To check whether searchterm maintained for   sales order

hi ,
i have to generate one alv report to check whether searchterm maintained for  sales order or not...
can any one help me on this...
thanks.

Hi,
   The field VBAK-KTEXT can be of use to you.Refer tables :VBAK and VBAP.

Similar Messages

  • Dynamic Credit Checks - Different Horizon for Sales Order & Delivery

    Hi Experts ,
    had a query . I am testing a scenario for Dynamic credit Check where the Horizon is ZERO for Sales Order & 3 Months Horizon for deliveries. How should the system behave in such a case. What would be the best way to test whether system behaviour is ok as per this expectations.
    Also I would like to know whether "0" horizon for sales order means that system looks into the entiire list of open sales orders or  the horizon of check is only upto the end of the current month . In FD32 the curent date is indiacted as the horizon date. While creating sales orders today I found dynamic block for 0 horizon is only working for sales orders with availabilty date upto 7th July '10 which neither covers the existing month-June & neither full of July. Beyond that there is no dynamic block soccuring.That made me a bit confused .
    Please advice with you valuable inputs.
    Thanking You.

    Hello Sai ,
    thank you for the response. Had already checked note . But this does not speak about the implication "0" M horizon of dynamic credit check . What is coverage for that ?

  • RBA GATP check is not getting invoked for Sales Order

    Hi Everyone,
    RBA GATP check is not getting invoked for Sales order.
    I maintained the configuration settings for 'Rules-Based Availability Check', APO general settings (check mode, check instruction), carried out integrated rule maintenance, Rule determination for the combination of order type & product, associated the check mode to product master. Also maintained all the settings in ECC towards Req class, Req type, checking control etc.
    However, sales order is not invoking RBA Check though it is showing up the 'Rule' icon in the screen. Also, in the APO Availability check in Sales order when I click onto 'check instruction', I get the checking mode that pertains to RBA for business event 'A' (Sales order). Though I have not maintained any stock for the main material for which I have the sales order, yet system is confirming any quantity that I put in.
    I would expect that system would propose the same material in an alternate location where we have stock through RBA.
    Request you to share ideas on this.
    Regards,
    Avijit Dutta

    Hi Avijit,
    You should used No Checking Horizon in Checking instructions and also Check your rule control settings.
    What you have defined in 1st and 2nd steps. Check whether product substitution is carried out or Location Substitution.
    Thanks,
    Bala.

  • How/ where to  check output type while saving sales order for confirmation

    Hi All,
    Could you anyone pls let me know How/ where to  check output type while saving sales order for confirmation.
    Present scenario : when the Sales Order is created the Order confirmation is sent irrespective of credit block of the sales order.
    Requirement : Order confirmation “ZA00” sent to the partner only for those Sales orders which does not have credit block and ZCLE sent to the partner if the order has credit block.
    Now i want to know where exactly to check the output types "ZA00" and 'ZCLE' based on the credit block to send the confirmation to partener.
    Quick help highly appreciated......
    Preetham

    Hi Santosh,
    Thanks for the info. But here in this case I have to send the confiramation based on credit limit check. If credit limit check exceeds "ZCLE' should go as confirmation else 'ZA00' should go as confirmation.
    Where can we check the credit limit whether it exceeded or not. My doubt is whether it is config issue or do we need to write code user exit or routine to send the specific output type for confirmation.
    Thanks & Regards,
    Preetham

  • User exit in ATP Check for sales Order to trigger notification

    Hi All
    please let me  know is there any user exit after ATP check or in ATP check for sales order to trigger a notication mail.
    Regards
    Kishore

    Hi,
    User Exits For Availability Check are given below:-
    The user exits named here are planned for projects that are to be carried out in agreement with SAP development as they may only be used in consultation with SAP.
    USEREXIT_PLANT_SELECTION in program RV03VFZZ is an exception to this rule (see below).
    User exits in program FV45VFZZ
    USEREXIT_ADD_FIELD_TO_HEADER
    USEREXIT_ADD_FIELD_TO_LINE
    User exits in program FV45VFZY
    USEREXIT_DELIVERY_GROUPS
    USEREXIT_MVERF_INIT
    USEREXIT_QUOTA_KEY_VALUE
    User exits in program RV03VFZZ
    USEREXIT_AVAILABILITY_IN
    USEREXIT_AVAILABILITY_OUT
    USEREXIT_DARA_REFRESH
    USEREXIT_PLANT_SELECTION
    This user exit is used to adjust the flow during plant transfer. A list of permitted plants, where this material is created, is determined and checked in the standard R/3 delivery. A dialog box appears where you can select the plants. The user exits allow you to modify the plant table so that plant selection takes place in advance for every flagged selection and a dialog box becomes unnecessary.
    regards
    Vivek.

  • Availability checking rule for sales orders

    Hi experts,
    To meet our useru2019s requirement I have switched off the availability check at the schedule line category level. But when I created a sales order the AVC is still happening. Upon checking I have noticed the availability checking group as u201C02u201D and checking rule as u201CBu201D in sales order. To my understanding the checking rule should be u201CAu201D for all sales orders. Could you please advise as to why it is happening so?

