To revert back a transport request from prd to dev server

hi experts
    how to revert back a transport request from prd server to
    dev server?
    a transport request has been wrongly transported
    and it has make major changes in production server,
   now  we want to revert back that request , we know the   request no.
regards
pankaj

All you have to do is create an order of transport type "Transport of copies" in PRO.
I give you the steps to follow:
1. Go to SE01 and create a new order (remember the type "Transport of copies").
2. Enter the data of the order of transport that is going to come back.
3. Enter the target, here is where you asign the target system to carry the request.
4. Now just add the number of request to the new request you just created.
5. Finally released the request from this transaction.
6. Check on the queue of transport in DES, the request must appear there.
I hope you serve =)

Similar Messages

  • How to transport requests from development  to production server

    hi gurus
    i am new to SDN
    can u pls give me detailed information how to transport requests from development server to production server?if possible give me screen shot documents
    regards
    surya

    Hi
    Transporting
    There are help pages that discuss creation of transports.
    In simple terms, you: create a transport package
    add objects to the package  export the package, plus optionally any related objects to a predefined folder/directory on the portal server into a file with an extension of .EPA copy the .EPA file to the import folder of your QA system and import it  test the contents on the QA system  copy the .EPA file to the import folder of your production system and import it  Create a transport package file
    Here is the step by step procedure to create a transport package:
    For Export
    1. Go to system administration, and click on transport?export.
    2. In the middle pane, select the folder you want to export and right click on the Transport Package. 3. Fill in the General Properties i.e the name of the package, id and description. 4. And say finish and open the object for editing.
    5. When the object has been opened then right click on the object you want to transport, and say "Add object to the Transport Package".
    6. Check the checkbox of the item u have added and see the properties if it has been added properly. 7. Now click on the save button.
    8. After the object is saved, click on the export button. 9. U will have an option to select where to store the .epa file which will be generated. U can overwrite an existing one by selecting the browse button, or store it with the generated name in the location it automatically generates. 10. Now Click on the Start Export button.
    11. once the export is completed, it shows a report on how much time is taken to generate the .epa file. 12. Here there is an option for downloading the .epa file. Click on the link and download the file. This file is ready to be uploaded into any other EP Server.
    For Import:
    Pre-requisites: You have to copy the .epa file created while export into the local drive. Optionally, you have to manually copy the .epa file generated in the export function into the Import directory of the server ie. chooseFollow the steps below for importing a certain file. 1. Go to System Administration in the portal, and click on Transport?Import. 2. For the source of the package, Click on the radio button Server for the .epa file you have copied lately. Else, click on the radio button on client if you are operating in the client and select the .epa file you have stored on the local drive. 3. Now select the file from the browse option and click on Upload.
    4. Now click on the import button. 5. Once the import process is finished, the report is shown. In the whole process, the par files are not included in the .epa files. For the par files to be included into the .epa files then we have to change the pcdStartup.properties file in the server. The property to be changed is Pcd.TransportApplication.Export.ExcludeObjectTypesAfterRuleProcessing: Keep this property's value as empty for enabling the par files to be uploaded into the .epa. You can check for this property in the portal in the following -System Administration-Support-Portal Content Directory-PCD Configuration.

  • Can we revert back a transport

    Hi,
    Recently we have imported a transport request in D environment which is given by SAP. As there are some errors we need to revert back that transport. We do not have option to retrieve the previous version in Version management. Because all objects are standard objects. So is there a way to revert back the transport request?
    Swapna.

    Hi Swapna,
    I dont know whether this may give solution to you.
    As You didnt transport the request yet to Quality System, so you can copy the code which is currently avialable in Quality back to Development system for the object.
    Thanks,
    Vinay

  • Import back the transport request to Development Server

    Hi All,
    I need to import back the Transport request which is in Quality Server to Development Server.
    For ex: DEV900764  from Quality to Development Server.
    But the same(DEV900764 ) transport request is available in Development also.
    How to overwrite the transport request which in Development server ?
    I deleted  the request in se01, stms  in DEV server.
    Once i updated the copy of Quality to Development in co-file,data file in OS level. But still it show the old one(DEV copy) while importing thro' stms in development server.
    How to solve this ?
    actually i need the data of quality transport request

