Total Replenishment days change at plant level - Materials to be automatically updated

Hi All,
Customer has raised a new requirement stating that they want to update the Total replenishment days plant wise, based upon this maintenance automatically all the compounds should be updated.
Existing System:
Right now they are maintaining the total replenishment days at material master level, based on this the ATP check happens.
New Requirement:
My thought is to accommodate this requirement is through developing the BDC in such a way that the plant and no of replenishment days will be updated in the spreadsheet and the BDC will update the Material master.
Please let me know if there is any other best solution or easy way to accommodate this requirement.

""LSMW does not work in my case, since customer does not want to upload the material and update it. They want to update based on the Plant that in turn should update the material"""
Have you tried this requirement by taking MM02 as recording transaction code and even you can record with Organisation levels like Plant in LSMW..
Pl update.
Phanikumar

Similar Messages

  • Vendor Master partner functions change at plant level

    Hello All,
      I need to change the vendor partner functions at the plant level.By default it takes the partner no equal to vendor no.But in my requirement the partner no can be differnt than the vendor no.Can anyone let me know how to do this?I cant do a BDC recording
    also since the system cant automatically select the plant no in the table control.
    Thanks,
    Rakesh.

    Hello Jürgen!
    Thanks!
    Do you know of any user exit which will help on this.
    Best Regards

  • Batch management level change to plant level

    Hi,
    Currently,i am using batch managment at material level.I have created material and has its stocks.
    I need to convert it to plant level..How can i convert it to plant level?
    Thanks
    Srini

    Hi,
    Please check the OSS Note 41715 - Resetting batch level from material to plant level.
    Hope it helps you.
    Kuber

  • Batch Management - Changing Material level to Plant level

    Hi friends,
    We are configuring batch management for ECC 6.0 with CRM 5 .
    I can see the batch level in my system as Material level. But we would like to convert  batch level in to Plant level. when i try to convert the batch level i am getting error "This type of conversion is not implemented".
    There is no batch record exists in the stock.
    Please clarify why can't able to change to plant level from material level.
    Thanks

    YOu need to use  the OSS note 41715
    This will explain what exactly you need to do.
    Please go through the above OSS note.

  • Can we change valuation area level ?

    Dear all :
    I have meet one question about valuation area .
    If we set a valuation area in company or in plant level , can we change the setting later
    ex : change from company level to plant level
          or change from plant level to company level
          or can't be change any more.
    And  if it can be change , what limit for the change ?
    Thanks.
    Gary

    Hi Gary
    In Versions from 4.7 or 4.6 onwards, Valuation area is always Plant level and it cant be changed...
    Only in earlier versions, valuation area at comp code was available.. Now that is completely gone and un-changeable
    Regards
    Ajay M

  • Stock Mismatch at Plant level and Serial Number Collection

    Hi,
    I'm working on with the material stocks in my application. For the serialised material (MATNR = 50004050), I'm gettting the plant level stock as 20 and the corresponding serial numbers collection for the same material is 27 which is wrong. Since the plant level stock and the serial number collection should be one and the same
    I'm using MARA, MARC table for getting the plant level stock and EQUI and EQBS table to get the serial number collection. If I increase the stock using the transaction 'MB1C' and movement type '561', the serial numbers which I'm giving for the serialised material is coming in the serial number collection but the plant level stock still in the previous value itself. If I raise the stock for the serialised material, the plant level stock also should get updated.
    Please let me know, how can I get the stock equal in both plant and serial number collection.
    Thanks in Advance,
    Mohan.

    This could happen, if the status of serial number is wrongly updated to ESTO. From where are you taking serial numbers?Physically what is right the qty showing plant stock or the qty showing serial number? May be you go and check the history of the serial number to see if it is really available in stock.
    Also it can be serial number is optional so though the stock is reduced but serial number is not captured while issuing so the stock at plant level is less but serial number is more,
    If this is the case, reconciallation directly from tables will be difficult.
    Regards
    Sangeeta
    Edited by: Sangeeta Khurana on May 4, 2011 12:34 AM

  • How do you create a calculation that automatically updates changes?

    Hi all,
    I am trying to create a calculation using subtraction. This is how it is set out:
    KM
    -KG
    =Field1
    -Field2
    =GM (fluid)
    Under the calculate tab for Field 1, I have written in the Simplified field notation:
    KM-KG
    And under the calculate tab for =GM (fluid), I have written in the Simplified field notation:
    Field1-Field2
    And this all works perfectly providing I don't change any of the totals in the KM or KG or Field2 fields.
    If I make changes in those fields they don't automatically update.
    How do I make them automatically update?
    Any assistance would be hugely appreciated.
    Many thanks.
    Bridie

    To set the field calculation order, first go into form editing mode (Tools > Forms > Edit) and then: Tasks > Other Tasks > Edit Fields > Set Field Calculation Order
    Order the fields in the list to whatever makes sense for your form. Be sure to do this again once you have the form working like you want to make sure it's still set up correctly.

