To find 'Maintenance Work Center' for Equipment (without Production order)

Hi,
I have a Report for - 'Equipment BOM' - IB03.
Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
[ Note: For Client -->  It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
So - Not possible to fetch from AUFK, HIKO or any other order tables. ]

I have a Report for - 'Equipment BOM' - IB03.
Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
[ Note: For Client --> It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
So - Not possible to fetch from AUFK, HIKO or any other order tables. ]
EQUZ-GEWRK has the main work center. Pass the equipment number and valid-to date to get the main work center.
Cheers
Sujay

Similar Messages

  • Table to find maintainence work center in equipment

    Please let me know  where maintenance work center data for an equipment is stored ...I searched in EQUI/EQUZ ..but could not find ...PP workcennter is there but Maint workcenter is not found in these tables

    Hi,
    EQUZ-GEWRK  is the work center on organization tab
    ILOA-PPSID is the work center on location tab
    In each case the work center is stored in a internal format. To find the actual work center / plant, find the CRHD record where OBJID field contains that internal number.
    -Paul

  • Tag Work center to Materials in Production Order

    hey everyone,
    I need to tag the correct work center to the prod order. One Production order has say 5 materials and they have different movements on it. We need to fetch the correct work center for each material movement. I am able to find work center for materials that have entry in the RESB table but for material that is final produced has no entry in RESB thus we cant tag it to any work center.
    Does any one know how to tag the produced material to the correct work center according to the operation on that production order.
    any suggestions would be appreciated.
    thanks !!

    Laura: Please don't post the same question in different forums. Thanks!

  • Tables to retrieve work center for target costs

    Dear all,
    currently i developing a report which requires me to display the work centers and their target and actual hours and costs. I tried using production order link tables but they only show work centers that are related to planned costs. May i know which tables can i refer to, in order to retrieve work centers that contribute to the target costs?
    Thanks and Regards
    YM

    I have a Report for - 'Equipment BOM' - IB03.
    Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
    [ Note: For Client --> It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
    So - Not possible to fetch from AUFK, HIKO or any other order tables. ]
    EQUZ-GEWRK has the main work center. Pass the equipment number and valid-to date to get the main work center.
    Cheers
    Sujay

  • Capacity Planer Group --- Maintenance work center

    Hi,
    I have a query
    1. like do we have to create capacity planner groups same as the planner groups in equipment master data....Do they have any link??
    2. What would be the start time and end time in maintenance work center, for 24 hrs open manufacturing industry with 3 shifts???
    thanks
    DM

    Hello Deepak,
    There is no relation between capacity planner grp & Maintenance planner group...These are 2 different things..
    Now the work centers can be defined for the technicians if  HR module is not implemented...
    To perform the capacity planning for the technicians, there daily working hrs must be maintained in the system..Though the maintenance is working for 24 hrs,Single technician cannot work for entire 24 hrs..
    Hope this will help..
    Thanks

  • Varying Maintenance Work Center Capacity by Days of the Week

    I had submiited a question a month or so ago about varying the capacity of a maintenance work center depending on the day of the week.  I got an answer and it worked.
    We've set up another work center (in staging) for the same scenario (the work center is half staffed on Fridays).  Monday through Thursday the capacity is 36 hours, Friday the capacity is 18 hours, the validity from date is 04/05/2010.  When we use CM34 to do some scheduling though, the capacity shown is 40 hours a day, Monday through Friday which is what the capacity was set up for prior to the validity from date.  It's also the same capacity as shown in the 'Standard Available Capacity' section.
    I looked back at the work center I had modified previously and it's showing the same thing.  It's like it's ignoring the validity dates.
    Any ideas?
    David Macindoe

    David,
      I know for sure that this is reflected in the standard profile for Capacity Availability check as part of release of the order (SAPSFCG013). The Availability for the week does show the capacity for the interval dates of the week and not the standard available capacity.
      I haven't checked this on CM24 and if the standard profiles don't reflect the change then the profile probably needs to be changed.I need to look into it to make sure. In the meantime if you aren't able to resolve the same, i would suggest to raise a note and see where that leads you.
    Regards
    Narasimhan