    Hi Milan,
    Even though you have deleted the request in Development system and later copy the co-file and data file from Quality to Development it will be the same. What is the reason of transporting from Quality to Development.
    Normally requests will move from Development to Quality and to production as you already know. Once the request is released from development and transported to next systems that request will have same data in the request what it was at the time it was released and whenever you re-transport that request it will have same changes.
    Why you want to do from Quality to development. If you find any differences in the changes of quality and development then some one might have done the chages directly in quailty with client being opened. If it is the same case then you need to take care of the system and avoid any direct changes. If as per my assumption if really there is any difference then make the  necessary changes directly in development instead of wanting to transport from Quality.
    Transporting from Quality to development is not good practise.....
    Regards,
    Sharath

  • Transport object from Prod to Dev

    Hi Folks,
    Developer wants to restore a version of SAP "Smart Form" from production to Dev system as the one in dev system lost some modifications. In Dev system, it was always showing the current active version and there are no traces of old versions or i am not looking in the correct place.
    In this particular landscape, there is no transport path between Dev and Prod. We manually FTP transports (Cofile and data files). Could you please, guide how to create a transport with a "Smart Form" from production to dev. After searching the forum, i could find only one posting talking about opening the production system and create a transport.  I can open the production system for a brief period and create a transport but i am seeking for help if any one has done this before.
    I am not sure if i have to crearte temporatry transport path.
    Thanks a lot in advance.

    Hello again rk_007
    on this case, you can create a 'temporary' transport route from Production to Development (temporary on the sense that you can delete it afterwards. By all means, this route is just another normal one).  By doing so, you will be able to create a transport request in the Productive system, release it and import it on the other system.
    You just have to go to u201CSTMS --> Overview --> Transport Routesu201D, create the route you want and distribute the new configuration. Once that the transport is done you can delete that transport request.
    Do you know who to manage transport routes? It's not difficult, you need to go to STMS transaction, click on the routes button (or Shift + F7), go on 'Edit' menu, then 'Transport Route' option then 'Add Transport Route'.
    You can find everything explained here:
    http://help.sap.com/saphelp_nw04/helpdata/en/44/b4a1df7acc11d1899e0000e829fbbd/frameset.htm
    Further and valuable information can be found here:
    http://help.sap.com/saphelp_nw04/helpdata/en/57/38de0c4eb711d182bf0000e829fbfe/content.htm
    http://www.sap-img.com/basis/transport-request-within-same-server-different-clients.htm
    http://wiki.sdn.sap.com/wiki/display/EmTech/TMSassigningclassorpackagetoroute
    But there is another option where the creation of a transport route is not needed, which might fit your need (and which I believe it's the FTP option you're already using):: you can create the transport request in Productive system (from SE01) and instead of creating a Workbench transport request, create a Transport of Copies. Once that the request is created, you can add the objects you need manually and release the transport request. The datafile and cofile will be created in the data and cofile directories of the transport directory of the Productive system; now you will have to copy manually (at operating system level) the datafile and cofile of the transport request to the transport directory of the Development system, and go to u201CSTMS --> Overview --> Imports --> double click in DEV --> Extras --> Other Requests --> Addu201D  to add this transport request to the import queue of DEV system. Now you will be able to import it into DEV, avoiding the creation of the transport route from PRD to DEV.
    Best regards,
    Tomas Black

  • Transport request from one server to another

    Hi All, We have two servers AB1 and AB2. We would like to transport request from client 101 (AB1) to client 110(AB2). How do i make transport route between these two servers. Thanks, Sam

    Hi Sam,
    You need to configure Transport Management System between these two system by following Configuring TMS - Software Logistics - SAP Library and by considering below detailed steps:
    1. After SAP Gui installed. (Development system is always domain controller.)
    2. Logon to Client :000User: DDIC.Pwd: ******
    3. Put a T-code (se06) in the command field
    4. Click standard installation and click post installation (yes)
    5. Put a T-code (STMS) in the command field and give a description then save it.
    6. Click System overview push botten, click extras option from the menu and click Distribute and activate configuration. (Yes)
    7. Back to the stms main screen and click Transport routes from the push botten
    8. Click Configuration button from the Menu.
    9. Click Distribute and activate from the configuration menu.
    10. Now your sap system is activate in domain controller.
    11. Now logon to QAS system.
    12. Client: 000User: DDICPwd: ****
    13. Put a T-code (se06). In the command field.
    14. Click standard installation and click post installation (yes)
    15. Put a T-code (STMS) in the command field.
    16. Click other Configuration push butten in the bottom of appear screen.
    17. Give information about development system.
    18. Then save it. OK
    19. Now QAS is waiting for include domain controller.
    20. Logon to Development system.
    21. Click system overview push butten.
    22. Click sap system from the menu.
    23. Select the QAS systems.
    24. Click Approve butten from the sap system menu.
    25. Now QAS is member system of domain Controller.  (Development system)
    26. Suppose if you want configuring Production also, following the same step in the QAS.
    Also you can follow links SAP Basis Tutorials/ Training: Transport Management System ( TMS ) Configuration In SAP Step By Step With Snap Shots
    Hope this will help you.
    Regards,
    Gaurav

