In our case say 50 materials is assigned to sales orde in year 2007, so its showing stock less by 50. So can anuone tell me the procedure to kno to which sales order it is assigned and hw to make changes so that system stock is shown correctly.
regards

sapsarang,
1. you Can Check thorugh MD04 - Stock/Requirement list, seek the help of PP Consultant he will be able to tell you to which order it is assigned.
2. If you have not done further process this qty will be reserved for this material as "scheduled for delivery" . Check in MMBE by entering the material, plant if required storage location and press execute.
Right click against the stock and choose Stock/Requirement list
Regards
Sathya

Similar Messages

  • Transfer of material from sales order stock to subcontractor

    Iam having subcontracting operation in routing. But i am not able to transfer of material from sales order stock to subcontractor when i do 541 movement

    Dear Mayuresh,
    You cannot move Sales Order assigned material directly to Sub contracting Vendor stock.
    For doing so firstly unassign the Sales order stock by transaction MB1B & movement type 411E.
    After this you can provide the stock to the vendor by transaction MB1B & movement type 541O.
    Other way is to create account assigned Purchase Orders. Thereafter create virtual sub contractor storage location in your plant. Transfer your Sales Order assigned material to these Virtual locations so that you can see the stock provided to the vendor. Now during Goods Receipt of the finished goods you can consume the material by movement type 543E.
    Regards,
    Subha.

  • To get the configuration detials of a material from sales order

    Hi Gurus,
    I know we can get the configuration details of a material from Purchase order using function module 'ME_VAR_GET_CLASSIFICATION'. I need an equivalent function module for getting configuration details of a material from sales order. Is there any?...
    thanks in advance...

    Hi Gurus,
    Myy probelm is solved. I used the same funcitton module ME_VAR_GET_CLASSIFICATION. wiht Material and configuration as the inputs. then i used table CABN to filter the hidden characteristics using the field ACTVE.
    This link in SDN will be more useful. please try this.
    https://www.sdn.sap.com/irj/scn/wiki?path=/display/profile/2007/09/12/classification+concept&showcomments=true

  • Mb1b movement 453 - profit center not from material but from sales order

    Dear All,
    we have the problem that by return process from sales order stock to free stock (453 movement) we would like to have the original Profit center from sales order, but as SAP standard it moves PC from material master.
    we have implemented already oss 978159 sowie 1038490, but did not help.
    Since days we try to find an uxer exit in MM or CO!? where we could write in the correct profit center. But unfortunately PC from material master pops up at the end of the process, and the system overwrites it again and again.
    Had sy of you similair problem? can you please help with an user exit?
    Thanks,
    BB

    Hi
    I think this behaviour is correct.. Since you are moving from Sales order stock to Unrestricted stock, the PC from mat master would prevail...
    As far as I know, this behaviour is correct
    Regards
    Ajay M

  • Inactive Material Display from Sales Order screen

    Hi Everyone,
    In Continuation to my previous thread,
    [Suppress Cost Feild in Sales Order;
    I want to inactive "Material Display (F8)" from Menu: Enviornment, in Sales Order Screen.
    The requirement is that user must not display material related details, mainly cost, from Sales Order screen, itself.
    Thanks,
    -Sumi.

    Hi,
    To prevent user from displaying MAterial information from Menu bar refer to the following link form SAP. It has the complete answer to your question although it is for a different module.
    http://wiki.sdn.sap.com/wiki/display/Snippets/TransactionVariant-AStepbyStepGuidefor+Creation
    The procedure would be same, except that in SHd0 transaction code you would be giving VA02 as T.Code instead.
    You can feel free to raise your queries if any after going through this link.
    Regards,
    Rohan Gudavalli

  • How material transfers from sales order to service order

    Hi All,
    In case of sales order (Debit memo request or quotation) created from service order, material in service order is transferred to sales order via DIP profile.
    but in case of,
    service order created from sales order how the material flows from sales order to service order.
    In customer service module.

    If Service Order gets created from Sales order, operations & components are transferred to Service order through Service Product assignment in Sales Order.
    Service Product will be created in MM01 & this will be linked to Task list in OISD. By assigning this Service Product in Sales Order, Service order will be created automatically with the assigned Task list.