  • To track the preventive maintenance work on the equipment itself

    Hi Experts,
    I have working on the requirement to track the preventive maintenance work on the equipment master data it self.
    I have thought of following way of  doing it.
    1. Create a charateristic "Plan no" having refrence to maintenance plan table & field (MHIS - WARPL)
    2. Create a charaterisic "Last completion date" having refrence to maintenance plan table & last date completion field (MHIS - LRMDT)
    3.combine these two charateristic in class say "Inspection data"
    4.Assign this class to equipment in classification tab
    5. Create a maintenance plan , generate order and complete the order.
    6. After doing this, these  data should updated in charateristic values as given above. But it is not happening.
    Am i missing something here. Or can you suggest me other way of doing this.
    Regards,
    Amar

    Hi,
         yes you are right we can use object information key and can navigate to required detail.
    But the client want the report in a tabular format.
    like Equipment no       Last testing done on   Maintenance plan no 
    There is one report in classification system that is CL30N in which you can find this kind of report provided the "Last Testing done on " and "maintenance plan no" you have used as  charateristics.
    Regards,
    Amar

  • Plant Maintenance, work center & component.

    Hi, I have some question as below:-
    company code: 1000
    Plant A: 1100
    Plant B:1200
    Component storage location under 1100
    Q1: work center for plant B is under 1200, so if work center need the component for maintenance job, then they need do the STO to transfer component from plant 1100 to 1200?
    Q2: work center for plant B is under 1100, so they NOT need do the STO to transfer component to do the job at 1200?

    Hello Dear,
                       Can you please tell which is the Maintenance Plant,
    if the maintenance Plant is different from the main Plant then you need to do the STO for the Main Plant(B),
    if you have assigned both the Maintenance plants to the main plant then no need for the STO.
    Hope it helps
    Regards,
    Yawar Khan

  • Standard Hours Required on a Work Center for a month along with CC

    HI Gurus,
    My requirement is :
    I need a report which fetches how many hours are required in a month on a particular cost center attached to work center for a plant.
    Is there any standard report to fetch this . If no how can we develop a report. Which tables we need to combine in CO and PP.

    Hi,
    Check report S_ALR_8703611.
    Regards.

  • I need to find a working file for the Adobe Download assistant?

    i need to find a working file for the Adobe Download assistant?

    I was going to recommend Brother becasue they held OS9 support longer than just about anyone, but their current printers are now supported back to Mac OS10.3 to 10.4, depending on printer model.
    If you can do with a b/w laser, the recently discontinued HL5250DN is very nice and OS9 drivers are still up on Brother support site (just checked). We have that model networked at home and its happily serving five Macs plus any visitors who bring their own computer.
    This printer has been absolutely reliable and trouble-free. It has both USB and ethernet connectivity (I prefer the latter), does duplex (two-sided) printing, and 1200 dpi res. If you Google the model HL5250DN, you should turn up some of the model still in stock someplace.
    If you need color, I'm at a loss for a recommendation there.

  • Maintenance Work Center : Capacity Planning CM01

    Hello Gurus,
    We are using T-code CM01 to determine the Requirements / RemAvailCap of the Maintenance Work Orders in a given Maintenance Work Center.
    After executing CM01, the detail capacity list contains Not Scheduled orders( CRTD )and  capacity of these not Released orders also taking into consider.
    How to restrict CM01 Order selection based on the work order System status or User status ?
    I found below discussions on SCN but couldn't get precise answere.
    Plant Maintenance: Capacity planning CM01/ CM07
    Configuring profiles in CAPACITY PLANNING (CM07)
    Please help.
    Thanks in Advance
    Ashok M

    There are a few ways:
    Create a new status profile via BS42 and assign the REL status only (see image 1). Then in the CM01 display screen, use menu path: Planning->Selection->Order and enter the status profile created above (see image 2)
    Create a new selection combination via OAP0. In the CM01 display screen, use menu path: Planning->Selection->Combination and enter the selection combination created above (see image 3)
    The above settings can then be defaulted via the various capacity planning profiles.

  • Maintenance Work Center, user status, system s into notification print out.

    I want to copy Maintenance Work Center(GEWRK), active user status and active system status to notification print out. I am not able to search from which table this field is coming. Can any body tell me the name of table ?
    Regards,
    VM
    Edited by: V M on Oct 5, 2008 4:03 PM

    VM,
    It may not work with print programs, but try putting the following code in your ABAP program:
    * get notification statuses
    data: lt_jest      type standard table of jest.
        call function 'STATUS_READ_MULTI'
          exporting 
            all_in_buffer  = 'X'
          importing
            status         = lt_jest.
    If that fails, then try this:
    data: lt_jsto_pre type table of jsto_pre with header line.
    data: lt_jest      type standard table of jest.
      call function 'STATUS_READ_MULTI'
           exporting
                client      = sy-mandt
                only_active = 'X'
           tables
                objnr_tab   = lt_jsto_pre
                status      = lt_jest.

