:
    1.  Time recording system (legecy system/time recording terminal) records time events (Employee arrival, short leave, official out, etc) and store it in .text file or in access database.
    2.  ABAPER (SAP programmer) maps this .text or .mdb file to Time Recording Information Infotype IT2011.
    3.  Run Time Evaluation Driver RPTIME00
    4.  RPTIME00 segregate each time event and store it in respective infotypes. for example Absence is recorded in Absence IT IT2001, Attendence in IT2002, overtime in IT2005
    5.  Now use Time Management Status in Planned Working Time InfoType IT0007 to integrate Time Management with payroll. You can use TMSTA feature to store default value for Time Management Status. The possible values are:
    0 No time evaluation
    1 Time evaluation of actual times
    2 PDC time Evaluation
    7 Time evaluation without payroll integration
    8 External services
    9 Time evaluation of planned times
    6.  As you have set the Time Management Status to value 9; this means your Time Management is integrated with payroll.  And as you run RPTIME00, this time evaluation driver generates Time Wage Types besides segregating time events.  Time Wages Types are evaluated in payroll.
    Hope your question is answered, dear.

  • SAP Time management reports for Ukraine

    Hi All,
    can anybody send me the list of Time management reports available for ukraine.
    i have checked in other sites also, i am getting only standard reports, but i am not getting reports for ukraine. i have given ukraine country grouping also.
    regards
    Vani

    Hai..
    Personal Work Schedules (Report RPTPSH10)
    Daily Work Schedules (Report RPTDSH20)
    Attendance
    Attendance/Absence Data: Overview (Report RPTABS20)
    Attendance/Absence Data: Calendar View (Report RPTABS50)
    Attendance/Absence Data: Multiple Employee View (Report RPTABS60
    Attendance Check (Report RPTEAB00)
    Attendances/Absences Overview Graphic (Report RPTLEA40)
    Absence
    Attendance/Absence Data: Overview (Report RPTABS20)
    Attendance/Absence Data: Calendar View (Report RPTABS50)
    Attendance/Absence Data: Multiple Employee View (Report RPTABS60
    Attendances/Absences Overview Graphic (Report RPTLEA40)
    Time Accounts
    Time Leveling (Report RPTCMP00)
    The Time Statement (Report RPTEDT00)
    Cumulated Time Evaluation Results: Time Balances and Time Wage T
    Time Accounts (Report RPTDOW00)
    Displaying Absence Quota Information (Report RPTQTA10)
    Displaying Time Evaluation Messages (Report RPTERL00)

  • Time Management - Building Rules

    Hi All,
    How to built rules in Time management so tht one absence type cannot be followed by another absence type for example Medical leave cannot be followed by Piad Leave but can be followed by Casual leave. ?

    I am also working on time managment module and my scenario is CL should not be combined with any other type of leave (PL, SL). I was tring to chk the program - SAPMYXYWS90300017H, but could not find as to which transaction code to look in... Can U please tell me how to access this program..I have tried exploring it in se80 & se38...
    Thanx

  • Time Management effect of other sub-modules

    Hi All,
    Can anyone please tell me how will be the functionlity of SAP HCM will be effected if we have implemented SAP HR without Time Management.
    I want to know the adverse effect of not implementing TM.
    Regards

    There are no adverse effects as such if time management not implemented.
    Time Management provides things like
    Absence Management
    Clock in& out
    Attendance Management
    Cross Application time sheets
    Personalized work schedules.
    Thanks

  • Time Evaluation : Operation/Function to update quota entitlement

    Hi,
    within time evaluation quato entitlements are determined.
    Due to changes legislation, under particluar circumstancens the entitlement of the quota need to be updated.
    I've build all 'circumstances' in a time evaluation rule and now all what needs to be done, is to perform a deduction an a specific quuta type. The number of hours to be deducted is already stored in a time wage type (as part of the new calculation rules).
    Which operation or function can be used to update the quota entitlement with the number of hours stored in the time wage type.
    Thanks,
    Wilfred.

    Hi,
    if was looking at this operation but couldn't manage to get things working as I would like.
    Is there a link available with more detailed information on this operation besides the information available in SAP (PDSY)?
    Thanks,
    Wilfred.

  • Use of Time Evaluation to generate Absence Quota

    Hi,
    We are planning to use time evaluation to generate absence quota. At the moment we are using RPTQTA00 report to generate Absence Quota. We have negative time management and since, the project has already gone live i have very limited scope to change the basic settings for example we do not have any employee subgroup to identify part time employees, PT & FT are in one employee sub-groups. We have only one ESG & PSG for time recording, time quota etc. The base entitlement is defined for the FT employees and it is reduced propertionately based on the employement percentage in IT0007. Now we are going to adopt a change in design, and planning to have specific work-schedule for PT employees. In that case, we will not have the scope to maintain %age in IT0007 for part time employees but exact no of working hours will be used. It means that system will treat the PT emploees as FT while generating absence quota and output the FT absence entitlement. As i said earlier we can not differentiate PT employees from FT employees based on ESG or PSG, i can not create a separate quota selection rule for part time employees. Hence, we are moving from running RPTQTA00 report to time evaluation for absence quota generation purpose.
    Now can anybody please help finding a alternate solution for the above, if it is possible to do it through report RPTQTA00 or we have to adopt the time evaluation. In case we are going to generate absence quota through time evaluation, can we only generate absence quota and skip anything that is related to payroll.
    Any comments/suggestion/advise will be very helpful to us.
    Thanks.
    Sujit

    We are not able to generate absence quota for part-time employees as when we do that, system is treating PT employees as FT employees and the FT base entitlement is referred while calculating absence quota. i can not define separate absence entitlement for PT employees as we have only one ESG and PSG, and based on this quota selection group is defined. The QUOMO feature is defined based on work contract - employee sub-group (there is no separate emp sub-group for PT employees) - Pay Scale Group. We are having this problem as we have specific work schedule for PT employees now (Ex. we create 3 days work schedule with 15 hours: 4.5,4.5, 6 hours) and we are not maintaining employement percentage for them. So system is treating PT employee as FT employee with 100% employement percentage. Please let me know if you need any specific info to understand my issue.
    Thank you so much for the response.

Maybe you are looking for

  • External requirement from non SAP system created in SRM 7.0 Extended Classi

    Hello SRM Gurus: Has anyone created an external requirement using XI ExternalRequirement_Create_In (http://sap.com/xi/EBP).  We are getting a E001 "No company code could be determined for backend  for product##".  I traced the error to FM 'BAPI_SCEC_

  • Iphone 3gs isnt being recognised by itunes and screen just frozen

    iphone 3gs 16gb plugged into main desktop but it has frozen on iphone screen and isnt being recognised by the computer at all,not bringing up itunes at all and when open itunes it doesnt recognise the iphone. Iv tried following the reset and restore

  • Why is one TIFF pixelated when saving .pages file as .doc?

    Hi, when I save my Pages file as Word '.doc' format (using the standard 'save copy as' method, OR exporting as .doc) one of the high resolution TIFFs in the file always shows up pixelated, the other is sharp. Do you know why one TIFF would be pixelat

  • Array of Class object

    Pls.c the following code, public class Rate private Points []startPoints; public Rate() startPoints = new Points[4]; startPoints[0].p_intX = 40; startPoints[0].p_intY = 40; }//Constr public static void main(String []args) new Rate(); }//main class Po

  • Role of nscd in 5.1 directory server

    Hi, Can somebody tell me the role of nscd in iplanet 5.1 directory server? I assume this has to be disabled on directory server for better performance by adding enable-cache hosts no in /etc/nscd.conf file. Can somebody validate this?? If possible wi