    Hi,
    I have done as what suggested and I created a new sales order. Upon checking (Sales screen --} environment --} availability) the availability checking group is 02 and checking rule is B. Please note that for the other sales document types we have, the checking group is 02 and checking rule is A

  • Check Credit and Stock on Sale Order

    Hi All
    Could you please tell me how to check Credit and Stock on Sale Order.
    Thank and Best Regard
    Thang

    How To Do Configuration For Credit Management
    Credit and risk management takes place in the credit control area. According to your corporate requirements, you can implement credit management that is centralized, decentralized, or somewhere in between. 
    An organizational unit that represents the area where customer credit is awarded and monitored.   This organizational unit can either be a single or several company codes, if credit control is performed across several company codes. One credit control area contains credit control information for each customer.
    For example, if your credit management is centralized, you can define one credit control area for all of your company codes. 
    If, on the other hand, your credit policy requires decentralized credit management, you can define credit control areas for each company code or each group of company codes. 
    Credit limits and credit exposure are managed at both credit control area and customer level.  You set up credit control areas and other data related to credit management in Customizing for Financial Accounting. The implementation guide is under Enterprise Structure -> Definition or Assignment -> Financial Accounting and then Maintain credit control area. You assign customers to specific credit control areas and specify the appropriate credit limits in the customer master record.
    Settings for determining the credit control area of a document.  The settings of items 1 - 4 are taken into account according to their priority.  The credit control area found is stored in field VBAK-KKBER.
    1. Transaction OB38
       Check which credit control area is assigned to the company code.
       Company code:
       Credit control area:
    2. Transaction OVFL
       Check which credit control area is assigned to the sales area.
       Sales area:
       Credit control area:
    3. Transaction XD02 or VD02
       Check which credit control area is assigned to the payer.
       Payer:
       Credit control area:
    4. Transaction SE37
       Is user exit EXIT_SAPV45K_001 being used?
    5. Transaction OBZK
       For the settings under items 2 - 4, field "All company codes" must be marked in Transaction
       OB45, or the credit control area must be entered under the relevant company code in table
       T001CM of the credit control areas allowed.
       Company code:
       Credit control areas allowed:
    6. Settings for the credit checks
    7. Transaction OVAK
       Which settings do exist for the sales document type used?
       Sales document:
       Check credit:
       Credit group:
    8. Transaction OVAD
       Which settings do exist for the delivery type used?
       Delivery type:
       Credit group for delivery:
       Credit group for goods issue:
    9. Transaction OB01
       Credit management/Change risk category
       Definition of the risk category for each credit control area. This risk category can be
       assigned to a credit account by using Transaction FD32.
    10. Transaction OVA8
        Here, the individual credit checks for key fields
        o credit control area
        o risk category
        o credit group are set. Take these key fields from the above settings and go to the detail
          screen. In particular, check whether fields "Reaction" and "Status/block" are set
          correctly. To carry out follow-up actions in case of a credit block, the credit check
          status must be set (field "Status/block").
    11. Transaction FD32
        Credit master data for the payer of the relevant document.
        Credit account:
        Credit limit:
        Risk category:
        Currency:
    12. Settings for updating the credit values Update of the credit values is required for the limit
        check (static or dynamic credit limit check).
    13. Transaction OVA7
        Update of the credit value is active for the corresponding item type if the check box is marked. This field corresponds to 
        field "Active receivable" in Transaction VOV7.
        Item type: 
        Active receivable:
    14. Transaction V/08, Pricing
        In the pricing procedure used for pricing, subtotal "A" must be entered in a line for
        determining the credit value (mark the pricing procedure and doubleclick on "Control").
        Usually, the net value plus taxes is used. This way the system is determined to use this
        subtotal for credit pricing. The credit price is stored in field VBAP-CMPRE and used for
        update and credit check.
        You can find the used pricing procedure of the order under "Item -> Condition -> Analysis".
        Pricing procedure:
        Line with subtotal = 'A':
    15. Transaction OB45
        Which update group (field "Update") do you use in the relevant credit control area? The
        default setting is "12". If you use another update group, check whether this is fine with
        you. If you open an OSS message, please tell us the alternative update group.
        Credit control area:
        Update:
    16. Transaction OMO1
        Which kind of update did you choose for structure S066? 
         In any case, "Synchronous update (1)" has to be chosen as the kind of update. 
         All other settings will lead to errors
    Regards
    Raja
    Edited by: ramanathan raja on Jul 25, 2008 4:37 PM

  • What are the User Exits for Sales Order creation process?

