To lock production version

Hi Gurus,
While running standard costing, system consider 1st available version only. We need 2nd version for standar costing, so if we inactive 1st and 3rd alternative BOM system will consider 2nd for standard cost calculation. So we need to inactive or lock the 1st and 3rd production version. When i try to lock that lock field is in greyed. How we can lock and unlock the production version

Dear Satish,
Two ways to run costing Material level & PV level
in CK11N just check third tab you can get option PV
Here give PV2 & run costing
Regards
Madhu

Similar Messages

  • Production version with status " locked for any use" being considered

    Dear All,
    while creating integration model for PDS , materials with production version locked for any use are being considered. Can any body put some light on it.
    My requirement is that in creation of integration model it should not take production version which are locked for use.
    Regards
    Arun Negi

    Check OSS Note 854561 - PDS does not recognize any locked production version in R/3
    "Symptom
    If a production version is locked in the R/3 System, this change is not transferred to the related production data structure (PDS) in APO. The PDS is therefore still used as a source in APO in the plan explosion. This causes errors during planning and results in terminations when an order is converted and subsequently transferred to the R/3 system."
    https://websmp130.sap-ag.de/sap(bD1lbiZjPTAwMQ==)/bc/bsp/spn/sapnotes/index2.htm?numm=854561
    Manish
    Edited by: Manish Kumar Rathi on Oct 10, 2008 11:46 AM

  • Automatic Production Version Selection

    Dear All,
    There are two production versions 0001 and 0002 for a finished material. When I create production order from planned order it automatically selects version 0001. If I want it to select version 0002 automatically what should I do?
    Regards
    Hammad

    Hi Hammad,
    As per your querry, you want production version 0002 should be selected automatically when you create production order instead od PV 0001. If you want PV 0002 should be selected automatically then,
    1. Maintain lot size of of PV 0002 to quantity which you usually use for the production. So when you create production order system will use PV0002 based on lot size.
    2. Or change validity period of PV0001 to a date which is outside the planning period. So it will be no longer valid in the period in which you are creating production order.
    3. As specified by experts, you can change PV selection to manual by going to transaction COR4. And change selection of PV to manual selection for your order type or you can change it by going to transaction MM02. Then lock production version by selecting locked for any usuage.
    Hope this resolve your issue, please reward if it is usefull.
    Regards,
    Avinash.

  • ISSUE:regarding production version tab of MRP4 of  data transfer using BD10

    Hi all,
    This is regarding production version tab of MRP4 of  data transfer using ALE idoc (BD10).
    When i transfer the data using BD10 the production version is received at receiving end through segment
    but not created in MRP4 view tab.An error is coming as-
    "You wanted to maintain the master record of the material AB_06.04.09(2). However, it is already being processed by the user EBGABAP and is therefore locked."
    I logged in as-EBGABAP
    Please help me resolve the issue.
    Thanks
    Edited by: sanu debu on May 6, 2009 11:08 AM
    Edited by: sanu debu on May 6, 2009 11:09 AM
    Edited by: sanu debu on May 6, 2009 11:11 AM

    >
    sanu debu wrote:
    > Hi,
    > I have to upload production version tab data of  MRP4 view(MM01).Please suggest a function  moduleor bapi  for the same.
    >
    > Thanks.
    >
    > Edited by: sanu debu on May 6, 2009 3:24 PM
    BAPI_MATERIAL_SAVEDATA can be used, populate the respective fields in input parameter PLANTDATA

  • Selecting production version in MRP run

    Hi dudes,
    our client is having reuirement is he will select the production version irrespective of lot size, but he select the production version at the time of manual creation of process order where it depends on resource(work center used in recipe of particular production version, BOM will be 1 alternative only.
    now while running MRP how to make system to allow manual selection of production version at the time of converting planned order to processs order.
    respond asap plz...
    Daniel.

    Hi ,
    During MRP, system will select the production version based on Validity date & Lot size.
    If a material contains two production versions with same validity date & Lot size qty , system will select the First valid PV by default (unless it is locked) & will copy to planned order.
    When u convert the planned order to production order,default PV will be copied automatically from planned order. Here u cannot select PV manually.
    Settings:
    Create valid production version with lot size and Valid routing , BOM at MRP view of Planning material.
    Assign the selection method = 2 or 3 at MRP view of Planning Material
    Regards,
    Anand.

