Tolerance limits at Schedule line level in PO

Hi
How to make tolerance limits at schedule line level in PO, (not at item level)
Thanks
Raju

HI Raju,
In PO Delivery schedule qty tolerance is not possible.
PO delivery line itemwise tolerance only possible and also we have freezed tolerance in the line items.
Based on line item qty, We have delivery schedule given and not exceed line item qty.
Hope, you are clear.
K.Rajendran

Similar Messages

  • Reg: Sale Order short close at Schedule lines level

    Dear Gurus,
    Requirement is to close all open schedule lines beyond one month.
    In detailed. User Enters Manual Schedule Lines as per the requirement of the customer say for 6 months.
    for Eg . Sale order entered on 1st of august to Dec with 500 qty, schedule 100 qty/Month, manually in sale order.
    Now if business delivers only 90 out of 100. they need to short close that particular schedule line only not the entire sale order or line item. I tried with Delivery block at schedule lines level. but it is not working.
    If any one has come across this scenario please share with me.
    Regards
    Praveen

    If we apply a delivery block the pending qty will automatically add to the last schedule date. Ex. if there is 3 dates in the schedule lines, and there is some 50 qty pending in second date, and if u apply delivery block it will carry forward that pending 50 qty to the third schedule line and adds up with it.
    But in my case i just want to close that pending 50 qty in second line item.
    Regards
    Praveen
    Edited by: Praveen_PG on Sep 15, 2011 1:28 PM

  • Is there a way to track the delivered qty at the schedule line level in R3

    Hello Gurus,
    Is there a way to track the delivered qty at the schedule line level in R3.  I spoke to al ot of functional guys on this and the answer is NO. If NO,then, how does the 2LIS_11_V_SSL extractor extract the delivered qty at schedule line level. Help is really appreciated.
    Thanks
    Simmi

    Hi Simmi,
    I have used this extractor for the purpose you describe at more than one customer without problem. My understanding is that it links the order schedule line with the delivery, but I haven't tried to work out the mechanism.
    Regards,
    Ken

  • Availability check box at schedule line level and requirement class level

    Hi All
    What is the significance of availability check field at schedule line level and requirement type level.
    If I remove the check box at schedule line level, then there won't be any availability check carried out in the sales order, even though in requirement class it is checked. Is it for doing availability once the requirement is passed to MRP...
    In make to stock scenario, no availability check is active at schedule line level.
    scenario 1. stock is 0 in plant, when i place an order for 10 quantity, does system give any confirmed quantity on so and so date...or the confirmed quantity will be zero or as there is no availability check carried out, it confirms 10 quantity on customer requested delivery date and the time of creation of delivery, it gives an error message stating zero quantity is available. which one is correct in all the above.
    In make to order scenario, no availability check is active at schedule line level.
    order was created for 10 qty, as there is no availability check active, does the system give some date based on the lead times maintained in the material master or not?
    Regards
    Sree

    Hi sreekar
    The significance of availability check at schedule line level  is to determine weather availability check and TOR should be carried out for sales orders  or not. 
    If you remove check box at schedule line level , availability check and TOR wont be  carried out at sales order level.
    Coming to the scenario you said , make to stock , i think the availability check you are using is 01 make it 02. which is planned requirements. and stratergy group as 10. in MRP3 view in MMR. .
    as the availability check u have put 01 & stratergy group as 10 availability check doesnt carry
    coming to the scenario 2  , if the stock is 0 in plant and if you create a sales order, then the confirmed quantity should be 0 and that particular order will go to backorder processing.
    sometimes it  confirms the ordered quantity as the  confirmed qunatity, and it gives a confiremed delivery date on which the stock is confirmed , but that date is a tentative date.
    all these unconfirmed orders will go to backorders. once the qunatity is confirmed automatically , delivery date also will be done
    Coming to scenario 3 , when you create MTO order there will be availability check checked at the schedule line level. can you tell wat is the schedule line you are getting is it CP or ND?
    for schedule lines , ND - no availability check will be there , PD - availability check will be there
    Note: plz check 1st the availability check you have entered in MMR , if it  is 01 make it as 02. and then run these cycles.
    Reward points if useful and if Any queries let me know
    Regards
    Srinath
    Edited by: sri nath on Mar 21, 2008 7:53 PM

  • Delivery block with confirm. block on schedule line level in sales order

    We customized a new delivery block with confirmation block.
    When using it in sales order header, it is working correctly: the availability check in APO gATP is executed; but as soon as I save the sales order, the confirmation quantity is set to zero.
    We now need to use this on schedule line level, not on header level. It is not working. Even after saving the confirmed quantity stays as filled by gATP availability check.
    What is wrong? SAP help / documentation officially describe that delivery block with confirmation block either works on header level or on schedule line level.
    Thanks in advance.
    Edited by: Schmidt on Aug 13, 2008 4:47 PM

    Please see if OSS notes 21584 and/or 19488 might help.
    Regards,
    Anisha.

