To maintain material with the plant

hi to all,
i hv create a configural material, but when im going to create a BOM for the material i face error, "material not maintained in plant". i want to know how i maintain this configural material with the plant to create BOM?

Hi
It seems you have created the material without giving any plant number
you need to go again T code MM01 give the material number select the required views and give the plant number and storage location then system will extend tis material to the respective plant
then you go ahead with BOM etc..
Regards
Abu Fathima

Similar Messages

  • Intial upload of Stock in Transit Material with in plant / Inter company

    Hi Friends,
    How can we do Intial upload of Stock in Transit Material with in plant / Inter company.
    In this case accounting entries has already completed while doing post goods issue (thru SD route) or in 1st step 301 mov. type.
    Now the material is in transit. While we go to new system how can do this without hit of aacounting entries.
    I tried 565, it Intial upload of stock to Blocked, so accounting entries took place.
    Regards
    Sai Krishna

    Hi,
    What I am proposing is:
    At this juncture both plants accounting has been done in legacy.
    Coming to new system whatever stock we upload that much value only updated in receiving plant. In reality there is difference between legacy & new system in this case. In legacy stock in transit value also added in receiving plant (since we did PGI). If we do stock upload with 565 mov. type .. intial entry to blocked stock i.e value of inventory is matching the legacy.
    Actual receiveal of material do transfer posting from blocked stock to unresticted stock.
    What is your opinion. 
    We won't upload the G/L inventory, it will come thru stock upload for kishore infor.
    Regards
    Sai Krishna

  • Problem in creating a material in the plant

    Hello,
    I have set up a complete warehouse in a Plant & SLOC combination, I am creating a material in the same plant but it gives me the error that " Tables TCURM and T001W inconsistent; notify your system administrator"
    Please help me with solution.
    Thanks. Nitin

    Hi,
    Refer the SAP Note – 137601
    Or,
    You have to upgrade the Kernel. Check the old patch number in ur system, upload the latest patches & down load from Market Place. Consult your Basis Consultant
    Regards,
    Biju K
    Edited by: Bijay Kumar Barik on Mar 27, 2008 8:25 AM

  • Find linkage of Project defination with the Plant in the activity field

    Hi All,
       I am stuck in a situation wherein i need to find the linkage between the Project definition and the plant field in activity.There is one AFVC database table for which we get the linkage of WBS element with all the activities assigned.Therefore i was trying to search for some table or some functional module which gives all the WBS elements assigned to a particular Project definition.I request you all to please give me some direction on this.
    Thanks and Regards,
       Harsh Shekhar

    Ahmed has already  provided solution,  Use  below link for the any basic PS Table related query.
    http://www.sdn.sap.com/irj/scn/weblogs;jsessionid=%28J2EE3417300%29ID1333036450DB11151894409959738832End?blog=/pub/wlg/9659
    With Regards
    Nitin P.

  • Materia transfer Procedure for asset  material within the plant

    Hi
    We need to set the process in SAP for asset material transfer from onle location to another within the plant and also send back defective one back to vendor.
    Please suggest the procedure to do the same SAP.
    Regards
    venkat
    Edited by: garapati on Feb 29, 2008 6:35 AM

    hi,
    clarify that material code is used or not.
    if material code is used then use 301 mov type.
    regards
    points if solved/helpful
    Edited by: RAMESH ARORA on Feb 29, 2008 12:04 PM

  • Sending material outside the plant to subcontractor for refurbishment

    Hello experts,
                         i have created a normal Miintenance order(PM01)and via that order i want to send my material outside for refurbishment to subcontractor,i have alread assigned the Control key as PM02for external services, now my problem is that when i go to components and put in my material with item category as "N"(NON-stock mtrl, though the mtrl is a stock mtrl). i m able to generat the PReq, but when i go to the PReq, i m getting the account assignment as "F", but item category is blank and in grey mode that i can not change.
    further when i go to making a PO for the PReq, i m still not able to change the item category.
    where r the settings that i m loosing.
    Please help
    Regards,
    yk

    yk,
      The subcontract indicator on the operation "External tab" is only available if you have DIMP (Discrete Industries and Mill Products solution active) in SAP.
    If this is active..this would be the process to follow..
    1) assign Control key with "external processing" to operation
    2) Select the "Subcontract" check box on the external tab of the operation
    3) Assign Components to the operation with item category "L" , when you are providing the materials to the vendor
    4) Assign Proper values to the Material provision indicator for the material
    5) When you save or release the order, the Subcontract PR is then created automatically.
    Regards
    Narasimhan