    Hi,
    what are the User Exits for Sales Order creation process? how can I find them?
    thanks in advance,
    will reward,
    Mindaugas

    Please check this info:
    User Exits In Sales Document Processing
    This IMG step describes additional installation-specific processing in sales document processing. In particular, the required INCLUDES and user exits are described.
    Involved program components
    System modifications for sales document processing affect different areas. Depending on the modification, you make the changes in the program components provided:
    MV45ATZZ
    For entering metadata for sales document processing. User-specific metadata must start with "ZZ".
    MV45AOZZ
    For entering additional installation-specific modules for sales document processing which are called up by the screen and run under PBO (Process Before Output) prior to output of the screen. The modules must start with "ZZ".
    MV45AIZZ
    For entering additional installation-specific modules for sales document processing. These are called up by the screen and run under PAI (Process After Input) after data input (for example, data validation). The modules must start with "ZZ".
    MV45AFZZ and MV45EFZ1
    For entering installation-specific FORM routines and for using user exits, which may be required and can be used if necessary. These program components are called up by the modules in MV45AOZZ or MV45AIZZ.
    User exits in the program MV45AFZZ
    The user exits which you can use for modifications in sales document processing are listed below.
    USEREXIT_DELETE_DOCUMENT
    This user exit can be used for deleting data which was stored in a separate table during sales document creation, for example, if the sales document is deleted.
    For example, if an additional table is filled with the name of the person in charge (ERNAM) during order entry, this data can also be deleted after the sales order has been deleted.
    The user exit is called up at the end of the FORM routine BELEG_LOESCHEN shortly before the routine BELEG_SICHERN.
    USEREXIT_FIELD_MODIFICATION
    This user exit can be used to modify the attributes of the screen fields.
    To do this, the screen fields are allocated to so-called modification groups 1 - 4 and can be edited together during a modification in ABAP. If a field has no field name, it cannot be allocated to a group.
    The usage of the field groups (modification group 1-4) is as follows:
    Modification group 1: Automatic modification with transaction MFAW
    Modification group 2: It contains 'LOO' for step loop fields
    Modification group 3: For modifications which depend on check tables or on other fixed information
    Modification group 4: is not used
    The FORM routine is called up for every field of a screen. If you require changes to be made, you must make them in this user exit.
    This FORM routine is called up by the module FELDAUSWAHL.
    See the Screen Painter manual for further information on structuring the interface.
    USEREXIT_MOVE_FIELD_TO_VBAK
    Use this user exit to assign values to new fields at sales document header level. It is described in the section "Transfer of the customer master fields into the sales document".
    The user exit is called up at the end of the FORM routine VBAK_FUELLEN.
    USEREXIT_MOVE_FIELD_TO_VBAP
    Use this user exit to assign values to new fields at sales document item level. It is described in the section "Copy customer master fields into the sales document".
    The user exit is called up at the end of the FORM routine VBAP_FUELLEN.
    USEREXIT_MOVE_FIELD_TO_VBEP
    Use this user exit to assign values to new fields at the level of the sales document schedule lines.
    The user exit is called up at the end of the FORM routine VBEP_FUELLEN.
    USEREXIT_MOVE_FIELD_TO_VBKD
    Use this user exit to assign values to new fields for business data of the sales document. It is described in the section "Copy customer master fields into sales document".
    The user exit is called up at the end of the FORM routine VBKD_FUELLEN.
    USEREXIT_NUMBER_RANGE
    Use this user exit to define the number ranges for internal document number assignment depending on the required fields. For example, if you want to define the number range depending on the sales organization (VKORG) or on the selling company (VKBUR), use this user exit.
    The user exit is called up in the FORM routine BELEG_SICHERN.
    USEREXIT_PRICING_PREPARE_TKOMK
    Use this user exit if you want to include and assign a value to an additional header field in the communication structure KOMK taken as a basis for pricing.
    USEREXIT_PRICING_PREPARE_TKOMP
    Use this user exit if you want to include or assign a value to an additional item field in the communication structure KOMP taken as a basis for pricing.
    USEREXIT_READ_DOCUMENT
    You use this user exit if further additional tables are to be read when importing TA01 or TA02.
    The user exit is called up at the end of the FORM routine BELEG_LESEN.
    USEREXIT_SAVE_DOCUMENT
    Use this user exit to fill user-specific statistics update tables.
    The user exit is called up by the FORM routine BELEG-SICHERN before the COMMIT command.
    Note
    If a standard field is changed, the field r185d-dataloss is set to X. The system queries this indicator at the beginning of the safety routine. This is why this indicator must also be set during the maintenance of user-specific tables that are also to be saved.
    USEREXIT_SAVE_DOCUMENT_PREPARE
    Use this user exit to make certain changes or checks immediately before saving a document. It is the last possibility for changing or checking a document before posting.
    The user exit is carried out at the beginning of the FORM routine BELEG_SICHERN.
    User exits in the program MV45AFZA
    USEREXIT_MOVE_FIELD_TO_KOMKD
    Use this user exit to include or assign values to additional header fields in the communication structure KOMKD taken as a basis for the material determination. This is described in detail in the section "New fields for material determination".
    USEREXIT_MOVE_FIELD_TO_KOMPD
    Use this user exit to include or assign values to additional item fields in the communication structure KOMPD taken as a basis for the material determination. This is described in detail in the section "New fields for material determination".
    USEREXIT_MOVE_FIELD_TO_KOMKG
    Use this user exit to include or assign values to additional fields in the communication structure KOMKG taken as a basis for material determination and material listing. This is described in detail in the section "New fields for listing/exclusion".
    USEREXIT_MOVE_FIELD_TO_KOMPG
    Use this user exit to include or assign values to additional fields in the communication structure KOMPG taken as a basis for material determination and material listung. This is described in detail in the section "New fields for listing/exclusion".
    USEREXIT_REFRESH_DOCUMENT
    With this user exit, you can reset certain customer-specific fields as soon as processing of a sales document is finished and before the following document is edited.
    For example, if the credit limit of the sold-to party is read during document processing, in each case it must be reset again before processing the next document so that the credit limit is not used for the sold-to party of the following document.
    The user exit is executed when a document is saved if you leave the processing of a document with F3 or F15.
    The user exit is called up at the end of the FORM routine BELEG_INITIALISIEREN.
    User-Exits in program MV45AFZB
    USEREXIT_CHECK_XVBAP_FOR_DELET
    In this user exit, you can enter additional data for deletion of an item. If the criteria are met, the item is not deleted (unlike in the standard system).
    USEREXIT_CHECK_XVBEP_FOR_DELET
    In this user exit, you can enter additional data for deletion of a schedule line. If the criteria are met, the schedule line is not deleted (unlike in the standard system).
    USEREXIT_CHECK_VBAK
    This user exit can be used to carry out additional checks (e.g. for completion) in the document header. The system could, for example, check whether certain shipping conditions are allowed for a particular customer group.
    USEREXIT_CHECK_VBAP
