Top-Down Distribution - tcode KE28 (release upgrade from 4.6 to ECC 6.0)

All,
we are performing a release upgrade from 4.6 to ECC 6.0 and we have a problem with the tcode KE28.
The variant already set up in the system don't match with the selection fields present in the screen, and the following message is shown:
Message no. KG346
The variant does not adhere to the current Customizing setup
We have saved the variant again, and no problem are present, but the error message refers also to Customizing setup.
Is there a section in the Customizing where it is possible set up the field to show in the initial screen or the new fields (All Valuation Views, Legal Valuation View and Profit Center Valuation View) are due to the release upgrade?
If yes, do you know the transaction/path?
Thanks in advance for your collaboration.
Regards,
Jody Mancini.

Hi Satish,
Now i am sending some URL for Functional upgrade
May be those are all useful toyou
https://www.sdn.sap.com/irj/scn/wiki?path=/display/erp6/transactionsChangedinECC6.0
http://solutionbrowser.erp.sap.fmpmedia.com/Default.aspx
https://www.sdn.sap.com/irj/scn/wiki?path=/display/erp6/
Regards
Surya

Similar Messages

  • KE28 Top-down distribution for only part of the Value Field

    Hi Experts,
    We have a situation where we will make manual postings in CO-PA through KE21N. Part of this postings will be at the lowest detailed level and part will be for a more summarized level od characteristics. All the postings will flow to the same value field.
    We need to make a top-down distribution only for the postings that were made in a summarized level, because the other postings already have the details that we need.
    Is it possible?
    Kind Regards
    Mayumi Blak

    Hi Venkata,
    Please note that :-
    you can not distribute to a characteristic that already contains a
    value.  Please see note 77476.  If you want to distribute to eg.
    profit center, then the characteristic must be initial (in the data
    to be distributed).
    In the case where the log showed "number of receivers" but no line
    written is a common problem in transaction KE28 logged by customers.
    One example is that, if the amount of line items is 0.00 for all the
    receivers, no line item will be written.
    No values in reference data:
    If there are no values in reference data for some segments (see the
    log). No records are posted (segments which were distributed, but
    their value is zero i.e. there is no value to be distributed, are not
    posted).
    No initial values in the distribution level (ie. # - non assigned)
    in each of the characteristics in distribution level.
    Kind Regards,
    Abhisek Patnaik,

  • SQ03, user group removed after release upgrade from 4.6C to ECC6

    Dear All,
    I have a problem about user group - transaction code SQ03.
    After the release upgrade from 4.6C to ECC6 the user group, that I created in the old system, are not present in quality and production environment.
    In the development environment there is the user group but doesn't contain the queries that I created in the old environment.
    How can I solve this issue?
    Can I recover all missing queries?
    (moreover I can access to the old environment)
    Thanks in advance.
    Regards

    Hi
        Please refer to the SAP note 1278056 and 1278115 - PDS Display: F4-characteristic values are not selectable.  Hope this will resolve your issue.
    Regards,
    JB

