TO priotization for putaway-- materials(refrigerated or dangerous goods)

Hi experts,
In a business scenario where refrigerated, dangerous goods are managed, we want to create a scenario with following requirement.
1. When a material with above properties arrive then they should be given the first priority for put away or TO priority should be the highest. Which inturn will be assign on the top of the RF queue so that warehouse operator can process the request ASAP.
Can you let me know how to do the settings for the same?
Thanks
Raj

Hi Uwe,
Thanks for the reply. Can we automatically set the TO priority fields to high priority for these kind of materials? Or can we work on "Special movement indicators" to cnfigure this requirement.
thanks
Raj Kiran

Similar Messages

  • Table name for the desc for marine pollutant HISubsMP in dangerous goods

    Hi All,
    I want the table name where the description of the marine pollutant gets stored in hazrd inducer substance.
    HISubsMP   CUST-100000000000262    (CONTAINS MARINE POLLUTANT)
    I want to fetch the 3rd descrition. in which table it is stored.?
    Thanks in advance
    Madhuri

    got by myself.

  • Serial Numbers for Raw Materials

    Hello All,
    We are not using serial numbers at the moment, but we would like to assign a serial number to each material that enters the warehouse. So not on finished goods, but on raw materials. If we for instance order 10 boxes of a material, we would like to create 10 different serial numbers for these boxes (in MIGO).
    Batch management is not the solution, since the 10 boxes would receive the same number, whereas we want a unique number per box.
    Is this possible?
    Regards, Marc
    Edited by: japie303 on May 12, 2009 1:08 PM

    Thanks for your replies.
    We already have storage unit types, one of them is "Box". So in the warehouse mgmt 2 tab, an entry has been made which looks like:
        LE quantity          Un         Sut
    1. 100                     Ea         Box
    This works nicely when goods are putaway: the system suggests that if there are 1000 materials ready for putaway, 10 boxes are delivered and thus 10 storage bins are required.
    The only thing that fails is that there will be 1000 serial numbers generated, instead of 10. Handling Unit management is no option, because that brings a lot of workload with packing and unpacking goods. Changing the base unit of measure to box is not an option, since a box is no unit of measure.
    Regards,
    marc.

  • Unable to capture Part 2 for exicse materials

    Hi
    In import Purchase order scenario I am unable to capture part 2 for excise materials
    First I have created import PO. Then I did miro where I posted BED,AED,ECS,SECss
    After that I did migo and captured part 1
    After that while I was capturing part 2 with ref to vendor invoice I m getting an error message as
    NO CENVAT AMOUNT TO BE POSTED
    NO CENVAT AMOUNT TO BE REVERSED
    We are using taxinj
    Can u please help me out in solving this issue?
    Rahul

    Hi,
    Once you have entered the needed information about the connection string and container, go to Object Tab and select the objects. then the Start button will enabled.
    Another way to reverse engineer is to use ERD component. Refre to the Note 299067.1 in Metalink.

  • Report for consignment materials

    Hi SAP Gurus,
    Is there a report for consignment materials that can show us the opening balance, receipts, Usage, and ending balance (of the stock) for a given time frame?
    thanks
    Anusha

    This doesn't do any good. it just gives the vendor information. I'm not looking for this. I'm looking for a report or a t code which gives what the opening stock levels, receipts of stock, usage of stock and ending balance of stock for consignment materials for a given time period for a plant
    thanks
    Anusha

  • Standard Report to check consumption values for multiple materials

    Hi,
    Is there any standard report to check "consumption" values for multiple materials? The user needs to check the consumption values over a period of time for multiple materials (VERP, ROH) before deciding the re-order and safety stock values for them. Any help on this will be greatly appreciated.
    Thanks,
    Swapnil

    Dear Swapnil,
    Report MCRE is widely used for the material cosnumption than checking in COOIS.
    Also these reports can help you.
    MCPF                 Material analysis: Dates                
    MCPO                 Material analysis: Quantities           
    MCPW                 Material analysis: Lead time            
    Regards
    Mangalraj.S

  • How to maintain One product cost collector for multiple materials and configuration setting

    Hi experts,
    my requirement is that i want to maintain one product cost collector for multiple materials ans also i want to know the configuration setting for the same.
    I have used KKF6N but it is not working in my case. I went through KKF6M also but there i found multiple cost collectors.
    please guide me in the same.
    Thanks in advance.