    This user exit can be used to carry out additional checks (e.g. for completion) at item level.
    USEREXIT_CHECK_VBKD
    The user exit can be used to carry out additional checks (e.g. for completion) on the business data in the order.
    USEREXIT_CHECK_VBEP
    This user exit can be use to carry out additional checks (e.g. for completion) on the schedule line. During BOM explosion, for example, you may want certain fields to be copied from the main item to the sub-items (as for billing block in the standard system).
    USEREXIT_CHECK_VBSN
    You can use this user exit to carry out additional checks (e.g. for completion) on the serial number.
    USEREXIT_CHECK_XVBSN_FOR_DELET In this user exit, you can enter additional criteria for deletion of the serial number. If the criteria are met, the serial number is not deleted (unlike in the standard system).
    USEREXIT_FILL_VBAP_FROM_HVBAP
    You can use this user exit to fill additional fields in the sub-item with data from the main item.
    USEREXIT_MOVE_FIELD_TO_TVCOM_H
    You can use this user exit to influence text determination for header texts. For example, you can include new fields for text determination or fill fields that already exist with a new value.
    USEREXIT_MOVE_FIELD_TO_TVCOM_I
    You can use this user exit to influence text determination for item texts. For example, you can include new fields for text determination or fill fields that already exist with a new value.
    User-Exits for product allocation:
    The following user exits all apply to structure COBL, in which the data for account determination is copied to item level.
    USEREXIT_MOVE_FIELD_TO_COBL
    Option to include new fields in structure COBL.
    USEREXIT_COBL_RECEIVE_VBAK
    Option to assign values from the document header to the new fields.
    USEREXIT_COBL_RECEIVE_VBAP
    Option to supply values from the item to the new fields.
    USEREXIT_COBL_SEND_ITEM
    A changed field can be copied from the structure into the item. You could use the user exit to display a certain field in the account assignment block (see also MV45AFZB).
    USEREXIT_COBL_SEND_HEADER
    A changed field can be copied from the structure to the header (see source text MV45AFZB)
    USEREXIT_SOURCE_DETERMINATION
    You can use this user exit to determine which plant will be used for the delivery. In the standard system, the delivering plant is copied from the customer master or the customer-material info record. If you want to use a different rule, then you must enter it in this user exit.
    USEREXIT_MOVE_FIELD_TO_ME_REQ
    With this user exit you can include additional fields for the following fields:
    EBAN (purchase requisition)
    EBKN (purchase requisition-account assignment)
    USEREXIT_GET_FIELD_FROM_SDCOM
    Option to include new fields for the variant configuration. Fields that are included in structure SDCOM can be processed and then returned to the order.
    USEREXIT_MOVE_WORKAREA_TO_SDWA
    You can use this user exit to format additional work areas for the variant configuration. You will find notes on the user exit in MV45AFZB.
    User-Exits for first data transfer:
    The following user exits can only be used for the first data transfer.
    Note
    Only use the user exits if the names/fields do NOT have the same name.
    USEREXIT_MOVE_FIELD_TO_VBAKKOM
    Option to include additional fields in structure VBAKKOM (communiction fields for maintaining the sales document header)
    USEREXIT_MOVE_FIELD_TO_VBAPKOM
    Option to include additional fields in structure VBAPKOM (communication fields for maintaining a sales item)
    USEREXIT_MOVE_FIELD_TO_VBEPKOM
    Option to include additional fields in structure VBEPKOM (communication fields for maintaining a sales document schedule line)
    USEREXIT_MOVE_FIELD_TO_VBSN
    You can use this user exit to include fields in structure VBSN (scheduling agreement-related change status).
    USEREXIT_MOVE_FIELD_TO_KOMKH
    You can use this user exit to include new fields for batch determination (document header).
    USEREXIT_MOVE_FIELD_TO_KOMPH
    You can use this user exit to include new fields for batch determination (document item).
    USEREXIT_CUST_MATERIAL_READ
    You can use this user exit to set another customer number in the customer material info record (e.g. with a customer hierarchy)
    USEREXIT_NEW_PRICING_VBAP
    Option for entry of preconditions for carrying out pricing again (e.g. changes made to a certain item field could be used as the precondition for pricing to be carried out again). Further information in MV45AFZB.
    USEREXIT_NEW_PRICING_VBKD
    Option for entry of preconditions for carrying out pricing again (e.g. changes to the customer group or price group could be set as the preconditions for the system to carry out pricing again). Further information in MV45AFZB.
    User-Exits in Program MV45AFZD
    USEREXIT_CONFIG_DATE_EXPLOSION
    The BOM is exploded in the order with the entry date. You can use this user exit to determine which data should be used to explode the BOM (explosion with required delivery date, for example).
    User exits in the program FV45EFZ1
    USEREXIT_CHANGE_SALES_ORDER
    In the standard SAP R/3 System, the quantity and confirmed date of the sales document schedule line is changed automatically if a purchase requisition is allocated, and it or the sales document is changed (for example, quantity, date).
    If you want to change this configuration in the standard system, you can define certain requirements in order to protect your sales orders from being changed automatically. Use this user exit for this purpose. Decide at this point whether the schedule lines are to be changed.
    User-Exits in Program RV45PFZA
    USEREXIT_SET_STATUS_VBUK
    In this user exit you can you can store a specification for the reserve fields in VBUK (header status). Reserve field UVK01 could, for example, be used for an additional order status (as for rejections status, etc.).
    The following workareas are available for this user exit:
    VBUK (header status)
    FXVBUP (item status)
    FXVBUV (Incompletion)
    USEREXIT_SET_STATUS_VBUP
    In this user exit you can you can store a specification for the reserve fields for VBUP (item status).
    The following workareas are available for this user exit:
    FXVBAP (Item data)
    FXVBAPF (Dynamic part of order item flow)
    FXVBUV (Incompletion)
    USEREXIT_STATUS_VBUK_INVOICE
    You can use this user exit to influence billing status at header level.
    User exits in the screens
    Additional header data is on screen SAPMV45A 0309, additional item data on screen SAPMV45A 0459. These screens contain the Include screens SAPMV45A 8309 or SAPMV45A 8459 as user exits.
    Fields which are also to be included in the sales document for a specific installation should be included on the Include screens for maintaining. If an application-specific check module is needed for the fields, this can be included in the Include MV45AIZZ. The module is called up in the processing logic of the Include screens.
    For field transports, you do not have to make changes or adjustments.
    Example
    A new field, VBAK-ZZKUN, should be included in table VBAK.
    If the check is defined via the Dictionary (fixed values or check table) the field must be included with the fullscreen editor in the Include screen SAPMV45A 8309. In this case, no change has to be made to the processing logic.
    User Exits in Program MV45AFZ4
    USEREXIT_MOVE_FIELD_TO_KOMK
    You can use this user exit to add or edit additional header fields in the communication structure - KOMK- for free goods determination. For more information, see the New Fields for Free Goods Determination IMG activity.
    USEREXIT_MOVE_FIELD_TO_KOMP
    You can use this user exit to add or edit additional item fields in the communication structure KOMP for free goods determination. For more information see the New Fields for Free Goods Determination IMG activity.
    User Exits in the SAPFV45PF0E and SAPFV45PF0C Programs
    EXIT_SAPFV45P_001
    You can use this user exit to decide whether intercompany billing data is used in the profitability segment for cross-company code sales, or whether the data comes from external billing (external customer, sales data from the selling company code.
    Regards
    Eswar