  • Unicode error while upgrading from 4.6 to ECC 6.0

    Dear All,
    I am getting unicode errror while upgrading from 4.6 to ECC 6.0, when iam trying to open downloaded file in excel.
    In debugging, error occurs while executing statment "CALL METHOD OF obj_ex_sheet " in the code given below:
    FORM open_downloaded_file_in_excel            *
    FORM open_downloaded_file_in_excel.
      DATA:
        lv_ole_books       TYPE ole2_object,
        lv_ole_sheets      TYPE ole2_object,
        lv_subrc           LIKE sy-subrc,
        lv_title(70)       TYPE c,
        lv_text1(70)       TYPE c,
        lv_text2(70)       TYPE c.
    start excel
      CREATE OBJECT obj_ex_sheet      'EXCEL.SHEET'.
      IF sy-subrc NE 0.
        lv_subrc = sy-subrc.
        FREE OBJECT obj_ex_sheet.
        PERFORM error_handling_ms_excel USING lv_subrc.
      ENDIF.
      CALL METHOD OF obj_ex_sheet     'Application' = obj_ex_app.
      IF sy-subrc NE 0.
        lv_subrc = sy-subrc.
        FREE OBJECT obj_ex_app.
        FREE OBJECT obj_ex_sheet.
        PERFORM error_handling_ms_excel USING lv_subrc.
      ENDIF.
      SET PROPERTY OF obj_ex_app 'Visible' = 1.
    open data file: main file
      CALL METHOD OF obj_ex_app        'Workbooks'  = lv_ole_books.
      CALL METHOD OF lv_ole_books      'Open'       = obj_ex_wbook
        EXPORTING #1  = gv_filename
                  #2  = 2
                  #3  = 0
                  #4  = 1
                  #5  = 0
                  #6  = 0
                  #7  = 1.
      IF sy-subrc NE 0.
        lv_subrc = sy-subrc.
        FREE OBJECT obj_ex_wbook.
        FREE OBJECT obj_ex_app.
        FREE OBJECT obj_ex_sheet.
        PERFORM error_handling_ms_excel USING lv_subrc.
      ENDIF.
      FREE OBJECT lv_ole_books.
      CALL METHOD OF obj_ex_wbook      'Worksheets' = lv_ole_sheets.
      CALL METHOD OF lv_ole_sheets     'Item'       = obj_ex_wsheet
        EXPORTING #1 = 1.
      FREE OBJECT lv_ole_sheets.
      GET PROPERTY OF obj_ex_wsheet    'UsedRange'  = obj_ex_usedrange.
      CALL METHOD  OF obj_ex_usedrange 'AutoFormat'
        EXPORTING #1 = 18.
      SET PROPERTY OF obj_ex_wsheet    'Name'       = sy-tcode.
      FREE OBJECT obj_ex_usedrange.
      PERFORM free_ole_objects.
      CALL FUNCTION 'FLUSH'
           EXCEPTIONS
                OTHERS = 0.
    ENDFORM.                              
    regards,
    Divya

    hi,
    In the OPEN DATASET STATEMENT ADD THE ENCODING ADDITION IN TEXT MODE.
    Regards,
    Balakumar.G
    Reward Points if helpful.

  • What are the key points to beconsider while upgrading from 4.7 to ECC 6.0

    hai
    What are the key points to beconsider while upgrading from 4.7 to ECC 6.0
    please provide sufficient material
    points will be rewarded
    regards
    v.sridhar

    Hi Sridhar,
    Please visit the following links:
    http://service.sap.com/erp
    http://solutionbrowser.erp.sap.fmpmedia.com/ (Functional perspective)
    http://service.sap.com/instguides --> mySAP Business Suite Applications --> mySAP ERP --> mySAP ERP 2005 --> Upgrade
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf
    For Functionality Differences pls refer to the below site -
    http://solutionbrowser.erp.sap.fmpmedia.com/
    After opening the site, please select the Source Release Version which is 4.6 b Then Select the Target Release Version which is "mySAP ERP 2005" or ECC 6.0
    Select the Solution Area like Financials, Human Capital Management, Sales....
    Select module like MM, PP, SD, and QM.....
    Click on Search
    then it displays the Release Version and the Delta Functionality. Which can be downloaded to a word document if required.
    And also check the release notes of ECC 6.0 in service.sap.com.
    When you are upgrading from 4.6C to ECC6
    Nothing major, follow the same process you'd follow if you were updating PI service packs in R/3 or enhancing data sources. Empty queues in RSA7 and lbwq. Also empty setup tables through lbwg as the upgrade doesn't like it if these tables contain data. This is all on the R/3 side (although you empty RSA7 by running each delta TWICE in BW).
    To transfer queues from lbwq to rsa7, execute jobs through LO cockpit (lbwe).
    Some of your data sources could also be using sm13 instead of lbwq, so do check it out as well.
    For installing ECC 6.0 you required a solution manager key. With out solution manager key you cannot install ECC6.0.
    For ECC 6.0 is called net weaver component here you have ABAP+JAVA stack.
    ECC6.0 supports UNCODE.
    For installing 4.6 you don't require solution manager key. It only having ABAP stack.
    4.6C supports NONUNICODE.
    Major difference is ECC6 is netwear product having WASJAVA+ABAP
    secondly support unicode apart from this we have other diff. you can get form master guide from service.sap.com/instguides.
    Please go through the link that is shown here and if there is any doubts then feel free to ask.
    Major difference is ECC6 is net weaver  product having WASJAVA+ABAP
    secondly support Unicode apart from this we have other diff. you can get from master guide from service.sap.com/instguides
    For installing ECC 6.0 you required a solution manager key. With out solution manager key you cannot install ECC6.0.
    For ECC 6.0 is called net weaver component here you have ABAP+JAVA stack.
    ECC6.0 supports UNCODE.
    For installing 4.6 you don't required solution manager key. It only having ABAP stack.
    4.6C supports NONUNICODE.
    Please also Refer sdn thread and make a small search where u can find lot of information Reg this
    olution Browser would give the differences (Features):
    http://solutionbrowser.erp.sap.fmpmedia.com/ Give source and target versions.
    Release Info:
    ECC 6.0:
    http://help.sap.com/saphelp_erp2005/helpdata/en/43/68805bb88f297ee10000000a422035/frameset.htm
    Refer below and search for posts on this topic on sdn
    There are so many differences between the version in different objects
    I
    These are the some of the settings that are differed in the two versions and in that two objects
    Please visit the following links:
    http://service.sap.com/erp
    http://solutionbrowser.erp.sap.fmpmedia.com/ (Functional prespective)
    http://service.sap.com/instguides --> mySAP Business Suite Applications --> mySAP ERP --> mySAP ERP 2005 --> Upgrade
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf
    For Functionality Differences pls refer to the below site -
    http://solutionbrowser.erp.sap.fmpmedia.com/
    Upgrade from 4.6c to 6.0 ECC
    upgrade from 4.7 to ecc 6.0
    Please Do Reward If Really Helpful,
    Thanks and Regards,
    Sateesh.Kandula