  • Changing Batch Management Level from Material to Plant

    Hi all,
    We are investigating changing our batch management level from material to plant to meet business requirements.
    SAP has pointed us to a note with a program to reset the batch level, as well as highlighting some things to look out for.
    I've conducted the change in a playpen system and so far it looks relatively straightforward, with complexities arising only when characteristics exist, or when a batch exists in multiple plants.
    Seems that batch master data is moved from MCH1 to MCHA, including the object link number to classification. Unfortunately it seems a limitation of the conversion is that the batch master data is copied to ONE plant only in MCHA, no doubt due to the fact the object number link to classification must be unique.
    My question is this: has anyone performed this change before, and if so can you offer me any advice on what to look out for, or potential problems that arose after the change?
    Any help or comments are appreciated.
    Mark.

    hi..
    first of all try this simple one...
    You will have to delete all the materials, remove stock and then switch the batch management flag.
    Or
    To convert the batch from plant level to material there is Conversion Program defind by the SAP...
    1. For all releases lower than Release 4.5B, implement the corrections and the modification in the report RM07CHDX as described in the correction instructions.
    2. Create the report ZCHTCUCH, which is specified in the attachment.
    3. Run this report in the clients for which you want to reset batch level to plant level.
    4. Call transaction OMCT.
    5. Check whether the batch level for "Batch unique at plant level" is set.
    6. Implement Notes 821891, 944278, 950540 and 1091613 if you have not already done so (or you have not imported the corresponding Support Package).
    7. Execute the function "Batch Level -> Conversion".
    8. Define a plant for a plant view that may be missing.
    9. Always execute the report in the test mode first. Analyze the error log.
    10. If no errors occur, you can execute the report in production mode.
    11. If you are working with batch long texts, first execute the report ZM07CHDX_TEXT in test mode.
    try this out..hope is works,,
    Thanks..

  • Plant level authorization for Notification Change

    Hi All
    We have 7 plants and person belong to one plant is able to open and change the notification of other plants.
    In the role we have given restriction for the plant for the Tcode IW 22 and for the object SWERK .In the Notification only Workcenter and Plant fields are mandatory.
    How can we restrict for a user belong to a particular plant can only change his plant notifications using IW22 only ---not IW28
    Thanks in advance
    gangs

    Dear gangs,
    Check in all the roles of that user in orgnozation levels maintenance plant and planning plant.
    It may happen in one role you have ristricted for that user, but in other roles it may be having the t.code authorization for IW22 and with other plant also.
    Check that also.
    Regards,
    Praveen.

  • My iTunes Match still has not finished after 3 1/2 days and step 3's total number keeps changing, Why?

    So I finally broke down and subscribled to iTunes Match just to see how it is and if it would be worth it to me.  well right now im about to wig out because its been 4 days and i still have not gotten past step 3 on the proccesing...now to itunes match's defense, or iMatch as ive seen it called, i do have an emense itunes library of movies, tv shows, podcas, ringtones, and music (somewhere around 15,000 total) so I knew it would take a while, but 3 days?!  And thats not even the problem, thats just a little grip I have cuz now I can't access my music on my iphone almost everything is greyed out.... i gould a back door to it where if i shuffle the album and skip to the song i want then that will work BUT! thats too much of a hassl!
    Ok enough ******** cuz ima sit here just to see how long it takes and report back.  Now for the real question.... I want to know that in all this waiting why does step 3 where it uploads artwork and remaining songs total number keep changing, i.e. :
    this is the screen ive seen for the last 3 full days, and the total items uploaded keeps changing yesturday it said 1500 of 7000
    so is it updating the number as it uploads them or what? It's confusing but im trying to give it a chance.

                                                                      *Update*
    ok so day 4-5 and im still not finished with the inital iMatch process.... BUT i found out that nothing was wrong its just taking for freakin ever. oh well at least i only got 1000 more to go....

  • Changing Batch Level from Material Level to Plant Level.

    I want to create the batch class with the class code 22 instead of 23. As the batch class is maintained at the Material Level, not at the Plant Level. So is it possible to change the batch class from Material to Plant Level and create batch class with code 22.
    Kindly suggest.