  • Error reading material cost estimate for sales order (KE292)

    Dear All,
    I have an issue with billing. we are posting july month transactions, the material cost is maintained through MR21. When releasing billing document for accounting we are getting error message like"Error reading the material cost estimate for sales order "11"
    Message no. KE292
    Diagnosis
    In Profitability Analysis (CO-PA), the system tried to valuate item 000010 of sales order 11 by reading the corresponding product cost estimate.
    However, no product cost estimate could be found for this sales order item.
    The system accessed product costing for product AMLFP011011XX00P using costing key YB3 as defined in the
    CO-PA Customizing settings.
    System Response
    The system cannot process the document any further.
    Procedure
    Check your Customizing settings."
    We cross checked with other client as a current date and we ran cost estimate through CK40N with same material. and we posted entries. Here it is working fine. but in above process it is not working. Can you pls guide me where i missed.
    Regards,
    Nagaraju,

    Hi,
    When the Costing Key is assigned to the material types in the COPA customizing, then system expects Cost estimation when billing is released to Accounts.
    If you dont run cost estimation but update the material master through MR21, system will not accept as in the Costing key configuration you must have selected the Current Standard price field for the valuation.
    Hence, try to run cost estimation and then do releasing.
    Thanks & Regards
    Ravi Kumar

  • How to configure rescheduling for sale order quantities

    kindly explain how to configure rescheduling for sale order quantities that are created last month. kindly explain. i am in urgent.
    regards,
    g.v.shivakkumar