  • Issues during technical upgrade from 4.6c to ecc 6.0

    Hi
    We are doing a technical upgrade from 4.6C to ECC 6.0. Some transactions in QM module when tested in ECC 6.0 test client give a abap termination message (or dump) and certain transactions like qs42,46, qa18, qs34 etc do not get executed (error = no entry foound for......) and similarly in PP-PI module transactions like C203 have similar problems, even though master data does exist. What should I look for?  Can somebody pl. give details on configuration checks and the OSS notes from a functional point of view for a technical upgrade?
    For certain transactions I get the error message - "Central system of distribution SM-P06CLNT430_TRUSTED is unreachable RFC destination SM_P06CLNT430_Trusted does not exist" - what does this mean?
    thanks
    BE

    Hi,
    1. Have you done successfull installation from 4.6C to ECC 6.0 at the time of PrePare ans SAPUP?
    2. Check SP' for QM and PP-PI modules from http://service.sap.com/sp-stacks.
    3. Configure RFC connections correctly, SM_<SID>CLNT<No>_Trusted automatically created, not manually.
    http://service.sap.com/notes --> search for RFC trusted connections for Ecc 6.0
    http://service.sap.com/upgrade.
    Regards,
    Srini Nookala

  • Information on impact on interfaces due to upgrade from 4.7 to ECC 6.0

    Hi friends,
    We are upgrading from 4.7 to ECC 6.0. We  have some interfaces with the SAP system in our current version.I need information on which of these interfaces will be affected due to Upgrade of the system to ECC 6.0
    Mentioned below is the list
    SAP R/3 --- CRM 5.0
    SAP R/3 --- Xi PAY
    SAP R/3 --- Vertex
    SAP R/3 --- TEKRF
    SAP R/3 --- Virsa
    SAP R/3 --- WTX
    SAP R/3 --- SOLMAN
    It would be really helpful if you can just provide the initial impact analysis for these interfaces due to upgrade.Points will be rewarded.
    Thank in advance.
    Regards,
    Pawan.