    Hi Shripad,
    you cannot assign same  Product cost collector to different material.
    Because you creating cost collector for material combination of material /production version,material /Bom Routing.
    so please create individual cost collector for every material.
    if you have any query kindly revert back.
    Please mark the answer as helpful if it is helpful to you.
    Because march 5 onwards scn has stopped awarding points to liked content.
    Starting now: No more points for likes on comments/replies
    Thanks & Regards
    Sandeep Kumar Praharaj

  • One pr for multiple materials with line items while running mrp

    Hi SAP gurus,
                  I am config the system for MRP as per my client requerement.
                     We use CBP for different RAW materialsfor example they having a 10 materials for planning,were,
             MRP type is VB,
              LOT size is FX,with Different Reorder points and fix order quantity for all materials,
             My client whant run MRP for all these materials in single time that means they whant multiple item at single levels,
            i soles these requirement with the help of Product Group(sop) and its working but when we running md02 for product group all materials have planed and they give different purchase requistion numbers for all these materials but my client Wants single purchase requistion with line items for all these materials.
         Pls give me the solution for that requirement.
    thanks and Regards,
    abhi

    this is not the way SAPs MRP run works.
    Where is the benefit for this?
    the requisitions are not even split into header and item table, it is just one table EBAN, and either way you would get exact the same number of records in EBAN.

  • Is it possible to combine multiple Pur Reqs for multiple materials to one vendor into one PO through MD07?

    We have material planners who use MD07 (traffic signal screen) Stock/Requirements List, Collective Access tab to review material requirements by MRP Controller.  Once the list is created, they select individual materials and review them in MD04.  In a lot of cases, Purchase Reqs (PRs) are reviewed and adopted into POs individually for each material.  Sometimes they will combine multiple PRs for one material into one PO.  This is a good practice.  However, from what I have found, it is not possible to combine multiple PRs for multiple materials into one PO.  If this was done it would dramatically reduce the number of POs that we are issuing to suppliers.  Problem statement:  We issue too many POs which causes additional influxes down the line (receiving dock/goods receipts processing, receiving issues, invoices, invoice issues, etc.).  Does anyone know of a way to address this problem without a major overhaul in approach or customization of the system?  Thank you in advance!   

    Hello Michael
    As far as I know, this is not possible directly from MD07, only from the MM transactions.
    The following thread suggests the following procedure to convert several PRs into one PO:
    Conversion of multiple PR into single P.O
    Drag and drop the first PR from the item overview to the shopping card on top of ME21N,
    then open the PO detail delivery schedule tab and drag  and drop all other PR to the shopping card shown  in the schedule tab
    You can use the same procedure, calling the order conversion from MD07 and then drag and drop another PRs into this PO.
    BR
    Caetano

  • Text Mandatory only for Certain Materials in Sales Order

    Is there anyway so that I can make certain item text mandatory only for certain materials?
    I tried creating new item category group and new item category. And then create new Text procedure making this text mandatory and assigning to this new item category.
    But there are lot of different types of item categories assigned. So it does not look good to create new item category for each and everyone for this new item category group and material.
    Please guide me how to make the document incomplete for certain materials only when one text is not filled at item level
    Thanks in advance

    Hi,
    what you tried is correct and that is been followed in most of my projects wherever I worked.  That is the best way recommended also.
    If you try with incompletion procedures for item category also, you will endup doing multiple item categories anyway....
    First when I looked at the subject line, even before I opened your POSTING, I got the same resolution as you did....May be the optimal one but, not sure, if something else is possible other than by doing user exit.
    Regards

  • Change Item Category in Sales Order for KMAT materials

    Hi,
    How can I change item category in sales order/quote for KMAT materials?
    Currently in the sales order/quote, the item category field is grayed out for KMAT/configurable materials and I can change the item category.
    Please help me.
    Sincerely.
    Ketan

    Dear Ketan,
    I hav exactly the same problem.
    Did you finally succeed?
    Thanks.
    Ben.

  • User-Exit or Badi for dangerous goods - master data

    Is there any user-exit or BADI    we can use while changing or saving dangerous goods?
    We want to do a copy on other dangerous goods immediately after the change or creation of the dangerous goods master data.
    But I can't find an user-exit which can be used before the changes are saved.
    Can anybody help?
    Thanks!

    Hi,
    Please check SAP enhancement DG100001
    You can use this SAP enhancement to define a customer exit to write change documents for dangerous goods master data and packaging data.
    The customer exit is in the function group XD10. It is called from the function DG10_CHANGE_DOC_USER_EXIT.
    If the system does not find a customer exit, a standard document description is called. This is stored in the include LDG1NU03
    Hope this will solve your problem
    Regards,
    Keshav

  • How to activate the new fields on material master(MM01/MM02/MM03) for existing Materials

    Hi,
    We have a requirement to add  some custom fields as a new tab in additional data option(Descriptions, Unit of measure, etc.) in Basic data of Material master (MM01/MM02/MM03). I have successfully added and these custom fields and they are not part of standard(MARA, MARC) but a custom table and the updates are also done in custom table.
    For new materials, I can see the new tab in additional data screens of basic data view and I could successfully create/change/display using MM01/MM02/MM03. However I cannot see the new tab/fields for existing materials in the system in all 3 tcodes (MM01/MM02/MM03). This is not a main view in material master so that I can extend it by MM01.
    Is there any setting or mass generation program I have top perform so that I can see and maintain these new fields for existing materials. Appreciate any leads or help on this.
    Thanks,
    Harry