  • Error " No working/operating time maintained in work center for scheduling"

    Hello Friends,
    When i am scheduling the planned order than in scheduling log, system throwing the error "No working/operating time maintained in work center for scheduling".
    Message no. C7014
    But in workcenter, i have attached the grouping and in interval and shift for the available capacity 1, i have maintained the shifts.
    According i can see the capacity on that workcenter in CM01.
    Same error i am getting when i am scheduling the routing and check the scheduling log.
    Regards,
    Jitendra.

    Hi
    Have u checked , to maintain the time required to perform the activity in the work-center?
    please check, i think, we have to maintain for each activity type.
    regards,
    rasika

  • How can i find differnet output types for a given sales order ?

    hi all,
    answer my question please........?
    how can i find differnet output types for a given sales order ?

    hi
    check in NACO transaction if you have assigned access sequence to your output ytpes and if you have ticked checkbox "Access to output conditions" - otherwise it will not even try to access condition records.
    From help :
    Access to output conditions
    Indicates whether the system determines the output by searching for valid
    condition records.
    Procedure
    If you want the system to search condition records for the appropriate
    output, mark the field.
    Note
    If you leave the field blank and if you are processing sales, shipping,
    or billing documents, the system automatically determines output from
    information stored in the customer master record.
    regards
    ravish
    <b>plz reward points if helpful</b>

  • BAPI/FM for Confirmation of Production order at operation level

    Hi ABAPers,
    I am using the 'BAPI_PRODORDCONF_CREATE_ACT'for Confirmation of Production order at operation level.
    I am able to pass the Production order number and Active Operation get the confirmation done.
    But the Confirmed Qty is not being updating in AFKO table.
    The 'BAPI_PRODORDCONF_CREATE_HDR' cannot be used for Confirmation of Production order at operation level as there is no Operation/Activity(Vornr) field in the input table. Hence using this bapi confirmation of Prod order can be only at Order level.
    Can someone know any FM/BAPI which can be used for the Confirmation of Production order at operation level(not order level).
    Thanks in Advance
    Ramesh Babu Cikka

    Hi Ramesh,
    Please use FUNCTION 'BAPI_PRODORDCONF_CREATE_TT'.
    This will work as like as T/Code "CO11".
    I hope this will help you.
    Example :
      CALL FUNCTION 'BAPI_PRODORDCONF_CREATE_TT'
        EXPORTING
          POST_WRONG_ENTRIES = '0'
          TESTRUN            = ' '
        IMPORTING
          RETURN             = ZRETURN
        TABLES
          TIMETICKETS        = ZBAPI_PP_TIMETICKET
          DETAIL_RETURN      = ZBAPI_CORU_RETURN.
      CALL FUNCTION 'BAPI_TRANSACTION_COMMIT'
        EXPORTING
          WAIT = 'W'.
    Lanka

Maybe you are looking for

  • How to do the effects used in this video?

    Hi, I'm curious as to how to do these effects in this video: Childish Gambino Type Beat - Inhale Ft. Drake - YouTube Mainly I'm looking for the colors, but knowing how to do the scratches would be nice too. Any information is greatly appreciated

  • Whats GOING ON with Pubcenter!? ALL TIME LOW Revenue and Fill rate!

    Whats going on here? Since 3 weeks the revenue has has not picked up one bit! I got the same number of impressions last month but the revenue was X3 more! :'( WHAT IS GOING ON? Support has there is "no demand" due to season. What does that mean? Why

  • Zfs snapshots and booting ...

    Hello, In solaris 9, filesystem snapshots did not survive reboots. Do zfs snapshots in solaris 10 persist across reboots ? Can I boot off of a zfs partition ? thanks.

  • X11 doesn't work?

    I didn't need to use GimpShop on my MacBook until recently, as it was running just fine on my Linux bot. But, recently, I have acquired an old Tablet, and my Linux bot (a very aged and patched together piece of hardware) will not be able to recognize

  • Is anyone else having problems with Apertures Date fields?

    After experiencing a sysems failure I began restoring my images from backups.  I have had no end of problems with Image dates.  I have come to the determination that Aperture is NOT using either the "Create Date" or "DateTimeOriginal" as the image "D