    Hi
    there are several oss-notes available which explain how to transfer your text customizing to the new procedure. This happens if you are uppgrading from a release 4.6c or lower. If you are already in 4.7, there should be no problem with text determination.
    Regards
    Rauno

  • OSS notes relevant for FI/CO for upgrade from 4.7 to ECC 6.0

    Hello,
    I need the list of the applicable OSS notes relevant for the FI/CO module for upgrade from 4.7 to ECC 6.0
    Thanks
    Sid

    Hi,
    Please visit the following links:
    http://service.sap.com/erp
    http://solutionbrowser.erp.sap.fmpmedia.com/ (Functional prespective)
    http://service.sap.com/instguides --> mySAP Business Suite Applications --> mySAP ERP --> mySAP ERP 2005 --> Upgrade
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf
    For Functionality Differences pls refer to the below site -
    http://solutionbrowser.erp.sap.fmpmedia.com/
    After opening the site, please select the Source Release Version which is 4.6 b Then Select the Target Release Version which is "mySAP ERP 2005" or ECC 6.0
    Select the Solution Area like Financials, Human Capital Management, Sales....
    Select module like MM, PP, SD, QM.....
    Click on Search
    Then it displays the Release Version and the Delta Functionality. which can be downloaded to a word document if required.
    and also check the release notes of ECC 6.0 in service.sap.com.
    Hope this helps you.
    Please assign points if it useful.
    Regards
    Ravinagh Boni

  • Requirements for upgradation from 4.7 to ECC 6.0

    Hi Guru's,
                      Can anybody explain what are the steps required for upgradation from 4.7 to ECC 6.0, technically and functionally. If any body have documents regarding the same, please share.Full marks will be awarded.thanx in advance....

    Hi
    You have to aware of all related program like BDC's , Screens related errors and all dictionary related problems.
    Some function modules may become obsolete, and some screens will change
    abnd some new fields will be added in the new versions etc.
    Also take care of SPAU and SPDD tcodes.
    You should be able to know about Unicode concept in sap.
    chk this
    http://www.thespot4sap.com/upgrade_guide_v2.pdf#search=%22upGRADE%20STEPS%20-%20SAP%22
    also chk these 2 notes in service.sap.com
    Technical Upgrade is only a version upgrade without any functionality changes.
    The objects that are needed to be upgraded are:
    Includes
    Function Groups / Function Modules
    Programs / Reports
    OSS Notes
    SAP Repository Objects
    SAP Data Dictionary Objects
    Domains, Data Elements
    Tables, Structures and Views
    Module Pools, Sub Routine pools
    BDC Programs
    Print Programs
    SAP Scripts, Screens
    User Exits
    You can refer to the below links for more information on technical upgrade:
    https://www.sdn.sap.com/irj/sdn/wiki?path=/display/profile/2007/05/07/upgradeFROMR3TOmySAPERP-PARTII&
    https://wiki.sdn.sap.com/wiki/display/profile/UPGRADEFROMR3TOmySAPERP-PARTIII
    http://help.sap.com/saphelp_nw2004s/helpdata/en/60/d6ba7bceda11d1953a0000e82de14a/content.htm
    http://help.sap.com/saphelp_nw04/helpdata/en/2e/6d66647d9011d396b60000e82de14a/content.htm
    https://www.sdn.sap.com/irj/sdn/go/portal/prtroot/docs/library/uuid/5ac31178-0701-0010-469a-b4d7fa2721ca
    Reward points if useful
    Regards
    Anji

  • LONGPOST.LOG Errors during Upgrade from 4.6C to ECC 6.0

    Dear all,
    We have received the below errors during our upgrade from 4.6C to ECC 6.0.
    Basically we have received three types of errors:
    1.
    4PETG065 RSUPGDEC: Table/structure "BAPE_VBAK" (component "SD-SLS" ) enhanced illegally: Error "2"
    2.
    A2PESEEF_BADI 103 BAdI implementation "/IRM/BADI_SDDOCFLOW" must still be migrated
    A2PESEEF_BADI 103 BAdI implementation "ZOTC218E_1" must still be migrated
    A2PESEEF_BADI 103 BAdI implementation "ZZ_MG_MASS_NEWSEG" must still be migrated A2PESEEF_BADI 103 BAdI implementation "ZOTC218E_1" must still be migrated
    A2PESEEF_BADI 103 BAdI implementation "ZOTC218E_1" must still be migrated
    3.
    3PETG447 Table and runtime object "/SSF/DHEAD" exist without DDIC reference ("Transp. table")
    3PETG447 Table and runtime object "/SSF/DTAB" exist without DDIC reference ("Transp. table")
    3PETG447 Table and runtime object "/SSF/PTAB" exist without DDIC reference ("Transp. table")
    Can anyone help us how to solve this issues.
    Thanks & Regards
    Senthil