  • Selection of Production version during MRP run

    Hello experts
    At present I am having 2 production versions for a material code as PV01 and MV01.
    By putting validity date I am restricting correct version to be picked in MRP.
    Is there any other way, for example in material master where if I maintain the production version, then MRP should pick that only.
    Please suggest the best way.
    Regards
    Pradipta Sahoo

    Dear Pradipata,
    If you are having more than one production version for a material for the same Lot size and validity
    dates,and if you have given BOM selection method as 2 in MRP4 view,then always the system picks up
    the first production version defaultly.
    If you want the system to pick up the second production version in that case means,you have to lock
    the first production in MM02 or C223.
    Check and revert back.
    Regards
    Mangalraj.S

  • Production version report

    Hi Gurus,
    is there a report that can give information about production versions. The fields at a minimum that i'm looking for are production version, material, text, alternate BOM, product line, Group, plant, valid from, lock, task list type, valid to, Bom usage
    Thanks
    Anusha

    Anusha,
    To my knowlede you cannot export it to Spread sheet from C223. If you need to download, then you can take it by table browser transaction SE16 from table MKAL.
    1. Execute transaction SE16.
    2. Input table as MKAL. Input the selection critera and also set the output fields and then execute.
    3. You would be able to export this output to Spread sheet.
    Regards,
    Prasobh

  • Production version selection based on Process order type

    Hi,
    I have the following requirement.
    A material is having two production version one is for R&D and one is for regular production. Now two process order types one for R&D and one for regular production. Now during creation of process order if we use order type of R&D then it has to select production version of R&D and if we use order type of regular productionthen it has to select production version of regular production. This selection has to be happened automatically. How this can be configured.
    Thanks
    Vinamrath.

    Dear Kumar,
    Assuming the production version selection is automatic in  the order type dependent parameters,then during order creation this
    can be automated only through validity date of the production version or else by locking the production version manually which
    should not get picked or else only through different Lot Size.
    Check and revert.
    Regards
    Mangalraj.S

  • Automatic selection production version in MFBF

    Hello !
    I have a material setted with Selection method = 2(Selection by production version) in Material Master, so, I have two production version: V001 & V002, the last one is locked for any usage. 
    I need automatic selection of production version in MFBF , but when I'm doing the confirmation the system show the screen of  production version selection  with two versions .
    Do you know what is missing for automatic selection works ?
    Thanks a lot.
    Vero

    Hi Vernoica ,
    Good Day , PV will be selected based on the lot size and the creation dates.
    It will copy the PV (BOM & Routing ) based on Lot size or Explosion date you defind in MRP-4 view i.e. BOM selection ,BY -explosion date,1-lot size,2- by PV and 3 by PV only.
    If you would like to get rid the selection of PV,
    why dont you try created a production version than only go to material master change screen MM02 in MRP4 view and Select 2 at selection method field.
    In the IMG (OPLD) for Order Type Dependent Parameters, the production version selection is already set to manual selection.  But the production version is always defaulted as version 1 which is the first one in the material master and is not asking to select the version at the time of converting the planned order to a production order!
    You can also check settings in configue trans OPL8 to have routing selection set to automatic selection if you want to avoid placing routing versions in each individual material master. Just another way to look at it
    Hope it will resolve your problem.

  • Selection of BOM with Production version

    Hello friends,
    I have Finish product say A with two alt. BOM and Production Version 1 & 2
    i have semi-finish product say B  with two alt. BOM 1 and 2 in the BOM of the Product A
    Now when i create PIR in MD61 for product A with production version 2 selection,how the system will select the component B
    with alternative BOM 2
    please suggest

    Hi Mangesh,
    The production version is selected based on the setting you are maitaining in MRP-4 view for Dependent Requirement Selection Method. The selection will be based on the Validity dates, Quantity i.e. based on the Lot sizes, and based on the production versions.
    If both the versions are having same date,lot size etc, then the system will select the first version by default.
    IF you do not want any version not to be selected then you can lock that version in MRP-4 view or in C223.
    Thanks and regards
    Muru

  • How to maintain production version for material and how it will work

    Dear Friends,
                          i  have created alternative bom for a material , My FG is having two  RM1 and RM2. like below, 
                    FG --->RM1
                    FG---->RM2
    i created alternative BOM. how it will fetch raw materils from BOM while doing production confimation.  what is meant by production  version and how to configure that. how it will work
    regards
    RK

    Dear Raja karthik,
    1.Production version is a combination of BOM & Routing in Discrete scenario & in REM scenario its a
    combination of BOM & Rate routing/Routing.The same can also be created only containing the BOM incase if it is going to be
    used for a sub-contracting purchase info record.
    2.Production version is a method or technique which's is used to produce a material.
    3.A Material may be having one or more than one production version.
    4.Production version can be differentiated by using either the validity date or Lot size range.
    5.Say For Eg: Prod.Version1 --> Alt BOM1 & Routing1
    Prod.Version2---> Alt BOM2 & Routing 1.
    6.It has the status Locked and unlock.We can lock it when it is to blocked for any usage purpose.
    6.Generally its created using T code MM02,by selecting MRP4 view and clicking on Production version key.
    7.It's a master data in REM scenario.
    8.Production versions can also be created using T code C223 for more than one material.
    9.Planned independent requirements can be created production version specific in MD61.
    Regards
    Mangalraj.S