    Hello Harry,
    Goto t.code SPRO ---> Display IMG --->  Logistics - General --> Material master --> Configuring the material master --> Create program for customized screens
    Use the above path and create the screen and assign it to the sequence using the below link as reference.
    **************** - Tips - Implementing screen exits for MM01/MM02/MM03
    Regards,
    Thanga

  • Issue in Exporting the Sales Price List and Purchase Price List for the Materials from SAP Business ByDesign (SAP Cloud)

    Hello Everyone,
    I would like to have a discussion on the issues, which I am facing at the time of Exporting the Sales Price List and Purchase Price List for the Materials from
    SAP Business ByDesign (SAP Cloud).
    (1). Sales Price List :
    We have maintained Customer Group Specific Sales Price List for the Materials in the following Location.
    Location :         Product and Service Portfolio Work Center > Pricing > Price Lists > Customer Group Specific Price List (Type of Price List)
    Target :             We want to export the entire records in some reports or excel sheet.
    Records :          Number of Materials in the Customer Group Specific Price List is more than 2,00,000
    Issues : 
                                         (A). In the SAP Business ByDesign Screen we can filter by number of records but we can export till  50,000 records.
                                                 And if we are trying to export records more than that limit, then it throws "HTTP 500 Internal Server Error".
                                         (B). We could not find any SAP standard reports in Product and Service Portfolio and/or Business Analytics Work Center
                                                for getting the entire record set of the Sales Price List, so that we can have the entire set of records together.
    Searching For :
                                          (A). Is there any SAP reports or data source available for getting the entire Sales Price List records?
                                          (B). Can we have any other filter conditions for exporting the Sales Price List records in a single shot or module wise?
    (2). Purchase Price List :
    We have maintained the Purchase Price List for the Materials in the following Location.
    Location :           Product Portfolio Work Center > List Prices > Active List Prices (Type of Price List)
    Target :               We want to export the entire records in some reports or excel sheet.
    Records :            Number of Materials in the Purchase Price List is more than 4,00,000.
    Issues :  
                                           (A). In the SAP Business ByDesign Screen we can not see more than 10,000 records and the actual number of
                                                   records are more than 4,00,000. We could able to download the records till 10,000 but that is not sufficient.
                                                   We want to export the entire records in an excel sheet.
                                           (B). We could not find any SAP standard reports in Product Portfolio and/or Business Analytics Work Center for
                                                  getting the entire record set of the Purchase Price List, so that we can have the entire set of records together.
    Searching For :
                                           (A). Is there any SAP reports or data source available for getting the entire Purchase Price List records?
                                           (B). Can we have any other filter conditions for exporting the Purchase Price List records in a single shot or module wise?
    Please go through the attached screen shots for the references and more clarity on the issues.
    I am waiting for the valuable responses.
    Thanks and regards,
    Susanta Dey Sarkar
    Bangalore, India
    19th March, 2015

    Dear Michael,
    The number of records :
    2 Million (Approximately) is for the Sales Price List Material Price Data
    4 Million (Approximately) is for the Purchase Price List Material Price Data.
    Regards,
    Susanta Dey Sarkar

  • Defaulting a Cost Center during PR/PO creation for Indirect Materials

    Dear Gurus,
    When creating a PR or PO for indirect materials (No Material Master/Numer), is there a way to default a Cost Center (maybe based on the Material Group) in the PR/PO during creation ?
    I know that there is a way to default the GL Account Code via Entry Aids. Is there something similiar for Cost Center ?
    Thanks

    I don;t think it is possible via config but you can do it with User exit where you can insert the logic for account assignment category and Material group combination and material number is blank than insert the particular cost center into the cost center field.
    use PR item level user exit for PR and same way for PO.

Maybe you are looking for

  • JDBC Adapter

    Hello, Can anyone email me some or all usefull files about using and step by step procedure of configuration of JDBC adapter please? I am using JDBC adapter to connect the oracle database and ECC system through XI.   [email protected] Many thanks in

  • Query required to compress multiple records

    I have a table containing customer name and module as follows Customer        Module_id         Company_Name AAA                   9                       ABC AAA                  13                      ABC AAA                  21                   

  • Customer wise inspection during Delivery

    Hi All, I am having a Finished Material which will be supplied to 2 customers, say A and B. Customer A requires inspection before delivery and when the same Finished material is delivered to customer B, B does not want inspection to happen. In materi

  • Sorting of Events/Faces

    Hi All, Here is my problem. I have all my events and faces synced to my iPhone (it's a replacement). On my old iPhone when I went into photos the faces where listed after all the events. It now seems to be the other way round. This is mightly frustra

  • TC shuts down soon after powering up

    i just returned back from 4 weeks away, and my TC was off. i restarted it and the light glowed green, then amber, waited a while and then the whole machine seemed to switch off. i tried the reset button after a few failed attempts, but still same dea