  • Revert back the transports done using CMS

    Hi.
    Please let me know how to revert back the transports that are done using CMS.
    If once the transport of the namespace has been done from DEV to CONS, can we revert back the transport so that the CONS system will have only those objects that it had before the transport.
    I've gone through help.sap.com and some of the forums here regarding transports, but couldn't find the solution.
    Please help me out in this regard.
    Thanks,
    Manohar.

    Hi,
    It is not possbile revert back the changes that are done using CMS. There is a scope to redo these changes at Oracle database level by redo logs but it is not at all suggestible as it may lead to inconsistencies.
    Thanks,
    Vijay Kumar T.

  • Transport request from I18N

    Hello.
    Can I transport requests from modifications by I18N transactions?
    Thanks in advance
    GLippmann

    Hi Sam,
    You need to configure Transport Management System between these two system by following Configuring TMS - Software Logistics - SAP Library and by considering below detailed steps:
    1. After SAP Gui installed. (Development system is always domain controller.)
    2. Logon to Client :000User: DDIC.Pwd: ******
    3. Put a T-code (se06) in the command field
    4. Click standard installation and click post installation (yes)
    5. Put a T-code (STMS) in the command field and give a description then save it.
    6. Click System overview push botten, click extras option from the menu and click Distribute and activate configuration. (Yes)
    7. Back to the stms main screen and click Transport routes from the push botten
    8. Click Configuration button from the Menu.
    9. Click Distribute and activate from the configuration menu.
    10. Now your sap system is activate in domain controller.
    11. Now logon to QAS system.
    12. Client: 000User: DDICPwd: ****
    13. Put a T-code (se06). In the command field.
    14. Click standard installation and click post installation (yes)
    15. Put a T-code (STMS) in the command field.
    16. Click other Configuration push butten in the bottom of appear screen.
    17. Give information about development system.
    18. Then save it. OK
    19. Now QAS is waiting for include domain controller.
    20. Logon to Development system.
    21. Click system overview push butten.
    22. Click sap system from the menu.
    23. Select the QAS systems.
    24. Click Approve butten from the sap system menu.
    25. Now QAS is member system of domain Controller.  (Development system)
    26. Suppose if you want configuring Production also, following the same step in the QAS.
    Also you can follow links SAP Basis Tutorials/ Training: Transport Management System ( TMS ) Configuration In SAP Step By Step With Snap Shots
    Hope this will help you.
    Regards,
    Gaurav

  • Error while uploading Transport request from SAP ECC6.0 EHP4 to SAP ECC 5.0

    Hi friends,
    Error while uploading transport request to the transport directory,
    we downloaded the transport request from one sap system which have a set of developments(contains screen programs)
    for example downloaded all co files and data files
    control file: K900470.SAD and Data file: R900470.SAP from transport directory.
    we are trying to upload the transport to another Sap system
    we have
    Uploaded the controlling file K900470.sad to the location  /usr/sap/transpad/cofiles/
    Uploaded the controlling file R900470.sad to the location  /usr/sap/transpad/data/
    we tried to add in the import queues using TCODE: STMS and trying to import.
    During import we get the below error:
    HALT: unknown dynpro format: d021s_length() returned 0 Please contact the SAP support.
    End with rc : 16
    Please help me on this
    We are trying to copy from ECC 6.0 EHP4 to SAP 5.0 and SAP 4.7EE
    Thanks & Regards
    Murali Papana

    Did you see that you tried to transport to an older release!! You should have expected such a result.
    Before doing such a thing, you should have looked at SAP notes to see SAP recommendations, if any. And you're lucky, there are ones: [Note 1090842 - Composite note: Transport across several releases|http://service.sap.com/sap/support/notes/1090842]. You need to know that ECC6 corresponds to SAP Basis 7.0, and ECC5 corresponds to SAP Basis 6.40.

  • For some reason my Itunes deleted my current library and reverted back to a library from 5 years ago! How do I take the music from my Iphone and put it back into my Itunes library?