    Hi,
    Short text
    Rescheduling sales and stock transfer documents: by material
    Description
    The 'Rescheduling' program (SDV03V02) processes sales document items that are contained in the item directory for the material. It takes into consideration open items and schedule lines from stock transfer items, stock transfer scheduling agreements and purchase order requests (items only), referred to hereafter as stock transfer documents, for the materials.
    All sales documents for the material that are still open are selected. This means that the material index must be activated for at least all sales document types, whose items may have requirements. All stock transfer documents or items for the material that are still open are also selected. Open in this case means for example, that there is no deletion indicator, that the item from a stock transfer purchase order request cannot be labeled as completed or that the quantity delivered and posted to goods issue for the item in a stock transfer purchase order is the same as the amount ordered. An availability check can only be carried out if a checking rule is assigned to the document type - if this is not the case, the document or document item is not checked.
    Checking rule 'A' is used as a basis for rescheduling sales orders (exceptions to this are rush orders  they use checking rule B, and orders with individual customer stock; they use checking rule AE). Stock transfer documents use the checking rule that is assigned in Customizing for Purchasing. It is important that the scope of checks is consistent for both the stock transfer documents and the sales documents and that they do not exclude each other, as this can lead to incorrect test results. An example of an incorrect setting would be: The scope of check for checking rule 'A' checks delivery schedules for stock transfer purchase orders and stock transfer purchase requests, however the scope of check for the checking rule for the stock transport scheduling agreement does not.
    The items and schedule lines found in the selection are sorted according to 'Priorities' - document category, delivery priority, creation date of the item or schedule line (for stock transfer purchase orders and delivery plans) entered on the selection screen or according to the schedule line date of the earliest schedule line with order quantity, document number and item number and then transferred to the availability check. Priority 1 is highest priority and priority 5 the lowest. Stock transfer purchase order requests are sorted after stock transfer purchase orders and scheduling agreements, as they are less binding. This means that when you have identical sort criteria such as delivery dates, the stock transfer purchase order item is checked first and then the item from the stock transfer purchase order request.
    The preset option 'Unconfirmed documents required' only carries out rescheduling for materials for which there is at least one unconfirmed transaction.
    You can use the parameters 'Sorting criteria delivery date' to define whether sorting is carried out with the order quantity after the creation date of the item or the delivery date of the earliest schedule line.
    If you mark the 'Simulation' field, the checked documents are not saved. Instead a results list is generated and saved. However, the availability check for the corresponding documents continues as if saving has taken place already, that is, that the simulated list corresponds to the actual one.
    Under 'Options' on the selection screen, specify whether sales documents and/or stock transfer documents should be processed. For stock transfer documents you can enter whether stock transfer purchase orders and scheduling agreements should be processed at item or schedule line level:
    Processing at item level:
    All open schedule lines for the item are read and collected, then transferred to the availability check. To sort and prioritize documents, you do not need each individual schedule line. It is sufficient to have the item or data from the first schedule line. All open schedule lines for the item are processed and checked.
    Example of processing at item level:
    Sorting: Date (Delivery date first schedule line) - Document number - Document item
    Doc. cat. Doc. number  Doc. item  Doc. schedule line  Delivery date PO        4500000012      10               0001              26.01. PO        4500000012      10               0002              26.02. PO        4500000025      20               0001              28.01. PO        4500000025      20               0002              02.02.
    You can see that the second schedule line for document 4500000025/20 from 02.02 was processed after the second schedule line for document 4500000012/10 from 26.02. This is because all open schedule lines for an item are read and processed. The first schedule line from 4500000012/10 has the earliest delivery date, therefore it has priority.
    Processing at schedule line level:
    Each open schedule line for an item is entered in document sorting in accordance with the values entered under 'Priorities'. The availability check is carried out for each individual schedule line.
    Example for processing at schedule line level:
    Sorting: Date (delivery date first schedule line) - document number -document item
    Doc. cat.    Doc. number  Doc. item  Doc. sched. line  Del. date PO           4500000012    10             0001           26.01. PO           4500000025    20             0001           28.01. PO           4500000025    20             0002           02.02. PO           4500000012    10             0002           26.02.
    Here you can see that each schedule line was sorted according to its delivery date. Note that this type of processing requires more runtime due to the individual checks and more frequent saving.
    The results of rescheduling are saved, as long as the program was not started in simulation mode. When calling up from the 'Sales' area menu or when directly starting via the development environment, the iniator is informed via a dialog box that he has just started a process that changes data. He can then decide whether or not he wants to continue.
    Checking procedure for stock transfer documents:
    An availability check of stock transfer documents in rescheduling is carried out in accordance with the check carried out when manually creating a document. If, however, the required quantity for a schedule line is not available on a particular date and will not be ready until later, new schedule lines are created for the stock transfer purchase orders and scheduling agreements, containing the relevant data. New items are created in this case for stock transfer purchase order requirements. The total sum of schedule line quantities for a processed schedule line corresponds to the schedule line quantity of the original schedule line.
    First example: Using a stock transfer purchase order item with a schedule line:
    a) Status of item before rescheduling run:
    Del. date  PO quantity   Confirmed quant  Confirmed del. date 23.07.      50 items       0 items              -
    ==> This now affects the stock/requirement situation:
        - Goods issue is posted for the material in the delivering plant on the 23.07.
        - A purchase order of 10 items was created for the material in the delivering plant. Delivery is expected on the 29.07.
    b) Status of stock transfer purchase order item after rescheduling run:
    Del. date PO quantity   Confirmed quant   Confirmed del. date 23.07.     40 items      40 items            23.07. 29.07.     10 items      10 items            29.07.
    ==> The first schedule line was changed in accordance with the results of the rescheduling availability check. Only 40 of the 50 original items could be delivered on the 23.07. Therefore, a new schedule line is created for the rest on the 29.07. for 10 confirmed items.
    Second example: Same output situation as the above example.
    ==> There is now a change in the requirement/stock situation:
    A purchase order for 10 items is created for the material in the delivering plant. Delivery is expected on the 29.07. A further purchase shows another 40 planned items on the 30.07.
       Status of stock transfer purchase order item after rescheduling run:
    Del. date PO quantity  Confirmed quant  Confirmed del. date 29.07.     10 items       10 items          29.07. 30.07.     40 items       40 items          30.07.
    ==> The first schedule line was changed in accordance with the result of the availability check for rescheduling. The original delivery date is set to the date confirmed in the ATP check. A new schedule line is created for the remaining 40 items, that are available on the 30.07.
    Note:
    Any set fixed delivery date and quantity indicators and creation indicators for schedule lines or items are 'inherited' by newly created schedule lines. Assuming that the original schedule line was fixed in the above example (since it is created manually), this indicator is also set for the newly created schedule line.
    If shipping scheduling is activated for a stock transfer document type, this is also implemented for newly created schedule lines, with the exception of route schedule determination. This means that in the current version of the program no route schedule has been determined for a schedule line containing a route schedule for which new schedule lines may need to be created.
    The results of the run are issued in the form of a list, which is also saved, so that the results can be controlled at a later date. This is done using the function 'Evaluate rescheduling', but it is only a good idea to do this after the first rescheduling has taken place. You can restrict selection requirements but these can however affect the runtime. You can use this function to analyze the saved list until the next rescheduling run, which writes over the result. If you start rescheduling in the background, a spool file with the result list referred to will be created in the corresponding setting. You can see this in spool management.
    Output
    A list of changed documents, a list of documents in which an error occurred during processing and as a result were not changed, can be called up via the menu 'Edit - Error log'. If in a subsequent evaluation a restricted selection is carried out, a note appears at the end of the list to say that not all document items are displayed.
    You can set the scope of the list under the menu option 'List' in the list display. You can view improvements, deteriorations and the whole list. Before the documents can be included in one or either of the restricted lists, the date or quantity has to have changed so that the item can be contained in both the list of improved or deteriorated documents.
    You can use the interface for changing transactions and the order list to navigate. Use 'Back' to exit the list and 'New selection' to return to the selection screen.
    Recommendation
    You should only start this program occasionally and use very restricted selectin criteria during working hours as it requires enormous system resources.
    Note
    The columns for 'New date' and 'New confirmed qty' only contain entries if the dates or quantities have changed.
    As the system only runs the change check (dates/quantities) per line in the original list, an item whose backlog has increased in the list of improvements. This occurs, for example, if the whole quantity can be delivered at once but at a later date. In this situation, the system determines an increase for the line when it compares quantities.
    Regards,
    Amrish Purohit