    Hi,
    Senthil following are ans to ur questions
    1. After the SPAU remediation is completed, should I manually release the transport or should I start the upgrade and the upgrade will release that transport?
    Ans : Once your SPAU remediation is completed you should release the requests and then start the upgrade of the DEV system.
    2. How do we import this SPDD & SPAU transport in the QA and PRD, I mean at what stage of the upgrade we need to specify/ include this transport?
    Ans : Now when you start the QA or PRD upgrade at that time you come across a phase during PREPARE called ADJUSTPRP.
    Refer following note for further information --
    SAPNote 124522 - Importing a modification adjustment in 2nd upgrade
    3. Suppose the QA & PRD has more objects to adjust than our Dev box, and this transport will not take care of the delta objects, so in that case how should we remediate, we need to create an other transport request in QA and then it will become two transports?
    Ans : First of all this should not be the scenario where you have more modified objects than that in DEV. As all the modfications should take place in DEV first and then should be transported to QA and then PRD. But in such case what you can do is complete the upgrade of QA system and then you are still having 14 days to complete the SPAU objects. So you can make another request which can be transported as a post upgrade activity once the upgrade is completed in production. For SPDD you will have to take care of the SPDD objects if there are different than those in DEV during the ACT_700 phase only or else you might risk data.
    This is the reason why SAP always asks you to follow a proper transport path.
    4. If our dev box has more objects for remediation than our QA & PRD, then will these objects be also imported into the QA & PRD box?
    Ans : Yes, thats why you should be very sure about the SPAU objects that you have found in DEV. You need to compare the objects with QA and PRD and then only make the modifications.
    I hope i have answered all your queries.
    Regards,
    Suhas

  • Transactions missing in Role After Upgrade from 4.6c to ECC 6.0

    Hello Friends,
    I did multiple searches on this question but it was unsuccessful. We are upgrading from 4.6c to ECC 6.0. We are testing roles to make sure the migrate properly.
    Irrespective of su25. There are transactions that are not obsolete and are missing in ECC 6.0
    For example if I have a role called FIROLE. Which has 20 tcodes in 4.6c. When we upgrade to ECC 6.0 8 tcodes will be missing. This is not because the tcodes become obsolete.
    What is the best way to approach this. Should we be testing each role?
    Thanks!

    Hello Imran,
    transactions can be 'obsolete' also if they still exist.....
    If the application developers create new functionality, new look,.... in new transactions but still let the 'old' ones in the system.
    Just think about the ME2*-transactions..... The developer can decide, that such new transactions should replace the old ones after upgrade in the roles or let the old ones as they are.
    You can get an overview about replaced/obsolete transactions by reviewing table PRGN_CORR2 (make sure, that you have the latest version, according to [SAP Note 991377|https://service.sap.com/sap/support/notes/991377]   !!!). SU25 gets its information from that table.
    b.rgds, Bernhard

  • Upgradation from 4.5B to ECC 6.0

    Hi,
    We are doing an upgrade from 4.5B  to ECC 6.0. any relevant documents are invited.Can somebody help me with procedure.
    Documents can also be send to my mail id: [email protected]
    Thanks,
    Satish.

    Dear Satish,
    http://service.sap.com/erp
    http://solutionbrowser.erp.sap.fmpmedia.com/ (Functional prespective)
    http://service.sap.com/instguides --> mySAP Business Suite Applications --> mySAP ERP --> mySAP ERP 2005 --> Upgrade
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf
    For Functionality Differences pls refer to the below site -
    http://solutionbrowser.erp.sap.fmpmedia.com/
    After opening the site, please select the Source Release Version which is 4.6 b Then Select the Target Release Version which is "mySAP ERP 2005" or ECC 6.0
    Select the Solution Area like Financials, Human Capital Management, Sales....
    Select module like MM, PP, SD, QM.....
    Click on Search
    Then it displays the Release Version and the Delta Functionality. which can be downloaded to a word document if required.
    and also check the release notes of ECC 6.0 in service.sap.com.
    Hope this helps you.
    Do award points if you found them useful.
    Regards,
    Rakesh