    Hi, Thanks for ur reply.
    I have applied SAP notes and changed the batch status from material level to plant level...But still i am getting the class type as 23.
    What are the next steps to be done. Currently in OMCT, Batch Level Conversion tab is active and rest all the tabs are in inactive state. so please guide.

  • SES - Change network disabled at plant level

    I am looking at the config in ML81N  - Create Service Entry Sheet.
    We have locked out the ability to change the network number at the SES , based on plant. We have allowed the change of Cost Center at all plants. My issue is I am trying to find where the locking out of changing the network at the plant level exists. I am trying to disable it at another plant.
    Thanks

    Hi All,
         Material Description is at client level data it will be applicable for all plants. But if you extend the material for using it in the other plant you can make a note in the sale text or purchase order text.
    Hope this will solve your problem,
    Regards,
    Pherasath

  • How Can We Change Batch Management Level From Client level to Plant Level?

    Hi all,
    I want to know whether it is possible to change the batch management level from client to plant level.Pls Help..

    Hi,
    Refer SAP Note 891902 - FAQ: Batch level

  • Total replenish lead time

    Hi gurus,
    anyone can explain why this field (total replenish lead time) is designed to enter manually instead of system automatically calculate from BOM for a manufactured part? and how does it work according to the following scenario:
    product X is produced in plant=1000 from material A and B (both A and B are procured externally for plant 1000, to simplify the case)
    in plant 1000, PO processing time=1day
    A: planned del.time=3 days, GR. processing time=1 day.
    B: planned del.time=5 days, GR. processing time=1 day.
    to make X need 2 operation: 1st operation need 1 day to assemble A and B together, after assembling, 2nd operation need 1 day to paint, 1 day to dry
    what's the total replenish lead time we should enter for X?
    thanks,
    cookie

    Dear Cookie
    3.if it's only for availability check, does that mean the MRP would not be affected by this field, then what would be the lead time feed into MRP? what's the relationship between MRP and availability check? why they use 2 different sets of data?
    1) MRP will not take this field into Account for Calculating Dates
    2) MRP for in-house materials - in-house production time & GR Procesing time ( Lead time )
    3 ) For external Procured materials - PR processing time , Planned delevery time & GR Processing time
    4) MRP Net Req. Calculation Concept is different from Availbility check Concept
    Regards
    Madhu

  • In SAP sales order, Is that possible to change the plant manually?

    Hi experts
    When we create sales order, for material , it will choose the shipping plant . Some materials
    has different level, like Material A is 0 Level, Material B is under A . So B will use same plant as A.
    We hope to manually change the plant for B, but the field of plant is grey.
    Is that possbile if we could enhanbe this field and could manually change plant ?
    Thanks
    ALice

    Hi all
    Thanks, Ya ,we have setup sales bom and extend the matieral plant . for sub-item
    Currently, our problem is we need 0 level mateiral A plant as X , and Sub-item mateiral plant as Y , we hope to manually change the sub-item plant , but that field is grey , so we can't do it. We can change the high level mateiral plant, but for our request, the we only want to change the low level item plant, high level plant still need be X, no need change to Y.
      The one way we found is to reject this line, and craete a new item and also input the level number.
    but it's not convenient
    So we hope to know for such plant field, Now in our sap, it's grey, we can't change it. Does sap need confige and allow this field un-grey, then we can manually directly change sub-item plant?
    Thanks
    Alice
    Edited by: alice zhang on Apr 30, 2008 5:37 AM

Maybe you are looking for

  • My 4 generation I touch is not recognized by windows 7 on any computer

    My itouch is not recognized by windows 7 on any computer. Please help me. Thank you Gail

  • Reader 8.1.2 won't open after download

    I am trying to install Reader 8.1.2 and have deleted all previous versions of Reader, including tmp files. It seems to download and install fine, including a message that the download was successfully completed. However, when I try to open Reader, I

  • PDF quick look in mail app

    Somehow, the quick look (or quick preview) of PDF files has gone corrupt on mail app. When I receive an email with a PDF attached, I used to be able to tap on the file and read it right away. Now I can't!!! Weird characters appear, as if I try to ope

  • VL10 A - Data type "LIKPVB" was found in a newer version than required

    hi Gurus! in transaction VL10A i get a short dump that states that the data type LIKPVB was reloaded and but in a newer version than required in program RVV50R10C. I checked the abap dictionary for the data type and it said that it was modified a mon

  • Trouble Booting to Ubuntu Live USB on T440

    Hey, I am having trouble booting to a Ubuntu Live USB on my T440. I turn on the laptop, press enter to interrupt the normal boot, and press F12 to select another boot option. But after selecting the appropritate USB, the screen goes black for a coupl