  • Quantity is different from sale order and delivery

    Hi,
    Gurus,
    Quantity is different from sale order and delivery.
    I identified the Material in the sales order, the item category for this material as BOM.
    I have also checked the bill of material display header overview. The Base Quantity maintained as 1000 EA3. The SUBITEM maintained in G in the unit field in bill of material display.
    Accordingly i have checked the same for material master's additionl data in Units of Measure tab, it is mentioned the basic unit as 1000 EA3 and alternative unit as 600 G.
    My client processed the order for 100 QTY. The QTY for the two sub item is 99.601 each in the sale order.
    My client Question is why in delivery the Material Qty is coming as 99.730 and the SUB ITEM is coming as 99.330 EACH.
    Note:- The material X is maintained in EA3 in Bill of material header overview. I do no how the sale unit came as G for the Material in sale order.
    The other two sub item is perfectly coming as G. Because it is maintained in G in the Bill of Material Display.
    Guide me GURUS.
    Thanks and Regards,
    ANAND

    Hello Rumar
    I guess you entered the text manually in the sales order. The Ship-to may not be having any text, but the Sold-to may be and it may be coming from sold to.
    In transaction VOTXN, check the access sequence for the text type id and see which one takes precedence - one from customer master or from the order by checking the order of accesses.

  • Sending Components to SC-Vendor from Sale Order Stock

    Hi
    Anybody can throw some lights on following Issue…..
    Our Customer is Placing Order with Us….It is an MTO Scenario….
    The Product is Assembly…
    In that Assembly, we have to Send some components to our Sub Contracting Vendor…and get back  one HALB Product….
    To create Sub Contracting PO…I have to create PO in ME21N with Item Category “L” and Acc.***.Category “E”…Here In Item Details, Material Data…The BOM is getting Exploded…..
    Now I want to send my Components( Which is also belongs to  Spl.Stock “E”) to my SC-Vendor…in ME2O…But Here I am not getting any Selection…ie) the Components which I want to send to my SC-Vendor based on that PO from Sale Order Stock “E” is not flowing in ME2O…
    Pl. Guide me How can I send components to my SC-Vendor based on my PO with Item Category “L” and Acc.***. Category “E”…
    Your Immediate response in this is highly appreciated…
    Regards
    S.Baskaran.

    use tcode MB1B with movement type 541 and choose TO PURCHASE ORDER and give the purchase order details here.
    regards,
    indranil

  • Budget error while creating delivery from sales order

    hi Gurus,
    System is throwing error PB603 "Item 004 WBS element ABC-XXX budget exceeded" while creating delivery from sales order.
    I am picking material from unrestricted plant stock (not in project stock).
    I am also confused as sales order has 3 line items & error shows Item 004 !

    Hi Kuldeep,
    Check this note,
    Note 159387 - Message BP603: incorrect line item is displayed
    Its valid only till 4.6. Might give you some idea but.
    Regards,
    Gokul

  • Creation of service order from sales order

    Dear gurus,
    I am creating a service order from sales order. the system is asking me the variant configurations for the said material.
    But i dont want to use a configurable material. I want to use a general material withour variant configuration and generate a service order using predefined tasklist.
    Please help!

    Hello Prashant,
    if you do not want to use configurable materials in sales order:
    make sure the material cannot be configured (material master view 'basic data2')
    make sure the customizing for the item line does not require configuration (remove the 'configuration strategy' in the customizing for the item line)
    Link your sales material to your task list using transaction OISD
    If you do not wat to configure your task list as well, just make sure it is not linked to a configuration profile.
    Does this help?  
    Nicolas

  • Automatic creation of project from Sales Order?

    hi..
    can someone guide me how to automatically generate PS Projects from SO USING TCODE HBS0?
    i have been able to generate projects automatically when i use tcode VA41 but my need is to do this for RE using sales browser and creation of Sales Order is by Tcode HBS0.
    when i save the sales order, no project is created. ( Note: Material i used is same one i used successfully in VA41+)
    thanks in advance..

    Hi Ramesh,
    Creation of project from sales order in SAP Project system is described as assembly processing.
    In the Project System only networks can be generated directly from a sales document during assembly processing. Indirectly the system can also generate work breakdown structures, when it creates the network.
    1.You start assembly processing by creating a sales document for a material. This sales
       document can be inquiry,quotation, sales order.
    2. The system then
        Configures the material, if necessary
        Creates a network using the standard network as a template
        Configures the network, if necessary
        Schedules the network backwards from the required delivery date
        Checks material availability
        Costs the network and transfers these costs to the sales document.
    3. When you save the sales document, the system saves the network together with the sales
        document. If applicable, it also generates a project definition and work breakdown structure.
        The project number is derived from the sales document number.
    Please refer link mentioned below to know more details
    http://help.sap.com/saphelp_47x200/helpdata/en/95/1613a8837b11d2b6700000e82d8bd1/frameset.htm
    Regards
    Tushar