    For some reason my Itunes deleted my current library and reverted back to a library from 5 years ago! How do I take the music from my Iphone and put it back into my Itunes library?

    backup from old computer and restore to new either to icloud  or an external drive  also check out turingtest2's excellent article on backup using synctoy

  • Problem transporting Request from Development to Quality Assurance Server

    Hi All,
    I m facing a problem of Transporting requests from one System to other.
    When adjusting the Request ,the error message reads as follows :
    <b>RFC system error in system/destination
    [email protected]_HSE</b>
    Now,when I check the RFC Connection for <b>[email protected]_HSE</b>,,
    i get the message :
    <b>" License Check required "</b>
    Please respond to this query urgently.....
    Thanks in advance

    Hi!
    I think it's better to call SAP support, if you have problems with the licenses...
    Maybe your company forget to pay their fees since a while
    Regards
    Tamá

  • Transport requests from dev to prod

    Hello,
    It's possible to transport requests from a BW developing system with
    HP-UX IA 64 (with itanium processor) operating system, to a production
    system with HP-UX 11i v1(with risc processors) operating system.
    We installed BW 3.0 for developing on HP-UX IA 64 and BW 3.0 on HP-UX
    11i v1.
    Thank you,
    Florin

    You could, if you configure your transport connection correctly.

  • Transport request from development system to testing system

    Hi,
    I have collected necessary objects in (development) the transport request except 0DUNN_AREA infoObject .Because info object  0COMP_CODE is compounded with Info object 0DUNN_AREA and 0COMP_CODE is in revised version in development system (But available in active version in testing). Suppose I release that transport request from development system to testing system  it get overwrite 0COMP_CODE  in testing system?
    Thanks

    Hi Jk,
    Depending the same technical names it will get overwrite in the testing server. But if the object 0DUNN_AREA is necessary in any objects which u have collected then u havce to collect it in the rtequest or else u will get RC8.
    Khaja

  • Transporting Transport Request from One System to other

    Hi All,
    I want to create tranport request from ECC 5.0 System to ECC 6.0 system.
    Please let me know steps for creating transport request and transporting transport request from one system to other system.
    Thanks in advance.
    Best Regds,
    zubera

    Hi,
    You cannot transport request from ECC5.0 to ECC6.0.
    Instead follow this:
    <b>In ECC5.0</b>
    Include all the objects into a transport request & provide the transport request no. to BASIS.
    BASIS team will create 2 files for you based on the transport request no.
    <b>in ECC6.0</b>
    Provide the 2 files to BASIS Team & ask them to import them.
    The objects would be available in ECC6.0
    Best regards,
    Prashant

  • How to reverse Transport requests from sand box to development client

    Dear all,
    I am doing some testing on Sand box, I made some transport requests from development to sandbox, which effected some settings in sandbox.
    Now I want to reverse those transport request from sand box to development, unfortunately I didn't make any note of transport requests which I transported from Development to Sandbox.
    Please educate me how to reverse transport requests from sand box to development.
    your suggestions are highly appreciated
    thank you
    Venu Gopal

    There is no reverse, you have to create a new transport with the original settings.
    Programs keep track of their versions and are easier to pull a previous version, configuration can be tougher, open all the folders in SE10 to see if you can determine the configuration changes.

Maybe you are looking for

  • Automatically run a keyboard shortcut after opening a document

    I unknowingly posted this elsewhere, but was asked to post this here. I have a curio document/template that I use often. Curio has a mode called: full screen view, which only works by: the keyboard shortcut: Cmd * or by: click on Window and then clic

  • I need help with exporting project for the web

    Probably something i am doing wron g but here are the problems. When I use Quicktime Converter, if I try to convert to a Quicktime movie or an MPEG-4 nothing happens and i get a 'File error;File Unknown message' when i try to convert to an AVI File,

  • RFC function module always creating BPs with the same user name (RFC user )

    Hi All I posted the below question in a different area before. But thought it would be more suitable here. Moderators - Please let me know if am doing any mistake. Question: I have a RFC function module in CRM that creates Business Partners in ECC (X

  • Os x re install from CD shows no destination to select, or options

    I have the dreaded blue screen on my i book. Tried pram reset etc, no good. Went to re install OS X for CD, got to select destination and nothing is in the window to select. No options button either. Is my HD dead? it started to operate very slowly,

  • WM/Menu/Panel - Need Help/Suggestions

    At the moment, I'm running KDE 3.5... with OpenBox3 as the window manager. I like the KDE apps, and the OpenBox look and feel. I really, really like Xfce4's panel and right click on desktop menu, and was wondering if it is possible to give up the DE