  • How to make plant default on the line item along with the item category

    Hi All,
    I want to default Plant on the line item along with the item category.In order to meet the following scnario.
    1. I have two plants,first plant is maintained for the valuated item and the second plant is maintained for the non valuated item (Free Goods).
    Whenever user is entering an item in the sales order for which corresponding free goods item is maintained in the master record.System is proposing two lines items in the sales order.
    First line item is the main item which appears along with the Plant 1 which contains valuated items
    Second line item is for the Free of charge item which is being proposed from Plant 2, which contains the non valuated items.
    I want that the system should always propose Plant 1 with main item and Plant 2 with the Free of Charge item by default. (Along with the item category TAN and TANN)
    Rahul

    Delivering Plant is determined in the following order
    1. Customer material info record.
    2. Customer master
    3. Material master.
    Use one of them an default your plant.
    I think in your case you can use the materila master which will give an item level plant different. The other two will default the plant at the header level.
    regards
    jude

  • Material determination occuring irrespective of the plant

    Dear Gurus,
    I am creating a sales order through a standard inbound Idoc.
    The material determination condition table consists of the following fields:
    'Sales org./Distr. Chl/Cust Hier/Plant/MatEntered'.
    I have maintained a condition record for this access for the plant BE01.
    Now, even the Idoc is creating an order for the plant BE02 - the condition record mentioned above is getting determined!
    Hence, it seems that the condition record is being picked up irrespective of the plant (in the condition record & the document).
    Do you have any pointers to the possible reason(s) for this issue?
    Thanks in advance for your help
    SR

    Hi
    I suppose the Material might have been maintained in X  plant and CMR data assigned plant should be Y plant and that is the reason you are facing this problem.So check the following data :
    Firstly , Check wheather the Material Determination  record has been maintained for both the plants or not. 
    Secondly also check wheather  both the  Materials are maintained in both the plants or not.
    Finally check in CMR data which plant has been maintained.
    Regards
    Srinath

  • How to trace Returnable packaging material pending with the Customer.

    Hello Everyone,
    In case of Returnable packaging,
    Is there any standard procedure, by which system can give you number of returnable packaging material with the custome.
    Client's requirement is to have number of pallets with the customer on the Invoice.
    Regards
    Trupti Deulkar

    hi,
    1.Returnable packging issue has a special stock indicator which will show in the Inventor stock with whom the returnable packging material lies in MMBE.
    Follow the link
    http://help.sap.com/saphelp_46c/helpdata/en/dd/560051545a11d1a7020000e829fd11/content.htm
    Thanks
    Shekar

  • Transaction to see the Open stock transfer order for the plant

    HI ,
    i need to develop one report in that client to make the report for the all open stock transfer order & the cost of the open stock transfer order for the plant .
    I need how to cretae the stock transfer order for the material , whci material master is required for this process.
    please give me step by step details for this .
    regards
    satish
    Edited by: satish kapartiwar on Jul 16, 2009 9:33 AM