  • Automactic Selection of production Version

    Hi.
    I have created a material "A"
    I maintained in material master's MRP4 view selection method "2"
    I have created two production version with same validity period & same lot size "0001" & "0002"
    I maintained in order type dependent parameter's masterdata tab in production version column "Automatic production version selection"
    Now when i am going to create a process order system is selection production version "0001".
    But I want automatic selection of production version "0002".
    What setting shall I do?
    Regards
    Vivek

    Dear Vivek,
    I maintained in order type dependent parameter's masterdata tab in production version column "Automatic production version selection"
    In order type dependent parameters maintain as manual selection
    Then system will raise an pop-up to select production version while creating prodiuction order
    The above setting is only useful while creating manual production order
    If you are converting plan order to production order then above setting will not play any role
    System will default take 1st PV
    All you can do is you can change manually in plan order
    Or if you want system to take automatically in MRP then you need to lock 1st PV
    Also refer my reply from this thread
    [Alternative BOM selection|Using customer to determine what BOM to use in Production order (tx:CO41);
    Regards
    Madhu

  • Production version selection

    Hi
    If we have two production version with same lot size quantity and same validity date
    On what basis system determines IN THE PRODUCTION OR PROCESS ORDERS.
    The selection key in Material master is Production version only
    Please explain the logic
    Regards
    Sasikanth

    What is the basis for the Selecting the production version .
    How the system identify this is the first production version ?
    system will check the validity date, from lot size and to lot size with requirement qty,  if both the PV has valid on date having same lot size, System will take first created PV, if the first created PV is locked, then system will take second PV
    If i created Version with Number 1000, 1001
    and if we kept 1001 as the first , Which version system will create ?
    System will take first created PV, if 1001 is created as first then system will take 1001

  • Production Version Not Reflecting in Production Order

    Hi Experts,
    I have a query, I have made alternative BOM and second Production Version of a FG Today. Production Version is very much Ok (Green). I have clearly mentioned Alternative BOM 2 in alternative bom.
    When creating production order thru CO01, production version is not coming in Co01. Message is coming " No valid production version is found for this material".
    Kindly confirm me what mistakes I have done.
    Regards
    GR
    Edited by: G R on Dec 18, 2008 9:48 AM

    Dear G R,
    1.Check whether your prod.version has been locked and what value have you maintained in MRP4 view
    BOM selection method.check whether has it got the value 02.
    2.Also in OPL8 - under planning tab select the option for manual selection of production version.
    check and revert back.
    3.Also check the validity dates.Also your production order start date.
    Regards
    Mangalraj.S

  • Capaity levelling and production version

    Dear SAPper,
    I curious about somecases in levelling.
    My client got 8 machine work center and they aware of capacity
    I create eight produciton version.
    MRP always put new planned order to first production order.
    After that my client would like to do capacity levelling.
    The problem is although they assign to other machine but the production version is not change
    leaving inconsistency of production version and new work center after capacity levelling
    is there any way we can capacity levelling considering produciton version too?
    Please kindly help.
    Best regards,
    Freddy Ha

    Dear Freddy,
    1.The system always picks up the first production version as a default,if more than one more production
    version exists for the same lot size,validity dates.
    2.Either you have to lock the production versions so that the system picks up the open production
    version or maintain different validity dates or Lot size.
    3.I'm not sure whether the system considers the prod version also during capacity leveling.
    check this link,
    http://help.sap.com/saphelperp60_sp/helpdata/en/1a/f2f33419ec8d44e10000009b38f844/frameset.htm_
    Regards
    Mangalraj.S

Maybe you are looking for

  • I updated to Firefox 4 but now Fire FTP add on has gone

    I updated to Firefox 4 and was about to go to Fire FTP to upload some files to a web site but it has gone from the tools menu. I have looked for it and cannot seem to find it in any other menus. Do I have to reinstall it? Does this mean I would have

  • BT Xtreme Experience ... A Rant / Complaint to BT

    BT are incredibly renowned for their atrocious customer service and pernicious greed. I have been with them for over 14 years. Now I am leaving. And the relief is so huge i just had to write. More than relief. Its like I've finally cut ties with a fo

  • [SOLVED] Load ALSA state on startup but do not save on shutdown

    I found that my options here are either to leave /etc/alsa with no state-daemon.conf to use alsa-store.service and alsa-restore.service or to touch that file to cause alsa-state.service to take over. What if I want to load the same volume state every

  • POP users cant see new mail on OSX 10.5 Server

    Hi All, I have just upgraded my 10.4 server to 10.5. I had to do a clean install due to some problems with the upgrade. My problem is, most of my POP3 users can not see any mail. The mail is being collected and can be accessed with the users login de

  • Adjustment layer- curves.

    Adjustment layer- curves. I have always used a Curves Adjustment Layer in CS3 to brighten images and increase contrast. I have just upgraded to CS6 and when I  open the adjustment layer and try to Command Click choose  points in the photograph to dra