  • Creation of Project from Sales Order

    Dear All,
    I am doing Customer Project.
    My Client want to Create a Project Directly from Sales Order. I think we can do it using Assembly Processing. But, I have not worked on it.
    If any one worked on this scenario kindly guide me in this case. Also, let me know any documents are avialble in this scenario.
    Thanks and Regards,
    Atul R. Rajmane

    Hi,
    Transaction Flow
    As per prerequisite we need to create following:
    1-       Standard WBS
    2-       Standard Network
    3-       Material
    4-       Link between the Network, Material and Standard WBS;o
    5-       Create Sales Order
    Create Standard WBS
    TCode : CJ91
    Path:  Choose Logistics ® Project management ® Basic data and then Standard structures ® Standard WBS® Create
    After entering the data press enter.
    Now select   icon to display the WBS element.
    You can add / delete the WBS element here.
    Remember that For All WBS Element, Operative indicator Account Assigned & Planning Element should be ticked.  Billing element should be ticked for the WBS element that will be assigned in the allocation of material to Std. Network
    Click on   icon to go back to the header.
    Here release the WBS elements.
    Make sure to release the WBS elements. (Remember without Release Status system will not allow to post any actual cost to new created project)
    Create Standard Network
    TCode: CN01 
    Path: Choose Logistics ® Project management ® Basic data and then Standard structures ® Standard networkà Create
    Select the   icon to copy from Template.
    Now enter standard Network (Which one you want to copy).
    Here you will link WBS to Network.( it is very important to create a new operative project from sale order ) Then press Enter
    Select the     for choose activities:
    You can create activity here as per requirement.
    You can maintain the relationship among the activities. Now Press the Total Tab :
    Now here you can decide that under which WBS element activity will assigned .
    Save the network
    Create Material
    TCode: MM01
    Path: Logistics ® Production ® Master data ® Material master or Logistics ® Material management ® Material master and then Material and create (special or general)
    Create material with using already exist material
    Maintain the necessary setting in Material Master. (It is necessary for Assembly processing).
    Select Sales ORG 1
    Press the conditions :
    The amount which enters here will be the sale value of material. During creation of sale order system take the sale order value from here.
    Select the relevant Item Category Group.
    Maintain Strategy in MRP3 View and save then Exit.
    Assignment of Material to Network:
    TCode: CN08
    Path: Logistics ® Project management ® Basic data and then Standard structures ® Network parameters from sales order ® Edit.
    Click the   icon to enter new line.
    Here we will link material to Standard Network & Standard WBS. 
    Assembly Processing
    Create Sales Order:
    TC: VA01/VA41
    Path: SAP Menu àLogistic àSales and DistributionàSalesàOrderàCreate
    Select the Order Type / Sale organization and Distribution Channel
    Enter
    Enter the Required field like Ship to party, PO No. , Required Delivery Date, Material No. and Quantity .Then Press Enter.
    Save the Sales Order and note down the Sale Order Number.
    Sales order number will use the project number
    Check in Project Builder.( CJ20N)
    Now we can see that System has created new operative project in background.
    And it has assigned activities to WBS accordingly.
    **source-somewhere at SDN,i forgot.will try to find original source then post here for reference and proper acknowledgement*
    regards.

  • BAPI or FM to create outbound delivery from Sales order

    Hello All,
    My requirement is to create a outbound delivery from sales order. Also i need the batch number and texts to be updated in the delivery.
    For this i need a single FM. The catch is that we don't have the batch number and texts in the sales order. That i have to take from some other delivery. I can get all the information .
    The problem is that i can not find a FM through which i can create the delivery from the order and update the same.
    I should not use two FM.
    Could you please tell me some FM which does both in one go?
    Thanks and Regards,
    Rahul Sinha