    Hi Satish,
    You can see open stock transfer quantity in MB5T and stock value in MB5L. If you want to make stock transfer, there is two types intra company transfer(with in same company code) and inter company transfer (different company codes).
    Steps for Intra company stock transfer:
    This is only within the comp.code(w/o SD)
    (w/o SD) 351101 MvT. and (with SD) 641101
    1. Mat.(1434)should be maintained in both the plants.(@1000&1100).
    2. Should have enough stock in supplying plant(1000).
    3. Make its supplying plant as a vendor in vendor master record in receiving plant(1100).
    4. Make it receiving plant as a customer in customization.
    Create customer (xd01) & and define the shipping data for plants in both the plants.
    Path: spro u2013 img u2013 material mgmt u2013 purchasing u2013 po u2013 set up STO u2013 define shipping data
    (1 by1 )
    In Receiving plant (1100)
    Customer num. 123345 (for ex.)
    Sales org. yyy
    Dist. Channel yy
    Sales div. y
    In Supplying plant (1000)
    Customer num. -
    (don't fill)
    Sales org. yyy
    Dist. Channel yy
    Sales div. y
    5. Assign doc. Type is "NL" for intra company STO. If STO is inter company, Assign doc. Type is "NLCC".
    Position doc type is "UB"
    Enter supplying plant(1000) & doc type (NL)&checking rule (ex:01)
    6.Assign doc. Type is "UB" to u'r plants.(PO)
    Go for new entries
    Enter supplying plant(1000) & Receiving plant (1100)&doc type (UB).
    7. Create a PO, choose the doc type is 'UB' & item cat.'U', Enter supplying plant as a vendor in PO of the receiving plant(1100).
    8. Provide this num (PO) to SD people, they will do the delivery by using transactional code is VL10B.
    9. Sales people they will provide "out bound delivery num".
    10. Do the GR. In GR the second tab 05 outbound delivery instead of PO mov.type 101.
    11. See the stock overview in the receiving & supplying plants.
    Steps for Inter company Transfer:
    1) Create one Customer Master in XD01 with respect to Supplying Plant Sales Area and assign this Customer no with Receiving Plant in OLME->PO-> set up STO->Define shipping data for plant and for the supplying Plant assign the above sales area.( Make sure, In Customer Master, sales Area Tab: you are maintaining shipping condition)
    2) For Receiving Plant Pur. Org and Co.Code Combination create Vendor master in XK01 and in this vendor master assign the Supplying plant in Pur.Org.Data screen->Extras--> Add.Pur.data
    3) OLME->PO-> Set up STO------>For your supplying plant assign document type NB, Delivery type NLCC and Checking Rule RP
    4)then For your supplying Plant and receiving Plant assign Document type NB
    5)Make sure you are maintaining Sales View for the material at supplying Plant and in Sales /Gen plant Data view maintain Availability check, Loading group and Transportation group.
    6) In SPRo-->Logistics execution> Shipping->Basic shipping functions->Shipping point Determination>assign shipping points-> For your Loading group, Shipping Condition and Supplying plant combination, Assign shipping point
    these are the configuration settings you have to do in background.
    Then Create STO from Receiving Plant in ME21N with document type NB.
    Based on that STO, Create Delivery in VL10B from supplying Plant
    Do PGI in VL02N from Supplying plant
    Do GR in MIGO at Receiving Plant keeping Outbound delivery as a ref. document.
    Now your STO bet. two plants belongs to diff. Co.Codes will be completed.
    Regards,
    Prasath

  • Regarding to stock in the plant.

    I maintained stock in the plant i.e. Unrestricted stock Having batch number . while doing the delivary the system showing "only 0 kg of the material is avilable.( i maintained the batch number in the delivary note also)".
    may i know what are the settings needed?

    have u posted the stock using using mb1c with batch number?
    if not post the material using mb1c with batch numbers

  • PR-PO material with one material group and GRN with another material group

    Dear friends,
    If PR is made for 40W Philips Bulb , PO is made 40W Philips bulb and at the time of GRN it is noticed that 40W Wipro bulbs are coming then how to map this in sap?
    Regards,
    Mahesh.