  • Upgrading from 4.6 to ECC 6.0

    Hello all,
    Kindly can any one provide me documentation on upgrading from 4.6 to ECC 6.0 Related to Finance Module.
    It will be very helpful If you can help me in the upgrading process of Finance/controlling about the activities Involved.
    Email id : [email protected]
    Thanking you in advance
    cheers
    Veena

    Dear veena peddineni, 
    Hope this helps you.
    Please visit the following links:
    http://service.sap.com/erp
    http://solutionbrowser.erp.sap.fmpmedia.com/ (Functional prespective)
    http://service.sap.com/instguides --> mySAP Business Suite Applications --> mySAP ERP --> mySAP ERP 2005 --> Upgrade
    http://help.sap.com/printdocu/core/Print46c/en/data/pdf/LOVC/LOVC.pdf
    For Functionality Differences pls refer to the below site -
    http://solutionbrowser.erp.sap.fmpmedia.com/
    After opening the site, please select the Source Release Version which is 4.6 b Then Select the Target Release Version which is "mySAP ERP 2005" or ECC 6.0
    Select the Solution Area like Financials, Human Capital Management, Sales....
    Select module like MM, PP, SD, QM.....
    Click on Search
    Then it displays the Release Version and the Delta Functionality. which can be downloaded to a word document if required.
    and also check the release notes of ECC 6.0 in service.sap.com.
    Hope this helps you.
    Do award points if you found them useful.
    Regards,
    Rakesh

  • Interview questions on upgrades from 4.7 to ECC

    Hi,
    Can any one please post some potential areas/questions that will be asked for upgrade projects from 4.7 to ECC6.0
    Points will be awarded.
    Thanks

    Hi Frank,
      this is good question,  why because sap upgrades from 4.6b to ecc 6.0 is very risky.
      take one example , in 4.5b , me21n application having 620 screen where as in ecc 6.0 having 9000 screen . that time we will take care of it.
       check the obsolete function modules ,  4.5b , having ws_upload, ws_download.... use cl_gui_frontend_services , under these having differnt type of methods.
      once you change the code in ecc , go to tranx : SLIN check the error where it is exact.

  • Error during Upgrade from 4.6c to ECC 6.0

    Hi All,
      We are facing an error when upgrading from 4.6c to ECC 6.0. We are facing this error on the table COEP - runtime object inconsistancy. What we found is there is ERP upgrade has created new extra fields in the table. In log file the error is specified as : Duplicate Field name, But we not able to find the duplicate field name in the table.  Please kindly help as early as possible. The upgrade process is stuck.
    Regards
    Anil Kumar K

    Hi Anil,
    Is this issue fixed? Can i know how you fixed it?
    replied to your message Re: How to adopt the index changes during upgrade.
    Thanks,
    Somar

Maybe you are looking for

  • Error while trying to connect to a remote SQL Server DB using multiconnect

    As part of our business process, we need to connect to a SQL Server DB external to SAP. We have done the following: 1. We set up an ODBC connection on our SAP sandbox server to the external SQL server DB.  Name: sdsdev Connection string: sdsdev\sqlex

  • Entity Descriptions are not displayed correctly in Combo box dropdown list

    In Web Analysis, Entity Descriptions are not displayed correctly in Combo box dropdown list when entity descriptions from HFM contains a dot(.) Example: 'Entity A. LTD' becomes 'LTD' 'Entity B Inc.' becomes blank It seems that everything before the d

  • The page dont open in the first try

    I have to click on the (x) in the addressfield and then click on the arrow (Update page) When you have opened a page it works fine the next time you open it. I have updated everything, stopped many programs to start when windows (xp) starts, reset an

  • Exchange 2010 - Create a new Mailbox Database

    Hello all and thanks in advance for your time and expertise. Here's my scenario: In my ORG we have one exchange server.  The hard drive space on this server was quite low so we added two more drives which are independent and in their own Raid Configu

  • No valid interval found

    Hi When I am trying to create Org Unit in PO10 I am getting an error saying "No valid interval found (internal number assignment)". Pl let me know your suggestions. Thanks in advance