  • How settlement rule will be created for Sales order with cost object

    Dear Experts,
    We are using product cost by sales order with valuated stock. In addition we are not using COPA
    We also consume some materials at sales order level and at the end of month we want to do the result analysis and settlement for the same amount. In this case can any on explain how system will behave regarding settlement of sales order cost and what entries will get pass in the system.
    In our case we have done below activities...
    we have created sales order,
    All production order activities completed till final GRN including month end activities
    Material consumption against sales order
    Result analysis executed
    At the time of sales order settlement, system throwing error (Sender doesn't have valid receiver, please create settlement rule for sender object)
    Then i checked in sales order there sales order settlement rule not defined.
    I guess this settlement rule need be generated by system automatically. If not, please let me know the process of it.

    HI kishore
          the reason is that sale order always carry the revenue  and production order and production period carry the cost .
       cost you can settle to the Material and even management want  to be settle the cost to material only in production order OR period
    but in sales order  when u sell the product it carry the revenue not the cost and management want see and analysis based on profitability segment are profit center level .
    Prerequisites
    If CO-PA is active, the system generates a settlement rule when you create the sales order. The settlement rule determines whether data is settled to other objects or other areas in Controlling. In accordance with this settlement rule, the relevant data is settled to CO-PA.
    If CO-PA is not active, create a settlement rule. This settlement rule that you create manually normally contains a G/L account as a receiver (such as 399999). You can also settle costs and revenues or results analysis data to objects with revenue.
    You can also settle the cost of sales calculated in results analysis to a fixed asset or a cost center. To do this, you must add to the allocation structure the results analysis cost elements under which the cost of sales is updated to the order.
    The settlement rule includes a distribution rule for the sales order item. The distribution rule is made up of a settlement receiver, a settlement share, and a settlement type:
    The settlement receiver (such as profitability segment or G/L account) specifies the object to which the actual costs and revenue of the sales order item are settled. The settlement receiver can be proposed through the settlement profile.
    The settlement share defines the percentage or the equivalence numbers used to distribute the costs to the individual settlement receivers. The settlement share for sales order items is usually 100%. A settlement share of 100% is preset in the system.
    The settlement type specifies full settlement of the sales order item. This ensures that all the data on the sales order is available for results analysis.
    Settlement still takes place in each period. The revenues and the cost of sales are transferred to CO-PA by period, and the work in process and the reserves are transferred to FI.

