To track the preventive maintenance work on the equipment itself
Hi Experts,
I have working on the requirement to track the preventive maintenance work on the equipment master data it self.
I have thought of following way of doing it.
1. Create a charateristic "Plan no" having refrence to maintenance plan table & field (MHIS - WARPL)
2. Create a charaterisic "Last completion date" having refrence to maintenance plan table & last date completion field (MHIS - LRMDT)
3.combine these two charateristic in class say "Inspection data"
4.Assign this class to equipment in classification tab
5. Create a maintenance plan , generate order and complete the order.
6. After doing this, these data should updated in charateristic values as given above. But it is not happening.
Am i missing something here. Or can you suggest me other way of doing this.
Regards,
Amar
Hi,
yes you are right we can use object information key and can navigate to required detail.
But the client want the report in a tabular format.
like Equipment no Last testing done on Maintenance plan no
There is one report in classification system that is CL30N in which you can find this kind of report provided the "Last Testing done on " and "maintenance plan no" you have used as charateristics.
Regards,
Amar
Similar Messages
-
To find 'Maintenance Work Center' for Equipment (without Production order)
Hi,
I have a Report for - 'Equipment BOM' - IB03.
Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
[ Note: For Client --> It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
So - Not possible to fetch from AUFK, HIKO or any other order tables. ]I have a Report for - 'Equipment BOM' - IB03.
Problem: How to find the 'Maintenance work Center ' For Equipment ? (IE03--> Organization > Responsibility> Main. W.Cntr)
[ Note: For Client --> It's not necessary that each Equipment has Production Order, Few Equipments are taken only for Repair purpose, Equipment is there in table - EQUI,
So - Not possible to fetch from AUFK, HIKO or any other order tables. ]
EQUZ-GEWRK has the main work center. Pass the equipment number and valid-to date to get the main work center.
Cheers
Sujay -
My tracking pad is not working. It controls itself and does not follow my finger commands. If I bring it to an apple store, would I be able to have a new pad installed?
Reset SMC. http://support.apple.com/kb/HT3964
Choose the method for:
"Resetting SMC on portables with a battery you should not remove on your own".
If this does not help, take the computer to the Apple store to have it checked out
and repaired, if needed.
Best. -
PM & PP integration during preventive maintenance
Dear Experts,
Once maintenance dept . will schedule preventive maintenance plan for a machine for a year , is it possible to block production order or to show capacity load in CM29 on the maintenance date?? I have assigned PP work center in the equipment & also put system condiiton as zero in maintenance plan & also in task list. Frequency of the maintenance plan is 1 month.Request your help on this.Thanks in advance.
rgds
rajibHi,
Let clear one thing that the Equipement is work center for the PP and for Plant maintenance it is equipment only.When creating order or plan some maintenance work on that equipement which workcenter for the PP. In PP module ther is standard functionality Capacity planning of work center in Routing when your maintenance work is going on that equipement then work center capacity get reduced due to your maintenace work which will reflect in PP capacity planning. according that reduced capacity planning production order release.there is no std functinality that you can intimate the PP that your work center is in maintenance not use it. it will reflect in capacity planning of PP routing.According that reduced capacity PP plan the production scheduling.and Production work will get adjusted or deayed according available capicity of PP work center.
Regards,
Rakesh -
How Preventive Maintenance Order Gets Generated Automatically
Dear Sir,
We have defined an equipment requiring Preventive Maintenance every month . We want that Preventive Maintenance Orders for this Equipment should get generated automatically for next comming 3 months .
Kindly guide us as what steps need to be followed so that Orders are generated automatically .
With Thanks & Rgds
SoniaHi for this please refer below link as u want call object in monthly basis kindly use single cycle plan for this.
[Please see|http://help.sap.com/saphelp_erp60_sp/helpdata/en/3c/abbcf6413911d1893d0000e8323c4f/frameset.htm]
Revert for any queries.
Rip -
iOS 7 problems with ford sync. Skip track button no longer works.
Sorry, I used the wrong term in my original post. I don't mean to say "mute" my phone, but meant lower the volume!
Should have read: "In Smart Actions, if I want to lower the notification volume on my phone to 13% when I'm in a meeting it only adjusts the volume for calls - not text or email notifications! What the heck is the point of adjusting your phone volume if it doesn't affect all the notifications!?" -
Varying Maintenance Work Center Capacity by Days of the Week
I had submiited a question a month or so ago about varying the capacity of a maintenance work center depending on the day of the week. I got an answer and it worked.