    Hi
    Hi,
    You can use the BAPI BAPI_DELIVERYPROCESSING_EXEC.
    Check this sample code..
    PARAMETERS: p_vbeln LIKE vbak-vbeln.
    DATA: BEGIN OF t_vbap OCCURS 0,
    vbeln LIKE vbap-vbeln,
    posnr LIKE vbap-posnr,
    kwmeng LIKE vbap-kwmeng,
    matnr LIKE vbap-matnr,
    werks LIKE vbap-werks,
    END OF t_vbap.
    DATA: t_request TYPE STANDARD TABLE OF bapideliciousrequest
    WITH HEADER LINE.
    DATA: t_created TYPE STANDARD TABLE OF bapideliciouscreateditems
    WITH HEADER LINE.
    DATA: t_return TYPE STANDARD TABLE OF bapiret2 WITH HEADER LINE.
    SELECT vbeln posnr kwmeng matnr werks
    INTO TABLE t_vbap
    FROM vbap
    WHERE vbeln = p_vbeln.
    LOOP AT t_vbap.
    t_request-document_numb = t_vbap-vbeln.
    t_request-document_item = t_vbap-posnr.
    t_request-quantity_sales_uom = t_vbap-kwmeng.
    t_request-id = 1.
    t_request-document_type = 'A'.
    t_request-delivery_date = sy-datum.
    t_request-material = t_vbap-matnr.
    t_request-plant = t_vbap-werks.
    t_request-date = sy-datum.
    t_request-goods_issue_date = sy-datum.
    t_request-goods_issue_time = sy-uzeit.
    APPEND t_request.
    ENDLOOP.
    CALL FUNCTION 'BAPI_DELIVERYPROCESSING_EXEC'
    TABLES
    request = t_request
    createditems = t_created
    return = t_return
    READ TABLE t_return WITH KEY type = 'E'.
    IF sy-subrc = 0.
    MESSAGE e208(00) WITH 'Delivery creation error'.
    ENDIF.
    COMMIT WORK.
    READ TABLE t_created INDEX 1.
    Write: / 'Delivery ', t_created-document_numb.
    Regards,
    Sreeram

  • Add new F4 (searchhelp) for material in sales order

    Hi there!
    I read the following related poste:
    customisation of F4 for material in sales order
    In that post Atul wanted to change an existing search help. My problem is differnet I think.
    What I have:
    In VA01 I have many different SearchHelps for the material: 9 standards and 2 from my serviceprovider. The standards have shortcuts M, A, H, K, L, N, O, P and S. The two custom ones have 2 and Y.
    in MM03 I have even more different SearchHelps for the material: maybe 23 standards and 3 customized ones. The standards have the shortcuts M, A, B, C, E, F, H, I, J, K, L, N, O, P, R, S, T, V and W (then one without ?!?), then G, U. The custom ones are 1, 2, 3, Y.
    I now want to use the searchhelp (for example) "I" (in german its "Artikel zur Liefarentenartikelnummer", so I think its about "Material from suppliermaterialnuber" in english) that I can use in MM03 as well in VA01.
    Where do I have to customize / program things to do so?
    Thanks in advance!

    Works!
    I had to include the Searchhelp MAT1I into the section "included searchhelps" of searchhelp SD_MAT1 within transaction SE11 and run the default parameter assignment (Button).
    I know it was MAT1I because I looked it up in Searchhelp MAT1_A... just to round this ticket for maybe the next readers.

  • How to find open item from sales order

    Hi all,
      my requirement is one sales order is there partial delivery is happened for some materials,take exampla matarial X has 100 quantity in sales order pratial delivery 50 is done, iwant to know the open order qunatity for a  material X from sales order.
    regards,
    kishore.

    hi kishore,
    in the partial delivery scenario, the sales order items always be a open.
    you can see the document flow of that document by using Tcode : VA03 then click on'update document flow' icon. then system will show the status.
    i.e  sales order is 'being processed'
      outbound delivery is completed
    billing document is completed
    and accounting document in not cleared.
    if it is helpful, then give me the points.
    Regards,
    somu.

Maybe you are looking for

  • What's up with my itunes screen?

    I have ipad3, the latest itunes software and iOS6.  My iTunes screen does not look like any of the pictures I see online or in books.  It does not have the left panel (LIBRARY, STORE, DEVICES,GENIUS, PLAYLISTS Etc).  I cannot find the tabs along the

  • Suggestions for removing video noise from converted Hi8 footage

    I am about to start capturing Hi8 material into FCP 6 through a Sony D8 camcorder that does the analog to digital conversion. Even after cleaning the tape heads, I notice a very few lines of noise at the very bottom of the frames - like a dirty head.

  • Scanner software for

    When I launch the HP scanning utility, I get an error message that says another program has control over the scanner. It says to quit the program and try again. But no other program is launched that I can find. I tried scanning directly from printer,

  • How to Validate Schedule Ship Date manually entered - Order Management

    Hi, When a sales order is booked for a customer, some sales staff maually enter the Scheduled Ship Date field under Shipping tab, insead of using the calendar. And if they enter a date that is not within a valid date range, the system accepts it. How

  • Need help installing just-purchased Photoshop Elements 11

    I just bought Photoshop Elements 11 at Costco. I want to install on a Mac with no CD drive. I went to download trial version from Adobe (so I could then upgrade to full, purchased version by entering serial number from the box), but the trial version