  • Maintaining min sales order value

    Hi,
    I am trying to maintain minimum sales order value of Rs 500,if not order should not be created . please help me.
    thank you,
    pranay

    Dear pranayreddy,
    You can use these 2 condition type AMIW and AMIZ.
    For these you need to maintain the condition records for reference condition type.
    You can set the value in the condition record, if the sales order value is not reached against the condition record value then system will add the rest of the amount and showing it as a surcharge.
    I hope with this process you can't stop the order to be created.
    Check and revert
    Thanks&Regards
    Raghu.k

  • "Not possible to determine account for sales order or project stock"

    Hi,
    I get this error when trying to create a purchase order (type EUB). I think I should define a new account for sales order. How should I proceed?
    Thanks in advance.
    Luis.

    Hi
    1) Check the spro-MM-purchasing-account assignment-Maintain account assignment categories -
        Here check the account modifications against Account assignment category C,P
    2) Then go to OBYC -GBB check the account maintained against the account modifier obtained in step 1
    Regards
    Sandeep

  • Wrong short text for sales order item

    Hi guys,
    I have an issue for the short text for sales order item. It is werid that I get the different short text depends on how we enter the material. If we only enter the material #, we get the short text for sales order item from material master data. If we enter the material #, plant and storage location, we get the short text for sales order item from customer material infor record. However, the customer material infor record is only maintained for inter-compnay transaction. System should not pick it for third-party transaction.
    I found a code in FV45PFAP_VBAP_FUELLEN:
    Bei Primärbedarfen ist MAAPV-ARKTX nicht relevant
        if vbak-vbtyp ne vbtyp_pbed.
          vbap-arktx = maapv-arktx.
        endif.
    Kundenmatinfo hat höhere Priorität
        if knmt-postx ne space.
          vbap-arktx = knmt-postx.
        endif.
        if da_arktx ne space and
           svbap-tabix = 0 and
           vbapin-matnr = vbap-matnr.
          vbap-arktx = da_arktx.
        endif.
    But it is nothing customized. Who can tell me what is wrong here?
    Thanks,
    DL

    Hi,
    Text coming from source (MMR, CMIR etc.) is being "pulled" via the access sequence. Check the Text analysis in your sales order in Tab Texts, at item category level.

  • Invoiced blocked for sales order (configurable material external procurement )

    Hello Expert
    Configurable material external procurement
    Invoiced blocked because ,"Error reading the material cost estimate for sales order "75501"
    Message no. KE292
    Diagnosis
    In Profitability Analysis (CO-PA), the system tried to valuate item
    000010 of sales order 75501 by reading the corresponding product cost
    estimate.
    However, no product cost estimate could be found for this sales order
    item.
    The system accessed product costing for product 10820 using costing
    key 002 as defined in the
    CO-PA Customizing
    settings.
    System Response
    The system cannot process the document any further.
    Procedure
    Check your Customizing settings.
    Note:We can't run cost estimate and releasing it because it's a configurable material  but external procurement. We place a purchse order based on configurable sales orser
    Thanks
    Parves

    Hello Declan,
    Thanks for your reply. Could you please give me the steps for Maintain the
    sales order cost estimate?
    Requirement: Customer service receive order with variant configuration product,
    then MRP Crete PeReq, convert  PO and
    send to supplier .Supplier configure the product and direct delivery to
    customer. Supplier sends an invoice to us. Then we send invoice to our customer
    Thanks
    Parves

Maybe you are looking for

  • How can I create an adaptable full-width site with sliding parallax panel?

    Hi guys! I have to create a web site with a full-width resolution, adaptable with any monitor and resolution using some panels that moves using the parallax scroll-motion with a sliding effects. For example I nedd a site like "collecdiv.com" that wor

  • White Rabbit module for NI's cRIO based on Spartan-6 FPGA: One clock makes you faster and one clock makes you slow

    Many distributed networks including those used for 5G communications, power-grid monitoring, and particle physics research need precise time synchronization among the distributed network nodes. CERN's White Rabbit Ethernet protocol is designed to pro

  • Manage User Matrix Like System Matrix

    Greetings Experts, Environment: B1 2007A, C# I have created a UD matrix on a UD form. I want to handle that matrix(and the table it is bound to) as if it were a child of the Service Contract form/table. This would mean that my user defined matrix wou

  • Approved Manufacturer list modules of Oracle e-Business Suite

    Hi all, For AMPL(approved manufacters part list) in SAP,what is the equivalent module which has got the Approved Manufacturer part list in Oracle apps R12.If any one knows anything in this regard.Please put some light on. it. Thanks Srikanth

  • Re: Web Connection Timeout

    I have a Nokia C6-01 and I have a problem when I connect to WLAN at my office. It establishes connection, but when I start browsing it hangs and I get an error message "Web: Connection time-out".  When I try connecting the same in some other phone, i