We've set up another work center (in staging) for the same scenario (the work center is half staffed on Fridays). Monday through Thursday the capacity is 36 hours, Friday the capacity is 18 hours, the validity from date is 04/05/2010. When we use CM34 to do some scheduling though, the capacity shown is 40 hours a day, Monday through Friday which is what the capacity was set up for prior to the validity from date. It's also the same capacity as shown in the 'Standard Available Capacity' section.
I looked back at the work center I had modified previously and it's showing the same thing. It's like it's ignoring the validity dates.
Any ideas?
David MacindoeDavid,
I know for sure that this is reflected in the standard profile for Capacity Availability check as part of release of the order (SAPSFCG013). The Availability for the week does show the capacity for the interval dates of the week and not the standard available capacity.
I haven't checked this on CM24 and if the standard profiles don't reflect the change then the profile probably needs to be changed.I need to look into it to make sure. In the meantime if you aren't able to resolve the same, i would suggest to raise a note and see where that leads you.
Regards
Narasimhan -
Restrict the Preventive Maintenance Order creation through IW31 for few users.
Dear Guru's,
Good Day.
My client requirement is he wants to restrict the Preventive Maintenance Orders through Transaction IW31 for few users. Is it possible through authorization? Please do the needful.
Regards,
Bhanu.possible for order type.
create a role with all order types (optional) including Prev. Maint Order type, obviously having T.code IW31. and create another similar role excluding Prev. Maint Order type.
Assign earlier role to few users (want to give the permission of IW31 Prev.) and later role to all remaining users.
Auth. Object: I_AUART, first test in sandbox or testing client. -
I BOUGHT an application from my iphone Application icon and paid 2.99 dollars too, for phone tracker , downloaded sucessfully and its working too but not tracking the phones as mentioned in the description can any one support me??? better from apple!!
Is this the app you're referring to?
http://itunes.apple.com/us/app/phone-tracker/id348537489?mt=8
As you'll note it's made by Presselite and that page has a link to their support.
Also, you'll find it best not to post questions about iPhone apps in the AppleWorks forum. Best to contact the makers of the app.
Regards
TD -
Export>Quicktime movie is not rendering video track, just the audio track. However, everything works when using Quicktime Conversion menu options. What is wrong with my setting for Export>Quicktime movie?
When you converted the original files via MPEG Streamclip, what did you convert them to?
Have you tried trashing your preferences in FCP? Trashing FCP prefs is usually the first step when FCP is performing strangely.
Download Preference Manager from Digital Rebellion (free) at:
http://www.digitalrebellion.com/prefman/
It will allow you to archive your current preferences if you wish to restore them later.
MtD -
The track pad buttom not working
Hey everyone,
I have a BB curve, and for some reason the track pad just stopped working. I am very gentle with my
BB and I don not really understand what could possibly happened. It is completely frozen on the left up side of the screen on the " search" option ( the hand lenses icon).
I already turned it off-on and I also removed the battery , and it is still in the same position.
I can receive calls, and make calls using the speed dial letter/pad. What can I do/try?
Please help!!!
Thanks in advance.
Betty 06Hello bettybetty06,
The following article may help regarding the issue you are experiencing with the trackpad on your BlackBerry® Curve™ smartphone:
Trackpad, trackball, or keyboard not working on a BlackBerry Smartphone - http://www.blackberry.com/btsc/KB29640
Thank you.
-FB
Come follow your BlackBerry Technical Team on Twitter! @BlackBerryHelp
Be sure to click Kudos! for those who have helped you.
Click "Accept as a Solution" for posts that have solved your issue(s)! -
I has a shipment tracking and the tracking number is not working
Hello, i just received a shipment notification.But i tried to track the item and it seem the tracking number is not correct.
Shipping Address
Yvonne McFadden
**** NW
Atlanta GA 30318-4703
Carrier Name
UPS
Tracking Number
<Personal Information Edited By Host>These are user forums. You aren't speaking to Apple here. We cannot help with your problem. Furthermore, you should never post personal information in an open forum. You have provided your address and phone number and full name to any of the millions of users who are on these forums every day.