  • Changing delivey dates on schedule line level in Purchase order in IS AFS

    Hi,
    I want to know if there is any standard transaction or enhancements to change the delivery dates in purchase order on schedule line level in IS AFS scenario on mass.
    Thanks,
    Kumar

    Hi Antony,
    Thanks for the reply.But the transaction MASS is not enhanced for changing delivery dates in schedule line level in IS AFS.
    Thanks,
    Kumar

  • Schedule line level data

    Hi,
    I understant that SRM could not handle schedule line level data, Can any one explain me what is schedule line level data exactly and if the current vesrion of SRM does support it?

    Hi,
    Schedule line data is handled in SUS(Supplier Self Service) one of the module of SRM since June 2002 version SRM 2.0
    You have to use Process " Plan driven Procurement with R/3 - SUS scenario.
    Schedule line data in MM R/3 is published to SUS - supplier system as Scheduling Agreement releases automatically.
    Supplier can either accept or reject a schedule line.
    In current version of SRM 5.0 many useful functions are available like automatic E mail to buyer on acknowledgment of Sc. line data by Supplier.
    Write me if you need more detailed info.

  • Force ATP-check at schedule line level

    Hello All,
    I want to trigger the ATP check when I change some specific values at schedule line level ( Change the value-> press enter and In the enter event the ATP should get triggered, so that I could see the Value changes online).
    I tried calling FM SD_BACKORDER_CHECK_AND_SAVE in user exit "userexit_check_vbep USING us_dialog" , But this is not the correct place to call this FM.
    Could anyone let me know if we can acheive this using any other FM.
    Thanks
    Bhavana
    Edited by: Bhavana Sati on Aug 11, 2010 10:43 AM

    Hi Victor,
    To do ATP check at Storage location level during sales order create/change, you need to make changes on the following areas.
    1. Scope of Check "Availability Check Control" for Checking rules pertaining to orders (TCode OVZ9)
        Storage location inspection checkbox should be blank.
    2. Enhance program MV45AFZB user-exit USEREXIT_SOURCE_DETERMINATION to determine storage location as it is not normally proposed in sales order.
    Let me know if this helps.
    Arnel Adordionicio

  • Tolerance Limits at all wbs levels

    Hi
    In our client process we need Tolerance limits at all  wbs elements for controlling budget process for ex in our process 5 to 10 wbs.
    wbs XXXX01 tolerance limit =100%
    wbs XXXX02 tolerance limit =102%
    wbs XXXX03 tolerance limit =103%
    Please advise to solve this issue
    Regards
    Sen

    hi
    Thanks for replay
    here client will create po at each level of wbs element.and now for one wbs element they are willing to allow more value  of limit form their budget.
    Regards
    Sen

  • Delivery Status at Schedule Line level.

    Hi All,
    I have to retrieve some data on the basis of Schedule line for which delivery is not complete. Please find below the requirement.
    I am having one sales order with one line item which having two schedule line. For one schedule line confirmed qty is 1K and for other 2k. For first line item deliver qty is also 1k.
    I want to know how to check the delivery status for schedule line counter so I will get the idea that for first schedule line qty is delivered and for second not.
    Thanks
    Piyush

    Use the function module
      CALL FUNCTION 'RV_SCHEDULE_CHECK_DELIVERIES'
        EXPORTING
          fbeleg                        = wa_vbap-vbeln
          fposnr                        = wa_vbap-posnr
      FVERRECHNUNG                  = ' '
      FS073_ALT                     = ' '
      IF_NO_SORT                    = ' '
        TABLES
       fvbfa                         = fvbfa
       fvbup                         = fvbup
       fxvbep                        = it_vbepvb
      FVBLB                        =
        fvbap                        = fvbap
    EXCEPTIONS
      FEHLER_BEI_LESEN_FVBUP        = 1
      FEHLER_BEI_LESEN_FXVBEP       = 2
      OTHERS                        = 3
      IF sy-subrc <> 0.
    MESSAGE ID SY-MSGID TYPE SY-MSGTY NUMBER SY-MSGNO
            WITH SY-MSGV1 SY-MSGV2 SY-MSGV3 SY-MSGV4.
      ENDIF.
    loop the internal table it_vbepvb.
    get the open qty in that schedule line
        MOVE wa_vbepvb-olfmng_flt TO wa_itab-openqty.
        IF  wa_vbepvb-bmeng EQ wa_itab-openqty.
    check that with the schedule line confirmed qty wa_vbepvb-bmeng
    If delivery is avaliable the open qty will not be equal to confirmed qty.