    Hi
    In SAP  movement type 101 and 161 for the Auto PO at the time if Receipt,
    configuration
    1. Material Master- Auto PO enable mark this tick in purchasing view
    2.Vandor Master- Auto PO enable mark this tick in purchasing tab of vendor master
    3. Material should be valuated maetrial
    4. P oran shoud be a STD p organ and it has to be assigned with the plant,,
    5 Info record has to be maintained with the Value/price with the Validity and tax code
    6 you can not post into GR blocked stock for auto po
    check following link
    [Automatic Po creation With MB01 i am getting Error;
    [http://www.sap-img.com/materials/steps-to-create-auto-po.htm]
    Regards
    Kailas Ugale

  • Wield char with the use of matnr

    Hi All,
    my requirement is like:
    I need 1 selection option which seems like parameter type mara-matnr.
    when I put any material with the using of "*", it sud be fetch all the material with combination.
    I did the code for that but somtime it fails..
    TABLES: rqm00.
    TYPES : BEGIN OF tp_matnr,
              matnr       TYPE mara-matnr,
            END OF tp_matnr.
    DATA: w_text  TYPE string.
    CONSTANTS:  c_wild   TYPE c VALUE '*',
                c_per    TYPE c VALUE '%'.
    DATA: t_matnr  TYPE STANDARD TABLE OF tp_matnr,
          wa_matnr type tp_matnr.
    SELECT-OPTIONS : s_matnr  FOR   mara-matnr  NO INTERVALS NO-EXTENSION.
    IF s_matnr-LOW CA c_wild.
          W_TEXT = S_MATNR-LOW.
          REPLACE ALL OCCURRENCES OF c_wild IN s_matnr-LOW WITH c_per.
    ENDIF.
      SELECT matnr
             FROM  mara
          INTO TABLE t_matnr
          WHERE matnr LIKE S_MATNR-LOW.
    IF SY-SUBRC = 0.
    loop at t_matnr into wa_matnr.
    write: wa_matnr-matnr.
    endloop.
    ENDIF.
    What should I do? what is the right solution which should not be fail in any condition.
    Thanks & Regards,
    Jaten Sangal
    Edited by: Jaten.sangal on Nov 18, 2009 11:26 AM

    Hi
    I just Executed this Code and working Fine
    TABLES: rqm00.
    TYPES : BEGIN OF tp_matnr,
    matnr TYPE mara-matnr,
    END OF tp_matnr.
    DATA: w_text TYPE string.
    CONSTANTS: c_wild TYPE c VALUE '*',
    c_per TYPE c VALUE '%'.
    DATA: t_matnr TYPE STANDARD TABLE OF tp_matnr,
    wa_matnr type tp_matnr.
    parameters : s_matnr type mara-matnr. " Replace this Parameters and proceed further
    *IF s_matnr-LOW CA c_wild.
    *W_TEXT = S_MATNR-LOW.
    REPLACE ALL OCCURRENCES OF c_wild IN s_matnr WITH c_per.
    *ENDIF.
    SELECT matnr
    FROM mara
    INTO TABLE t_matnr
    WHERE matnr LIKE S_MATNR.
    IF SY-SUBRC = 0.
    loop at t_matnr into wa_matnr.
    write:/ wa_matnr-matnr.
    endloop.
    ENDIF.
    Did you try this one
    Cheerz
    Ram
    Edited by: Ramchander Krishnamraju on Nov 18, 2009 11:41 AM

  • GR for BOM Material with Serial number

    Hi all
    I have 2 serialised materials A and B, A is the Parent Material and B the child material (BOM Scenario), both having serial numbers
    I want to do GR without PO (501movement type) for the A material with the serial number, while doing GR i want BOM to be trigerred and at the same time i need to enter the serial number for the child material also.
    This is not a subcontracting scenario, here i am not issuing any goods to vendor, i am getting some used parts which i want to track individual accessiroes wise with serial numbers.
    Kindly suggest the backend settings
    Regards
    Amuthan M

    Try MASE. it hold the last serial number.

  • BAPI to copy a material to other plant

    Hi Forum,
       I need to copy a material from the plant(werks) 2000 to the plant 2300, but i need to use the same material number, wich BAPI can copy this material?
    Thanks in advance,
    John P.

    Hi John,
    Use the BAPI BAPI_MATERIAL_SAVEDATA, but pass the material number in the HEADDATA as well as providing the new PLANTDATA.
    If you supply the material number, it will extend the material, rather than creating a new one.
    Cheers,
    Brad

Maybe you are looking for