-
Revision: 12552
Revision: 12552
Author: [email protected]
Date: 2009-12-04 13:45:12 -0800 (Fri, 04 Dec 2009)
Log Message:
DataGroup now tracks the indices of the active virtual item renderers with a list, rather than the min/max values.
DataGroup/addItemRendererToDisplayList() now respects the overlay.
QE notes:
Doc notes:
Bugs: sdk-24052
Reviewer:
Tests run: DataGroup, List
Is noteworthy for integration: no
Ticket Links:
http://bugs.adobe.com/jira/browse/sdk-24052
Modified Paths:
flex/sdk/trunk/frameworks/projects/spark/src/spark/components/DataGroup.asHello Martin:
Thanks for your input. However I am not certain we have resolved this issue adequately, or understand the principles governing the css as regards this spry menu framework 2.0 (1.0).
For example, the menu only works in IE 6.0 if the css remains in the head. I agree with your original post that it shouldn't make any difference whether the css is posted in the head or in a separate style sheet (so long as specificity issues are addressed). Both should work -- and yet it doesn't.
If the CSS is placed in the separate style sheet governing the total site, it doesn't work for 6.0. If placed at the top of the style sheet, conflicts of specificity prevent the menu from rendering properly in any of the browsers causing the rules for general links to govern the menu. This has been verified using a cross browser testing. If the styles are placed at the bottom of the style sheet to help them take precedence, they work in all the browsers except for IE 6.
The website I am building needs to support IE 6 for a variety of reasons, and because it is catering to the non-profit community and to low income persons, I am mindful of even small differences in page weight.
So for me, at least, the issue remains baffling.
I appreciate your input, but also would appreciate the input from others, and especially Adobe Community Professionals and employees. The spry framework in this regard is not well documented. I am not certain if this is exclusively a CSS problem, if it might also be complicated by the architecture of the spry framework, or if indeed other variables are at play.
I would be my hope that in resolving the problem, other users of the this particular spry framework might also benefit.
Thanks,
Steve. -
my new iphone was stolen today. I'm trying to track it via icloud but it shows the average ratio that the phone is disconnected. Are there any other way to track the phone. Thanks for your help.
If the phone is turned off, doesn't have an internet connection, or has been restored preventing "Find my iPhone" from being able to work, there is no other way to track it.
-
How to track the material in WIP stage
Hi all,
our product flows in differt stages from raw material to finished product. For example first it goes to Melting,than to foundry,than forging and lastly it goes to machine shop from where we get the finished product.
my requirement is I want a way to track the material in this WIP stage. where this material is datewise or if now i want to know at which stage (melting , foundry , forging, machine shop ) the material is, how can I find ?
Is there any std report for this?
Regards
KumarHi,
Unfortunately no such report was available in SAP.
But SAP has introduced EHP4 to address the requirement.
Follow the link given,
http://www.sdn.sap.com/irj/scn/go/portal/prtroot/docs/library/uuid/20ff2779-f9d3-2b10-9dab-e9d84c5953c5?quicklink=index&overridelayout=true
You will have to activate the 'Work in Process Batches (WIP Batch)' functionality in EHP4.
Or else go for some develop report for the WIP.
Hope this helps you.
SmanS
Maybe you are looking for
-
Aligning Headings in Pivot View in one line
Hi, I have a situation where Pivot View is displaying results as below H4--H5--H6 H1--H2-H3 A B C D E F I know this is how pivot view display results but user has asked me to align heading like this H1--H2-H3 H4--H5--H6 A B C D E F I have tried vario
-
Let's say you have an image on page 9 of your document, and on page 2 you wish to include the following statement: "A specimen of Africanus Bumblebeus can be found on page 9" Then you need to delete a few paragraphs in your document and now the image
-
E71 corruption / installation issues
Hi all, I was playing about with the remote lock feature last night and when I turned my phone on this morning it would appear that I somehow corrupted the memory card. I reformatted the card and did a restore to factory defaults and I noticed that n
-
I try to download an app but all it says is waiting
I try to download an app but all it says is waiting
-
GATP check without delivery proposal (pop-up window)
Hi experts, we have the following requirement. The customer would like to implement a gATP check for several products with a neutral product allocation check (in the current project phase). The specific requirement is, no delivery proposal pop-up win