  • Customer purchase order number at schedule line level in scheduling agreeme

    Hi,
    We have one typical requirement from scheduling agreement functionality. The scenario is we receive the schedule lines from Idocs from customer with purchase order number for each schedule line. We need to print that PO number on packing slip and ASN. How do we capture the schedule line po number in SAP SA?
    Please share your ideas on this.
    Regards, Lakshmikanth

    Hi Chandrasekhar,
    Thanks for your reply, here we create one delivery for each schedule line quantity, we need to copy the respective purchase order number into delivery. There is no Corelation between schedule line number and additional data field, so we can not use very freely.  Do we have any other option?
    Regards, Lakshmikanth

  • Issue with Delivered Quantity in Schedule line level

    Hi,
    I have a situation where the Delivered quantity in the sales order line item is not correct. we tried creating a delivery for a line item ( after the initial partial delivery was made), the delivery document did not get saved, however the sales order line item got updated with the delivered quantity equal to the other quantity. which is now causing the issue that i am not able to create a new delivery against this line item, please let me know on the ways of proceeding. this had happened for quite number of sales orders as the delivery processing job had an issue.
    Tried using SDVBUK00 program ( specific to Sales order status update) but the results were no good.
    Do we have any other methods/ correction programs?
    Regards
    Ilango

    Are you able to create the delivery with ref to sales order again-then what error system throwing here--including the message number....
    Note: here i presume the error like---No delivery relevant items.
    Have you checked your VBFA here??
    Note: once you created a delivery with respect to sales order--just do picking(even without picking)--save this delivery--now check the delivery quantity in sales order--system will update delivery quantity in sales order schedule lines--test this.Here you can do only one thing--either VBFA(follow this delivery number) or delete the delivery document & recreate..
    Pl update--Hope this helps...
    Phanikumar

  • 2LIS_02_SCL (Schedule line level)

    Hi There,
    Quick question on the usage of Datasource for "Open PO Activity Report"
    According to the requirement i need to work on
    2LIS_02_ACC
    2LIS_-02_SCL
    2LIS_02_HDR &
    2LIS_02_ITM
    So...the data in 2LIS_02_SCL would cover whatever is there in the 2LIS_02_HDR & 2LIS_02_ITM.
    Do we still have to use the three datasources for Header and Item Data or just 2LIS_02_SCL is suffice?
    Please share your experience & knowledge.
    Thanks
    Vandana

    Vandana
    2LIS_02_ITM might have many fields which are not given in 2LIS_02_SCL datasource so please compare them first and find out what you need in your report is available in which datasource and take the decision.
    Hope this helps or let me know if you have any specific questions.

  • Need to check PO Posting date at schedule line and material document level

    HI All,
    I am facing an issue to reconciliation data with ECC.
    Issue :
    we have a PO,item,schedule line with delivery date, scheduled qty and quantity received from EKET table
    we have PO,item,Material document,movement type,posting date with quantity received from EKBE table
    the standard extractor 2LIS_02_SGR is providing data at
    PO,item,schedule line,material document,movement,posting date
    as if now we are using this extractor to get the posting date at schedule line level.
    can some one let me know how exacty the EKET and EKBE table are joined ???

    Hi,
    The data for the datasource 2lis_02_sgr can be compared in ECC using ME80FN transaction.
    Please check the below Link for all the details reragrding 2LIS_02_SGR datasource.
    [http://help.sap.com/saphelp_dm40/helpdata/en/69/063f3f2615e07fe10000000a114084/content.htm]
    Hope this helps..
    Thanks,
    Nagarjuna

  • Link between Delivery and Sales Order Schedule Line

    Hi Gurus,
    I have a requirement in which i need to display quantity and amount at schedule line level and also the delivery and delivery item for each schedule line.
    For example, if there is a sales order O1 and item 10 for which we have 3 schedule lines and 3 deliveries as well say D1, D2 and D3.
    Report should be something like this
    Sales Order    Item   Schedule Line    Delivery    Del Item   Confirmed Order Qty
    O1                 10      1                       D1           10            5
    O1                 10       2                      D2            10            5
    O1                 10       3                      D3            10            4
    How can i determine that a particular delivery corresponds to which schedule line of that saler order-item?
    We have the link between delivery and sales order but is there any way that we can get the link of delivery at schedule line level?
    Please help.
    Regards,
    Gaurav

    Hi,
    I suppose you must check with SD functional consultant and the post should also be in the logistics SD forum and not BI. But I suppose there is know specific link between the schedule line of SO to the Delivery. It is more like a bucket flow for ex.
    Sale order   Item    Schedule line  qty
    SO1            Item1     Sch1            10
    SO2            Item1      Sch2           10
    Delivery Item QTy
    DO1       IT1   15
    DO2       IT1    5
    In this case qty 15 is distributed over both SO1 and SO2, and SO2 ITem1 Sch2 has link to both the DOs
    So I am not sure if you can establish a one to one link, please check with your SD consultants.
    Regards,
    Ashwin G